Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
71586
Service:
DTV
Call Sign:
KCNS
Channel:
39 (UHF)
File Number:
0000028449
FRN:
0029023009
Date Submitted:
09/12/2022

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

RNN National, LLC

Christian French

800 Westchester Avenue

S 640

Rye Brook , NY 10573

United States

+1 (914) 417-2787 cfrench@rnntv.com Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

The Preparer is same as the reimbursement contact.

 

 

 

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan Tower Mgt Co will manage all aspects of combiner and antenna installation. KCNS will install new transmitter and coordinate the transition with tower owner and other stations.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Paragon DCXP-2
Year 2007
Type Inductive Output Tube
IOT Power Type Two
Power Capacity 40 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model ULXTE-72
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 47 kW
Justification for New Transmitter Cost of retuning (including interim transmitter) exceeds replacement cost. Proposed solid state replacement less expensive than IOT replacement. See attached statement.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring Yes
Size 3 inches
Length 155.0 feet
Other Electrical Service Yes
Description Install additional 400A service disconnect, LV transformer, Surge suppressor
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Transmitter Cooling Installation

Installation of transmitter heat exchangers and cooling piping including required demo and modifications of existing facilities

Misc parts and supplies

Misc small parts and supplies required for transmitter installation

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Retune Existing
Antenna Use Primary (Main)
Description of Use N/A
Ownership Leased
Owner Sutro Tower Inc
Site N/A
Is the existing antenna shared with another station or stations? Yes
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Top
Polarization Elliptical
Type Broadband Panel
Number of Stations Supported 4
Number of Panels 14
Design power capacity in use 100.0 %
Lower Limit 518.00 MHz
Upper Limit 698.00 MHz
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer Dielectric
Model TUM20-C5SP-14/60H-2_R-T
Year 2007

Facility ID's and Call Signs of all stations with whom the antenna is shared.

Facility ID Call Sign
35500 KQED

Primary Antenna

Back to Top

Adjustment to Existing Antenna

Section Question Response
Sweep Test of Existing Antenna Do you need a sweep test of existing antenna? Yes

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 2
Frequencies of channels supported RF channel
Frequency N/A

Enter a list of RF channel numbers.

RF Channel Number
30
32

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Combiner HVAC Upgrade

New HVAC to handle heat load from new combiner

Auxiliary Antenna

Back to Top

Add Antenna Information

Section Question Response
Existing Antenna Description Type of change Retune Existing
Antenna Use Auxiliary (Backup)
Description of Use Aux Backup
Ownership Leased
Owner Sutro Tower Inc
Site N/A
Is this antenna currently shared with any other stations? Yes
Is this antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Bottom
Polarization Horizontal
Type Broadband Panel
Number of Stations Supported 5
Number of Panels 12
Design power capacity in use 100.0 %
Lower Limit 470.00 MHz
Upper Limit 860.00 MHz
Other Antenna Type N/A
ERP: 500.0 kW
Manufacturer Dielectric
Model TUA-C4SP-12/40U-1-S
Year 2007

Facility ID's and Call Signs of all stations with whom the antenna is shared.

Facility ID Call Sign
58912 kpjk
35500 KQED
43095 KMTP-TV
51429 KFSF-DT
69619 KBCW

Auxiliary Antenna

Back to Top

Adjustment to Existing Antenna

Section Question Response
Sweep Test of Existing Antenna Do you need a sweep test of existing antenna? Yes

Auxiliary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 4
Frequencies of channels supported RF channel
Frequency N/A

Enter a list of RF channel numbers.

RF Channel Number
30
32
34
28

Auxiliary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Combiner HVAC Upgrade

New HVAC to handle heat load from new combiner

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Utilize Existing
Use Primary (Main)
Description of Use N/A
Ownership Leased
Owner Sutro Tower Inc
Site N/A
Is the existing transmission line shared with another station or stations? Yes
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer Dielectric
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 1
Length 950 feet per run

Facility ID's and Call Signs of all stations with whom the transmission line is shared.

Facility ID Call Sign
35500 KQED
43095 KMTP-TV
58912 kpjk

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Retune Existing Line

Retune line, Install additional components and test as necessary for new CH.

Auxiliary Transmission Line

Back to Top

Add Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Utilize Existing
Use Auxiliary (Backup)
Description of Use Aux Backup
Ownership Leased
Owner Sutro Tower Inc
Site N/A
Is this transmission currently shared with any other stations? Yes
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer Dielectric
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 1
Length 750 feet per run

Facility ID's and Call Signs of all stations with whom the transmission line is shared.

Facility ID Call Sign
58912 kpjk
35500 KQED
69619 KBCW
43095 KMTP-TV

Auxiliary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Retune Existing Line

Retune, install additional components and test lines for new channel

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? Candelabra
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1001289
Coordinates (NAD83) Latitude (NAD83) 37° 45' 19.0" N-
Longitude (NAD83) 122° 27' 10.0" W-
Overall Structure Height 976.69 feet
Support Structure Height 779.85 feet
Ground Elevation Above Mean Sea Level (AMSL) 833.98 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner SUTRO TOWER INC
Date Constructed 03/27/1998

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
43095 KMTP-TV DTV
51429 KFSF-DT DTV
35500 KQED DTV
35703 KTVU DTV
65526 KRON-TV DTV
54770 KNBR-FM FM
65484 KOSF FM
70032 KSOL FM
59964 KISQ FM
6380 KOIT FM
25452 KPIX-TV DTV
34470 KGO-TV DTV
69619 KBCW DTV

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for tower with candelabra
Tower Reinforcements Please select whether tower reinforcements are needed: No reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Candelabra
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Information not provided.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 700
Explanation Complex tower and transition require substantial coordination with vendors, governments, and other tenants on Sutro tower. Transmitter installation logistics and planning. 125hr rate
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements Yes
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Architectural Engineering: Transmission Space Alteration

Detailed site layout planning for installation of transmitter, trans lines, and other equipment, including calculation of resultant floor and ceiling loads. Includes preparation of 3D construction drawings for local permitting process.

Alternate Site Study

Engineering, antenna designs, architectural budgeting etc

Neighborhood RF Survey

Local RF Survey required by planning commision

Outside Consultant Expenses

Travel, Per Diem, Lodging etc for outside consultant on-site visits

Post Assignment Antenna Studies

Antenna design, application data, vertical sketches for structural eng, cost estimates

Schedule 387 quarterly reports

Legal fees for preparation and review of quarterly Schedule 387 progress reports

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning Yes
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Sales Tax

Sales tax on items pertaining to transmission lines, combiners , antennas and lines.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,680,886.56 $1,541,284.83 N/A $1,541,284.83 N/A
Total for all systems $3,814,605.84 $6,884,984.50 N/A $5,562,902.00 N/A
Primary Transmitter ULXTE-72 $1,680,886.56 $1,541,284.83 $1,541,284.83
Other Electrical Service: Install additional 400A service disconnect, LV transformer, Surge suppressor $62,125.28 $62,125.28 Increased 1/10/2020 to reflect actual quote for transmitter installation electrical from McClure Electric $62,125.28 N/A
3" Rigid Conduit and Wiring (Cost per foot) $8,060.00 $49,507.00 McClure Electric Actual Cost Item #3 $49,507.00 N/A
Switchgear - industrial 800 amp $38,200.00 $13,547.00 McClure Electric Actual Cost of Item #2 $13,547.00 N/A
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW $1,473,000.00 $1,316,604.27 increased Jan 10 2020 to match final invoice, which included actual freight that exceeded the budget estimate $1,316,604.27 N/A
Transmitter Cooling Installation $99,107.00 $99,107.00 Estimate is based on actual invoice. Increased 5/19/2020 by 1,075 for glycol containment pans invoice $99,107.00 N/A
Misc parts and supplies $394.28 $394.28 Actual costs of small parts and supplies used for electrical and HVAC related to transmitter installation $394.28 N/A

Components

Actual Information Description File Name
Other Electrical Service: Install additional 400A service disconnect, LV transformer, Surge suppressor

Component Description:
Down payment of 33% of item C (Electrical) for GatesAir Transmitter, per Quote Q-78277
Amount:
$3,344.49

Component Description:
Transmitter Electrical: 90% progress payment
Amount:
$39,048.00

Component Description:
Final payment of balance of item C (Electrical) for GatesAir Transmitter, per Quote Q-78277, incl sales tax
Amount:
$4,307.30

Component Description:
2nd payment of 33% of item C (Electrical) for GatesAir Transmitter, per Quote Q-78277
Amount:
$3,344.49

Component Description:
Install new transformer and associated breaker
Amount:
$7,743.00

Component Description:
Transmitter Electrical: 10% final payment
Amount:
$4,338.00
3" Rigid Conduit and Wiring (Cost per foot)

Component Description:
Install three 3" feeder conduits and wiring and one ground conduit
Amount:
$49,507.00
Switchgear - industrial 800 amp

Component Description:
Install new 700 amp main breaker and distribution panel
Amount:
$13,547.00
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW

