Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
IGLESIA MANMIN TODA LA CREACION USA INC. Doing Business As: IGLESIA MANMIN TODA LA CREACION USA INC. |
Esteban Handal 1636 WEST FLAGLER ST. MIAMI, FL 33130 United States |
+1 (305) 921-0039 | estebanhandal357@gmail.com | Not-for-Profit |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Jeffrey C Gehman Engineering Associate Kessler and Gehman Associates, Inc. |
Jeffrey C. Gehman 507-D NW 60th Street Gainesville, FL 32607 United States |
+1 (352) 332-3157 | jeff@kesslerandgehman.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Moving from channel 39 UHF to channel 4 VHF we need to do the following: purchase a new transmitter purchase a new antenna purchase a new coax cable and move to a new transmitter site |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | E1000 | |
Year | 2011 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | BE-2.2KWB1 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 2.2 kW | |
Justification for New Transmitter | We are changing channels from UHF to VHF channel.The old transmitter cannot be re-tuned. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | Yes | |
Description | 100 AMPS CIRCUIT | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | Other | |
Other Size | 2 tons | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Exciter |
Exciter |
Filter |
Filter |
Single Rack Cabinet |
Single Rack Cabinet |
Surge Suppressor |
Surge Suppressor |
Site survey and training |
Site survey and training |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Top Mount | |
Antenna position in stack | Top | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels | 4 | |
Design power capacity in use | 80.0 % | |
Lower Limit | 620.00 MHz | |
Upper Limit | 626.00 MHz | |
ERP: | 3.0 kW | |
Manufacturer | ||
Model | 4-K723141 | |
Year | 2011 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Top Mount | |
Antenna position in stack | Top | |
Polarization | Horizontal | |
Type | Other | |
Other Antenna Type | Flat panel | |
ERP: | 3.0 kW | |
Manufacturer | ||
Model | JVHD-LV2 | |
Year | 2019 | |
Justification for New Antenna | We need to move from 39 UHF Channel to 3 VHF Channel. The antenna cannot be re-tuned. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | No | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 160 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Air | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 220 feet per run | |
Justification for New Transmission Line | A new line is required. | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | Yes |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
Coordinates (NAD83) | Latitude (NAD83) | 29° 45' 36.0" N- |
Longitude (NAD83) | 095° 21' 49.0" W- | |
Overall Structure Height | 1059.00 feet | |
Support Structure Height | 1013.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 45.00 feet | |
Structure Type | B - Building | |
Tower Owner | Prime Asset Management | |
Date Constructed | 02/28/2011 |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 25 | |
Explanation | Manmin does not have the expertise to perform work. Therefore we will need to hire outside professional services to do the job. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
FCC Antenna Structure Registration ASR filing |
FCC Antenna Structure Registration (ASR) filing |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
AV Rack |
AV Rack |
EAS |
EAS |
Encoder MUX |
Encoder MUX |
Generator |
Generator |
HVAC Installation |
HVAC Installation |
TX Site Conditioning |
TX Site Conditioning |
Travel |
Travel |
UPS |
UPS |
RF Engineer |
RF Engineer |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $206,300.00 | $206,300.00 | N/A | $206,300.00 | N/A |
Total for all systems | $627,762.50 | $561,647.50 | N/A | $529,174.50 | N/A |
Primary Transmitter BE-2.2KWB1 | $206,300.00 | $206,300.00 | $206,300.00 | ||
Site survey and training | $20,000.00 | $20,000.00 | See attached / uploaded PDF file titled "OM Sys 11718 v220810jgv1.pdf" | $20,000.00 | N/A |
Surge Suppressor | $2,800.00 | $2,800.00 | See attached / uploaded PDF file titled "OM Sys 11718 v220810jgv1.pdf" | $2,800.00 | N/A |
Single Rack Cabinet | $1,700.00 | $1,700.00 | See attached / uploaded PDF file titled "OM Sys 11718 v220810jgv1.pdf" | $1,700.00 | N/A |
Filter | $16,200.00 | $16,200.00 | See attached / uploaded PDF file titled "OM Sys 11718 v220810jgv1.pdf" | $16,200.00 | N/A |
Exciter | $23,600.00 | $23,600.00 | See attached / uploaded PDF file titled "OM Sys 11718 v220810jgv1.pdf" | $23,600.00 | N/A |
Other -- HVAC Service Type: C Size:2 (Other) | $4,500.00 | $4,500.00 | See attached / uploaded PDF file titled "OM Sys 11718 v220810jgv1.pdf" | $4,500.00 | N/A |
Low VHF - Air Cooled Solid State Transmitter 2.2 kW | $112,500.00 | $112,500.00 | See attached / uploaded PDF file titled "OM Sys 11718 v220810jgv1.pdf" | $112,500.00 | N/A |
