Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
NPG of Missouri, LLC Doing Business As: NPG of Missouri, LLC |
825 Edmond Street Saint Joseph, MO 64501 United States |
+1 (816) 271-8504 | tim.hannan@npgco.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Please refer to Supplemental Explanation |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | RXi-5 | |
Year | 2009 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1.2 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | UAXTE-2R23 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.2 kW | |
Justification for New Transmitter | Please refer to revised transition plan exhibit |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Installation for Proof of Performance |
Installation for Proof of Performance |
Tune System from Channel 22 to Channel 30 |
Tune System from Channel 22 to Channel 30 |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 11.8 kW | |
Manufacturer | ||
Model | ALP16M4-HS0C | |
Year | 2009 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | RD24OM488548L3S | |
Year | 2019 | |
Justification for New Antenna | Please refer to revised transition plan exhibit |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Name | Description |
---|---|
Combiner Related Expenses |
Combiner Related Expenses |
Engineering Component Costs |
Engineering Component Costs |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Air | |
Diameter | 3 inches | |
Number of parallel runs | 1 | |
Length | 900 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | Other | |
Other Diameter | 4 inches | |
Segment Length | Other | |
Other Segment Length | 19.38 feet | |
Number of parallel runs | 1 | |
Length | 1000 feet per run | |
Justification for New Transmission Line | Please refer to revised transition plan exhibit | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | Yes |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Construct New |
Tower Use | Primary (Main) | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1003118 | |
Coordinates (NAD83) | Latitude (NAD83) | 38° 46' 32.1" N- |
Longitude (NAD83) | 092° 33' 24.9" W- | |
Overall Structure Height | 1099.07 feet | |
Support Structure Height | 1026.89 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 818.89 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | NPG of Missouri, LLC | |
Date Constructed | 01/01/1970 |
Facility ID | Call Sign | Service |
---|---|---|
63164 | KMIZ | DTV |
Section | Question | Response |
---|---|---|
Construct New Tower | Use | Primary (Main) |
Is this a request for upgraded equipment? | No | |
Height | 1099.10 feet | |
Justification for New Tower | Please refer to revised transition plan exhibit |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Allstate Tower Ultra-Sonic Test on Tower and Visual Inspection |
Allstate Tower Ultra-Sonic Test on Tower and Visual Inspection |
RIA Corporation multi-rate distribution amplifier |
RIA Corporation multi-rate distribution amplifier |
Internet Service at Temporary Tower Site |
Internet Service at Temporary Tower Site |
Rent for Use of Temporary Tower |
Rent for Use of Temporary Tower |
Electrical Service at Temporary Tower Site |
Electrical Service at Temporary Tower Site |
FDH Infrastructure Tower Evaluation and Structural Analysis |
FDH Infrastructure Tower Evaluation and Structural Analysis |
Engineering expenses relating to new tower and transmission system |
Engineering expenses relating to new tower and transmission system |
Spencer Fane Tower Study Legal Fees |
Spencer Fane Tower Study Legal Fees |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
Additional Displacement Legal Services Not Otherwise Specified in Form 399 |
Additional Displacement Legal Services Not Otherwise Specified in Form 399 |
du Treil Invoices relating to antenna and tower work |
du Treil Invoices relating to antenna and tower work |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $101,945.25 | $48,273.49 | N/A | $48,273.49 | N/A |
Total for all systems | $3,297,709.33 | $878,927.75 | N/A | $872,704.05 | N/A |
Primary Transmitter UAXTE-2R23 | $101,945.25 | $48,273.49 | $48,273.49 | ||
Installation for Proof of Performance | $6,698.25 | $6,698.25 | N/A | $6,698.25 | N/A |
Tune System from Channel 22 to Channel 30 | $11,247.00 | $11,247.00 | N/A | $11,247.00 | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $30,328.24 | N/A | $30,328.24 | N/A |
Actual Information Description | File Name |
---|---|
Installation for Proof of Performance | |
Tune System from Channel 22 to Channel 30 | |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $28,562.06 | $28,562.06 | N/A | $28,562.06 | N/A |
Total for all systems | $3,297,709.33 | $878,927.75 | N/A | $872,704.05 | N/A |
Primary Antenna RD24OM488548L3S | $28,562.06 | $28,562.06 | $28,562.06 | ||
Engineering Component Costs | $0.00 | $0.00 | N/A | $0.00 | N/A |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Horizontal | $14,038.26 | $14,038.26 | N/A | $14,038.26 | N/A |
Combiner Related Expenses | $14,523.80 | $14,523.80 | Additional expenses were incurred as indicated in the attached invoices. | $14,523.80 | Additional expenses were incurred as indicated in the attached invoices. |
Actual Information Description | File Name |
---|---|
Engineering Component Costs | |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Horizontal | |
Combiner Related Expenses |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $42,329.09 | $42,329.09 | N/A | $42,329.09 | N/A |
Total for all systems | $3,297,709.33 | $878,927.75 | N/A | $872,704.05 | N/A |
