Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
CNZ COMMUNICATIONS SE, LLC |
Randy E. Nonberg 15200 Sunset Blvd Suite 202 PACIFIC PALISADES, CA 90272 United States |
+1 (310) 573-1600 | randynonberg@cnzcommunications.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Thomas Edmund Long , Jr . Director of Engineering CNZ Communications SE LLC |
Thomas Long Jr 526 Main Avenue SE Hickory, NC 28602 United States |
+1 (828) 324-5265 | tlongjr@whky.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Current transmission system is being replaced with a 2-site DTS. Work includes tower study/rehabilitation to support new antenna, t-line and transmitter at both sites. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | Alternate | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Quantum | |
Year | 2006 | |
Type | Inductive Output Tube | |
IOT Power Type | Two | |
Power Capacity | 55 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Auxiliary (Backup) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | THU9-36 Evo | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 55 kW | |
Justification for New Transmitter | Existing transmitter is no longer supported. This new transmitter is the alternate xmtr of a main-alternate system that is the direct replacement of the existing transmitter. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 300 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 4 inches | |
Length | 125.0 feet | |
Other Electrical Service | Yes | |
Description | Wiring and support for cooling system and control. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | No | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | N/A | |
Year | 2000 | |
Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power Capacity | 19 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | THU9EVO-12 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 19 kW | |
Justification for New Transmitter | This transmitter provides the RF signal for site #2 of the WLGA DTS. The present licensed facility does not include a DTS site #2 xmtr. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | Yes | |
Size | 3 inches | |
Length | 100.0 feet | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Quantum | |
Year | 2006 | |
Type | Inductive Output Tube | |
IOT Power Type | Two | |
Power Capacity | 55 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | THU9-36 Evo | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 55 kW | |
Justification for New Transmitter | Existing 110kw main-alternate TX is no longer supported by the manufacturer. This new transmitter is the main transmitter for WLGA. Another transmitter is listed as the replacement alternate transmitter. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 300 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 4 inches | |
Length | 125.0 feet | |
Other Electrical Service | Yes | |
Description | Support of Cooling systems, and control | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 500.0 kW | |
Manufacturer | ||
Model | ATW24G475-HSS-30 | |
Year | 2006 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 500.0 kW | |
Manufacturer | ||
Model | TBD | |
Year | 2017 | |
Justification for New Antenna | Existing antenna is not designed to operate on the repack channel |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 7 3/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this antenna currently shared with any other stations? | No | |
Is this antenna directional? | No | |
Is antenna in operating condition? | No | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels | 8 | |
Design power capacity in use | 50.0 % | |
Lower Limit | 470.00 MHz | |
Upper Limit | 608.00 MHz | |
Other Antenna Type | N/A | |
ERP: | 120.0 kW | |
Manufacturer | ||
Model | New for DTS #2 | |
Year | 2000 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 12 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 608.00 MHz | |
Design power capacity in use | 18.5 % | |
Other Antenna Type | N/A | |
ERP: | 120.0 kW | |
Manufacturer | ||
Model | ETU6U8-ESP2C-17 | |
Year | 2020 | |
Justification for New Antenna | This antenna radiates the signal from Site #2 of the WLGA DTS. This is a new site and a new antenna. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Custom mounts |
