Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
COCOLA BROADCASTING COMPANIES, LLC Doing Business As: COCOLA BROADCASTING COMPANIES, LLC |
Gary M. Cocola 706 W. HERNDON AVENUE FRESNO, CA 93650 United States |
+1 (559) 269-0425 | garyc@cocolatv.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | Station will transition from RF ch 49 to RF ch 14, replace the transmitter and rotate the existing antenna from 270 to 290 degrees per the displacement CP; transition will be completed during the Phase 9 transition ending May 1, 2020. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | 834A | |
Year | 1998 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TRN-U-1000-FA | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.4 kW | |
Justification for New Transmitter | Current ITS 834A 1kW transmitter purchased in 1998 is no longer supported and will not operate on RF channel 14. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | Yes | |
Size | 1 inches | |
Length | 10.0 feet | |
Other Electrical Service | Yes | |
Description | Basic electrical installation and wiring. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Contract Installer |
Costs to install the new Anywave transmitter |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Retune Existing |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Bottom | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels | 12 | |
Design power capacity in use | 80.0 % | |
Lower Limit | 470.00 MHz | |
Upper Limit | 862.00 MHz | |
ERP: | 10.3 kW | |
Manufacturer | Scala | |
Model | 6X2KBBU | |
Year | 1998 |
Facility ID | Call Sign |
---|---|
34570 | KSTV-LD |
Section | Question | Response |
---|---|---|
Sweep Test of Existing Antenna | Do you need a sweep test of existing antenna? |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 80 | |
Explanation | Coordination of equipment order and delivery, installation and contractor management, certification and approval. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | Yes | |
Number of Days | 3 | |
Justification | RF channel 14 engineering and field analysis. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $288,725.17 | $93,965.17 | N/A | $90,965.17 | N/A |
Total for all systems | $386,207.67 | $164,955.17 | N/A | $110,370.17 | N/A |
Primary Transmitter TRN-U-1000-FA | $288,725.17 | $93,965.17 | $90,965.17 | ||
RF Consulting Engineer | $5,260.00 | $2,700.00 | Engineering work for move to RF channel 14. | $2,700.00 | N/A |
Contract Installer | $5,465.17 | $5,465.17 | Contract installation services provide by West Coast Broadcast Services, LLC and Broadcast Engineering Services to install the Anywave transmitter. | $5,465.17 | N/A |
Channel 14 Mask Filter | $189,500.00 | $0.00 | Channel 14 Mask Filter included in transmitter costs. | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $81,300.00 | Anywave quote for new 1.4kW transmitter and filter | $81,300.00 | N/A |
1" Rigid Conduit and Wiring | $500.00 | $500.00 | Estimated cost for conduit and wiring material. | N/A | N/A |
Other Electrical Service: Basic electrical installation and wiring. | $2,500.00 | $2,500.00 | Installation conduit and wiring for new transmitter. | N/A | N/A |
Channel 14 -- Additional field engineering time, 3 days | $1,500.00 | $1,500.00 | Three (3) days filed engineering for additional interference analysis for RF channel 14. | $1,500.00 | N/A |
Actual Information Description | File Name |
---|---|
RF Consulting Engineer | |
Contract Installer | |
Channel 14 Mask Filter | Information not provided. |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | |
1" Rigid Conduit and Wiring | Information not provided. |
Other Electrical Service: Basic electrical installation and wiring. | Information not provided. |
Channel 14 -- Additional field engineering time, 3 days |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $5,730.00 | $5,500.00 | N/A | $0.00 | N/A |
Total for all systems | $386,207.67 | $164,955.17 | N/A | $110,370.17 | N/A |
Primary Antenna 6X2KBBU | $5,730.00 | $5,500.00 | $0.00 | ||
Sweep test of transmission line and antenna | $5,730.00 | $5,500.00 | Sweep transmission line and antenna after modification per CP to ensure operating efficiently. | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $89,307.50 | $63,155.00 | N/A | $19,405.00 | N/A |
Total for all systems | $386,207.67 | $164,955.17 | N/A | $110,370.17 | N/A |
Outside Professional Services | $89,307.50 | $63,155.00 | $19,405.00 | ||
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,500.00 | File LTC application. | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $2,500.00 | Attorney fees to prepare and file CP application for RF channel 14 | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,000.00 | Prepare engineering section of LTC application | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,000.00 | Prepare engineering section of CP application | N/A | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,750.00 | Engineering for RF 14 displacement application | N/A | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $3,950.00 | Prepare, review, revise, submit and resubmit 399 invoices for reimbursement. | $3,950.00 | N/A |
Project management of the transition | $8,440.00 | $10,555.00 | Project management costs for coordination of the move from RF channel 49 to RF channel 14 | $10,555.00 | N/A |
Form 399 assistance or other Program Management costs | $1,900.00 | $1,900.00 | Prepare 399 Eligibility and Broadcaster Relocation documents | $1,900.00 | N/A |
Comprehensive coverage verification via field study, if needed | $52,600.00 | $25,000.00 | Estimated cost for interference analysis for RF channel 14 | N/A | N/A |
RF Exposure Measurements | $12,100.00 | $10,000.00 | Engineering costs for RF interference measurements | N/A | N/A |
Additional Field Engineering Service, 3 Days | $3,000.00 | $3,000.00 | Additional engineering costs associated with move to RF channel 14. | $3,000.00 | N/A |
Actual Information Description | File Name |
---|---|
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for displacement application | Information not provided. |
Prepare/ Review 399 reimbursement form | |
Project management of the transition | |
Form 399 assistance or other Program Management costs | |
Comprehensive coverage verification via field study, if needed | Information not provided. |
RF Exposure Measurements | Information not provided. |
Additional Field Engineering Service, 3 Days |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,445.00 | $2,335.00 | N/A | $0.00 | N/A |
Total for all systems | $386,207.67 | $164,955.17 | N/A | $110,370.17 | N/A |
Other Expenses | $2,445.00 | $2,335.00 | $0.00 | ||
Disposal Costs (for equipment and other waste, net of any salvage value) | $1,000.00 | $1,000.00 | Removal and disposal of older transmission equipment being replaced as part of this transition to RF channel 14 | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,000.00 | CP application fees | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $386,207.67 | $164,955.17 | $110,370.17 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Gary M Cocola Managing Member 09/06/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Gary M Cocola Managing Member 09/06/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Gary M. Cocola Managing Member 09/06/2022 |