Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
WNYT-TV, LLC Doing Business As: WNYT-TV, LLC |
Ryan Vandewiele 3415 University Ave., West St. Paul, MN 55114 United States |
+1 (651) 642-4334 | KShuldes@hbi.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Charles R. Naftalin Legal Counsel Holland & Knight LLP |
800 17th Street, N.W. Suite #1100 Washington, DC 20006 United States |
+1 (202) 457-7040 | charles.naftalin@hklaw.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | The DRT will install a new transmitter, transmission line, and antenna to replace its existing facility. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | MAGNUM DTT2.5KSU | |
Year | 2001 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 2500 W |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | UAXTE-4R37 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 2400 W | |
Justification for New Transmitter | The existing transmitter is channel specific and cannot be retuned. The model is discontinued and the manufacturer is defunct. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | Yes | |
Size | 1 inches | |
Length | 150.0 feet | |
Other Electrical Service | Yes | |
Description | Circuit Breaker, Flexible Conduit, Circuit Breaker Panel, Power Distribution Units | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Other Transmitter Expenses |
Staff Transmitter Training |
Surge Suppressor |
Electrical Surge Suppressor |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | AL8-O | |
Year | 2010 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | ALP-12-L7-ESOC-27 | |
Year | 2020 | |
Justification for New Antenna | Existing antenna is channel specific. The translator is moving to a new channel. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | MYAT |
Type | Rigid | |
Diameter | 4 1/16 inches | |
Segment Length | 20 inches | |
Number of parallel runs | 1 | |
Length | 690 feet per run |
Name | Description |
---|---|
Jumper, Hangers, and Hardware |
Flexible Transmission Line Jumper from Existing Transmission Line to New Antenna |
Line Sections - Adapter, Internal |
Transmission Line for Inside Transmitter Room and 1-5/8" to 4-1/16" Adapter |
Matching Section Adjustment |
RF Analysis to Adjust Matching Section Upon Installation |
Matching Section, Fine |
Matching Section for Antenna Input |
Monitor, Transmission Line Pressure |
Monitors pressurization in transmission lines |
Reducers |
Reducing Adapter |
Transmission Line Refit |
See attached letter to Invoice #20220827A |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1004249 | |
Coordinates (NAD83) | Latitude (NAD83) | 42° 47' 09.0" N- |
Longitude (NAD83) | 073° 37' 41.0" W- | |
Overall Structure Height | 737.52 feet | |
Support Structure Height | 693.56 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 950.12 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | WNYT-TV, LLC | |
Date Constructed | 01/01/1978 |
Facility ID | Call Sign | Service |
---|---|---|
20922 | W254DA | FX |
6613 | WQBK-FM | FM |
Users |
---|
Public Safety |
Land Mobile |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study need for guyed or free-standing tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | Yes |
Name | Description |
---|---|
Lighting, Obstruction |
FAA "E2" Level Obstruction Lighting System |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
Abatement, Asbestos |
Removal of Asbestos Containing Material in Transmitter Room |
Evaluation, HVAC |
Study of Transmitter Room HVAC Requirements |
Floor Resurfacing |
Floor Preparation in Transmitter Room |
Scanning, Blueprints |
Scanning of Antenna, Tower, and Building (Construction & Mechanical) Blueprints for Contractors' Use |
Testing, Asbestos |
Evaluation of Transmitter Room Floor Tiles for ACM (Asbestos Containing Material) |
Outside Legal Advice and Analysis |
Attorney Fees and FCC transition requirement |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
Sales Tax |
NY State Sales Tax |
Other Expense Cost |
Power Sensors |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $115,762.00 | $110,135.51 | N/A | $100,305.51 | N/A |
Total for all systems | $825,596.33 | $968,921.94 | N/A | $777,360.73 | N/A |
Primary Transmitter UAXTE-4R37 | $115,762.00 | $110,135.51 | $100,305.51 | ||
