Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
HC2 STATION GROUP, INC. |
295 MADISON AVENUE, 12TH FLOOR NEW YORK, NY 10017 United States |
+1 (212) 339-5864 | RGORBAL@HC2BROADCASTING.COM | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | This displaced facility is currently in the process of complying with its new displacement construction permit as part of the repack program. |
Question | Response |
---|---|
Sharee Station Facility ID | 66781 |
Call Sign | KIRO-TV |
Type | Commercial |
Licensee Name | KIRO-TV, Inc. |
Status | LICENSED |
DTS | No |
Community of License | SEATTLE, WA |
Pre-auction RF Channel | 23 |
Post-auction RF Channel | 23 |
Neilsen DMA | Seattle-Tacoma |
Network Affiliation |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | TXUD1000A | |
Year | 2009 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | TMV9/4 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 2.9 kW | |
Justification for New Transmitter | The applicant plans on replacing the existing transmitter because of its age and lack of current support. This facility is relocating from the UHF band to the VHF band. The Hpol power is 1.45kW. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | Yes | |
Description | Minor Electrical Work. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 5 tons | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
UHF Inside RF System Including Switching |
UHF Inside RF System Including Switching |
Additional Field Engineering Time |
Additional Field Engineering Time |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Other | |
Other Antenna Type | Panel UHF | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | SWR SWLP8EC | |
Year | 2009 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 1 | |
Lower Limit | 174.00 MHz | |
Upper Limit | 216.00 MHz | |
Design power capacity in use | 100.0 % | |
ERP: | 3.0 kW | |
Manufacturer | ||
Model | 2x3 750 00085 | |
Year | 2019 | |
Justification for New Antenna | The applicant plans on replacing the existing antenna to support the new displacement construction permit. Facility is relocating from UHF band to VHF band. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Power Dividers | Does the panel antenna require power dividers? | Yes |
Number of Power Dividers | 3 | |
Cable Harness | Does the panel antenna require cable harness? | Yes |
Number of Cable Harnesses | 3 |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | ||
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1056094 | |
Coordinates (NAD83) | Latitude (NAD83) | 47° 30' 16.3" N- |
Longitude (NAD83) | 121° 58' 10.0" W- | |
Overall Structure Height | 310.04 feet | |
Support Structure Height | 270.01 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 2838.88 feet | |
Structure Type | LTOWER - Lattice Tower | |
Tower Owner | American Towers LLC | |
Date Constructed | 12/01/1998 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study need for guyed or free-standing tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Other |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 200 | |
Explanation | Outside consulting engineering, legal work, and accounting services, as well as project management for regional and comprehensive repack execution. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | No |
Prepare engineering section of Form FCC Construction Permit Application | No | |
Prepare engineering section of Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
Prepare and file Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
Internal Time Costs |
Internal Time Costs |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $137,257.14 | $89,733.38 | N/A | $59,483.38 | N/A |
Total for all systems | $259,646.40 | $210,522.64 | N/A | $136,155.26 | N/A |
Primary Transmitter TMV9/4 | $137,257.14 | $89,733.38 | $59,483.38 | ||
Other Electrical Service: Minor Electrical Work. | $1,568.14 | $1,568.14 | N/A | $1,568.14 | N/A |
UHF Inside RF System Including Switching | $2,339.00 | $2,339.00 | N/A | $2,339.00 | N/A |
Additional Field Engineering Time | $2,100.00 | $2,100.00 | N/A | $2,100.00 | N/A |
Transmitter Building Site Survey/Installation | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
5 Ton system | $20,250.00 | $20,250.00 | N/A | N/A | N/A |