Component Description:
Final payment. Services and Freight
Amount:
$146,963.62

Component Description:
Down payment of 33% of items A, B, D and E on Quote Q-78277 for GatesAir Transmitter
Amount:
$376,615.76

Component Description:
2nd payment of 33% of items A, B, D and E on Quote Q-78277 plus ChgOrder Q-80294 for GatesAir Transmitter
Amount:
$382,915.23

Component Description:
3rd Transmitter Invoice (final bill for hardware)
Amount:
$410,109.66
Transmitter Cooling Installation

Component Description:
Steel containment pans installed underneath new transmitter glycol cooling pumps
Amount:
$1,075.00

Component Description:
Transmitter Cooling System Installation
Amount:
$98,032.00
Misc parts and supplies

Component Description:
Small parts and supplies purchased by KCNS employee for electrical and HVAC installation of new transmitter
Amount:
$394.28

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $324,231.50 $350,497.50 N/A $337,798.83 N/A
Total for all systems $3,814,605.84 $6,884,984.50 N/A $5,562,902.00 N/A
Primary Antenna TUM20-C5SP-14/60H-2_R-T $204,827.00 $238,096.00 $231,637.76
Combiner HVAC Upgrade $113,897.00 $113,897.00 See explanation and quotation included with Sutro Invoice 9115 $113,897.00 N/A
New combiner, cost per channel (without antenna) $84,200.00 $117,959.00 Cost updated per supporting documentation uploaded in SutroTower.CostEstimateUpdates.2021.07.14 Previous estimate of 140,553.00 from 2.26.20 $117,740.76 N/A
Sweep test of existing antenna $6,730.00 $6,240.00 N/A N/A N/A
Auxiliary Antenna TUA-C4SP-12/40U-1-S $119,404.50 $112,401.50 $106,161.07
Combiner HVAC Upgrade $28,474.50 $28,474.50 See explanation and quotation included with Sutro Invoice 9115 $28,474.50 N/A
New combiner, cost per channel (without antenna) $84,200.00 $77,687.00 Cost updated per supporting documentation uploaded in SutroTower.CostEstimate 7.14.2021 estimate is 76570 plus extra $1,117.48 for Combiner Upper Aux 27‐29‐3= $77,687 $77,686.57 N/A
Sweep test of existing antenna $6,730.00 $6,240.00 N/A N/A N/A

Components

Actual Information Description File Name
Combiner HVAC Upgrade

Component Description:
30% progress billing - combiner HVAC
Amount:
$34,169.10

Component Description:
94A Upgrade HVAC
Amount:
$11,389.70

Component Description:
60% progress billing - combiner HVAC
Amount:
$68,338.20
New combiner, cost per channel (without antenna)

Component Description:
New Combiner for shared primary antenna system
Amount:
$12,658.79

Component Description:
Preliminary TL parts list, reconfiguration of combiners
Amount:
$2,463.10

Component Description:
New Combiner for shared primary antenna system
Amount:
$12,897.61

Component Description:
New Combiner for shared primary antenna system
Amount:
$2,868.75

Component Description:
New Combiner for shared primary antenna system
Amount:
$11,300.63

Component Description:
New Combiner for shared primary antenna system
Amount:
$67,566.79

Component Description:
Preliminary TL parts list, reconfiguration of combiners. See cover letter for explanation of why request is $217.50 lower than invoice
Amount:
$4,024.41

Component Description:
New Combiner for shared primary antenna system
Amount:
$2,274.09

Component Description:
New Combiner for shared primary antenna system
Amount:
$1,686.59
Sweep test of existing antenna Information not provided.
Combiner HVAC Upgrade

Component Description:
30% progress billing - combiner HVAC
Amount:
$8,542.35

Component Description:
60% progress billing - Combiner HVAC
Amount:
$17,084.70

Component Description:
107A Upgrade
Amount:
$2,847.45
New combiner, cost per channel (without antenna)

Component Description:
Combiner Install
Amount:
$240.00

Component Description:
Allocation of the share for the Sutro Invoice as explained in cover letter item 6 and reflected on Line #109 in the Repacking Invoice Detail & Share cost.
Amount:
$7,859.60

Component Description:
New Combiner for shared auxiliary antenna system
Amount:
$268.63

Component Description:
Allocation of the share for the Sutro Invoice as explained in cover letter item 7 and reflected on Line # 110 in the Repacking Invoice Detail & Share cost.
Amount:
$2,721.25

Component Description:
New Combiner for shared auxiliary antenna system
Amount:
$5,063.69

Component Description:
New combiner for shared auxiliary antenna system
Amount:
$6,446.32

Component Description:
New combiner for shared auxiliary antenna system
Amount:
$42,403.38

Component Description:
Allocation of the share for the Sutro Invoice as explained in cover letter item 8 and reflected on Line # 115 in the Repacking Invoice Detail & Share cost.
Amount:
$1,185.12

Component Description:
Combiner Upper Aux 272931
Amount:
$1,117.48

Component Description:
New Combiner for shared auxiliary antenna system
Amount:
$8,453.69

Component Description:
New Combiner for shared auxiliary antenna system
Amount:
$1,927.41
Sweep test of existing antenna Information not provided.

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $341,222.00 $341,222.00 N/A $341,217.78 N/A
Total for all systems $3,814,605.84 $6,884,984.50 N/A $5,562,902.00 N/A
Primary Transmission Line $289,742.00 $289,742.00 $289,740.79
Retune Existing Line $289,742.00 $289,742.00 Cost updated (lowered) per supporting documentation uploaded in SutroTower.CostEstimateUpdates.2020.07.14.pdf. Previous estimate 2.20 $358096.00 $289,740.79 N/A
Auxiliary Transmission Line $51,480.00 $51,480.00 $51,476.99
Retune Existing Line $51,480.00 $51,480.00 Cost updated (lowered) per supporting documentation uploaded in SutroTower.CostEstimateUpdates.2021.07.14.pdf. Previous estimate from 2.2021 $107931.00 $51,476.99 N/A

Components

Actual Information Description File Name
Retune Existing Line

Component Description:
Retune Primary Transmission Lines
Amount:
$20,712.38

Component Description:
Retune Primary Transmission Line
Amount:
$83,135.87

Component Description:
Retune 2 6 inch lines
Amount:
$3,988.75

Component Description:
Retune Primary Transmission Lines
Amount:
$49,559.00

Component Description:
Retune Primary Transmission Lines
Amount:
$28,884.55

Component Description:
Retune Primary Transmission Line
Amount:
$397.68

Component Description:
Retune Primary Transmission Line
Amount:
$4,678.47

Component Description:
Line item 93 on Sutro invoice
Amount:
$8,778.64

Component Description:
Retune Primary Transmission Line
Amount:
$12,839.50

Component Description:
Retune Primary Transmission Line
Amount:
$18,850.28

Component Description:
Retune Primary Transmission Line
Amount:
$2,387.56

Component Description:
scaffold
Amount:
$933.50

Component Description:
Retune Primary Transmission Line
Amount:
$4,015.00

Component Description:
Retune Primary Transmission LIne
Amount:
$2,284.81

Component Description:
Retune Primary Transmission Lines
Amount:
$33,080.40

Component Description:
Retune 2 6 inch lines
Amount:
$11,340.00

Component Description:
Retune Transmission Line
Amount:
$3,874.40
Retune Existing Line

Component Description:
Allocation of the share for the Sutro Invoice as explained in cover letter item 9 and reflected on Line #116 in the Repacking Invoice Detail & Share cost.
Amount:
$710.87

Component Description:
Retune Auxiliary Transmission Line
Amount:
$200.00

Component Description:
Retune Auxiliary Transmission Line
Amount:
$1,069.84

Component Description:
Retune Transmission Line
Amount:
$14,133.40

Component Description:
scaffold
Amount:
$466.75

Component Description:
Retune Auxiliary Transmission Line
Amount:
$5,052.98

Component Description:
Retune Auxiliary Transmission Line
Amount:
$500.00

Component Description:
Retune auxililary transmission line
Amount:
$1,542.26

Component Description:
Retune auxililary transmission line
Amount:
$2,110.85

Component Description:
Retune Auxiliary Transmission Line
Amount:
$9,174.30

Component Description:
Retune Auxiliary Transmission Line
Amount:
$695.85

Component Description:
Retune auxililary transmission line
Amount:
$833.25

Component Description:
Retune auxililary transmission line
Amount:
$9,301.27

Component Description:
Retune auxililary transmission line
Amount:
$1,570.12

Component Description:
Retune Auxiliary Transmission Line
Amount:
$4,115.25

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $441,000.00 $3,386,127.63 N/A $2,243,026.62 N/A
Total for all systems $3,814,605.84 $6,884,984.50 N/A $5,562,902.00 N/A
Primary Tower TOWER $441,000.00 $3,386,127.63 $2,243,026.62
Structural engineering tower load study for a documented tower with candelabra $20,000.00 $21,781.63 updated Sutro Estimate 7.14.2021 $20,706.63 N/A
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $3,364,346.00 Cost updated per supporting documentation uploaded in SutroTower 07 1421 Overall FCC Criteria Cost Analysis. increase $2,222,319.99 N/A