Surge Suppressor | $6,000.00 | $6,000.00 | N/A | $1,625.00 | N/A |
Other Transmitter Expenses | $4,162.00 | $4,162.00 | N/A | $4,162.00 | N/A |
Transmitter Building Site Survey/Installation | $10,000.00 | $10,958.00 | Estimates are based on manufacturer's quotes. | $8,605.00 | N/A |
Other Electrical Service: Circuit Breaker, Flexible Conduit, Circuit Breaker Panel, Power Distribution Units | $10,400.00 | $10,400.00 | N/A | $8,498.00 | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $77,415.51 | N/A | $77,415.51 | N/A |
1" Rigid Conduit and Wiring | $1,200.00 | $1,200.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Surge Suppressor | |
Other Transmitter Expenses | |
Transmitter Building Site Survey/Installation | |
Other Electrical Service: Circuit Breaker, Flexible Conduit, Circuit Breaker Panel, Power Distribution Units | |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | |
1" Rigid Conduit and Wiring | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $28,672.50 | $27,571.10 | N/A | $27,571.10 | N/A |
Total for all systems | $825,596.33 | $968,921.94 | N/A | $777,360.73 | N/A |
Primary Antenna ALP-12-L7-ESOC-27 | $28,672.50 | $27,571.10 | $27,571.10 | ||
Side Mount antenna brackets | $4,625.00 | $2,853.60 | N/A | $2,853.60 | N/A |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Elliptical | $18,317.50 | $18,317.50 | Quoted antenna upgrades an existing 8-bay H-Pol antenna to a 12-bay E-Pol one. 12-bay allows a smaller transmitter for equivalent ERP. Reimbursement requested/estimated cost also reflects standard mfr. 15% discount on H-Pol (not E-Pol) antenna. | $18,317.50 | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $6,400.00 | Estimated cost is based on attached consultant's quote. | $6,400.00 | N/A |
Actual Information Description | File Name |
---|---|
Side Mount antenna brackets | |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Elliptical | |
Sweep test of transmission line and antenna |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $88,184.10 | $88,184.10 | N/A | $7,812.09 | N/A |
Total for all systems | $825,596.33 | $968,921.94 | N/A | $777,360.73 | N/A |
Primary Transmission Line | $88,184.10 | $88,184.10 | $7,812.09 | ||
Transmission Line Refit | $72,522.00 | $72,522.00 | See attached letter to Invoice #20220827A. | $0.00 | N/A |
Reducers | $725.05 | $725.05 | Adapter from 4-1/16" to 1-5/8" at Antenna End of Transmission Line | $725.04 | N/A |
Monitor, Transmission Line Pressure | $830.36 | $830.36 | N/A | $830.36 | N/A |
Matching Section, Fine | $2,983.00 | $2,983.00 | N/A | $2,983.00 | N/A |
Matching Section Adjustment | $7,850.00 | $7,850.00 | N/A | $0.00 | N/A |
Jumper, Hangers, and Hardware | $1,002.28 | $1,002.28 | N/A | $1,002.28 | N/A |
Line Sections - Adapter, Internal | $2,271.41 | $2,271.41 | N/A | $2,271.41 | N/A |
Actual Information Description | File Name |
---|---|
Transmission Line Refit | |
Reducers | |
Monitor, Transmission Line Pressure | |
Matching Section, Fine | |
Matching Section Adjustment | Information not provided. |
Jumper, Hangers, and Hardware | |
Line Sections - Adapter, Internal |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $451,193.98 | $484,173.98 | N/A | $456,193.98 | N/A |
Total for all systems | $825,596.33 | $968,921.94 | N/A | $777,360.73 | N/A |
Primary Tower TOWER | $451,193.98 | $484,173.98 | $456,193.98 | ||
Lighting, Obstruction | $61,643.98 | $61,643.98 | See attached letter to Turris Services invoices (TE7070/7075). | $61,643.98 | N/A |
Tower Helicopter Lift | $223,100.00 | $223,100.00 | See attached letter to Turris Services invoices (TE7070/7075). | $223,100.00 | N/A |
Study needed for guyed or free-standing tower | $8,700.00 | $8,000.00 | N/A | $8,000.00 | N/A |
Tower Rigging Tall Tower (greater than 500') | $157,750.00 | $191,430.00 | See attached letter to Turris Services invoices (TE7070/7075). | $163,450.00 | N/A |
Actual Information Description | File Name |
---|---|
Lighting, Obstruction | |
Tower Helicopter Lift | |
Study needed for guyed or free-standing tower | |
Tower Rigging Tall Tower (greater than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $127,889.75 | $245,268.25 | N/A | $184,810.92 | N/A |
Total for all systems | $825,596.33 | $968,921.94 | N/A | $777,360.73 | N/A |
