Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
VENTANA TELEVISION, INC. Doing Business As: VENTANA TELEVISION, INC. |
Eric Yonkin 1 HSN Drive St. Petersburg, FL 33729 United States |
+1 (727) 872-7443 | EASnotice@hsn.net | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Warren A. Kessler Hogan Lovells US LLP |
555 Thirteenth Street, NW Washington, DC 20004 United States |
+1 (202) 637-3632 | warren.kessler@hoganlovells.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Station must receive new transmitter, antenna, and equipment for modifying transmission line; assemble transmitter; conduct study for current tower; and install new equipment. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | TXUD1000MA | |
Year | 2011 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1.0 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | LPTV-5000-500V3 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 500 W | |
Justification for New Transmitter | The existing transmitter will not work on post-repack channel. (Pre-auction channel was UHF, post-auction channel is VHF.) |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
14502 Hitachi SHP-HAN |
Shipping and handling of Hitachi equipment |
LPTV-5000-500V3 |
New Transmitter |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | ALP16L2-HSW | |
Year | 2011 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Slotted Coaxial | |
ERP: | 500.0 W | |
Manufacturer | ||
Model | JSL-4/D13 SCP-V | |
Year | 2021 | |
Justification for New Antenna | Previous channel 45 antenna would not work on channel 13. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Broadband | |
Feed Line Size | 1 5/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Name | Description |
---|---|
Invoice No. 20003-1 Jampro, Antenna Purchase |
Invoice No. 20003-1 Jampro, Antenna Purchase |
Centerline Communications - rework mounting |
Rework mounting brackets on antenna |
INV78113 - SCMS |
Ohm Reducer/Anchor, Elbow Flanged |
Invoice No. 2803 - Centerline Communications-Total Tower |
Removal of Pre-pack Antenna and installation of new channel 13 antenna |
Centerline Communications |
Antenna replacement service call |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | Andrew/CommScope |
Type | Flexible Air | |
Diameter | 4 inches | |
Number of parallel runs | 1 | |
Length | 634 feet per run |
Name | Description |
---|---|
Jumper |
New antenna requires jumper from previous antenna bottom feed point to new antenna center feed point. |
Connectors and Adapters |
These are connectors and adapters necessary for this particular installation but not the line itself. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | Candelabra | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1223132 | |
Coordinates (NAD83) | Latitude (NAD83) | 33° 48' 26.4" N- |
Longitude (NAD83) | 084° 20' 21.5" W- | |
Overall Structure Height | 1182.07 feet | |
Support Structure Height | 1056.09 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 867.12 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | American Towers LLC | |
Date Constructed | 03/27/2002 |
Facility ID | Call Sign | Service |
---|---|---|
6900 | WUPA | DTV |
48813 | WUVG-DT | DTV |
64033 | WPCH-TV | DTV |
125850 | WBUD-LD | LPD |
73345 | WWWQ | FM |
54585 | WRFG | FM |
73161 | WKHX-FM | FM |
22819 | WATL | DTV |
13805 | WZGC | FM |
125861 | WDWW-LD | LPD |
182024 | WUEO-LD | LPD |
183170 | WLVO-LD | LPD |
168812 | WANN-CD | DTV |
29735 | WUBL | FM |
147273 | W266BW | FX |
158597 | W250BC | FX |
148550 | W255CJ | FX |
23960 | WSB-TV | DTV |
11675 | WCLK | FM |
11275 | WWPW | FM |
69785 | WUVM-LD | LPD |
88937 | W229AG | FX |
72120 | WANF | DTV |
Users |
---|
Cell Providers |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Tower mapping and report for structural engineer |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Candelabra |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Invoice No. 2803 - Centerline Communications |
Removal of Pre-pack antenna and installation of the new channel 13 antenna. |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | No |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
Prepare and file Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
Invoice No. 20003-C, PO No. HN813230680 for Structural Analysis and report for JSL-4-D13- SCP-V |
Invoice No. 20003-C, PO No. HN813230680 for Structural Analysis and report for JSL-4-D13- SCP-V, Serial No. 20003-A Mounts |
SHP-HAN POHN813211840 |
SHP-HAN POHN813211840, SHIP&HANDLE W13DQ, LPTV-5000-500V3 D1. Invoice No. 14502 |
Invoice No. A249979 American Tower - PO Line 1 - W45DX Facility ID: 61199 Customer Structural Study |
Structural engineering study for a candelabra tower |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $84,264.62 | $84,264.62 | N/A | $24,389.86 | N/A |
Total for all systems | $381,204.18 | $356,542.18 | N/A | $80,697.45 | N/A |
Primary Transmitter LPTV-5000-500V3 | $84,264.62 | $84,264.62 | $24,389.86 | ||