The antenna needs custom mounts to place the antenna at the right distance from the tower. |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 350.0 kW | |
Manufacturer | ||
Model | TFU16WB | |
Year | 2017 | |
Justification for New Antenna | Need lower side mount antenna to remain on air during replacement of main antenna |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | S | |
Feed Line Size | 3 1/8 inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmission currently shared with any other stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1040 feet per run | |
Justification for New Transmission Line | This transmission line is used for Site #2 of the approved DTS. Reimbursement was approved for 3" T-line and the licensee of WLGA/WGBP has decided to purchase 6" T-line. The licensee is aware it is responsible for the amount between the additional cost. |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmission currently shared with any other stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1040 feet per run | |
Justification for New Transmission Line | This is new transmission line for the WLGA DTS site #2 which provides the RF signal to the site #2 antenna. |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1765 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1765 feet per run | |
Justification for New Transmission Line | According to manufactures freq chart the existing line lengths will not support the repacked channel. |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Flexible Air | |
Diameter | 4 inches | |
Segment Length | N/A | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 200 feet per run | |
Justification for New Transmission Line | Need to move line to install new main antenna. Need 200 feet of line to reach from current combiner to base of tower |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1018795 | |
Coordinates (NAD83) | Latitude (NAD83) | 32° 51' 06.8" N- |
Longitude (NAD83) | 084° 42' 05.5" W- | |
Overall Structure Height | 1102.35 feet | |
Support Structure Height | 1053.14 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 1305.76 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | GEORGIA PUBLIC TELECOMMUNICATIONS COMMISSION | |
Date Constructed | 03/07/2016 |
Facility ID | Call Sign | Service |
---|---|---|
23918 | WJSP-TV | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Major Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1243417 | |
Coordinates (NAD83) | Latitude (NAD83) | 32° 19' 16.4" N- |
Longitude (NAD83) | 084° 47' 28.2" W- | |
Overall Structure Height | 1765.73 feet | |
Support Structure Height | 1642.70 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 482.93 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | American Tower, LLC | |
Date Constructed | 10/06/2005 |
Facility ID | Call Sign | Service |
---|---|---|
3359 | WRBL | DTV |
595 | WTVM | DTV |
39457 | WVRK | FM |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Tower Crew Rain Delay |
Tower Crew was delayed for two days due to heavy rain. |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 300 | |
Explanation | Applicant has no internal resources capable of overseeing, identifying, purchasing, installing and commissioning this repack project. It will rely solely on outside services to manage all work required. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
PMO and FS SURVEY |
Project management service for DTS Site #2 and field strength survey for DTS Site #2. FS study is necessary due to fact that the facility is a DTS. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
ITV Tech ASI Equipment |
ITV Tech ASI Equipment for link DTS1 to Dts2 |
Acrodyne Temp Transmitter DTS1 |
Acrodyne Temp Transmitter DTS1 used during install of new R and S transmitter |
Antenna and line ship tax |
Shipping and tax for ERI Master order WLGA DTS2 |
Antenna and Line Ship Tax |
Shipping and tax for ERI Master order WLGA DTS1 |
DP Jones Generator Move |
DP Jones Electric move generator to make room for heat ex changers for R and S transmitter |
DP Jones TX DTS1 install |
DP Jones TX DTS1 install of Electrical |
DTS1 and DTS2 UPS |
UPS need for transmitter and processing equipment |
FS Survey |
Field strength survey for DTS Site #2. |