Components

Actual Information Description File Name
Structural engineering tower load study for a documented tower with candelabra

Component Description:
Tower Mapping
Amount:
$3,081.56

Component Description:
Tower Mapping
Amount:
$268.66

Component Description:
Tower Mapping
Amount:
$4,329.35

Component Description:
Tower Mapping
Amount:
$1,481.09

Component Description:
Tower Mapping
Amount:
$118.82

Component Description:
Tower Mapping
Amount:
$1,416.66

Component Description:
Tower Mapping
Amount:
$152.41

Component Description:
Tower Mapping
Amount:
$113.66

Component Description:
Tower Mapping
Amount:
$2,670.83

Component Description:
Tower Mapping
Amount:
$4,184.71

Component Description:
Tower Mapping
Amount:
$2,888.88
Complex Tower (includes, for example, those with candelabras and/or stacked antennas)

Component Description:
Architectural Plans, Building Mapping, TL locations, hole locations,outdoor cooling equipment location, plan submissions
Amount:
$340.56

Component Description:
59 D Structural Reinforcing Ground to Level 6
Amount:
$15,429.70

Component Description:
line item 59 D Sutro invoice Structural reinforcing ground to level 6 --Shop drawings, new steel, labor, rigging plan, project management, insurance--Serious modifications-2019 CBC Code Changes
Amount:
$11,626.07

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$8,184.93

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$2,091.66

Component Description:
VSWR Monitoring Tower Worker Antenna Lockout Replaces Symphony
Amount:
$2,298.85

Component Description:
Structural reinforcing ground to level 6
Amount:
$48,686.47

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$55,395.09

Component Description:
VSWR Monitoring, Tower Worker Antenna Lookout
Amount:
$2,204.55

Component Description:
59D Structural reinforcing Ground to Level 6 - Shop Drawings, new steel, labor rigging plan, project management, insurance Total Tower - 2019 CBC Code Changes
Amount:
$118,412.64

Component Description:
Structural reinforcing Ground to Level 6
Amount:
$60.00

Component Description:
Structural Reinforcement Level 6 and above
Amount:
$18,421.87

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$83.99

Component Description:
Architectural Plans, Building Mapping, TL locations, hole locations, outdoor cooling equipment location, plan submissions
Amount:
$854.73

Component Description:
line item 54 A sutro invoice As built drawings
Amount:
$77.82

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$901.71

Component Description:
Allocation of the share for the Sutro Invoice as explained in cover letter item 5 and reflected on Line #59A in the Repacking Invoice Detail & Share cost.
Amount:
$14,532.97

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$579.42

Component Description:
line item 59 A Sutro invoice. Structural reinforcing Level 6 and above--Shop drawings, new steel, labor, rigging plan, project management, insurance--Serious modifications--2019 CBC Code Changes
Amount:
$211.75

Component Description:
Structural Reinforcement Level 6 and above
Amount:
$21,666.49

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$8,763.09

Component Description:
Structural reinforcing Ground to Level 6
Amount:
$97,054.28

Component Description:
VSWR Monitoring, Tower Worker Antenna Lookout
Amount:
$2,077.69

Component Description:
Sutro invoice 59D Structural reinforcing Ground to L evel 6Shop drawings new steel labor rigging plan project management, insuranceTotal Tower2019 CBC Code Changes
Amount:
$12,519.66

Component Description:
59D Structural Reinforcing Ground to Level 6
Amount:
$8,082.06

Component Description:
VSWR Monitoring,Tower Worker Antenna Lockout, ReplacesSymphony
Amount:
$800.56

Component Description:
VSWR Monitoring Tower Worker Antenna Lockout Replaces Symphony
Amount:
$833.13

Component Description:
Architectural Plans, Building Mapping, TL locations, hole locations, outdoor cooling equipment location, plan submissions
Amount:
$10,067.49

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$20,420.87

Component Description:
Structural reinforcing ground to level 6
Amount:
$18,821.83

Component Description:
Structural reinforcing Ground to Level 6
Amount:
$2,317.42

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$4,183.54

Component Description:
Architectural Plans, Building Mapping, TL locations, hole locations,outdoor cooling equipment location, plan submissions
Amount:
$6,107.75

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$34,714.49

Component Description:
Structural Reinforcement Level 6 and above
Amount:
$139.88

Component Description:
VSWR Monitoring
Amount:
$515.99

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$11,567.52

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$12,508.06

Component Description:
Architectural Plans, Building Mapping, TL locations, hole locations, outdoor cooling equipment location, plan submissions
Amount:
$8,439.89

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$1,762.03

Component Description:
Structural Reinforcing Level 6 and above
Amount:
$77.14

Component Description:
Architectural Plans, Building Mapping, TL locations, hole locations,outdoor cooling equipment location, plan submissions
Amount:
$561.64

Component Description:
59D Structural reinforcing Ground to Level 6
Amount:
$12,341.34

Component Description:
Structural Reinforcement Level 6 and above
Amount:
$468.57

Component Description:
Structural Reinforcement Level 6 and above
Amount:
$139.88

Component Description:
Architectural Plans, Building Mapping, TL locations, hole locations, outdoor cooling equipment location, plan submissions
Amount:
$1,744.63

Component Description:
59D Structural reinforcing Ground to Level 6
Amount:
$23,812.74

Component Description:
59D structural reinforcing Ground to level 6
Amount:
$14,259.84

Component Description:
as built drawing
Amount:
$2,733.71

Component Description:
Structural Reinforcement Level 6 and above
Amount:
$35,421.06

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$582.85

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$2,937.55

Component Description:
Structural Reinforcement Level 6 and above
Amount:
$20,247.33

Component Description:
Structural Reinforcement Ground to Level 6
Amount:
$171.42

Component Description:
Architectural Plans, Building Mapping, TL locations, hole locations,outdoor cooling equipment location, plan submissions
Amount:
$612.05

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$9,726.80

Component Description:
Structural Reinforcement Level 6 and above
Amount:
$53,131.59

Component Description:
59D Sturctural reinforcing Ground Level 6 - Shop drawings, new steel, labor rigging plan, project management, insurance - Total Tower - 2019 CBC Code changes
Amount:
$20,147.87

Component Description:
Structural reinforcing Ground to Level 6
Amount:
$92,857.14

Component Description:
Structural Reinforcement Level 6 and above
Amount:
($5,784.95)

Component Description:
Structural Reinforcement Ground to Level 6
Amount:
$7,235.04

Component Description:
Structural Reinforcement Level 6 and above
Amount:
$4,670.19

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$15,562.30

Component Description:
Structural Reinforcement Level 6 and above
Amount:
$3,726.81

Component Description:
59D Structural reinforcing Ground to Level 6 - Shop Drawings, new steel, labor rigging plan, project management, insurance - Total Tower - 2019 CBC Code Changes
Amount:
$14,411.19

Component Description:
59D Structural reinforcing Ground to Level 6
Amount:
$85,714.28

Component Description:
Architectural Plans, Building Mapping, TL locations, hole locations,outdoor cooling equipment location, plan submissions
Amount:
$1,053.41

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$1,822.11

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$977.13

Component Description:
line item 131 sutro invoice VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$2,699.98

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$2,264.68

Component Description:
Allocation of the share for the Sutro Invoice as explained in cover letter item 3 and reflected on Line # 54A in the Repacking Invoice Detail & Share cost.
Amount:
$4,959.43

Component Description:
Allocation of the share for the Sutro Invoice as explained in cover letter item 1 and reflected on Line #59D in the Repacking Invoice Detail & Share cost.
Amount:
$80,769.13

Component Description:
Line item 131 sutro invoice VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$2,053.85

Component Description:
59 D Structural reinforcing Ground to level 6
Amount:
$64,233.38

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$10,092.46

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$4,852.14

Component Description:
Structural reinforcing Ground to Level 6
Amount:
$3,029.22

Component Description:
Structural Reinforcement Ground to Level 6
Amount:
$5,825.41

Component Description:
59D Structural reinforcing Ground to Level 6
Amount:
$38,867.16

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$9,057.92

Component Description:
line item 59 D Sutro invoice Structural reinforcing ground to level 6 -Shop drawings, new steel, labor, rigging plan, project management, insurance--Serious modifications--2019 CBC Code Changes
Amount:
$18,987.79

Component Description:
59D Structural reinforcing Ground to Le vel 6 Shop drawings, new steel, labor rigging p lan, project management, insurance Total Tower 2019 CBC Code Changes
Amount:
$143,876.27

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$19,035.80

Component Description:
Architectural Plans, Building Mapping, TL locations, hole locations,outdoor cooling equipment location, plan submissions
Amount:
$5,780.19

Component Description:
59D Structural reinforcing Ground to Level 6 - Shop Drawings, new steel, labor rigging plan, project management, insurance - Total Tower - 2019CBC Code Changes
Amount:
$30,532.24

Component Description:
59D Structural reinforcing Ground to Level 6S
Amount:
$85,714.28

