Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
Guenter Marksteiner Doing Business As: GUENTER MARKSTEINER |
PO Box 34990 Palm City, FL 34990 United States |
+1 (857) 399-3319 | MARKSTEINER@SEKUR.COM | Individual |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Joseph L Snelson , Jr . Technical Consultant Meintel, Sgrignoli and Wallace |
1282 Smallwood Drive Suite 372 Waldorf, MD 20603 United States |
+1 (281) 466-2080 | ctamediaproductions@gmail.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Station to install equipment and transition to repack channel. This will be a complex project by converting from UHF to VHF, due to the size and location of the antenna. Antenna is in a downtown area and will require helicopter installation. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | UHF 5 kW | |
Year | 2015 | |
Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power Capacity | 5 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | Anywave 5KW | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 5 kW | |
Justification for New Transmitter | Former transmitter is UHF and cannot be retuned to VHF. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | Yes | |
Description | Connection by licensed electrician from panel to transmitter. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Top Mount | |
Antenna position in stack | Top | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | UHF Top Mount | |
Year | 2014 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | ||
Mounting | Top Mount | |
Antenna position in stack | Top | |
Polarization | Circular | |
Type | Cross Dipole | |
ERP: | 100.0 kW | |
Manufacturer | ||
Model | Lambda 3Bay | |
Year | 2022 | |
Justification for New Antenna | Former antenna is UHF and won't support VHF operation. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 7/8 inches inches | |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | No | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Air | |
Diameter | 3 inches | |
Number of parallel runs | 3 | |
Length | 50 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Air | |
Diameter | 3 inches | |
Number of parallel runs | 3 | |
Length | 50 feet per run | |
Justification for New Transmission Line | VHF antenna requires a corporate feed comprised of multiple power dividers and tuned coaxial sections which are provided by the antenna manufacturer. It has been determined that the existing UHF end-fed system is incompatible and cannot be reuse. | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | Yes |
Name | Description |
---|---|
VHF Mask Filter connections |
Conversion from UHF to Band I VHF has changed the existing patch, load, and phasing systems. Reconstruction of the interior transmission system is required. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | Located on Building | |
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1031648 | |
Coordinates (NAD83) | Latitude (NAD83) | 42° 21' 31.0" N- |
Longitude (NAD83) | 071° 03' 39.0" W- | |
Overall Structure Height | 587.26 feet | |
Support Structure Height | 564.30 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 59.05 feet | |
Structure Type | BANT - Building with an Antenna | |
Tower Owner | OBS REIT, LLC | |
Date Constructed | 01/24/1997 |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Located on Building |
Helicopter Services Required | Are helicopter services required? | Yes |
Name | Description |
---|---|
Structural Study |
Structural Study required by building owner. |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 360 | |
Explanation | The antenna manufacturer and building owner require a structural analysis of the tower to determine if augmentation is needed to comply with current standards. The size and weight of the top-mounted VHF antenna requires supervised on-site assembly. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
Construction Management Services |
On-site construction and engineering management, permit preparation, subcontractor supervision, antenna assembly |
Dielectric |
Two-Part Engineering Analysis |
Grasshopper |
Engineering Services |
Green Mountain Communications |
Install Temp Antenna |
Legal Fees |
Fees relating to channel change |
MSW |
Engineering Services |
Pillsbury Winthrop Shaw Pittman LLP |
Attorney Services |
Robert DeMattia |
General Services |
SGH |
Structural Consulting |
US Rooftops |
Construction Services |
Vertical Technology Services |
Structural Analysis |
Blumark |
Engineering |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | Yes |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $750,500.00 | $750,500.00 | N/A | $0.00 | N/A |
Total for all systems | $2,022,892.32 | $2,009,414.82 | N/A | $218,768.55 | N/A |
Primary Transmitter Anywave 5KW | $750,500.00 | $750,500.00 | $0.00 | ||
Anywave | $574,500.00 | $574,500.00 | N/A | $0.00 | N/A |
Other Electrical Service: Connection by licensed electrician from panel to transmitter. | $1,000.00 | $1,000.00 | N/A | N/A | N/A |
Low VHF - Liquid Cooled Solid State Transmitter 5 kW | $175,000.00 | $175,000.00 | N/A | $0.00 | Manufacturer will not warrant equipment without installing each of the items listed in the invoice. Invoice amount includes delivery expense to loading dock, but does not include rigging expense to deliver to building roof. |
