Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | WVUX currently runs a Hitachi 650P into Elettronika AVTV1500(500w) into DRV array. To protect 1st adjacent and co-channels, we will reduce noise-limited contour and offset population loss with penetrating antennae and 1kw transmitter |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | AVTV1500ST | |
Year | 2009 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 500 W |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | LPTV-5000-1000V3 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1 kW | |
Justification for New Transmitter | New contour requires boosted signal to maintain population level. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | Yes | |
Size | 3 inches | |
Length | 12.0 feet | |
Other Electrical Service | Yes | |
Description | 200 amp service with breaker box, building ground rods at 6' intervals and conduit installed for $8500 per verbal estimate from Master electrician, Peter McCluskey | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 5 tons | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 225.0 square feet |
Name | Description |
---|---|
Auxiliary Equipment and Services |
estimated cost 12520 for auxiliary equipment and services such as install assistance |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels | 2 | |
Design power capacity in use | 100.0 % | |
Lower Limit | 174.00 MHz | |
Upper Limit | 230.00 MHz | |
ERP: | 2.7 kW | |
Manufacturer | ||
Model | DRV 174-230 mhz | |
Year | 2015 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 2.0 kW | |
Manufacturer | ||
Model | PSIVLP4OI-10 | |
Year | 2020 | |
Justification for New Antenna | new omnioid pattern requires new antennae and more penetration |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 1 5/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Installation |
remove old antenna and install new 4 bay antennae |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 140 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 460 feet per run | |
Justification for New Transmission Line | Depending on possibility of building new tower, a 200' line will be adequate; but if license relocates to another existing facility, longer line will be required | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | No |
Name | Description |
---|---|
two way power divider |
requires new two-way power divider |
installation |
install end connectors on both ends of line, install mounting brackets, install power divider and install line |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Construct New |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | Terrain Constrained | |
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1248738 | |
Coordinates (NAD83) | Latitude (NAD83) | 39° 16' 33.3" N- |
Longitude (NAD83) | 080° 17' 37.3" W- | |
Overall Structure Height | 160.10 feet | |
Support Structure Height | 149.93 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 1499.33 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Communication Service, Inc. | |
Date Constructed | 03/25/2005 |
Section | Question | Response |
---|---|---|
Construct New Tower | Use | Primary (Main) |
Is this a request for upgraded equipment? | Yes | |
Height | 480.00 feet | |
Justification for New Tower | current tower structure leaning and cannot hold weight of new 4-bay antenna nor is it structurally sound for a human to climb; see attached explanation along with Tower Inspection Report attached |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Terrain constrained |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Tower Inspection |
Existing tower needs inspected for repair if new tower construction is not an option |
Land purchase |
necessary because unable to locate suitable tower space to reach same population |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 310 | |
Explanation | need person to oversee installation, delivery, handle purchasing and verification and reimbursement forms submittal and was needed to find new tower space and eventually land purchase and new tower build | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
Attorney Fees, Prepare and file Minor Modification Application of Construction Permit |
Attorney fees for preparing and filing Application for Minor Change in CP to change location because of dilapidated tower |
Engineering Fee for Minor Modification of Construction Permit |
Preparation and filing of engineering portion of Application for Minor Change of Construction Permit |
FAA and 1A certifications |
Initial FAA Study, 1A Certification and Extended FAA Study for new location |
Tower Consultant services |
consultant for modification, removal and reconstruction of tower |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
ASR registration |
ASR registration |
FAA |
FAA, extended FAA study & certification prior to ASR registration |
Local Building Permit |
City of Clarksburg permit required to rebuild tower |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $95,894.00 | $112,995.60 | N/A | $70,105.60 | N/A |
Total for all systems | $1,267,884.34 | $799,696.94 | N/A | $643,110.94 | N/A |
Primary Transmitter LPTV-5000-1000V3 | $95,894.00 | $112,995.60 | $70,105.60 | ||