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$16,361.63

Component Description:
59D Structural reinforcing Ground to Level 6
Amount:
$14,952.07

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$805.71

Component Description:
VSWR Monitoring
Amount:
$274.28

Component Description:
59D Structural Reinforcing Ground to Level 6 - Shop drawings, new steel, labor rigging plan, project management, insurance - Total Tower - 2019 CBC Code Changes
Amount:
$49,870.93

Component Description:
Credit Memo for line 131 VSWR Monitoring amounts have been mistakenly allocated to the broadcasters from Sutro inovice is too large uploaded in 7 different parts
Amount:
($39,949.08)

Component Description:
59D Structural reinforcing Ground to Level 6
Amount:
$15,368.82

Component Description:
Structural Reinforcement Level 6 and above
Amount:
$93.25

Component Description:
N/A
Amount:
N/A

Component Description:
59D Structural reinforcing Ground to Level 6-Shop drawings, new steel, labor rigging plan, project management, insurance-Total Tower-2019 CBC Code Changes
Amount:
$15,440.97

Component Description:
59d structural reinforcing
Amount:
$85,714.28

Component Description:
VSWR Monitoring tower worker antenna.
Amount:
$846.85

Component Description:
VSWR Monitoring Tower Worker Antenna Lockout
Amount:
$3,248.56

Component Description:
Architectural Plans, Building Mapping, TL locations, hole locations,outdoor cooling equipment location, plan submissions
Amount:
$1,332.28

Component Description:
As Built Drawings
Amount:
$1,442.40

Component Description:
Structural Reinforcing Level 6 and above
Amount:
($1,976.28)

Component Description:
VSWR Monitoring
Amount:
$1,167.42

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$4,241.86

Component Description:
Architectural Plans, Building Mapping, TL locations, hole locations,outdoor cooling equipment location, plan submissions
Amount:
$1,038.80

Component Description:
59D Structural reinforcing Ground to Level 6
Amount:
$31,432.68

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replace Symphony
Amount:
$632.57

Component Description:
59D Structural reinforcing Ground to Level 6
Amount:
$14,647.39

Component Description:
Structural Reinforcement Ground to Level 6
Amount:
$64.28

Component Description:
Structural Reinforcement Ground to Level 6
Amount:
$37,272.17

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$1,569.09

Component Description:
Structural Reinforcement Ground to Level 6
Amount:
$5,480.07

Component Description:
Structural Reinforcement Level 6 and above
Amount:
$20,247.33

Component Description:
Structural Reinforcement Ground to Level 6
Amount:
$185,714.28

Component Description:
VSWR monitoring
Amount:
$404.56

Component Description:
59D Structural Work
Amount:
$59,096.41

Component Description:
Architectural Plans, Building Mapping, TL locations, hole locations, outdoor cooling equipment location, plan submissions
Amount:
$10,460.43

Component Description:
Structural Reinforcement Level 6 and above
Amount:
$5,237.02

Component Description:
59D Structural reinforcing Ground to Level 6 - Shop drawings, new steel, labor rigging, plan, project management, insurance - Total Tower - 2019 CBC Code Changes
Amount:
$29,000.51

Component Description:
Structural Reinforcement Level 6 and above
Amount:
$34,240.25

Component Description:
As Built Drawings
Amount:
$1,705.88

Component Description:
Allocation of the share for the Sutro Invoice as explained in cover letter item 14 and reflected on Line # 131 in the Repacking Invoice Detail & Share cost.
Amount:
$9,563.50

Component Description:
VSWR Monitoring Tower Worker Antenna Lockout Replaces Symphony
Amount:
$757.70

Component Description:
Architectural Plans, Building Mapping, TL locations, hole locations,outdoor cooling equipment location, plan submissions
Amount:
$471.91

Component Description:
Architectural Plans, Building Mapping, TL locations, hole locations, outdoor cooling equipment location, plan submissions
Amount:
$7,103.48

Component Description:
Structural reinforcing ground to level 6
Amount:
$20,943.18

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$1,960.00

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$1,464.16

Component Description:
Architectural Plans, Building Mapping, TL locations, hole locations, outdoor cooling equipment location, plan submissions
Amount:
$249.21

Component Description:
Architectural Plans, Building Mapping, TL locations, hole locations, outdoor cooling equipment location, plan submissions
Amount:
$2,285.23

Component Description:
VSWR Monitoring, Tower Worker Antenna Lockout, Replaces Symphony
Amount:
$4,005.14

Component Description:
As-Built Drawings
Amount:
$1,522.23

Component Description:
59D Structural reinforcing Ground Level 6, Shop drawings, new steel, labor rigging plan, project management, insurance - Total Tower - 2019 CBC Code Changes
Amount:
$22,525.44

Component Description:
Structural reinforcing Ground to Level 6
Amount:
$42.85

Component Description:
as built drawings
Amount:
$4,100.55

Component Description:
Structural Reinforcement Level 6 and above
Amount:
$93.25

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $413,331.78 $648,272.54 N/A $523,407.43 N/A
Total for all systems $3,814,605.84 $6,884,984.50 N/A $5,562,902.00 N/A
Outside Professional Services $413,331.78 $648,272.54 $523,407.43
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $200,000.00 Complex tower situation requires extensive legal work with tower company (Sutro Tower Inc.) Revised estimate as of May 2022 upwards to $200,000 $170,183.51 Attorney Fees for the negotiation of lease is grater than expected for the repack project. Town of San Francisco has included additional requirements to the project that have required legal advice. New estimate as of January 2022 is $120,000
Schedule 387 quarterly reports $3,125.00 $3,125.00 $312.50 per quarter (1/2 hour legal time) times 10 quarters to end of Phase 8 $125.00 N/A
Post Assignment Antenna Studies $10,000.00 $10,000.00 Required by Sutro Tower Inc. Very complex system.budget updated 7.14.2021 $5,099.14 N/A
Neighborhood RF Survey $5,714.00 $5,714.00 Required by local planning board, estimate updated 7.14.2021 $5,407.13 N/A
Alternate Site Study $77,607.78 $77,607.78 Required by Sutro Tower Inc. Very complex system. Updated with actual final cost per Sutro Tower Inc invoice 7960 (attached) $77,607.78 Actual costs higher than original estimate because of cost of obtaining an option to procure an alternate site for repack facilities in the event San Francisco permitting for Sutro Tower modifications is not successful
Architectural Engineering: Transmission Space Alteration $54,500.00 $54,500.00 Tower landlord requires detailed engineering of alterations required for installation of transmitter and associated electrical, plumbing, etc. including calculations of floor and ceiling loading and 3D construction drawings suitable for use in permitting. $45,892.88 N/A
RF Exposure Measurements $21,050.00 $7,844.29 N/A $0.00 N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $7,743.00 Cost updated (lowered) per supporting documentation uploaded in SutroTower.CostEstimateUpdates.2021.07.14 Previous estimate 2.2020 $64286.00 $7,742.85 N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A $576.50 N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A $2,029.00 N/A
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application $4,210.00 $4,000.00 N/A $1,321.55 N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A $3,107.28 N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,750.00 N/A $1,750.00 N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application $2,105.00 $2,000.00 N/A $1,750.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $0.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $24,570.00 KCNS Share. Very complex situation at Mt. Sutro. Requires extensive outside work using prime contractor Sutro Tower Inc. See Sutro Cost Estimate attachment. updated 7.14.2021 $24,481.63 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A
Prepare and or review reimbursement form $2,630.00 $4,742.00 actual invoices received $4,742.00 N/A
Project management of the transition $110,600.00 $221,706.47 Cost updated per supporting documentation uploaded in Sutro Tower Repack Estimate Package 7.14.2021, PLUS $10,277.47 for non-Sutro project management costs to-date (Widelity, Wiley Rein and NRJ TV VI) $171,591.18 Extra work required at the tower
Outside Consultant Expenses $3,720.00 $3,720.00 Project Manager on-site expenses. N/A N/A

Components

Actual Information Description File Name
Attorney Fees - Negotiation of lease and other matters for shared locations

Component Description:
Attorney Fees - Negotiation of lease and other matters for shared locations.
Amount:
$1,396.22

Component Description:
Legal Fees-Multi-Station Project Control
Amount:
$367.17

Component Description:
Legal Fees- Multi-Station Project Control
Amount:
$934.48

Component Description:
Attorneys fees for the period June 1 to June 30 to advise KCNS on reviews, conference calls, and preparation of analyses for shared locations.
Amount:
$6,585.20

Component Description:
Attorney Fees - Negotiation of lease and other matters for shared locations.
Amount:
$978.50

Component Description:
Attorneys fees for the period of April 1 to April 30 - Negotiation of lease and other matters for shared locations.
Amount:
$9,111.40

Component Description:
Legal Fees - Multi-Station Project Control
Amount:
$143.31

Component Description:
Legal Fees - Multi-Station Project Ctrl
Amount:
$217.68

Component Description:
Legal fees multistation
Amount:
$210.96

Component Description:
Legal fees multi project
Amount:
$63.31

Component Description:
Legal Fees - Multi-Station Project Control
Amount:
$367.24