High VHF - Air Cooled Solid State Transmitter 1.1 - 4.4 kW | $101,000.00 | $53,476.24 | N/A | $53,476.24 | N/A |
Actual Information Description | File Name |
---|---|
Other Electrical Service: Minor Electrical Work. | |
UHF Inside RF System Including Switching | |
Additional Field Engineering Time | |
Transmitter Building Site Survey/Installation | Information not provided. |
5 Ton system | Information not provided. |
High VHF - Air Cooled Solid State Transmitter 1.1 - 4.4 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $49,402.00 | $47,802.00 | N/A | $32,147.00 | N/A |
Total for all systems | $259,646.40 | $210,522.64 | N/A | $136,155.26 | N/A |
Primary Antenna 2x3 750 00085 | $49,402.00 | $47,802.00 | $32,147.00 | ||
Cable harness (each, for panel antenna system, if not included in antenna cost) | $3,000.00 | $4,000.00 | N/A | N/A | N/A |
Power Dividers (each, for panel antenna system, if not included in antenna cost) | $3,900.00 | $1,300.00 | N/A | N/A | N/A |
Side Mount antenna brackets | $4,625.00 | $4,625.00 | N/A | N/A | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $5,730.00 | N/A | N/A | N/A |
High VHF-Low Power, Side Mount, Broadband Panel, 1 bay, 3.0kW input, Circular | $32,147.00 | $32,147.00 | N/A | $32,147.00 | N/A |
Actual Information Description | File Name |
---|---|
Cable harness (each, for panel antenna system, if not included in antenna cost) | Information not provided. |
Power Dividers (each, for panel antenna system, if not included in antenna cost) | Information not provided. |
Side Mount antenna brackets | Information not provided. |
Sweep test of transmission line and antenna | Information not provided. |
High VHF-Low Power, Side Mount, Broadband Panel, 1 bay, 3.0kW input, Circular |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $36,675.00 | $36,675.00 | N/A | $27,975.00 | N/A |
Total for all systems | $259,646.40 | $210,522.64 | N/A | $136,155.26 | N/A |
Primary Tower LTOWER | $36,675.00 | $36,675.00 | $27,975.00 | ||
PE Letter | $750.00 | $750.00 | N/A | $750.00 | N/A |
Complex Tower (includes, e.g., towers with candelabras and/or stacked antennas) | $27,225.00 | $27,225.00 | N/A | $27,225.00 | N/A |
Study needed for guyed or free-standing tower | $8,700.00 | $8,700.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
PE Letter | |
Complex Tower (includes, e.g., towers with candelabras and/or stacked antennas) | |
Study needed for guyed or free-standing tower | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $26,778.86 | $26,778.86 | N/A | $11,461.48 | N/A |
Total for all systems | $259,646.40 | $210,522.64 | N/A | $136,155.26 | N/A |
Outside Professional Services | $26,778.86 | $26,778.86 | $11,461.48 | ||
Internal Time Costs | $1,468.86 | $1,468.86 | N/A | $1,468.86 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | N/A | N/A |
Project management of the transition | $21,100.00 | $21,100.00 | N/A | $9,992.62 | N/A |
Form 399 assistance or other Program Management costs | $2,500.00 | $2,500.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Internal Time Costs | |
Prepare/ Review 399 reimbursement form | Information not provided. |
Project management of the transition | |
Form 399 assistance or other Program Management costs | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $9,533.40 | $9,533.40 | N/A | $5,088.40 | N/A |
Total for all systems | $259,646.40 | $210,522.64 | N/A | $136,155.26 | N/A |
Other Expenses | $9,533.40 | $9,533.40 | $5,088.40 | ||
Equipment Storage | $1,445.00 | $1,445.00 | N/A | $1,445.00 | N/A |
Equipment Delivery and Handling Charges | $3,643.40 | $3,643.40 | N/A | $3,643.40 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $3,000.00 | $3,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Equipment Storage | |
Equipment Delivery and Handling Charges | |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $259,646.40 | $210,522.64 | $136,155.26 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Michael Voge Director of Engineering Operations 09/06/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Michael Voge Director of Engineering Operations 09/06/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Michael Voge Director of Engineering Operations 09/06/2022 |