Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Station plans to remove original channel equipment and replace with post-transition, channel specific transmitter, antenna, and line. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | TBD | |
Year | 2000 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 500 W |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TRN-VI-800-FA-H | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 800 W | |
Justification for New Transmitter | Comparable replacement transmitter for new VHF channel |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | Yes | |
Description | electrical service required as preparation for transmitter installation | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 5 tons | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Transmitter site prep |
Transmitter site prep |
Taxes |
Taxes |
Shipping |
Transmitter shipping costs |
Decommission |
Decommission of original transmitter |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Bottom | |
Polarization | Circular | |
Type | Other | |
Other Antenna Type | Panel | |
ERP: | 3.0 kW | |
Manufacturer | ||
Model | AT15-241 | |
Year | 2009 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Other | |
Other Antenna Type | TV Antenna | |
ERP: | 5.0 kW | |
Manufacturer | ||
Model | TV-IV-CP-3 | |
Year | 2022 | |
Justification for New Antenna | Corrected VHF replacement antenna for new channel. Original antenna was circularly polarized, so new CP antenna will not be an upgrade. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Installation parts |
Installation parts |
Shipping |
Antenna shipping |
Removable hardware |
Removable hardware |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Foam | |
Diameter | 7/8 inches | |
Number of parallel runs | 1 | |
Length | 200 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Foam | |
Diameter | 7/8 inches | |
Number of parallel runs | 1 | |
Length | 200 feet per run | |
Justification for New Transmission Line | New transmission line required for replacement antenna | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1234946 | |
Coordinates (NAD83) | Latitude (NAD83) | 41° 47' 02.7" N- |
Longitude (NAD83) | 112° 13' 57.8" W- | |
Overall Structure Height | 305.11 feet | |
Support Structure Height | 305.11 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 6858.84 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Broadway Media, LLC | |
Date Constructed | 07/26/2002 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Tower mapping and report for structural engineer |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 150 | |
Explanation | Project management of the transition | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 5 | |
Justification | On-site engineering during installation |
Name | Description |
---|---|
Permit pickup |
Flat fee for picking up permit |
Building permit application |
Flat fee for preparation of BP application |
A and E Walk |
Site walk coordinated with A&E firm |
Co-location application |
Flat fee for preparation of co-location application |
Complex zoning |
Potential for complex zoning with hearing |
Construction drawings |
Construction drawings |
Fully executed amendment with non-MLA landlord |
Flat fee service for completion of amendment |
Landlord NTP |
Flat fee for landlord approval to proceed |
Leasing audit |
Entitlement review of existing lease documents |
NEPA and SHPO compliance |
NEPA/SHPO compliance |
Negotiation of co-location lease |
Negotiation of co-location lease by telecom consultant |
Zoning and permitting determination |
Flat fee service for zoning/permitting determination |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | Yes |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
Tower owner application processing fee |
Landlord review fee for modification application |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $128,840.00 | $128,840.00 | N/A | $76,590.00 | N/A |
Total for all systems | $403,165.00 | $385,445.00 | N/A | $123,312.50 | N/A |
Primary Transmitter TRN-VI-800-FA-H | $128,840.00 | $128,840.00 | $76,590.00 | ||
Low VHF - Air Cooled Solid State Transmitter 800 Watts | $73,590.00 | $73,590.00 | Cost of Anywave 800 W Transmitter per attached invoice. | $73,590.00 | N/A |
Other Electrical Service: electrical service required as preparation for transmitter installation | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
5 Ton system | $20,250.00 | $20,250.00 | Cast catalog estimate used until vendor can provide a quote this week. The new transmitter requires cooling from a new 5-ton A/C unit. | N/A | N/A |
Transmitter Building Site Survey/Installation | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
Decommission | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Shipping | $3,000.00 | $3,000.00 | Actual Shipping Costs | $3,000.00 | actual costs submitted |
Taxes | $2,000.00 | $2,000.00 | N/A | N/A | N/A |
Transmitter site prep | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Low VHF - Air Cooled Solid State Transmitter 800 Watts | |
Other Electrical Service: electrical service required as preparation for transmitter installation | Information not provided. |
5 Ton system | Information not provided. |
Transmitter Building Site Survey/Installation | Information not provided. |
Decommission | Information not provided. |
Shipping | |
Taxes | Information not provided. |
Transmitter site prep | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $30,905.00 | $30,905.00 | N/A | $12,000.00 | N/A |
Total for all systems | $403,165.00 | $385,445.00 | N/A | $123,312.50 | N/A |
Primary Antenna TV-IV-CP-3 | $30,905.00 | $30,905.00 | $12,000.00 | ||
$0.00 | $0.00 | N/A | N/A | N/A | |