Component Description:
Legal fees
Amount:
$332.50

Component Description:
Legal Fees - Multi-Station Project Control
Amount:
$2,281.73

Component Description:
Attorney Fees - Negotiation of lease and other matters for shared locations
Amount:
$1,201.07

Component Description:
Legal Fees
Amount:
$1,339.50

Component Description:
Legal Fees - Multi-Station Project Control
Amount:
$1,073.22

Component Description:
legal fees
Amount:
$1,759.26

Component Description:
Attorney Fees - Negotiation of lease and other matters for shared locations
Amount:
$590.35

Component Description:
Legal Fees - Multi-Station Project Control
Amount:
$551.47

Component Description:
Legal expenses
Amount:
$1,177.45

Component Description:
Mt. Sutro Repack Reimbursement
Amount:
$8,400.60

Component Description:
Mt. Sutro Repack Reimbursement
Amount:
$12,324.40

Component Description:
Legal Fees - Multi-Station Project Control
Amount:
$280.04

Component Description:
Legal Fees
Amount:
$3,754.79

Component Description:
KCNS Mr. Sutro Repack Reimbursement
Amount:
$25,463.80

Component Description:
Legal Fees
Amount:
$115.62

Component Description:
Legal Fees - Multi-Station Project Control
Amount:
$238.05

Component Description:
Legal Fees multi station
Amount:
$44.35

Component Description:
Legal
Amount:
$407.95

Component Description:
Legal Fees - Multi-Station Project Control
Amount:
$1,519.20

Component Description:
Legal Fees-Multi-Station Project Control
Amount:
$655.57

Component Description:
Attorney Fees - Negotiation of lease and other matters for shared locations
Amount:
$1,723.50

Component Description:
Legal Fees - Multi-Station Project Control
Amount:
$1,276.56

Component Description:
Legal Fees
Amount:
$744.66

Component Description:
Coordination of joint repacking project at Sutro site
Amount:
$968.50

Component Description:
Legal Fees - Multi-station Project Control
Amount:
$3,002.27

Component Description:
Legal Fees - Multi-Station Project Control
Amount:
$274.07

Component Description:
Legal Fees - Multi-Station Project Control
Amount:
$100.54

Component Description:
Attorney fees for the period of January 1 through January 31 - Negotiation of lease and other matters for shared locations
Amount:
$11,163.00

Component Description:
Legal Fees - Multi-Station Project Control
Amount:
$1,260.24

Component Description:
Attorney fees performed for the period of May 1 to May 31, 2022 to advise KCNS on reviews, conference calls and preparation of analyses for shared locations.
Amount:
$5,125.80

Component Description:
Legal Fees
Amount:
$1,347.64

Component Description:
Legal Fees - Multi-Station Project Control
Amount:
($2,547.67)

Component Description:
Legal fees multi station
Amount:
$541.36

Component Description:
Legal Fees - Multi-Station Project Control
Amount:
$283.49

Component Description:
Legal fees multi stations
Amount:
$1,963.57

Component Description:
Legal Fees-Multi-Station Project Control
Amount:
$44.78

Component Description:
Legal Fees - Multi-Station Project Control
Amount:
$1,587.60

Component Description:
Legal Fees - Multi-Station Project Control
Amount:
$509.43

Component Description:
Attorney Fees - for the period of February 1 through February 28, 2022 - Negotiation of lease and other matters for shared locations.
Amount:
$17,147.00

Component Description:
Removing this from the 399. See cover letter.
Amount:
N/A

Component Description:
Attorney Fees for the period of March 1 to March 31 - Negotiation of lease and other matters for shared locations.
Amount:
$8,648.80

Component Description:
Attorney Fees - Negotiation of lease and other matters for shared locations
Amount:
$1,793.86

Component Description:
Legal Fees - Multi-Station Project Control
Amount:
$148.20

Component Description:
Legal Fees - Multi-Station Project Control
Amount:
$2,001.96

Component Description:
Legal Fees - Multi-Station Project Control
Amount:
$435.33

Component Description:
Legal Fees - Multi-Station Project Control
Amount:
$537.93

Component Description:
Legal Fees-Multi-Station Project Control
Amount:
$12,651.89

Component Description:
KCNS Mt. Sutro Repack Reimbursement
Amount:
$8,512.20

Component Description:
Legal Fees-Multi-Station Project Control
Amount:
$214.97

Component Description:
Legal Fees - Multi-Station Project Control
Amount:
$4,201.44

Component Description:
Legal Fees - Multi-Station Project Control
Amount:
$634.20
Schedule 387 quarterly reports

Component Description:
0.2 hrs at $625 to review quarterly 387 report
Amount:
$125.00
Post Assignment Antenna Studies

Component Description:
Post Assignment Antenna Studies--antenna design, application data, vertical sketches for structural engineering, cost estimates
Amount:
$91.66

Component Description:
RF Eng - Post Assignment Antenna Studies
Amount:
$570.83

Component Description:
Post Assignment Antenna Studies
Amount:
$233.33

Component Description:
Post AssignmentAntenna Studies--antenna design,application data, verticalsketches for structural engineering, costestimates
Amount:
$3,890.83

Component Description:
Post Assignment Antenna Studies--antenna design, application data, vertical sketches for structural engineering, cost estimates
Amount:
$62.50

Component Description:
Removed component per revised invoices from Sutro; this cost was reallocated to other stations at Sutro
Amount:
N/A

Component Description:
Post Assignment Antenna Studies--antenna design, application data, vertical sketches for structural engineering, cost estimates
Amount:
$20.83

Component Description:
Post Assignment Antenna Studies--antenna design, application data, vertical sketches for structural engineering, cost estimates
Amount:
$229.16
Neighborhood RF Survey

Component Description:
Neighborhood RF Survey
Amount:
$1,178.57

Component Description:
Neighborhood RF Survey
Amount:
$471.42

Component Description:
Neighborhood RF Survey for planning Commission
Amount:
$357.14

Component Description:
Neighborhood RF survey
Amount:
$3,400.00
Alternate Site Study

Component Description:
Alternate Site Study--engineering, antenna designs, architectural ,budgeting, etc.
Amount:
$44,903.11

Component Description:
Alternate Site Study--engineering, antenna designs, architectural, budgeting, etc.
Amount:
$5,849.86

Component Description:
Alternate Site Study--engineering, antenna designs, architectural, budgeting, etc.
Amount:
$7,882.05

Component Description:
Alternate Site Study--engineering, antenna designs, architectural ,budgeting, etc.
Amount:
$12,916.66

Component Description:
Alternate Site Study--engineering, antenna designs, architectural, budgeting, etc.
Amount:
$6,056.10
Architectural Engineering: Transmission Space Alteration

Component Description:
Architectural engineering services for alteration of existing space to accommodate new transmission equipment
Amount:
$2,784.00

Component Description:
Architectural engineering services for alteration of existing space to accommodate new transmission equipment
Amount:
$4,628.50

Component Description:
Architectural engineering services for alteration of existing space to accommodate new transmission equipment
Amount:
$15,135.11

Component Description:
Architectural engineering services for alteration of existing space to accommodate new transmission equipment
Amount:
$9,282.00

Component Description:
Architectural engineering services for alteration of existing space to accommodate new transmission equipment
Amount:
$4,182.60

Component Description:
Architectural engineering services for alteration of existing space to accommodate new transmission equipment
Amount:
$356.00

Component Description:
Architectural engineering services for alteration of existing space to accommodate new transmission equipment
Amount:
$3,378.00

Component Description:
Architectural engineering services for alteration of existing space to accommodate new transmission equipment
Amount:
$701.27

Component Description:
Architectural engineering services for alteration of existing space to accommodate new transmission equipment
Amount:
$3,143.00

Component Description:
Architectural engineering services for alteration of existing space to accommodate new transmission equipment
Amount:
$1,946.40

Component Description:
Architectural engineering services for alteration of existing space to accommodate new transmission equipment
Amount:
$356.00
RF Exposure Measurements Information not provided.
Comprehensive coverage verification via field study, if needed

Component Description:
field strength studies
Amount:
$7,742.85
Attorney Fees - Prepare and File request for Special Temporary Authorization

Component Description:
Filing Fees - Prepare and File Request for special temporary authorization - FCC Temporary authority - New - CH - Susan Anderson
Amount:
$270.00

Component Description:
Attorney Fees for STA filing
Amount:
$306.50
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application

Component Description:
This reimbursable amount belongs to the category: Attorney Fees Prepare and File FCC Form 2100 (main), License to Cover Application. Invoice items are broken down by category in the cover letter.
Amount:
$2,029.00
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application

Component Description:
Professional Services
Amount:
$759.00

Component Description:
Part of this invoice follow under the category Attorney FeesAux Antenna, Prepare and File FCC Form 2100 Construction Permit or License Application. The remaining amount belongs to different categories.See cover letter for detailed breakdown
Amount:
$562.55
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
This reimbursable amount belongs to the category: Attorney Fees Prepare and File FCC Form 2100 (main), Construction Permit. Invoice items are broken down by category in the cover letter.
Amount:
$2,169.78