Inside Coax for DTS site 1 |
This is for coax to tie the transmitter to filter and the filter to the antenna system |
Land Com Install TX DTS1A |
Land Com Install TX DTS1A |
Land Com Install TX DTS1B |
Land Com Install TX DTS1B |
Local Zoning permits |
Permits for construction and related matters for WLGA DTS Site 2. |
Mater Clock time system |
This provided time sync to the transmitter to lock frequency and Data together for both transmitters |
Miscellaneous expenses for DTS Site 2. |
Med notifications, disposal, storage, etc, costs for WLGA DTS site 2. |
Old DTS1 TX Removal |
Remove old Acrodine transmitter cabinets 1,2,and3. Cabinet 4 retune to channel 17 install temp ch 30 and ch 17 RF system. |
PMO DTS 2 |
Project management for WLGA DTS Site #2. |
Proof of Performance DTS1 |
Proof of Performance DTS1 transmitters A and B |
SCMS Remote control Equipment |
SCMS Remote control Equipment to control DTS1 and DTS2 from Central location |
Tesla RF Install DTS1 |
Tesla RF Install DTS1 Install and support of crews working at site |
Tesla RF Install DTS2 |
Tesla RF Install DTS2 Install and support of crews working at site |
Thor Fiber ASI Link |
Thor Fiber ASI Link between DTS1 and DTS2 |
Water System Cable Tray |
Parts need to install water system for DTS1 and DST2 |
Dielectric Filter DTS1 TX B |
Dielectric Filter DTS1 TX B |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $4,498,050.00 | $3,620,541.00 | N/A | $2,876,193.30 | N/A |
Total for all systems | $9,084,199.91 | $8,089,805.91 | N/A | $5,786,087.90 | N/A |
Primary Transmitter THU9EVO-12 | $741,800.00 | $656,200.00 | $478,017.61 | ||
3" Rigid Conduit and Wiring (Cost per foot) | $5,200.00 | $5,000.00 | N/A | N/A | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $37,150.00 | N/A | $30,071.71 | N/A |
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $14,050.00 | N/A | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | $684,000.00 | $600,000.00 | N/A | $447,945.90 | N/A |
Primary Transmitter THU9-36 Evo | $1,878,125.00 | $1,480,008.00 | $1,407,418.34 | ||
Other Electrical Service: Support of Cooling systems, and control | $2,500.00 | $2,500.00 | Provide support for cooling system on liquid cooled transmitter | N/A | N/A |
4" Rigid Conduit and Wiring (Cost per foot) | $12,625.00 | $12,000.00 | N/A | N/A | N/A |
Transformer 3 phase/480v - 300 KVA | $36,800.00 | $35,000.00 | N/A | N/A | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $36,300.00 | N/A | $13,211.32 | N/A |
UHF - Liquid Cooled Solid State Transmitter 52 - 61 kW | $1,788,000.00 | $1,394,208.00 | See attached quote to justify the new estimated amount. | $1,394,207.02 | N/A |
Auxiliary Transmitter THU9-36 Evo | $1,878,125.00 | $1,484,333.00 | $990,757.35 | ||
Switchgear - industrial 800 amp | $38,200.00 | $38,200.00 | N/A | N/A | N/A |
Transformer 3 phase/480v - 300 KVA | $36,800.00 | $36,800.00 | N/A | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 52 - 61 kW | $1,788,000.00 | $1,394,208.00 | See the attached quote for the new estimated cost of the transmitter. | $990,757.35 | N/A |
Other Electrical Service: Wiring and support for cooling system and control. | $2,500.00 | $2,500.00 | N/A | N/A | N/A |
4" Rigid Conduit and Wiring (Cost per foot) | $12,625.00 | $12,625.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
3" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Switchgear - industrial 800 amp | |
Service entrance 3 phase/800 amp/208 volt | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | |
Other Electrical Service: Support of Cooling systems, and control | Information not provided. |
4" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Transformer 3 phase/480v - 300 KVA | Information not provided. |
Switchgear - industrial 800 amp | |
UHF - Liquid Cooled Solid State Transmitter 52 - 61 kW | |
Switchgear - industrial 800 amp | Information not provided. |
Transformer 3 phase/480v - 300 KVA | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 52 - 61 kW | |
Other Electrical Service: Wiring and support for cooling system and control. | Information not provided. |
4" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $605,520.00 | $594,700.00 | N/A | $310,333.90 | N/A |
Total for all systems | $9,084,199.91 | $8,089,805.91 | N/A | $5,786,087.90 | N/A |