Installation parts | $1,000.00 | $1,000.00 | N/A | N/A | N/A |
Low VHF-Low Power, Side Mount, Other, 5.0kW input, Circular | $11,550.00 | $11,550.00 | Revised antenna to be reimbursed per License to Cover. | $10,000.00 | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $5,730.00 | N/A | N/A | N/A |
Side Mount antenna brackets | $4,625.00 | $4,625.00 | N/A | N/A | N/A |
Removable hardware | $6,000.00 | $6,000.00 | N/A | N/A | N/A |
Shipping | $2,000.00 | $2,000.00 | Actual cost of shipping | $2,000.00 | N/A |
Actual Information Description | File Name |
---|---|
Information not provided. | |
Installation parts | Information not provided. |
Low VHF-Low Power, Side Mount, Other, 5.0kW input, Circular | |
Sweep test of transmission line and antenna | Information not provided. |
Side Mount antenna brackets | Information not provided. |
Removable hardware | Information not provided. |
Shipping |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,200.00 | $2,200.00 | N/A | $0.00 | N/A |
Total for all systems | $403,165.00 | $385,445.00 | N/A | $123,312.50 | N/A |
Primary Transmission Line | $2,200.00 | $2,200.00 | $0.00 | ||
Flexible Foam Transmission Line - dielectric, 7/8" | $2,200.00 | $2,200.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $87,190.00 | $85,000.00 | N/A | $0.00 | N/A |
Total for all systems | $403,165.00 | $385,445.00 | N/A | $123,312.50 | N/A |
Primary Tower TOWER | $87,190.00 | $85,000.00 | $0.00 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $50,000.00 | N/A | N/A | N/A |
Tower mapping and report for structural engineer | $21,000.00 | $25,000.00 | Full report including tower and foundation mappings and tower and foundation analyses. | N/A | N/A |
Minor tower reinforcement/modifications | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $136,320.00 | $120,790.00 | N/A | $34,722.50 | N/A |
Total for all systems | $403,165.00 | $385,445.00 | N/A | $123,312.50 | N/A |
Outside Professional Services | $136,320.00 | $120,790.00 | $34,722.50 | ||
Project management of the transition | $15,825.00 | $28,172.50 | Actual costs submitted, including final Invoice #1142. | $28,172.50 | Actual invoices submitted |
NEPA and SHPO compliance | $2,500.00 | $2,500.00 | N/A | N/A | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | N/A | N/A |
Form 399 assistance or other Program Management costs | $15,000.00 | $15,000.00 | Per attached quote | $1,850.00 | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | N/A | $0.00 | N/A |
Prepare request for Special Temporary Authorization | $1,280.00 | $1,280.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $4,700.00 | Actual cost of invoice | $4,700.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $3,262.50 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $2,235.00 | N/A | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $52,600.00 | $22,125.00 | Per attached quote QU-171168 | $0.00 | N/A |
Additional Field Engineering Service, 5 Days | $12,500.00 | $12,500.00 | N/A | N/A | N/A |
Permit pickup | $700.00 | $700.00 | N/A | N/A | N/A |
Building permit application | $1,500.00 | $1,500.00 | Per estimate #1217 | N/A | N/A |
A and E Walk | $4,500.00 | $4,500.00 | N/A | N/A | N/A |
Co-location application | $500.00 | $500.00 | Per estimate #1217 | N/A | N/A |
Complex zoning | $2,000.00 | $2,000.00 | Per estimate #1217 (non-complex) | N/A | N/A |
Construction drawings | $3,500.00 | $3,500.00 | N/A | N/A | N/A |
Fully executed amendment with non-MLA landlord | $3,500.00 | $3,500.00 | Per estimate #1217 | N/A | N/A |
Landlord NTP | $500.00 | $500.00 | Per estimate #1217 | N/A | N/A |
Leasing audit | $750.00 | $750.00 | Per estimate #1217 | N/A | N/A |
Negotiation of co-location lease | $1,750.00 | $1,750.00 | N/A | N/A | N/A |
Zoning and permitting determination | $650.00 | $650.00 | Per estimate #1217 | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Project management of the transition | |
NEPA and SHPO compliance | Information not provided. |
Prepare/ Review 399 reimbursement form | Information not provided. |
Form 399 assistance or other Program Management costs | |
Perform engineering study for displacement application | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Additional Field Engineering Service, 5 Days | Information not provided. |
Permit pickup | Information not provided. |
Building permit application | Information not provided. |
A and E Walk | Information not provided. |
Co-location application | Information not provided. |
Complex zoning | Information not provided. |
Construction drawings | Information not provided. |
Fully executed amendment with non-MLA landlord | Information not provided. |
Landlord NTP | Information not provided. |
Leasing audit | Information not provided. |
Negotiation of co-location lease | Information not provided. |
Zoning and permitting determination | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $17,710.00 | $17,710.00 | N/A | $0.00 | N/A |
Total for all systems | $403,165.00 | $385,445.00 | N/A | $123,312.50 | N/A |
Other Expenses | $17,710.00 | $17,710.00 | $0.00 | ||
Equipment Storage | $2,000.00 | $2,000.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 Major change CP application | $4,960.00 | $4,960.00 | N/A | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $305.00 | $305.00 | N/A | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $2,000.00 | $2,000.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $2,000.00 | $2,000.00 | N/A | N/A | N/A |
Tower owner application processing fee | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $403,165.00 | $385,445.00 | $123,312.50 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Larry Soule Owner 09/27/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Larry Soule Owner 09/27/2022 |