Component Description:
Legal fees for initial post-auction CP application
Amount:
$375.00

Component Description:
0.9 hrs at $625 Legal for initial post-auction CP application
Amount:
$562.50
Prepare request for Special Temporary Authorization

Component Description:
Prepare STA for Interim Facility
Amount:
$1,750.00
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application

Component Description:
Prep of engineering portion of KCNS-DT FCC App for Construction Permit for auxiliary facility
Amount:
$1,750.00
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application Information not provided.
Perform engineering study for new channel assignment and antenna development

Component Description:
Preliminary Repacking Study-- engineering,studies, antenna designs,budgeting, architectural, etc.
Amount:
$24,481.63
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Prepare and or review reimbursement form

Component Description:
0.8 hrs at $625 legal fees to assist with 399 reimbursement form
Amount:
$500.00

Component Description:
Prepare and or review reimbursement forms
Amount:
$1,742.00

Component Description:
Form 399 Preparation
Amount:
$2,500.00
Project management of the transition

Component Description:
Project management of transition
Amount:
$303.74

Component Description:
Project Management
Amount:
$8,053.96

Component Description:
Project Management
Amount:
$938.74

Component Description:
Project Management
Amount:
$759.37

Component Description:
Project Mng
Amount:
$312.31

Component Description:
Assistance with management of Sutro-related reimbursement issues (increased costs and delayed timing)
Amount:
$412.50

Component Description:
Project Management for the transition.
Amount:
$458.74

Component Description:
Project Management
Amount:
$316.06

Component Description:
Project Management of the transition
Amount:
$405.71

Component Description:
Project Management
Amount:
$812.07

Component Description:
Project Management
Amount:
$1,032.50

Component Description:
Project Management
Amount:
$146.87

Component Description:
Project Mng line item 129
Amount:
$2,613.56

Component Description:
Project Mng line item 129 Sutro invoice
Amount:
$4,984.55

Component Description:
Project Management
Amount:
$4,280.68

Component Description:
Allocation of the share for the Sutro Invoice as explained in cover letter item 13 and reflected on Line #129 in the Repacking Invoice Detail & Share cost.
Amount:
$5,868.42

Component Description:
Project Management
Amount:
$956.25

Component Description:
Project Management
Amount:
$2,051.38

Component Description:
Project Management
Amount:
$6,651.00

Component Description:
Project Management
Amount:
$738.22

Component Description:
pm
Amount:
$6,539.90

Component Description:
Project Management
Amount:
$944.58

Component Description:
Project Management
Amount:
$583.33

Component Description:
project management
Amount:
$8,851.93

Component Description:
Project Management
Amount:
$1,709.37

Component Description:
Project Management
Amount:
$125.00

Component Description:
pm
Amount:
$287.31

Component Description:
Project Management
Amount:
$1,188.75

Component Description:
Project Management
Amount:
$5,043.53

Component Description:
Project Management
Amount:
$1,183.92

Component Description:
Project Management
Amount:
$293.75

Component Description:
project mng
Amount:
$3,000.46

Component Description:
Project Management
Amount:
$6,321.74

Component Description:
pm (Revised invoice from Peter Eckman)
Amount:
$6,183.48

Component Description:
Project Management of the Transition
Amount:
$407.13

Component Description:
PM
Amount:
$666.07

Component Description:
Project Management
Amount:
$4,189.44

Component Description:
Project Management
Amount:
$4,248.72

Component Description:
Project Management
Amount:
$1,162.50

Component Description:
project management
Amount:
$317.13

Component Description:
Project Management
Amount:
$8,968.54

Component Description:
PM
Amount:
$389.28

Component Description:
Project Management
Amount:
$336.95

Component Description:
Project Management
Amount:
$7,344.78

Component Description:
Project Management
Amount:
($3,020.07)

Component Description:
Project Management
Amount:
$251.78

Component Description:
Project Management
Amount:
$1,203.74

Component Description:
Project Management
Amount:
$1,033.56

Component Description:
Project Management
Amount:
$2,885.90

Component Description:
Project Management
Amount:
$1,396.39

Component Description:
PM
Amount:
$6,291.66

Component Description:
Project Management
Amount:
$889.58

Component Description:
Project Management
Amount:
$5,450.00

Component Description:
Project Management
Amount:
$6,353.86

Component Description:
Project Management
Amount:
$5,329.08

Component Description:
Project Management
Amount:
$225.00

Component Description:
Project Management
Amount:
$4,799.88

Component Description:
PM
Amount:
$531.60

Component Description:
PM
Amount:
$332.49

Component Description:
Project management
Amount:
$6,851.97

Component Description:
Project Management of the Transition
Amount:
$608.21

Component Description:
Project Management
Amount:
$4,376.44

Component Description:
Project Management
Amount:
$3,344.92

Component Description:
Project Management
Amount:
$1,180.35

Component Description:
Project Management of the transition
Amount:
$512.14

Component Description:
Project Management
Amount:
$496.57

Component Description:
Project Management
Amount:
$7,881.91
Outside Consultant Expenses Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $613,934.00 $617,580.00 N/A $576,166.51 N/A
Total for all systems $3,814,605.84 $6,884,984.50 N/A $5,562,902.00 N/A
Other Expenses $613,934.00 $617,580.00 $576,166.51
Disposal Costs (for equipment and other waste, net of any salvage value) $156,419.00 $156,419.00 Increased demo cost of old transmitter. The Disposal costs include the removal service performed by Wadleigh for $110,362 plus theSutro disposal costs to date have exceeded the initial estime (equal $22,470.04) Updated estimate Sutro 7.14.2021 $46,057. $145,765.56 Incurred additional costs in the disposal of the old equipment increased estimated cost per Sutro budget 7.14.2021
Equipment Delivery and Handling Charges $165,314.00 $165,314.00 Complex site requires substantial handling equipment and charges. Updated Dec 23, 2019 per Sutro Estimate Revisions Aug 20 2019.Updated estimate 7.14.2021 $149,724.08 Increase in Cost- new Estimate total is $165,314
Sales Tax $16,546.00 $16,546.00 Updated Dec 23, 2019 per Sutro Estimate Revisions Aug 20 2019. See attachment KCNS.Sutro Estimate 7.14.2021 $14,297.99 N/A
MVPD Notification of Channel Change $5,000.00 $5,000.00 N/A $2,400.00 N/A
Develop and air announcement of upcoming channel change $500.00 $500.00 N/A N/A N/A
Equipment Storage $1,200.00 $1,200.00 Storage for KCNS only equipment N/A N/A
Local Zoning $255,765.00 $255,765.00 Super complex project requires extensive zoning work. KCNS portion. See Sutro Cost Estimate attachment 7.14.2021 $247,142.88 New Estimate Local Zoning $275,700
FCC Filing Fees - Special Temporary Authorization request $195.00 $200.00 actual fee charged by FCC $200.00 N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $4,670.00 The estimated cost was increased to cover the aux and the main license to cover fee and the sharing modification of permit. Revision 9.2.2020 $4,670.00 Please reference the updated cover letter 9.2.2020. The previous can be removed as it is partially duplicate of the invoice resubmitted.
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,070.00 N/A $1,070.00 N/A
DTV Medical Facility Notification $11,550.00 $10,896.00 N/A $10,896.00 N/A

Components

Actual Information Description File Name
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
Disposal Costs for equipment and other waste, net of any salvage value
Amount:
$342.56

Component Description:
Old Transmitter Demo and Disposal
Amount:
$55,181.00

Component Description:
Disposal, remove old line hardware, wall patch, painting, vinyl floor patch, patch roof holes, debris disposal, etc.
Amount:
$208.33

Component Description:
Disposal Costs
Amount:
$453.97

Component Description:
Disposal Costs
Amount:
$445.16

Component Description:
Disposal Costs
Amount:
$1,335.51

Component Description:
Disposal and remove old line hardware wall patch painting vinyl floor patch roof holes
Amount:
$389.14

Component Description:
Disposal, remove old line hardware
Amount:
$2,793.70

Component Description:
Second invoice for disposal costs
Amount:
$55,181.00

Component Description:
Disposal, remove old line hardware, wall patch, painting, vinyl floor patch, patch roof holes
Amount:
$199.83

Component Description:
disposal,remove old lines
Amount:
$2,162.53

Component Description:
Disposal Cost
Amount:
$2,218.66

Component Description:
Disposal Costs (for equipment and other other waste, net of any salvage value)
Amount:
$171.28

Component Description:
Disposal and remove old line and hardware
Amount:
$1,676.22

Component Description:
Disposal Costs
Amount:
$485.94

Component Description:
Disposal, remove old line hardware, wall patch, painting, vinyl floor patch, patch roof holes, debris disposal, etc.
Amount:
($990.52)

Component Description:
Disposal, remove old line hardware, wall patch, painting, vinyl floor patch, roof holes
Amount:
$2,234.96

