Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
NBC TELEMUNDO LICENSE LLC |
Angela Ball 300 NEW JERSEY AVENUE, NW SUITE 700 WASHINGTON, DC 20001 United States |
+1 (202) 524-6413 | Angela.Ball@nbcuni.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Angela Ball Assistant Secretary NBCUniversal, LLC |
300 New Jersey Avenue, NW Washington, DC 20001 United States |
+1 (202) 524-6413 | Angela.Ball@nbcuni.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Install new antenna in place of existing analog antenna and new transmitter for new channel. The old transmitter and antenna will remain in place for interim use until the cut-over. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | SCA202UB | |
Year | 2000 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1.0 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TMU9-3 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.8 kW | |
Justification for New Transmitter | The old transmitter, SCA202UB, was no longer supported. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | Yes | |
Description | Installation of 240 V outlet behind transmitter. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Installation and Commissioning at KMMW Stockton, CA |
Installation and Commissioning at KMMW Stockton, CA |
Other Transmitter Costs |
Other Transmitter Costs |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | PSILP8ANR-28-CP | |
Year | 2009 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 5.5 kW | |
Manufacturer | ||
Model | SFN-2030-G-8 | |
Year | 2019 | |
Justification for New Antenna | The old antenna which was single channel would not operate on the new channel. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Installation Costs |
Installation of Antenna |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1050375 | |
Coordinates (NAD83) | Latitude (NAD83) | 38° 07' 09.7" N- |
Longitude (NAD83) | 120° 43' 30.9" W- | |
Overall Structure Height | 415.02 feet | |
Support Structure Height | 410.10 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 2737.83 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | American Towers LLC | |
Date Constructed | 09/02/1998 |
Facility ID | Call Sign | Service |
---|---|---|
90988 | KCAI | FM |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Tower mapping and report for structural engineer |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 400 | |
Explanation | Project oversight of transmitter install, electrical connectivity, tower work, and antenna installation. Additional time will be spent tracking financial and legal process and coordinating with other broadcasters. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | No |
Prepare engineering section of Form FCC Construction Permit Application | No | |
Prepare engineering section of Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 5 | |
Justification | Site survey required |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | Yes |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | Yes |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
DTV Medical Facility Notifications |
DTV Medical Facility Notifications |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $331,460.00 | $195,810.72 | N/A | $137,126.42 | N/A |
Total for all systems | $600,912.50 | $750,833.22 | N/A | $500,730.05 | N/A |
Primary Transmitter TMU9-3 | $331,460.00 | $195,810.72 | $137,126.42 | ||
Other Transmitter Costs | $4,200.00 | $4,200.00 | N/A | $4,200.00 | N/A |
Installation and Commissioning at KMMW Stockton, CA | $22,000.00 | $22,000.00 | N/A | $22,000.00 | N/A |
Transmitter Building Site Survey/Installation | $10,000.00 | $10,000.00 | N/A | $965.70 | N/A |
Channel 14 -- Additional field engineering time, 5 days | $15,000.00 | $15,000.00 | N/A | N/A | N/A |
Channel 14 Mask Filter | $189,500.00 | $29,390.00 | N/A | N/A | N/A |
RF Consulting Engineer | $5,260.00 | $5,260.00 | N/A | $0.00 | N/A |
Other Electrical Service: Installation of 240 V outlet behind transmitter. | $1,500.00 | $1,500.00 | N/A | $1,500.00 | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $108,460.72 | Actual costs exceeds predetermined costs | $108,460.72 | N/A |
Actual Information Description | File Name |
---|---|
Other Transmitter Costs | |
Installation and Commissioning at KMMW Stockton, CA | |
Transmitter Building Site Survey/Installation | |
Channel 14 -- Additional field engineering time, 5 days | Information not provided. |
Channel 14 Mask Filter | Information not provided. |
RF Consulting Engineer | Information not provided. |
Other Electrical Service: Installation of 240 V outlet behind transmitter. | |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $97,475.00 | $100,245.00 | N/A | $93,895.00 | N/A |
Total for all systems | $600,912.50 | $750,833.22 | N/A | $500,730.05 | N/A |
Primary Antenna SFN-2030-G-8 | $97,475.00 | $100,245.00 | $93,895.00 | ||
Installation Costs | $63,745.00 | $63,745.00 | Antenna installations cost | $63,745.00 | N/A |
UHF-Low Power, Side Mount, Slotted Coaxial, 5.5kW input, Horizontal | $28,000.00 | $28,000.00 | N/A | $27,200.00 | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $8,500.00 | Estimated costs is less than predetermined costs estimate | $2,950.00 | N/A |
Actual Information Description | File Name |
---|---|
Installation Costs | |
UHF-Low Power, Side Mount, Slotted Coaxial, 5.5kW input, Horizontal | |
Sweep test of transmission line and antenna |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $77,190.00 | $77,190.00 | N/A | $20,512.00 | N/A |
Total for all systems | $600,912.50 | $750,833.22 | N/A | $500,730.05 | N/A |
Primary Tower GTOWER | $77,190.00 | $77,190.00 | $20,512.00 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $56,190.00 | tbd | $16,512.00 | N/A |
Tower mapping and report for structural engineer | $21,000.00 | $21,000.00 | tbd | $4,000.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Short Tower (less than 500') | |
Tower mapping and report for structural engineer |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $62,332.50 | $345,132.50 | N/A | $232,039.05 | N/A |
Total for all systems | $600,912.50 | $750,833.22 | N/A | $500,730.05 | N/A |
Outside Professional Services | $62,332.50 | $345,132.50 | $232,039.05 | ||
Additional Field Engineering Service, 5 Days | $7,500.00 | $7,500.00 | N/A | $0.00 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | $714.00 | N/A |
Form 399 assistance or other Program Management costs | $6,320.00 | $6,320.00 | N/A | $5,336.70 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | $719.70 | N/A |
Project management of the transition | $42,200.00 | $325,000.00 | Extra Project management work has been required for this project. KMMW has accrued a lot of hours because of the CH14 testing/coordination, which makes it more complicated than a normal displaced Low Power station. | $224,304.75 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | $963.90 | N/A |
Actual Information Description | File Name |
---|---|
Additional Field Engineering Service, 5 Days | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Form 399 assistance or other Program Management costs | |
Prepare/ Review 399 reimbursement form | |
Project management of the transition | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $32,455.00 | $32,455.00 | N/A | $17,157.58 | N/A |
Total for all systems | $600,912.50 | $750,833.22 | N/A | $500,730.05 | N/A |
Other Expenses | $32,455.00 | $32,455.00 | $17,157.58 | ||
DTV Medical Facility Notifications | $5,000.00 | $5,000.00 | N/A | $4,950.00 | N/A |
Equipment Storage | $6,000.00 | $6,000.00 | N/A | $4,168.39 | N/A |
Equipment Delivery and Handling Charges | $8,900.00 | $8,900.00 | N/A | $8,039.19 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $2,000.00 | $2,000.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 Major change CP application | $4,960.00 | $4,960.00 | N/A | $0.00 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
AM Pattern Disturbance -- Impact study | $5,260.00 | $5,260.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
DTV Medical Facility Notifications | |
Equipment Storage | |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
FCC Filing Fees - Form 2100 Major change CP application | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
AM Pattern Disturbance -- Impact study | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $600,912.50 | $750,833.22 | $500,730.05 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Angela Ball Assistant Secretary 01/19/2023 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Angela Ball Assistant Secretary 01/19/2023 |