Interim Antenna TFU16WB | $232,240.00 | $220,800.00 | $33,620.40 | ||
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $5,000.00 | N/A | $0.00 | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $22,000.00 | N/A | $0.00 | N/A |
Elbow complex, single channel, at antenna input, per 3 1/8. feedline (if needed) | $7,600.00 | $7,400.00 | N/A | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $0.00 | N/A |
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized | $189,500.00 | $180,000.00 | N/A | $33,620.40 | N/A |
Primary Antenna TBD | $229,040.00 | $226,800.00 | $174,415.00 | ||
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $5,200.00 | N/A | $2,625.00 | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $22,000.00 | N/A | $9,800.00 | N/A |
Elbow complex, single channel, at antenna input, per 7 3/16. feedline (if needed) | $13,900.00 | $13,200.00 | N/A | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $6,250.00 | N/A |
UHF - High Power, Side Mount, basic slot antenna, 500 kW input, directional,, horizontally polarized | $180,000.00 | $180,000.00 | From the catalog - One station –200-500 kW, horizontally polarized $125,000 - $180,000 | $155,740.00 | N/A |
Primary Antenna ETU6U8-ESP2C-17 | $144,240.00 | $147,100.00 | $102,298.50 | ||
Sweep test of existing antenna | $6,730.00 | $6,730.00 | N/A | $5,625.00 | N/A |
UHF - Lower Power Side Mount, One Station antenna . medium power (50-200 kW), elliptically or circularly polarized | $103,100.00 | $103,100.00 | Licensee is purchasing Epol antenna. Licensee recognizes it is responsible for cost difference between Hpol and Epol antenna. Quotes for both Epol antenna & Hpol antenna are provided. See Antenna cover letter attachment. | $87,316.00 | N/A |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $8,120.00 | Scatter analysis engineering required additional effort and time to achieve the desired results. | $7,357.50 | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $23,150.00 | N/A | $0.00 | N/A |
Custom mounts | $6,000.00 | $6,000.00 | N/A | $2,000.00 | N/A |
Actual Information Description | File Name |
---|---|
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | |
Side mount brackets for high power antennas (if not included in antenna base cost) | Information not provided. |
Elbow complex, single channel, at antenna input, per 3 1/8. feedline (if needed) | Information not provided. |
Sweep test of existing antenna | Information not provided. |
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized | |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | |
Side mount brackets for high power antennas (if not included in antenna base cost) | |
Elbow complex, single channel, at antenna input, per 7 3/16. feedline (if needed) | Information not provided. |
Sweep test of existing antenna | |
UHF - High Power, Side Mount, basic slot antenna, 500 kW input, directional,, horizontally polarized | |
Sweep test of existing antenna | |
UHF - Lower Power Side Mount, One Station antenna . medium power (50-200 kW), elliptically or circularly polarized | |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | |
Side mount brackets for high power antennas (if not included in antenna base cost) | |
Custom mounts |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $946,810.00 | $704,550.00 | N/A | $570,012.84 | N/A |
Total for all systems | $9,084,199.91 | $8,089,805.91 | N/A | $5,786,087.90 | N/A |
Interim Transmission Line | $14,800.00 | $25,260.00 | $25,260.70 | ||
Flexible Air Transmission Line - dielectric, 4" | $14,800.00 | $25,260.00 | This cost included connectors, reducers, and matching transformers. | $25,260.70 | This estimated cost included line, connectors, reducers, and matching transformers. |
Primary Transmission Line | $210,080.00 | $5,000.00 | $4,851.00 | ||
Rigid Transmission Line - copper, 6 1/8" | $210,080.00 | $5,000.00 | These components are used to mate the outside transmission line to the line inside the building. These are 6" components and the Licensee is responsible for the difference between the 3" price and the 6" price indicated on the quotes. | $4,851.00 | N/A |
Primary Transmission Line | $210,080.00 | $187,150.00 | $94,901.50 | ||