Auxiliary Equipment and Services | $12,520.00 | $12,520.00 | Hitachi-Comark adds this cost on top of cost of purchasing transmitter | $12,520.00 | N/A |
Transmitter Building Site Survey/Installation | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
Other -- Building Addition Size: 225.0 | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
Other Electrical Service: 200 amp service with breaker box, building ground rods at 6' intervals and conduit installed for $8500 per verbal estimate from Master electrician, Peter McCluskey | $12,500.00 | $12,500.00 | 3" conduit with 200 amp service with breaker box, building ground rods at 6' intervals and conduit installed costs 12,500 instead of as originally estimated at $8500 from Master electrician, Peter McCluskey | $12,500.00 | actual amount is 12,500 instead of original guess of 8500 by electrician |
3" Rigid Conduit and Wiring (Cost per foot) | $624.00 | $4,212.00 | 81 ft of 3" conduit and wiring at 52.00 per ft because 81ft would be needed in replacement at current location; initial guess of 12 ft was incorrect | $4,212.00 | reason for increase is the guess when originally submitting form 399 was only 12' but in reality should have been 81' for replacement |
5 Ton system | $20,250.00 | $22,890.00 | Cost for 5 ton air conditioning was more expensive than anticipated | $0.00 | N/A |
High VHF - Air Cooled Solid State Transmitter 400 - 1000 Watts | $30,000.00 | $40,873.60 | See attached estimate from Hitachi plus the final invoice which added $2313.60 in sales tax to the $38,560 quote for a total $40873.60; see also re-verification by Hitachi letter of May 29, 2020 | $40,873.60 | The quote is the same as estimated but typographical error input $30k instead of $38560, plus the estimated quote failed to include sales tax. With $2313.60 in sales tax, the total for the transmitter is $40,873.60. |
Actual Information Description | File Name |
---|---|
Auxiliary Equipment and Services | |
Transmitter Building Site Survey/Installation | Information not provided. |
Other -- Building Addition Size: 225.0 | Information not provided. |
Other Electrical Service: 200 amp service with breaker box, building ground rods at 6' intervals and conduit installed for $8500 per verbal estimate from Master electrician, Peter McCluskey | |
3" Rigid Conduit and Wiring (Cost per foot) | |
5 Ton system | |
High VHF - Air Cooled Solid State Transmitter 400 - 1000 Watts |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $53,855.00 | $60,260.00 | N/A | $43,360.00 | N/A |
Total for all systems | $1,267,884.34 | $799,696.94 | N/A | $643,110.94 | N/A |
Primary Antenna PSIVLP4OI-10 | $53,855.00 | $60,260.00 | $43,360.00 | ||
Installation | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
Side Mount antenna brackets | $4,625.00 | $11,030.00 | Antenna Brackets to attach to tower cost more than anticipated and antenna is 30' long which is larger than anticipated when originally filing Form 399 | $11,030.00 | N/A |
Elbow complex, single channel, 1 5/8” input (if needed) | $6,900.00 | $6,900.00 | N/A | N/A | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $5,730.00 | N/A | $5,730.00 | N/A |
High VHF-Low Power, Side Mount, Slotted Coaxial, 2.0kW input, Horizontal | $26,600.00 | $26,600.00 | N/A | $26,600.00 | N/A |
Actual Information Description | File Name |
---|---|
Installation | Information not provided. |
Side Mount antenna brackets | |
Elbow complex, single channel, 1 5/8” input (if needed) | Information not provided. |
Sweep test of transmission line and antenna | |
High VHF-Low Power, Side Mount, Slotted Coaxial, 2.0kW input, Horizontal |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $18,640.00 | $18,640.00 | N/A | $0.00 | N/A |
Total for all systems | $1,267,884.34 | $799,696.94 | N/A | $643,110.94 | N/A |
Primary Transmission Line | $18,640.00 | $18,640.00 | $0.00 | ||
two way power divider | $2,600.00 | $2,600.00 | N/A | N/A | N/A |
Flexible Foam Transmission Line - dielectric, 1 5/8" | $11,040.00 | $11,040.00 | N/A | N/A | N/A |
installation | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $952,165.00 | $480,740.00 | N/A | $410,740.00 | N/A |
Total for all systems | $1,267,884.34 | $799,696.94 | N/A | $643,110.94 | N/A |
Primary Tower TOWER | $0.00 | $0.00 | $0.00 | ||
Primary Tower | $952,165.00 | $480,740.00 | $410,740.00 | ||
New tower shorter than 500' | $816,000.00 | $344,575.00 | quote of $349375 for removal and reinstallation of 195' tower, subtracted by $4800 for nonreimburseable T-Booms | $344,575.00 | Please delete the 18,000.00 invoice for Cannon Holdings Ltd. Then was not sure whether to pay all of tower steel and portion of tower services or vice versa |
Complex Tower (includes, e.g., towers with candelabras and/or stacked antennas) | $58,965.00 | $58,965.00 | Expert tower crew removal and installation of antenna and transmission line invoice is more expensive than original guess of $10000.00 | $58,965.00 | N/A |
Land purchase | $70,000.00 | $70,000.00 | unable to relocate to any other tower in area so must build tower which necessitates the purchase of land upon which to build | N/A | N/A |
Tower Inspection | $7,200.00 | $7,200.00 | N/A | $7,200.00 | N/A |
Actual Information Description | File Name |
---|---|