Actual Information Description | File Name |
---|---|
Anywave | |
Other Electrical Service: Connection by licensed electrician from panel to transmitter. | Information not provided. |
Low VHF - Liquid Cooled Solid State Transmitter 5 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $393,390.00 | $393,390.00 | N/A | $0.00 | N/A |
Total for all systems | $2,022,892.32 | $2,009,414.82 | N/A | $218,768.55 | N/A |
Primary Antenna Lambda 3Bay | $393,390.00 | $393,390.00 | $0.00 | ||
Jampro Antenna | $380,015.00 | $380,015.00 | N/A | $0.00 | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $5,730.00 | N/A | $0.00 | N/A |
Low-VHF, Low Power,Yagi/Cross dipole/Log Periodic Transmit antenna | $1,095.00 | $1,095.00 | N/A | N/A | N/A |
Elbow complex, single channel, 7/8” input (if needed) | $6,550.00 | $6,550.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Jampro Antenna | |
Sweep test of transmission line and antenna | Information not provided. |
Low-VHF, Low Power,Yagi/Cross dipole/Log Periodic Transmit antenna | Information not provided. |
Elbow complex, single channel, 7/8” input (if needed) | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $33,172.00 | $24,322.00 | N/A | $0.00 | N/A |
Total for all systems | $2,022,892.32 | $2,009,414.82 | N/A | $218,768.55 | N/A |
Primary Transmission Line | $33,172.00 | $24,322.00 | $0.00 | ||
VHF Mask Filter connections | $0.00 | $0.00 | N/A | $0.00 | N/A |
Interior RF Systems: Inside RF system including switching, patch panels and dehydrators | $24,322.00 | $24,322.00 | N/A | $0.00 | N/A |
Flexible Air Transmission Line - dielectric, 3" | $8,850.00 | $0.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
VHF Mask Filter connections | Information not provided. |
Interior RF Systems: Inside RF system including switching, patch panels and dehydrators | |
Flexible Air Transmission Line - dielectric, 3" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $290,000.00 | $290,000.00 | N/A | $0.00 | N/A |
Total for all systems | $2,022,892.32 | $2,009,414.82 | N/A | $218,768.55 | N/A |
Primary Tower BANT | $290,000.00 | $290,000.00 | $0.00 | ||
Complex Tower (includes, e.g., towers with candelabras and/or stacked antennas) | $0.00 | $0.00 | N/A | $0.00 | N/A |
Tower Helicopter Lift | $285,000.00 | $285,000.00 | N/A | N/A | N/A |
Structural Study | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $538,535.32 | $534,367.82 | N/A | $218,768.55 | N/A |
Total for all systems | $2,022,892.32 | $2,009,414.82 | N/A | $218,768.55 | N/A |
Outside Professional Services | $538,535.32 | $534,367.82 | $218,768.55 | ||
Blumark | $147,460.00 | $147,460.00 | N/A | $0.00 | N/A |
Green Mountain Communications | $9,780.00 | $9,780.00 | N/A | $0.00 | N/A |
Grasshopper | $21,410.00 | $21,410.00 | N/A | $17,454.00 | N/A |
Construction Management Services | $88,010.00 | $88,010.00 | N/A | $0.00 | N/A |
RF Exposure Measurements | $12,100.00 | $1,000.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,000.00 | N/A | N/A | N/A |
Perform engineering study for displacement application | $1,800.00 | $9,000.00 | No UHF channels were available. An exhaustive study was needed to find a channel. | N/A | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,700.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,000.00 | N/A | N/A | N/A |
Pillsbury Winthrop Shaw Pittman LLP | $20,000.00 | $20,000.00 | N/A | $18,986.73 | N/A |
Vertical Technology Services | $108,000.00 | $108,000.00 | N/A | $108,000.00 | N/A |
US Rooftops | $42,315.82 | $42,315.82 | N/A | $42,315.82 | N/A |
SGH | $20,000.00 | $20,000.00 | N/A | $20,000.00 | N/A |
Robert DeMattia | $650.00 | $650.00 | N/A | $650.00 | N/A |
MSW | $2,650.00 | $2,650.00 | N/A | $2,650.00 | N/A |
Legal Fees | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
Dielectric | $6,912.00 | $6,912.00 | N/A | $6,912.00 | N/A |
Project management of the transition | $37,980.00 | $37,980.00 | N/A | $1,800.00 | N/A |
Actual Information Description | File Name |
---|---|
Blumark | |
Green Mountain Communications | |
Grasshopper | |
Construction Management Services | |
RF Exposure Measurements | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for displacement application | Information not provided. |
Prepare/ Review 399 reimbursement form | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Pillsbury Winthrop Shaw Pittman LLP | |
Vertical Technology Services | |
US Rooftops | |
SGH | |
Robert DeMattia | |
MSW | |
Legal Fees | Information not provided. |
Dielectric | |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $17,295.00 | $16,835.00 | N/A | $0.00 | N/A |
Total for all systems | $2,022,892.32 | $2,009,414.82 | N/A | $218,768.55 | N/A |
Other Expenses | $17,295.00 | $16,835.00 | $0.00 | ||
FCC Filing Fees - Form 2100 Major change CP application | $4,960.00 | $4,500.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $3,000.00 | $3,000.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $3,000.00 | $3,000.00 | N/A | N/A | N/A |
Equipment Storage | $6,000.00 | $6,000.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $2,022,892.32 | $2,009,414.82 | $218,768.55 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | GUENTER MARKSTEINER LICENSEE 09/06/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | GUENTER MARKSTEINER LICENSEE 09/06/2022 |