Rigid Transmission Line - copper, 6 1/8" | $210,080.00 | $187,150.00 | Licensee is purchasing 6" transmission line for DTS Site #2 and recognizes that it is responsible for cost difference between reimbursable 3 inch line and 6 inch line. See attached transmission line cover letter. | $94,901.50 | N/A |
Primary Transmission Line | $511,850.00 | $487,140.00 | $444,999.64 | ||
Rigid Transmission Line - copper, 7 3/16" | $511,850.00 | $487,140.00 | N/A | $444,999.64 | N/A |
Actual Information Description | File Name |
---|---|
Flexible Air Transmission Line - dielectric, 4" | |
Rigid Transmission Line - copper, 6 1/8" | |
Rigid Transmission Line - copper, 6 1/8" | |
Rigid Transmission Line - copper, 7 3/16" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,043,900.00 | $1,133,415.00 | N/A | $1,103,837.85 | N/A |
Total for all systems | $9,084,199.91 | $8,089,805.91 | N/A | $5,786,087.90 | N/A |
Primary Tower GTOWER | $399,800.00 | $380,000.00 | $373,266.50 | ||
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $25,000.00 | N/A | $22,845.00 | N/A |
Minor tower reinforcement/modifications | $158,000.00 | $150,000.00 | N/A | $147,684.00 | N/A |
Tall Tower (greater than 500') | $210,500.00 | $200,000.00 | N/A | $197,737.50 | N/A |
Tower Crew Rain Delay | $5,000.00 | $5,000.00 | N/A | $5,000.00 | N/A |
Primary Tower GTOWER | $644,100.00 | $753,415.00 | $730,571.35 | ||
Tall Tower (greater than 500') | $210,500.00 | $200,000.00 | N/A | $189,456.35 | N/A |
Structural engineering tower load study for well documented tower | $12,600.00 | $12,300.00 | N/A | N/A | N/A |
Major tower reinforcement/modifications | $421,000.00 | $541,115.00 | See attached quote for DTS Site #2 tower. WLGA agrees to this portion per agreement with tower owner. | $541,115.00 | Estimated cost of the tower modification is $1,082,230. 50% is the share of WLGA of the total cost. |
Actual Information Description | File Name |
---|---|
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | |
Minor tower reinforcement/modifications | |
Tall Tower (greater than 500') | |
Tower Crew Rain Delay | |
Tall Tower (greater than 500') | |
Structural engineering tower load study for well documented tower | Information not provided. |
Major tower reinforcement/modifications |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $710,145.00 | $757,380.00 | N/A | $322,475.92 | N/A |
Total for all systems | $9,084,199.91 | $8,089,805.91 | N/A | $5,786,087.90 | N/A |
Outside Professional Services | $710,145.00 | $757,380.00 | $322,475.92 | ||
PMO and FS SURVEY | $530,000.00 | $530,000.00 | The estimate includes 300 hours of engineering time plus $80000 for time to execute the field strength study. | $126,839.00 | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $137,000.00 | Site #2 fees for antenna verification, elliptical polarization, Azimuth and elevation pattern field study. And, onsite engineering oversight of panel antenna investigation. | $136,400.84 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $7,360.00 | $7,000.00 | N/A | $5,911.50 | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $4,000.00 | N/A | $2,215.50 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | $423.50 | N/A |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | $4,210.00 | $4,000.00 | N/A | $2,433.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $0.00 | N/A |
Prepare request for Special Temporary Authorization | $4,100.00 | $3,000.00 | N/A | $265.50 | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | $1,580.00 | $1,500.00 | N/A | $0.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | $2,105.00 | $2,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $0.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $4,900.00 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | $0.00 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,630.00 | N/A | $2,325.00 | N/A |
Project management of the transition | $47,400.00 | $45,000.00 | N/A | $40,762.08 | N/A |
Actual Information Description | File Name |
---|---|
PMO and FS SURVEY | |
Comprehensive coverage verification via field study, if needed | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare request for Special Temporary Authorization | |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | |
Prepare and or review reimbursement form | |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,279,774.91 | $1,279,219.91 | N/A | $603,234.09 | N/A |