New tower shorter than 500' | |
Complex Tower (includes, e.g., towers with candelabras and/or stacked antennas) | |
Land purchase | Information not provided. |
Tower Inspection |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $133,950.00 | $113,716.00 | N/A | $113,713.00 | N/A |
Total for all systems | $1,267,884.34 | $799,696.94 | N/A | $643,110.94 | N/A |
Outside Professional Services | $133,950.00 | $113,716.00 | $113,713.00 | ||
Tower Consultant services | $20,000.00 | $20,000.00 | Estimated tower consultant fee | $20,000.00 | N/A |
FAA and 1A certifications | $3,000.00 | $3,000.00 | For new location the initial FAA study, 1A certification and extended FAA study were required | $3,000.00 | N/A |
Engineering Fee for Minor Modification of Construction Permit | $2,100.00 | $2,100.00 | Must file application for minor change in CP to relocate to new tower from dilapidated tower | $2,100.00 | N/A |
Attorney Fees, Prepare and file Minor Modification Application of Construction Permit | $500.00 | $500.00 | Attorney fees to prepare and file Application for Minor Change to move location of Construction Permit | $500.00 | N/A |
Comprehensive coverage verification via field study, if needed | $52,600.00 | $30,000.00 | N/A | $30,000.00 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $3,500.00 | STA required two additional amendments | $3,500.00 | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $3,262.50 | N/A | $3,262.50 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | $1,577.50 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | $3,025.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | $1,052.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | $2,100.00 | N/A |
Prepare request for Special Temporary Authorization | $1,280.00 | $2,500.00 | Engineer had to conduct additional analysis for multiple towers | $2,500.00 | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | N/A | $1,800.00 | N/A |
Form 399 assistance or other Program Management costs | $5,000.00 | $5,000.00 | actual invoices higher than estimated because retained CPA services to assist in accounting for WVUX's transition funding | $5,000.00 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | $1,710.00 | N/A |
Project management of the transition | $32,705.00 | $32,586.00 | project management to oversee transition took far more hours than originally anticipated | $32,586.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Consultant services | |
FAA and 1A certifications | |
Engineering Fee for Minor Modification of Construction Permit | |
Attorney Fees, Prepare and file Minor Modification Application of Construction Permit | |
Comprehensive coverage verification via field study, if needed | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | |
Perform engineering study for displacement application | |
Form 399 assistance or other Program Management costs | |
Prepare/ Review 399 reimbursement form | |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $13,380.34 | $13,345.34 | N/A | $5,192.34 | N/A |
Total for all systems | $1,267,884.34 | $799,696.94 | N/A | $643,110.94 | N/A |
Other Expenses | $13,380.34 | $13,345.34 | $5,192.34 | ||
FCC Filing Fees - Special Temporary Authorization request | $305.00 | $270.00 | Had to file for STA which was not initially anticipated | $270.00 | The FCC fee for filing an application for STA is $270.00. WVUX had to file for an STA and thus the fee was paid upfront by its attorney. |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | $335.00 | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | $1,110.00 | N/A |
Local Building Permit | $4,153.00 | $4,153.00 | To build a tower in Clarksburg, WV a building permit is required and this portion covers the fee based on replacement cost only and not additional cost of upgraded tower | $0.00 | N/A |
FAA | $3,000.00 | $3,000.00 | $1000 FAA, $1000 Extended FAA study and $1000 certification of tower prior to ASR registration | $0.00 | initial FAA study, 1A certification and extended FAA study for the new tower |
ASR registration | $1,000.00 | $1,000.00 | required for new tower | $0.00 | N/A |
Equipment Storage | $1,625.00 | $1,625.00 | $65 storage rental fee per month was estimated for 15 months but actually has been 24 months and likely another month so rental fee assessed since October 8 2020 and last likely October 8 2022 | $1,625.00 | N/A |
Equipment Delivery and Handling Charges | $1,852.34 | $1,852.34 | cost for actual invoices was higher than estimated $1000.00 | $1,852.34 | actual invoices were higher than anticipated shipping costs |
Actual Information Description | File Name |
---|---|
FCC Filing Fees - Special Temporary Authorization request | |
FCC Filing Fees - Form 2100 license to cover application | |
FCC Filing Fees - Form 2100 minor change CP application | |
Local Building Permit | |
FAA | Information not provided. |
ASR registration | |
Equipment Storage | |
Equipment Delivery and Handling Charges |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $1,267,884.34 | $799,696.94 | $643,110.94 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jennifer Scragg Karr Attorney 09/27/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jennifer Scragg Karr Attorney 09/27/2022 |