Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
New Hola TV LLC |
Wandeley Gonzalez Macias 6115 Lake Avenue West Palm Beach, FL 33405 United States |
+1 (416) 301-5862 | ISSY@HOLATV47.COM | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | The station is purchasing a new VHF transmitter, antenna, etc. and locating the same at the coordinates approved by the FCC (File No. 0000121282). Once all equipment is in place, the previous UHF equipment will be removed. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Retune Existing |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | Elmwi |
Model | A1KST8U | |
Year | 1998 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1000 kW |
Section | Question | Response |
---|---|---|
New Mask Filter | Does the transmitter require a new mask filter? | No |
New Exciter | Is a new exciter needed? | No |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | A1KST8U | |
Year | 1998 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1000 W |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | AAT-VHF III-3000 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 3000 W | |
Justification for New Transmitter | Requested by the FCC, due to transmitting frequency change |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | Yes | |
Description | all electrical power supply to transmitter | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | No | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Top | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 5 | |
Number of Panels | 1 | |
Design power capacity in use | 50.0 % | |
Lower Limit | 54.00 MHz | |
Upper Limit | 88.00 MHz | |
ERP: | 500.0 W | |
Manufacturer | ||
Model | CL-26/HCM | |
Year | 2018 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Top | |
Polarization | Horizontal | |
Type | Yagi | |
ERP: | 300.0 W | |
Manufacturer | ||
Model | PA11-SDP | |
Year | 2020 | |
Justification for New Antenna | requested by FCC Transmitter change from UHF to VHF |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Broadband | |
Feed Line Size | 7/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Filter |
Filter |
cable |
coaxial cable |
Endec |
Encoder and decoder |
Modulator |
Modulator |
connector |
7/16 DIN male connector for 7/8 Coaxial cable |
fittings |
7/8 fittings |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1031315 | |
Coordinates (NAD83) | Latitude (NAD83) | 26° 45' 43.2" N- |
Longitude (NAD83) | 080° 04' 41.2" W- | |
Overall Structure Height | 519.02 feet | |
Support Structure Height | 499.99 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 17.06 feet | |
Structure Type | LTOWER - Lattice Tower | |
Tower Owner | Pinnacle Towers Acquisition LLC | |
Date Constructed | 09/09/2016 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study need for guyed or free-standing tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 40 | |
Explanation | Engineering cost and labor crew for specialty and qualified personnel. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 15 | |
Justification | Mounting Installation, analitics and software installation, and staff trainning. |
Name | Description |
---|---|
Candidate selection - leasing |
Leasing fee |
Construction drawings |
Construction drawings |
Permitting service |
permitting fee |
Site inspection |
Site inspection |
Structural analysis |
Structural analysis |
Lease review and audit |
Lease review and audit |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | Yes | |
Type | Unlicensed |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $14,676.24 | $35,676.24 | N/A | $35,676.24 | N/A |
Total for all systems | $310,844.74 | $183,966.99 | N/A | $117,369.49 | N/A |
Primary Transmitter A1KST8U | $11,000.00 | $32,000.00 | $32,000.00 | ||
Retune - UHF and VHF - minor re-channel issues | $11,000.00 | $32,000.00 | Work required to convert original UHF transmitter to operate on repack VHF channel at an expense less than the cost of a replacement transmitter. | $32,000.00 | N/A |
Primary Transmitter AAT-VHF III-3000 | $3,676.24 | $3,676.24 | $3,676.24 | ||
Mask Filter | $3,676.24 | $3,676.24 | ***System Notice: Estimate adjusted and locked because line has been superseded.*** | $3,676.24 | N/A |
Actual Information Description | File Name |
---|---|
Retune - UHF and VHF - minor re-channel issues | |
Mask Filter |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $31,329.00 | $35,004.00 | N/A | $400.00 | N/A |
Total for all systems | $310,844.74 | $183,966.99 | N/A | $117,369.49 | N/A |
Primary Antenna PA11-SDP | $31,329.00 | $35,004.00 | $400.00 | ||
fittings | $1,200.00 | $1,200.00 | N/A | N/A | N/A |