LPTV-5000-500V3 | $43,206.00 | $43,206.00 | N/A | $0.00 | N/A |
Transmitter Building Site Survey/Installation | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
14502 Hitachi SHP-HAN | $1,058.62 | $1,058.62 | Shipping and handling | $1,058.62 | N/A |
High VHF - Air Cooled Solid State Transmitter 400 - 1000 Watts | $30,000.00 | $30,000.00 | N/A | $23,331.24 | N/A |
Actual Information Description | File Name |
---|---|
LPTV-5000-500V3 | |
Transmitter Building Site Survey/Installation | Information not provided. |
14502 Hitachi SHP-HAN | |
High VHF - Air Cooled Solid State Transmitter 400 - 1000 Watts |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $98,104.59 | $100,917.59 | N/A | $11,067.59 | N/A |
Total for all systems | $381,204.18 | $356,542.18 | N/A | $80,697.45 | N/A |
Primary Antenna JSL-4/D13 SCP-V | $98,104.59 | $100,917.59 | $11,067.59 | ||
Centerline Communications | $1,000.00 | $1,000.00 | N/A | N/A | N/A |
Invoice No. 2803 - Centerline Communications-Total Tower | $42,140.00 | $42,140.00 | N/A | $0.00 | N/A |
INV78113 - SCMS | $3,629.59 | $3,629.59 | Cost of parts, does not include UPS cost (which is not reimburseable) | $3,629.59 | N/A |
Centerline Communications - rework mounting | $0.00 | $0.00 | Cost of service call for rework of mounting brackets. | $0.00 | Total cost increased due to the need for rework of mounting brackets and necessary replacement |
Invoice No. 20003-1 Jampro, Antenna Purchase | $17,300.00 | $17,300.00 | N/A | $0.00 | Total cost of antenna over 2 parts |
Side Mount antenna brackets | $4,625.00 | $7,438.00 | Total cost for required custom mounting brackets for VHF antenna. | $7,438.00 | N/A |
High VHF-Low Power, Side Mount, Slotted Coaxial, 500.0watt input, Circular | $29,410.00 | $29,410.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Centerline Communications | Information not provided. |
Invoice No. 2803 - Centerline Communications-Total Tower | |
INV78113 - SCMS | |
Centerline Communications - rework mounting | |
Invoice No. 20003-1 Jampro, Antenna Purchase | |
Side Mount antenna brackets | |
High VHF-Low Power, Side Mount, Slotted Coaxial, 500.0watt input, Circular |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $5,347.47 | $5,347.47 | N/A | $0.00 | N/A |
Total for all systems | $381,204.18 | $356,542.18 | N/A | $80,697.45 | N/A |
Primary Transmission Line | $5,347.47 | $5,347.47 | $0.00 | ||
Jumper | $750.00 | $750.00 | N/A | N/A | N/A |
Connectors and Adapters | $4,597.47 | $4,597.47 | N/A | $0.00 | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $108,140.00 | $108,140.00 | N/A | $45,240.00 | N/A |
Total for all systems | $381,204.18 | $356,542.18 | N/A | $80,697.45 | N/A |
Primary Tower GTOWER | $108,140.00 | $108,140.00 | $45,240.00 | ||
Invoice No. 2803 - Centerline Communications | $42,140.00 | $42,140.00 | N/A | $42,140.00 | N/A |
Complex Tower (includes, e.g., towers with candelabras and/or stacked antennas) | $25,000.00 | $25,000.00 | N/A | N/A | N/A |
Tower mapping and report for structural engineer | $21,000.00 | $21,000.00 | N/A | $3,100.00 | N/A |
Minor tower reinforcement/modifications | $20,000.00 | $20,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Invoice No. 2803 - Centerline Communications | |
Complex Tower (includes, e.g., towers with candelabras and/or stacked antennas) | Information not provided. |
Tower mapping and report for structural engineer | |
Minor tower reinforcement/modifications | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $57,912.50 | $30,437.50 | N/A | $0.00 | N/A |
Total for all systems | $381,204.18 | $356,542.18 | N/A | $80,697.45 | N/A |
Outside Professional Services | $57,912.50 | $30,437.50 | $0.00 | ||
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | Included consultation on antenna design. | N/A | N/A |
Form 399 assistance or other Program Management costs | $1,500.00 | $1,500.00 | N/A | N/A | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $52,600.00 | $25,125.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $27,435.00 | $27,435.00 | N/A | $0.00 | N/A |
Total for all systems | $381,204.18 | $356,542.18 | N/A | $80,697.45 | N/A |
Other Expenses | $27,435.00 | $27,435.00 | $0.00 | ||
Invoice No. 20003-C, PO No. HN813230680 for Structural Analysis and report for JSL-4-D13- SCP-V | $1,600.00 | $1,600.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
Invoice No. A249979 American Tower - PO Line 1 - W45DX Facility ID: 61199 Customer Structural Study | $1,500.00 | $1,500.00 | N/A | $0.00 | N/A |
SHP-HAN POHN813211840 | $24,000.00 | $24,000.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $381,204.18 | $356,542.18 | $80,697.45 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Eric Yonkin Associate General Counsel, Legal 11/02/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Eric Yonkin Associate General Counsel, Legal 11/02/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Eric Yonkin Associate General Counsel, Legal 11/02/2022 |