Primary Transmission Line | $42,329.09 | $42,329.09 | $42,329.09 | ||
Rigid Transmission Line - 4" 1 parallel runs 1000 feet | $42,329.09 | $42,329.09 | Additional expenses were incurred as indicated in the attached invoices. | $42,329.09 | Additional expenses were incurred as indicated in the attached invoices. |
Interior RF Systems: Inside RF system including switching, patch panels and dehydrators | $0.00 | $0.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - 4" 1 parallel runs 1000 feet | |
Interior RF Systems: Inside RF system including switching, patch panels and dehydrators |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $3,080,424.74 | $669,794.92 | N/A | $669,794.92 | N/A |
Total for all systems | $3,297,709.33 | $878,927.75 | N/A | $872,704.05 | N/A |
Primary Tower GTOWER | $0.00 | $0.00 | $0.00 | ||
Primary Tower | $3,080,424.74 | $669,794.92 | $669,794.92 | ||
Engineering expenses relating to new tower and transmission system | $895.99 | $895.99 | N/A | $895.99 | Placeholder |
RIA Corporation multi-rate distribution amplifier | $0.00 | $0.00 | N/A | $0.00 | N/A |
Rent for Use of Temporary Tower | $0.00 | $0.00 | Additional expenses were incurred as indicated in the attached invoices. | $0.00 | Additional expenses were incurred as indicated in the attached invoices. |
Tower Rigging Tall Tower (greater than 500') | $157,750.00 | $0.00 | N/A | N/A | N/A |
Internet Service at Temporary Tower Site | $0.00 | $0.00 | N/A | $0.00 | N/A |
Allstate Tower Ultra-Sonic Test on Tower and Visual Inspection | $11,425.00 | $11,425.00 | N/A | $11,425.00 | N/A |
Spencer Fane Tower Study Legal Fees | $13,483.75 | $13,483.75 | N/A | $13,483.75 | N/A |
Electrical Service at Temporary Tower Site | $0.00 | $0.00 | N/A | $0.00 | N/A |
FDH Infrastructure Tower Evaluation and Structural Analysis | $6,500.00 | $6,500.00 | N/A | $6,500.00 | N/A |
New tower between 1000' and 1500' without elevator, presumptive soil conditions | $2,890,370.00 | $637,490.18 | N/A | $637,490.18 | Estimated and actual are equal |
Actual Information Description | File Name |
---|---|
Engineering expenses relating to new tower and transmission system | |
RIA Corporation multi-rate distribution amplifier | |
Rent for Use of Temporary Tower | |
Tower Rigging Tall Tower (greater than 500') | Information not provided. |
Internet Service at Temporary Tower Site | |
Allstate Tower Ultra-Sonic Test on Tower and Visual Inspection | |
Spencer Fane Tower Study Legal Fees | |
Electrical Service at Temporary Tower Site | |
FDH Infrastructure Tower Evaluation and Structural Analysis | |
New tower between 1000' and 1500' without elevator, presumptive soil conditions |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $43,808.19 | $89,328.19 | N/A | $83,384.49 | N/A |
Total for all systems | $3,297,709.33 | $878,927.75 | N/A | $872,704.05 | N/A |
Outside Professional Services | $43,808.19 | $89,328.19 | $83,384.49 | ||
Prepare/ Review 399 reimbursement form | $1,710.00 | $43,282.50 | Additional expenses were incurred as indicated in the attached invoices. | $43,282.50 | Additional expenses were incurred as indicated in the attached invoices. |
du Treil Invoices relating to antenna and tower work | $5,166.66 | $5,166.66 | Additional expenses were incurred as indicated in the attached invoices. | $5,166.66 | Additional expenses were incurred as indicated in the attached invoices. |
Additional Displacement Legal Services Not Otherwise Specified in Form 399 | $23,859.03 | $23,859.03 | Additional expenses were incurred as indicated in the attached invoices. | $23,859.03 | Additional expenses were incurred as indicated in the attached invoices. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $2,235.00 | N/A | $979.70 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | $602.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,975.00 | Additional expenses were incurred as indicated in the attached invoices. | $2,975.00 | N/A |
Perform engineering study for displacement application | $1,800.00 | $4,875.00 | Additional expenses were incurred as indicated in the attached invoices. | $4,875.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $1,280.00 | $1,280.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | $1,644.60 | N/A |
Actual Information Description | File Name |
---|---|
Prepare/ Review 399 reimbursement form | |
du Treil Invoices relating to antenna and tower work | |
Additional Displacement Legal Services Not Otherwise Specified in Form 399 | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for displacement application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $640.00 | $640.00 | N/A | $360.00 | N/A |
Total for all systems | $3,297,709.33 | $878,927.75 | N/A | $872,704.05 | N/A |
Other Expenses | $640.00 | $640.00 | $360.00 | ||
FCC Filing Fees - Special Temporary Authorization request | $305.00 | $305.00 | N/A | $190.00 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | $170.00 | N/A |
Actual Information Description | File Name |
---|---|
FCC Filing Fees - Special Temporary Authorization request | |
FCC Filing Fees - Form 2100 license to cover application |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $3,297,709.33 | $878,927.75 | $872,704.05 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | J. Timothy Hannan EVP & CFO of Parent, NPGCO 08/30/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | J. Timothy Hannan EVP & CFO of Parent, NPGCO 08/30/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | J. Timothy Hannan EVP & CFO of Parent, NPGCO 08/30/2022 |