Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
SCRIPPS BROADCASTING HOLDINGS LLC |
Chief Engineer 312 WALNUT STREET 28TH FLOOR CINCINNATI, OH 45202 United States |
+1 (513) 977-3000 | DAVE.GILES@SCRIPPS.COM | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Samuel Hariton Widelity |
4031 University Dr Suite 100 Fairfax, VA, VA 22030 United States |
+1 (339) 222-8107 | sam.hariton@widelity.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | Due to the repack, KZCO must share a channel with KLPD; however previous tower owners wouldn't allow KLPD to move to it. KZCO must move to a new tower and upgrade equipment. KZCO is purchasing a new transmission line and upgraded transmitter and antenna. |
Question | Response |
---|---|
Sharee Station Facility ID | 23074 |
Call Sign | KUSA |
Type | Commercial |
Licensee Name | MULTIMEDIA HOLDINGS CORPORATION |
Status | LICENSED |
DTS | No |
Community of License | DENVER, CO |
Pre-auction RF Channel | 9 |
Post-auction RF Channel | 9 |
Neilsen DMA | Denver |
Network Affiliation |
Question | Response |
---|---|
Sharee Station Facility ID | 47903 |
Call Sign | KCNC-TV |
Type | Commercial |
Licensee Name | CBS TELEVISION STATIONS INC. |
Status | LICENSED |
DTS | No |
Community of License | DENVER, CO |
Pre-auction RF Channel | 35 |
Post-auction RF Channel | 35 |
Neilsen DMA | Denver |
Network Affiliation |
Question | Response |
---|---|
Sharee Station Facility ID | 67539 |
Call Sign | KLPD-LD |
Type | |
Licensee Name | SYNCOM MEDIA GROUP, INC. |
Status | LICENSED |
DTS | No |
Community of License | DENVER, CO |
Pre-auction RF Channel | 30 |
Post-auction RF Channel | |
Neilsen DMA | |
Network Affiliation |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Ranger | |
Year | 2004 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | UAXTE-4R37 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 2.4 kW | |
Justification for New Transmitter | New transmitter required for operation on shared post-displacement channel. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Top | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 3 | |
Number of Panels | 12 | |
Design power capacity in use | 0.5 % | |
Lower Limit | 470.00 MHz | |
Upper Limit | 608.00 MHz | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | TUA/C3/12/36U-1-S | |
Year | 2008 |
Facility ID | Call Sign |
---|---|
47903 | KCNC-TV |
23074 | KUSA |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | Yes | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | ALP4L-ESER-30 | |
Year | 2019 | |
Justification for New Antenna | New antenna required due to KZCO moving to new tower and channel sharing agreement with KLPD. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | Located on Building | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
Coordinates (NAD83) | Latitude (NAD83) | 39° 43' 45.9" N- |
Longitude (NAD83) | 105° 14' 09.9" W- | |
Overall Structure Height | 45.93 feet | |
Support Structure Height | 45.93 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 7372.00 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Mauna Towers | |
Date Constructed | 04/12/2019 |
Facility ID | Call Sign | Service |
---|---|---|
67539 | KLPD-LD | LPD |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Located on Building |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 254 | |
Explanation | KZCO-LD requires the aid of outside project management services in order to fulfill the requirements of the repack. KZCO-LD does not have sufficient resource capacity and expertise in house to handle all of the reimbursement filing, expense tracking, etc. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | Yes | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
Transition Timing and Coordination |
Transition Timing and Coordination |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
Broadcast Integrated Receiver-Decoder System |
Parts required for repeater station to receive and decode the broadcast signal |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $84,000.00 | $74,462.36 | N/A | $74,336.45 | N/A |
Total for all systems | $252,462.50 | $286,707.81 | N/A | $207,805.89 | N/A |
Primary Transmitter UAXTE-4R37 | $84,000.00 | $74,462.36 | $74,336.45 | ||
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $74,462.36 | Please see GatesAir, Inc. Quote #Q-80364 & Invoice #US0324165 | $74,336.45 | N/A |
Actual Information Description | File Name |
---|---|
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $20,460.06 | $14,730.06 | N/A | $8,623.16 | N/A |
Total for all systems | $252,462.50 | $286,707.81 | N/A | $207,805.89 | N/A |
Primary Antenna ALP4L-ESER-30 | $20,460.06 | $14,730.06 | $8,623.16 | ||
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Elliptical | $14,730.06 | $14,730.06 | Please see Estimated Cost Justification KZCO-LD-210-Primary Antenna - UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Elliptical v0 (1) | $8,623.16 | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $0.00 | Cost for sweep test will be included once supporting documents are provided. | N/A | N/A |
Actual Information Description | File Name |
---|---|
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Elliptical | |
Sweep test of transmission line and antenna | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $81,190.00 | $81,190.00 | N/A | $19,948.20 | N/A |
Total for all systems | $252,462.50 | $286,707.81 | N/A | $207,805.89 | N/A |
Primary Tower TOWER | $81,190.00 | $81,190.00 | $19,948.20 | ||
Complex Tower (includes, e.g., towers with candelabras and/or stacked antennas) | $81,190.00 | $81,190.00 | LPTV Catalog pricing for antenna removal | $19,948.20 | N/A |
Actual Information Description | File Name |
---|---|
Complex Tower (includes, e.g., towers with candelabras and/or stacked antennas) |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $57,542.00 | $107,054.95 | N/A | $97,151.11 | N/A |
Total for all systems | $252,462.50 | $286,707.81 | N/A | $207,805.89 | N/A |
Outside Professional Services | $57,542.00 | $107,054.95 | $97,151.11 | ||
Transition Timing and Coordination | $1,125.00 | $1,125.00 | Please see KZCO-LD Transition Timing and Coordination Budget Revision Justification Letter | $1,125.00 | N/A |
Project management of the transition | $26,797.00 | $48,859.95 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $48,859.95 | N/A |
RF Exposure Measurements | $12,100.00 | $1,000.00 | Please see JB Schoedler Associates Proposal 20190219a | $1,000.00 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $462.40 | Please see KZCO-LD Attorney STA Budget Revision Justification Letter | $462.40 | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $31,255.10 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $31,255.10 | x |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | $93.66 | N/A |
Prepare Form 601 | $755.00 | $755.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | $225.00 | N/A |
Perform engineering study for displacement application | $1,800.00 | $14,130.00 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $14,130.00 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Transition Timing and Coordination | |
Project management of the transition | |
RF Exposure Measurements | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Prepare Form 601 | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Perform engineering study for displacement application | |
Prepare/ Review 399 reimbursement form | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $9,270.44 | $9,270.44 | N/A | $7,746.97 | N/A |
Total for all systems | $252,462.50 | $286,707.81 | N/A | $207,805.89 | N/A |
Other Expenses | $9,270.44 | $9,270.44 | $7,746.97 | ||
Broadcast Integrated Receiver-Decoder System | $3,046.94 | $3,046.94 | Please see KZCO-LD Broadcast Integrated Receiver/Decoder System Budget Justification Cover Letter | $1,523.47 | N/A |
Equipment Delivery and Handling Charges | $6,223.50 | $6,223.50 | Please see Estimated Cost Justification KZCO-LD-610-Equipment Delivery and Handling v0 | $6,223.50 | N/A |
Actual Information Description | File Name |
---|---|
Broadcast Integrated Receiver-Decoder System | |
Equipment Delivery and Handling Charges |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $252,462.50 | $286,707.81 | $207,805.89 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | sravan varakantam reddy Senior Director, General Accounting 09/06/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | sravan varakantam reddy Senior Director, General Accounting 09/06/2022 |