Component Description:
Disposal, remove old line hardware, wall patch, painting, vinyl floor patch, patch roof holes, debris disposal, etc.
Amount:
$1,676.22

Component Description:
Disposal Costs
Amount:
$4,506.66

Component Description:
Disposal Costs
Amount:
$200.78

Component Description:
disposal remove old line hardware
Amount:
$1,676.22

Component Description:
Disposal Costs
Amount:
$2,171.28

Component Description:
line item 123 sutro invoice Disposal, remove old line hardware, wall patch, painting, vinyl floor patch, patch roof holes, debris disposal,etc.
Amount:
$9,164.42

Component Description:
Disposal Costs
Amount:
$1,028.57

Component Description:
Allocation of the share for the Sutro Invoice as explained in cover letter item 10 and reflected on Line # 123 in the Repacking Invoice Detail & Share cost.
Amount:
$852.14
Equipment Delivery and Handling Charges

Component Description:
Hoist Rental
Amount:
$728.57

Component Description:
Forklift Rental
Amount:
$828.05

Component Description:
Fork Lift Rental
Amount:
$780.52

Component Description:
forklift rental
Amount:
$803.93

Component Description:
Welder Equipment Rental
Amount:
$342.85

Component Description:
Shipping/Storage/Equipment Delivery/Handling
Amount:
$3,413.50

Component Description:
Shipping Storage Equip Delivery and Handling
Amount:
$523.85

Component Description:
Hoist Rental
Amount:
$2,557.14

Component Description:
Fork Lift Rental
Amount:
($1,348.80)

Component Description:
Hoist Rental
Amount:
$1,285.71

Component Description:
Fork Lift Rental
Amount:
$757.78

Component Description:
Credit for Shipping and Storage
Amount:
($8.16)

Component Description:
Hoist Rental
Amount:
$1,828.57

Component Description:
Shipping/Storage/Equipment Delivery/ Handling
Amount:
$5,843.57

Component Description:
Fork Lift Rental
Amount:
$757.78

Component Description:
forklift rental
Amount:
$803.93

Component Description:
Forklift Rental
Amount:
$828.05

Component Description:
forklift
Amount:
$803.93

Component Description:
Equipment Delivery and Handling
Amount:
$2,891.23

Component Description:
Fork Lift Rental
Amount:
$757.78

Component Description:
Shipping/Storage/Equipment Delivery/Handling
Amount:
$1,022.48

Component Description:
Equipment Delivery and Handling (incl Fork Lift Rental)
Amount:
$858.33

Component Description:
line item 128 sutro invoice Hoist Rental
Amount:
$1,285.71

Component Description:
Fork Lift Rental
Amount:
$757.78

Component Description:
Forklift Rental
Amount:
$803.93

Component Description:
Hoist Rental
Amount:
$4,719.44

Component Description:
Equipment Delivery and Handling
Amount:
$378.04

Component Description:
Fork Lift Rental
Amount:
$757.78

Component Description:
Shipping/Storage/Equipment Delivery/Handling
Amount:
$293.23

Component Description:
Shipping/Storage/Equipment Delivery/Handling
Amount:
($262.41)

Component Description:
Fork Lift Rental
Amount:
$780.52

Component Description:
Hoist rental
Amount:
$1,285.71

Component Description:
Shipping/Storage/Equipment Delivery/Handling
Amount:
$149.15

Component Description:
Fork Lift Rental
Amount:
$757.78

Component Description:
Fork Lift Rental
Amount:
$757.78

Component Description:
Hoist Rental
Amount:
$2,557.14

Component Description:
shipping/storage
Amount:
$102.85

Component Description:
Forklift Rental
Amount:
$828.05

Component Description:
Fork Lift Rental
Amount:
$757.78

Component Description:
Welder Equipment Rental
Amount:
$342.85

Component Description:
Disposal, remove old line hardware, wall patch, painting, vinyl floor patch, patch roof holes
Amount:
$2,838.16

Component Description:
Forklift Rental
Amount:
$803.93

Component Description:
Fork Lift Rental
Amount:
$757.78

Component Description:
Shipping/Storage/Equipment Delivery/Handling
Amount:
$1,876.31

Component Description:
Hoist Rental
Amount:
$3,628.56

Component Description:
forklift rental
Amount:
$803.93

Component Description:
forklift rental
Amount:
$780.52

Component Description:
Forklift Rental
Amount:
$828.05

Component Description:
shipping/storage/equipment delivery
Amount:
$385.71

Component Description:
Forklift
Amount:
$803.93

Component Description:
Allocation of the share for the Sutro Invoice as explained in cover letter item 11 and reflected on Line #125 in the Repacking Invoice Detail & Share cost.
Amount:
$780.52

Component Description:
Equipment Delivery and Handling
Amount:
$1,125.91

Component Description:
Fork Lift Rental
Amount:
$858.33

Component Description:
Forklift rental
Amount:
$780.52

Component Description:
Welder Equipment Rental
Amount:
$342.85

Component Description:
Hoist Rental
Amount:
$1,071.42

Component Description:
Forklift Rental
Amount:
$828.05

Component Description:
Shipping/Storage/Equipment Delivery/Handling
Amount:
$1,801.45

Component Description:
hoist rental
Amount:
$1,285.71

Component Description:
Forklift Rental
Amount:
$803.93

Component Description:
Hoist Rental
Amount:
$2,557.14

Component Description:
Welder Equipment Rental
Amount:
$342.85

Component Description:
Fork Lift Rental
Amount:
$757.78

Component Description:
line 125 sutro invoice Forklift Rental
Amount:
$780.52

Component Description:
shipping and storage
Amount:
$6.48

Component Description:
Forklift Rental
Amount:
$757.78

Component Description:
Forklift rental
Amount:
$780.52

Component Description:
Shipping/Storage/Equipment Delivery/Handling
Amount:
$88.51

Component Description:
Forklift Rental
Amount:
$803.93

Component Description:
Equipment Delivery and Handling (incl Fork Lift Rental)
Amount:
$1,534.68

Component Description:
Equipment Delivery and Handling
Amount:
$89.58

Component Description:
Fork Lift Rental
Amount:
$858.33

Component Description:
Hoist rental
Amount:
$2,557.14

Component Description:
Equipment Delivery and Handling
Amount:
$2,993.34

Component Description:
line item 125 sutro invoice Forklift Rental
Amount:
$780.52

Component Description:
Hoist Rental
Amount:
$2,557.14

Component Description:
Welder Equipment Rental
Amount:
$342.85

Component Description:
Hoist Rental
Amount:
$1,285.71

Component Description:
fork lift rental
Amount:
$803.93

Component Description:
Fork Lift Rental
Amount:
$780.52

Component Description:
fork lift
Amount:
$803.93

Component Description:
Hoist Rental
Amount:
$3,628.56

Component Description:
forklift rental
Amount:
$780.52

Component Description:
Forklift Rental
Amount:
$828.05

Component Description:
Welder Equipment Rental
Amount:
$342.85

Component Description:
Hoist Rental
Amount:
$2,557.14

Component Description:
line item 127 sutro invoice Shipping/Storage/Equipment Delivery/ Handling
Amount:
$189.21

Component Description:
Allocation of the share for the Sutro Invoice as explained in cover letter item 12 and reflected on Line #127 in the Repacking Invoice Detail & Share cost.
Amount:
$4,366.14

Component Description:
Fork Lift Rental
Amount:
$757.78

Component Description:
Shipping/Storage/Equipment Delivery/Handling
Amount:
$7.93

Component Description:
Fork Lift Rental
Amount:
$858.33

Component Description:
Shipping/Storage/Equipment Delivery/ Handling
Amount:
$12,007.33

Component Description:
Forklift Rental
Amount:
$858.33

Component Description:
Equipment Delivery and Handling (incl Fork Lift Rental)
Amount:
$1,113.64

Component Description:
Fork Lift Rental
Amount:
$780.52

Component Description:
line item 125 Sutro Invoice
Amount:
$780.52

Component Description:
Equipment Delivery and Handling
Amount:
$270.19

Component Description:
Hoist Rental
Amount:
$5,114.28

Component Description:
Shipping/Storage/Equipment Delivery/ Handling
Amount:
$308.57

Component Description:
Equipment Delivery and Handling (incl Fork Lift Rental)
Amount:
$1,146.78

Component Description:
Forklift rental
Amount:
$803.93

Component Description:
Fork Lift Rental
Amount:
$858.33

Component Description:
Hoist Rental
Amount:
$6,185.70

Component Description:
Hoist Rental
Amount:
$7,609.27

Component Description:
Forklift rental
Amount:
$780.52

Component Description:
Forklift Rental
Amount:
$828.05

Component Description:
Equipment Delivery and Handling Charges (Forklift Rental)
Amount:
$858.33

Component Description:
Fork Lift Rental
Amount:
$858.33

Component Description:
Shipping/Storage/Equipment Delivery/Handling
Amount:
$1,223.61