Total for all systems | $9,084,199.91 | $8,089,805.91 | N/A | $5,786,087.90 | N/A |
Other Expenses | $1,279,774.91 | $1,279,219.91 | $603,234.09 | ||
Dielectric Filter DTS1 TX B | $37,000.00 | $37,000.00 | N/A | $35,626.25 | N/A |
Water System Cable Tray | $7,500.00 | $7,500.00 | N/A | $6,968.26 | N/A |
Thor Fiber ASI Link | $6,000.00 | $6,000.00 | N/A | $5,499.05 | N/A |
Tesla RF Install DTS2 | $75,000.00 | $75,000.00 | N/A | $72,536.46 | N/A |
Tesla RF Install DTS1 | $110,000.00 | $110,000.00 | N/A | $104,031.06 | N/A |
SCMS Remote control Equipment | $24,000.00 | $24,000.00 | N/A | $22,395.48 | N/A |
Proof of Performance DTS1 | $20,000.00 | $20,000.00 | N/A | $20,000.00 | N/A |
PMO DTS 2 | $450,000.00 | $450,000.00 | N/A | N/A | N/A |
Old DTS1 TX Removal | $40,000.00 | $40,000.00 | N/A | $33,690.94 | N/A |
Miscellaneous expenses for DTS Site 2. | $15,000.00 | $15,000.00 | N/A | $6,452.50 | N/A |
Mater Clock time system | $15,000.00 | $15,000.00 | N/A | $11,436.90 | N/A |
Local Zoning permits | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Land Com Install TX DTS1B | $29,000.00 | $29,000.00 | N/A | $29,000.00 | N/A |
Land Com Install TX DTS1A | $29,000.00 | $29,000.00 | N/A | $29,000.00 | N/A |
Inside Coax for DTS site 1 | $25,000.00 | $25,000.00 | N/A | $17,451.00 | N/A |
DTS1 and DTS2 UPS | $30,000.00 | $30,000.00 | N/A | $28,614.45 | N/A |
DP Jones TX DTS1 install | $16,000.00 | $16,000.00 | N/A | $15,866.33 | N/A |
DP Jones Generator Move | $12,000.00 | $12,000.00 | N/A | $11,587.25 | N/A |
Antenna and Line Ship Tax | $91,084.91 | $91,084.91 | N/A | $91,084.91 | N/A |
Antenna and line ship tax | $75,000.00 | $75,000.00 | N/A | $5,422.13 | N/A |
Equipment Storage | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $2,000.00 | $2,000.00 | N/A | N/A | N/A |
Non-zoning permits | $2,000.00 | $2,000.00 | N/A | N/A | N/A |
Local Zoning | $2,000.00 | $2,000.00 | N/A | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $200.00 | Amount of FCC filing fees. | $200.00 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | Cost of FCC fees. | $0.00 | N/A |
DTV Medical Facility Notification | $11,550.00 | $11,000.00 | N/A | $5,900.00 | N/A |
FS Survey | $80,000.00 | $80,000.00 | N/A | N/A | N/A |
Acrodyne Temp Transmitter DTS1 | $42,000.00 | $42,000.00 | N/A | $41,190.12 | N/A |
ITV Tech ASI Equipment | $9,500.00 | $9,500.00 | N/A | $9,281.00 | N/A |
MVPD Notification of Channel Change | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Develop and air announcement of upcoming channel change | $2,500.00 | $2,500.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Dielectric Filter DTS1 TX B | |
Water System Cable Tray | |
Thor Fiber ASI Link | |
Tesla RF Install DTS2 | |
Tesla RF Install DTS1 | |
SCMS Remote control Equipment | |
Proof of Performance DTS1 | |
PMO DTS 2 | Information not provided. |
Old DTS1 TX Removal | |
Miscellaneous expenses for DTS Site 2. | |
Mater Clock time system | |
Local Zoning permits | Information not provided. |
Land Com Install TX DTS1B | |
Land Com Install TX DTS1A | |
Inside Coax for DTS site 1 | |
DTS1 and DTS2 UPS | |
DP Jones TX DTS1 install | |
DP Jones Generator Move | |
Antenna and Line Ship Tax | |
Antenna and line ship tax | |
Equipment Storage | Information not provided. |
Equipment Delivery and Handling Charges | Information not provided. |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Non-zoning permits | Information not provided. |
Local Zoning | Information not provided. |
FCC Filing Fees - Special Temporary Authorization request | |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | |
DTV Medical Facility Notification | |
FS Survey | Information not provided. |
Acrodyne Temp Transmitter DTS1 | |
ITV Tech ASI Equipment | |
MVPD Notification of Channel Change | Information not provided. |
Develop and air announcement of upcoming channel change | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $9,084,199.91 | $8,089,805.91 | $5,786,087.90 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Randy E Nonberg Manager 08/31/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Randy E Nonberg Manager 08/31/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Randy E Nonberg Manager 08/31/2022 |