connector | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Modulator | $3,601.00 | $3,601.00 | Actual costs submitted | $0.00 | N/A |
Endec | $1,701.00 | $1,701.00 | Actual costs submitted | $0.00 | N/A |
cable | $7,001.00 | $7,001.00 | Actual costs submitted | $0.00 | Actual cost greater than estimate provided by vendor. |
Filter | $5,001.00 | $5,001.00 | Actual costs submitted | $0.00 | N/A |
Pattern scatter analysis for side mount (if not included in antenna base cost) | $1,000.00 | $1,000.00 | N/A | N/A | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $5,000.00 | N/A | N/A | N/A |
Low-VHF, Low Power,Yagi/Cross dipole/Log Periodic Transmit antenna | $1,095.00 | $5,500.00 | Actual costs submitted | $400.00 | Actual costs submitted |
Actual Information Description | File Name |
---|---|
fittings | Information not provided. |
connector | Information not provided. |
Modulator | |
Endec | |
cable | |
Filter | |
Pattern scatter analysis for side mount (if not included in antenna base cost) | Information not provided. |
Sweep test of transmission line and antenna | Information not provided. |
Low-VHF, Low Power,Yagi/Cross dipole/Log Periodic Transmit antenna |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $173,450.00 | $26,251.25 | N/A | $10,551.25 | N/A |
Total for all systems | $310,844.74 | $183,966.99 | N/A | $117,369.49 | N/A |
Primary Tower LTOWER | $173,450.00 | $26,251.25 | $10,551.25 | ||
Tower Climber | $7,000.00 | $7,000.00 | N/A | $0.00 | N/A |
Study needed for guyed or free-standing tower | $8,700.00 | $8,700.00 | Using predetermined cost for estimate until vendor quote received | N/A | N/A |
Tower Rigging Tall Tower (greater than 500') | $157,750.00 | $10,551.25 | Actual cost of invoices | $10,551.25 | N/A |
Actual Information Description | File Name |
---|---|
Tower Climber | |
Study needed for guyed or free-standing tower | Information not provided. |
Tower Rigging Tall Tower (greater than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $89,139.50 | $85,535.50 | N/A | $70,742.00 | N/A |
Total for all systems | $310,844.74 | $183,966.99 | N/A | $117,369.49 | N/A |
Outside Professional Services | $89,139.50 | $85,535.50 | $70,742.00 | ||
Additional Field Engineering Service, 15 Days | $1,200.00 | $1,200.00 | N/A | $0.00 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | N/A | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | N/A | N/A | N/A |
Form 399 assistance or other Program Management costs | $13,102.00 | $13,102.00 | Actual costs submitted | $13,102.00 | Actual costs submitted |
Project management of the transition | $4,220.00 | $29,515.00 | Actual costs submitted plus est. #1221 | $29,515.00 | Actual costs submitted |
Lease review and audit | $750.00 | $750.00 | Per est. #1221 | N/A | N/A |
Structural analysis | $2,500.00 | $2,500.00 | N/A | $2,500.00 | N/A |
Site inspection | $1,500.00 | $1,500.00 | N/A | $1,500.00 | N/A |
Permitting service | $500.00 | $500.00 | N/A | $500.00 | N/A |
Construction drawings | $1,000.00 | $1,000.00 | N/A | $1,000.00 | N/A |
Candidate selection - leasing | $500.00 | $500.00 | N/A | $500.00 | N/A |
Comprehensive coverage verification via field study, if needed | $52,600.00 | $22,125.00 | Per Quote #QU-171169 | $22,125.00 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $3,286.00 | Unanticipated complexity of completing Form 399 | $0.00 | Complications with form preparation due to LMS issues and significant time needed to complete forms. |
Actual Information Description | File Name |
---|---|
Additional Field Engineering Service, 15 Days | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for displacement application | Information not provided. |
Form 399 assistance or other Program Management costs | |
Project management of the transition | |
Lease review and audit | Information not provided. |
Structural analysis | |
Site inspection | |
Permitting service | |
Construction drawings | |
Candidate selection - leasing | |
Comprehensive coverage verification via field study, if needed | |
Prepare/ Review 399 reimbursement form |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,250.00 | $1,500.00 | N/A | $0.00 | N/A |
Total for all systems | $310,844.74 | $183,966.99 | N/A | $117,369.49 | N/A |
Other Expenses | $2,250.00 | $1,500.00 | $0.00 | ||
New Point to Point Microwave System: Unlicensed | $2,250.00 | $1,500.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $310,844.74 | $183,966.99 | $117,369.49 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Wandeley Gonzalez Macias Vice President 09/22/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Wandeley Gonzalez Macias Vice President 09/22/2022 |