Outside Professional Services | $127,889.75 | $245,268.25 | $184,810.92 | ||
Perform engineering study for displacement application | $1,800.00 | $3,500.00 | Due to more complicated spectrum considerations, more extensive displacement tech review was required. | $3,497.00 | N/A |
Scanning, Blueprints | $152.25 | $152.25 | N/A | $152.25 | N/A |
Floor Resurfacing | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Evaluation, HVAC | $3,200.00 | $3,200.00 | N/A | N/A | N/A |
Abatement, Asbestos | $32,000.00 | $32,000.00 | N/A | N/A | N/A |
RF Exposure Measurements | $12,100.00 | $9,000.00 | N/A | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $52,600.00 | $25,000.00 | N/A | $20,500.00 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $6,000.00 | Because additional efforts were necessary to confirm the parameters of the Station’s final displacement license to cover application, attorney costs for the license to cover for the DRT slightly exceeded costs as had been previously budgeted. | $5,830.50 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $6,150.00 | Licensee required additional help in preparing and then modifying its displacement construction permit, including an expedited change in its permitted antenna and polarization. See e.g. FCC File No. 0000154317. | $5,130.17 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,050.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,100.00 | N/A | $1,180.00 | N/A |
Form 399 assistance or other Program Management costs | $5,000.00 | $5,000.00 | N/A | $3,225.00 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $140,546.00 | Licensee required more help in preparing Form 399 & supporting materials due to personnel changes, including loss of chief engineer & GM as well as additional steps in completing work under displacement permit. | $139,536.50 | N/A |
Outside Legal Advice and Analysis | $5,500.00 | $5,500.00 | Because of legal review of work contracts necessarily related to the tower modification, outside legal costs were higher than initially estimated. | $4,984.50 | N/A |
Testing, Asbestos | $1,070.00 | $1,070.00 | N/A | $775.00 | N/A |
Actual Information Description | File Name |
---|---|
Perform engineering study for displacement application | |
Scanning, Blueprints | |
Floor Resurfacing | Information not provided. |
Evaluation, HVAC | Information not provided. |
Abatement, Asbestos | Information not provided. |
RF Exposure Measurements | Information not provided. |
Comprehensive coverage verification via field study, if needed | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Form 399 assistance or other Program Management costs | |
Prepare/ Review 399 reimbursement form | |
Outside Legal Advice and Analysis | |
Testing, Asbestos |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $13,894.00 | $13,589.00 | N/A | $667.13 | N/A |
Total for all systems | $825,596.33 | $968,921.94 | N/A | $777,360.73 | N/A |
Other Expenses | $13,894.00 | $13,589.00 | $667.13 | ||
Other Expense Cost | $1,056.00 | $1,056.00 | INSERT | $1,056.00 | N/A |
Equipment Delivery and Handling Charges | $8,927.00 | $8,927.00 | Costs were slightly higher because palletized deliveries were made in trucks without liftgates, the building has no loading dock, and the parking area is grass/gravel -- so telehandlers were required. Also, there was some additional equipment needed. | $8,926.78 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $2,000.00 | $2,000.00 | N/A | ($10,786.20) | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | $215.00 | N/A |
Sales Tax | $466.00 | $466.00 | N/A | $450.55 | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $805.00 | N/A | $805.00 | N/A |
Actual Information Description | File Name |
---|---|
Other Expense Cost | |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
FCC Filing Fees - Form 2100 license to cover application | |
Sales Tax | |
FCC Filing Fees - Form 2100 minor change CP application |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $825,596.33 | $968,921.94 | $777,360.73 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Ryan Vandewiele Vice President 09/06/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Ryan Vandewiele Vice President 09/06/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|