Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
CENTRO CRISTIANO DE VIDA ETERNA Doing Business As: CENTRO CRISTIANO DE VIDA ETERNA |
HECTOR GUEVARA 8230 ANTOINE DR. HOUSTON, TX 77088 United States |
+1 (713) 875-8728 | apostolguevara@gmail.com | Not-for-Profit |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
MARTIN GUEVARA DIRECTOR SLEEK VENTURES LLC |
MARTIN GUEVARA 8322 BLACKSMITH DR HOUSTON, TX 77064 United States |
+1 (713) 757-2355 | SLEEKVENTURESLLC@GMAIL.COM |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | We are moving from channel 54 to channel 2 to accommodate the repacking. To accomplish this we are changing the transmitter site, buying a new transmitter, antennas and transmission line |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | TXUD3000AAC | |
Year | 2011 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 15 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TXVD2000AACB1 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 2 kW | |
Justification for New Transmitter | The old transmitter cannot be re-tuned. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Cross Dipole | |
ERP: | 3.0 kW | |
Manufacturer | ||
Model | TVO-2 | |
Year | 2011 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Yagi | |
ERP: | 3.0 kW | |
Manufacturer | ||
Model | CA2 | |
Year | 2019 | |
Justification for New Antenna | We are moving from channel 48 to channel 2. The antennas cannot be re-tuned. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | No | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 500 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 500 feet per run | |
Justification for New Transmission Line | New transmission line is needed at the new site. | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1206286 | |
Coordinates (NAD83) | Latitude (NAD83) | 30° 58' 40.3" N- |
Longitude (NAD83) | 094° 49' 28.7" W- | |
Overall Structure Height | 495.07 feet | |
Support Structure Height | 479.98 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 246.06 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | American Towers LLC | |
Date Constructed | 10/18/1999 |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 40 | |
Explanation | Outside expertise needed. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $111,000.00 | $87,579.50 | N/A | $87,579.50 | N/A |
Total for all systems | $228,347.50 | $193,347.35 | N/A | $173,612.85 | N/A |
Primary Transmitter TXVD2000AACB1 | $111,000.00 | $87,579.50 | $87,579.50 | ||
High VHF - Air Cooled Solid State Transmitter 1.1 - 4.4 kW | $101,000.00 | $80,129.50 | N/A | $80,129.50 | Amount Charged |
Transmitter Building Site Survey/Installation | $10,000.00 | $7,450.00 | N/A | $7,450.00 | N/A |
Actual Information Description | File Name |
---|---|
High VHF - Air Cooled Solid State Transmitter 1.1 - 4.4 kW | |
Transmitter Building Site Survey/Installation |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $11,475.00 | $42,998.00 | N/A | $32,643.00 | N/A |
Total for all systems | $228,347.50 | $193,347.35 | N/A | $173,612.85 | N/A |
Primary Antenna CA2 | $11,475.00 | $42,998.00 | $32,643.00 | ||
Sweep test of transmission line and antenna | $5,730.00 | $5,730.00 | N/A | $0.00 | N/A |
High-VHF, Low Power, Yagi/Cross-Dipole/Log Periodic Transmit Antenna | $1,120.00 | $32,643.00 | This is the amount charged | $32,643.00 | This is the amount charged |
Side Mount antenna brackets | $4,625.00 | $4,625.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Sweep test of transmission line and antenna | Information not provided. |
High-VHF, Low Power, Yagi/Cross-Dipole/Log Periodic Transmit Antenna | |
Side Mount antenna brackets | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $12,000.00 | $8,229.10 | N/A | $8,229.10 | N/A |
Total for all systems | $228,347.50 | $193,347.35 | N/A | $173,612.85 | N/A |
Primary Transmission Line | $12,000.00 | $8,229.10 | $8,229.10 | ||
Flexible Foam Transmission Line - dielectric, 1 5/8" | $12,000.00 | $8,229.10 | N/A | $8,229.10 | N/A |
Actual Information Description | File Name |
---|---|
Flexible Foam Transmission Line - dielectric, 1 5/8" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $56,190.00 | $12,500.00 | N/A | $12,500.00 | N/A |
Total for all systems | $228,347.50 | $193,347.35 | N/A | $173,612.85 | N/A |
Primary Tower TOWER | $56,190.00 | $12,500.00 | $12,500.00 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $12,500.00 | N/A | $12,500.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Short Tower (less than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $35,037.50 | $39,560.75 | N/A | $32,491.25 | N/A |
Total for all systems | $228,347.50 | $193,347.35 | N/A | $173,612.85 | N/A |
Outside Professional Services | $35,037.50 | $39,560.75 | $32,491.25 | ||
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $2,025.00 | N/A | $2,025.00 | Amount charged |
Form 399 assistance or other Program Management costs | $16,287.50 | $16,287.50 | This is the amount charged | $15,575.00 | Amount charged |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $2,493.25 | This is the amount charged | $2,493.75 | This is the amount charged |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $5,625.00 | This is the amount charged | $5,625.00 | This is the amount charged |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $2,000.00 | This is the amount charged | $2,000.00 | This is the amount charged |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $4,300.00 | This is the amount charged | $4,300.00 | This is the amount charged |
Prepare/ Review 399 reimbursement form | $1,710.00 | $810.00 | This is the amount charged | $472.50 | This is the amount charged |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | N/A | N/A | N/A |
Project management of the transition | $4,220.00 | $4,220.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Form 399 assistance or other Program Management costs | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Prepare/ Review 399 reimbursement form | |
Perform engineering study for displacement application | Information not provided. |
Project management of the transition | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,645.00 | $2,480.00 | N/A | $170.00 | N/A |
Total for all systems | $228,347.50 | $193,347.35 | N/A | $173,612.85 | N/A |
Other Expenses | $2,645.00 | $2,480.00 | $170.00 | ||
Equipment Delivery and Handling Charges | $850.00 | $850.00 | N/A | N/A | N/A |
Equipment Storage | $350.00 | $350.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $170.00 | N/A | $170.00 | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Equipment Delivery and Handling Charges | Information not provided. |
Equipment Storage | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $228,347.50 | $193,347.35 | $173,612.85 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Martin Guevara President 09/30/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Martin Guevara President 09/30/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Martin Guevara President 09/30/2022 |