Component Description:
Welder Equipment Rental
Amount:
$342.85

Component Description:
Hoist Rental
Amount:
$2,557.14

Component Description:
line 127 Shipping/Storage/Equi pment Delivery/ Handling
Amount:
$1,075.20

Component Description:
Shipping/Storage/Equipment Delivery/Handling
Amount:
$264.22
Sales Tax

Component Description:
Sales Tax
Amount:
$4,650.12

Component Description:
Sales Tax
Amount:
$4,231.19

Component Description:
Sales Tax
Amount:
$1.09

Component Description:
Sales Tax
Amount:
$1,851.94

Component Description:
Sales Tax
Amount:
$885.58

Component Description:
Sales Tax
Amount:
$2,678.07
MVPD Notification of Channel Change

Component Description:
MVPD Notifications
Amount:
$2,400.00
Develop and air announcement of upcoming channel change Information not provided.
Equipment Storage Information not provided.
Local Zoning

Component Description:
Building Permits - Serious modifications - SF Planning - Environmental Impact Report etc.
Amount:
$2,092.10

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc.and Permit Public Relations
Amount:
$812.09

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc.
Amount:
$3,420.67

Component Description:
Allocation of the share for the Sutro Invoice as explained in cover letter item 2 and reflected on Line # 57 in the Repacking Invoice Detail & Share cost.
Amount:
$150.00

Component Description:
building permits
Amount:
$382.37

Component Description:
Permit Public Relation
Amount:
$139.28

Component Description:
Building permits
Amount:
$421.39

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc.
Amount:
$10,478.13

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc.and Permit Public Relations
Amount:
$292.68

Component Description:
Permit Public Relations
Amount:
$705.37

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc.
Amount:
$966.15

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc.
Amount:
$26,769.63

Component Description:
Building Permits - Serious modifications - SF Planning - Environmental Impact Report, Etc.
Amount:
$2,153.37

Component Description:
Building Permits - Serious modifications - SF Planning - Environmental Impact Report, etc.
Amount:
$3,178.41

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc.and Permit Public Relations
Amount:
$9,761.92

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental ImpactReport, etc.and Permit Public Relations
Amount:
$19,207.92

Component Description:
Removing this item. See Cover letter
Amount:
N/A

Component Description:
Building Permits - Serious Modifications - SF Planning - Environmental Impact Report, etc.
Amount:
$1,682.17

Component Description:
permit public relationship
Amount:
$192.85

Component Description:
Allocation of the share for the Sutro Invoice as explained in cover letter item 4 and reflected on Line # 56 in the Repacking Invoice Detail & Share cost.
Amount:
$5,614.77

Component Description:
Building Permits - Serious modifications - SF Planning - Environmental Impact Report, etc.
Amount:
$6,974.54

Component Description:
Permit Public Relations
Amount:
$1,431.90

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental ImpactReport, etc.and Permit Public Relations
Amount:
$2,266.79

Component Description:
Permit Public Relations
Amount:
$310.71

Component Description:
line item 57 Sutro invoice Permit Public Relations
Amount:
$42.85

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc.and Permit Public Relations
Amount:
$357.43

Component Description:
Permit PR
Amount:
$278.57

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc.
Amount:
$3,829.31

Component Description:
Building Permits - Serious Modifications - SF Planning - Environmental Impact Report, Etc,
Amount:
$8,224.33

Component Description:
Permit Public Relations
Amount:
($700.57)

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc.
Amount:
$3,973.57

Component Description:
Permit Public Relations
Amount:
$2,947.09

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc.
Amount:
$8,688.85

Component Description:
Permit PR
Amount:
$321.42

Component Description:
Building Permits Serious modifications SF Planning Environmental Impact Report etc
Amount:
$1,115.30

Component Description:
Public Relationship
Amount:
$589.28

Component Description:
Permit Public Relations
Amount:
$267.85

Component Description:
Permit Public Relations
Amount:
$107.14

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc.
Amount:
$2,174.70

Component Description:
Public relations
Amount:
$21.42

Component Description:
line item 57 sutro invoice Permit Public Relations
Amount:
$192.85

Component Description:
Permit Public Relations
Amount:
$557.14

Component Description:
Permit Public Relations
Amount:
($117.78)

Component Description:
building permits serious modifications
Amount:
$1,137.62

Component Description:
Building Permits Serious modifications
Amount:
$3,475.10

Component Description:
Building Permits Serious modifications
Amount:
$1,673.49

Component Description:
Permit Public Relations
Amount:
$364.28

Component Description:
Building Permits - Serious modifications - SF Planning - Environmental Impact Report
Amount:
$920.82

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc
Amount:
$5,844.12

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc.
Amount:
$9,527.24

Component Description:
Building Permits
Amount:
$2,308.36

Component Description:
Permit Public Relations
Amount:
$312.50

Component Description:
Permit Public Relations
Amount:
$21.42

Component Description:
permit
Amount:
$42.85

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc.
Amount:
$3,971.00

Component Description:
Permit Public Relations
Amount:
$942.85

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc.
Amount:
$12,260.62

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc.
Amount:
$6,894.36

Component Description:
Building Permits, Serious modifications
Amount:
$1,464.49

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc.
Amount:
$11,378.44

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc.and Permit Public Relations
Amount:
$704.66

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc
Amount:
($2,096.93)

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc
Amount:
$1,685.06

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc.
Amount:
$7,529.19

Component Description:
Permit Public Relations
Amount:
$337.50

Component Description:
Permit Public Relations
Amount:
$237.50

Component Description:
Permit Public Relations
Amount:
$225.00

Component Description:
Building Permits - Serious modifications - SF Planning - Environmental Impact Report, etc
Amount:
$3,304.64

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc.
Amount:
$2,622.33

Component Description:
Permit Public Relations
Amount:
$632.14

Component Description:
Permit Public Relations
Amount:
$137.50

Component Description:
Permit Public Relations
Amount:
$139.28

Component Description:
Building Permits
Amount:
$5,362.57

Component Description:
Building Permits
Amount:
$1,660.73

Component Description:
Building Permits- Serious modifications- SF Planning
Amount:
$2,385.99

Component Description:
Permit Public Relations
Amount:
$62.50

Component Description:
Building Permits Serious Modification SF Planning Environmental Impact Report
Amount:
$1,642.55

Component Description:
Permit Public Relations
Amount:
$137.50

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc.
Amount:
$5,171.32

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental ImpactReport, etc.and Permit Public Relations
Amount:
$5,379.43

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental ImpactReport, etc.and Permit Public Relations
Amount:
$714.32

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc.and Permit Public Relations
Amount:
$3,654.06

Component Description:
Building permits
Amount:
$571.83

Component Description:
Permit Public Relations
Amount:
$64.28

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc.
Amount:
$523.29

Component Description:
line item 56 Sutro invoice Building Permits-Serious modifications-SF Planning-Environmental Impact Report, etc.
Amount:
$1,980.71

Component Description:
Permit Public Relations
Amount:
$375.00

Component Description:
Permit Public Relations
Amount:
$387.50

Component Description:
Permit Public Relations
Amount:
$525.00

Component Description:
Building Permits
Amount:
$3,726.44

Component Description:
Permit Public Relations
Amount:
$439.28

Component Description:
Permit Public Relation
Amount:
$21.42

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc.and Permit Public Relations
Amount:
$407.31

Component Description:
Building Permits--Serious modifications--SF Planning--Environmental Impact Report, etc.
Amount:
($6,048.17)

Component Description:
Permit Public Relationship
Amount:
$21.42

Component Description:
Permit Public Relations
Amount:
$62.50

Component Description:
Line item 56 Sutro Tower Building Permits--Serious modifications--SF Planning-Environmental Impact Report, etc.
Amount:
$2,091.22

Component Description:
Building Permits - Serious Modifications - SF Planning - Environmental Impact Report, etc
Amount:
$2,283.18

Component Description:
Permit Public Relations
Amount:
$696.42

Component Description:
building permits
Amount:
$1,425.27

Component Description:
Permit Public Relation
Amount:
$21.42

Component Description:
Permit Public Relations
Amount:
$64.28

Component Description:
Permit Public Relations
Amount:
$396.42

Component Description:
Permit Public Relations
Amount:
$512.50

Component Description:
Permit Public Relations
Amount:
$150.00
FCC Filing Fees - Special Temporary Authorization request

Component Description:
FCC STA Filing Fee
Amount:
$200.00
FCC Filing Fees - Form 2100 license to cover application

Component Description:
FCC Filing fees for aux and main
Amount:
$1,340.00

Component Description:
KCNS Filing Fees
Amount:
$4,670.00
FCC Filing Fees - Form 2100 minor change CP application

Component Description:
Filing fee for CP to modify auxiliary transmission facility to post-repack channel 32.
Amount:
$1,070.00
DTV Medical Facility Notification

Component Description:
Medical Facility Notification
Amount:
$10,896.00

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $3,814,605.84 $6,884,984.50 $5,562,902.00

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Nicholas Gagliardo

Controller


09/12/2022

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Nicholas Gagliardo

Controller


09/12/2022

Attachments

Back to Top