Other Electrical Service: 100 AMPS CIRCUIT | $25,000.00 | $25,000.00 | See attached / uploaded PDF file titled "OM Sys 11718 v220810jgv1.pdf" | $25,000.00 | N/A |
Actual Information Description | File Name |
---|---|
Site survey and training | |
Surge Suppressor | |
Single Rack Cabinet | |
Filter | |
Exciter | |
Other -- HVAC Service Type: C Size:2 (Other) | |
Low VHF - Air Cooled Solid State Transmitter 2.2 kW | |
Other Electrical Service: 100 AMPS CIRCUIT |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $63,025.00 | $63,025.00 | N/A | $58,400.00 | N/A |
Total for all systems | $627,762.50 | $561,647.50 | N/A | $529,174.50 | N/A |
Primary Antenna JVHD-LV2 | $63,025.00 | $63,025.00 | $58,400.00 | ||
$4,625.00 | $4,625.00 | N/A | N/A | N/A | |
Low VHF-Low Power, Top Mount, Other, 3.0kW input, Horizontal | $58,400.00 | $58,400.00 | See attached / uploaded PDF file titled "OM Sys 11718 v220810jgv1.pdf" | $58,400.00 | N/A |
Actual Information Description | File Name |
---|---|
Information not provided. | |
Low VHF-Low Power, Top Mount, Other, 3.0kW input, Horizontal |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $10,160.00 | $16,900.00 | N/A | $16,900.00 | N/A |
Total for all systems | $627,762.50 | $561,647.50 | N/A | $529,174.50 | N/A |
Primary Transmission Line | $10,160.00 | $16,900.00 | $16,900.00 | ||
Interior RF Systems: Inside RF system including switching, patch panels and dehydrators | $2,900.00 | $2,900.00 | See attached / uploaded PDF file titled "OM Sys 11718 v220810jgv1.pdf" | $2,900.00 | N/A |
Flexible Air Transmission Line - dielectric, 1 5/8" | $7,260.00 | $14,000.00 | See attached / uploaded PDF file titled "OM Sys 11718 v220810jgv1.pdf" | $14,000.00 | N/A |
Actual Information Description | File Name |
---|---|
Interior RF Systems: Inside RF system including switching, patch panels and dehydrators | |
Flexible Air Transmission Line - dielectric, 1 5/8" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $157,750.00 | $84,500.00 | N/A | $84,500.00 | N/A |
Total for all systems | $627,762.50 | $561,647.50 | N/A | $529,174.50 | N/A |
Primary Tower B | $157,750.00 | $84,500.00 | $84,500.00 | ||
Tower Rigging Tall Tower (greater than 500') | $157,750.00 | $84,500.00 | See attached / uploaded PDF file titled "OM Sys 11718 v220810jgv1.pdf" | $84,500.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Tall Tower (greater than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $30,412.50 | $30,807.50 | N/A | $4,404.50 | N/A |
Total for all systems | $627,762.50 | $561,647.50 | N/A | $529,174.50 | N/A |
Outside Professional Services | $30,412.50 | $30,807.50 | $4,404.50 | ||
FCC Antenna Structure Registration ASR filing | $695.00 | $695.00 | See attached / uploaded PDF file titled "KGA 1043-02 v220615jgv1.pdf" | $695.00 | N/A |
RF Exposure Measurements | $12,100.00 | $12,100.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $3,262.50 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,050.00 | N/A | N/A | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | N/A | N/A | N/A |
Form 399 assistance or other Program Management costs | $450.00 | $450.00 | N/A | N/A | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | $1,209.50 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,500.00 | See attached / uploaded PDF file titled "KGA 1043-01 v220615jgv1.pdf" | $2,500.00 | N/A |
Project management of the transition | $2,637.50 | $2,637.50 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
FCC Antenna Structure Registration ASR filing | |
RF Exposure Measurements | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Perform engineering study for displacement application | Information not provided. |
Form 399 assistance or other Program Management costs | Information not provided. |
Prepare/ Review 399 reimbursement form | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Project management of the transition | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $160,115.00 | $160,115.00 | N/A | $158,670.00 | N/A |
Total for all systems | $627,762.50 | $561,647.50 | N/A | $529,174.50 | N/A |
Other Expenses | $160,115.00 | $160,115.00 | $158,670.00 | ||
RF Engineer | $25,000.00 | $25,000.00 | See attached / uploaded PDF file titled "OM Sys 11718 v220810jgv1.pdf" | $25,000.00 | N/A |
TX Site Conditioning | $20,000.00 | $20,000.00 | See attached / uploaded PDF file titled "OM Sys 11718 v220810jgv1.pdf" | $20,000.00 | N/A |
HVAC Installation | $5,500.00 | $5,500.00 | See attached / uploaded PDF file titled "OM Sys 11718 v220810jgv1.pdf" | $5,500.00 | N/A |
Travel | $18,000.00 | $18,000.00 | See attached / uploaded PDF file titled "OM Sys 11718 v220810jgv1.pdf" | $18,000.00 | N/A |
AV Rack | $16,479.00 | $16,479.00 | See attached / uploaded PDF file titled "OM Sys 11718 v220810jgv1.pdf" | $16,479.00 | N/A |
EAS | $10,291.00 | $10,291.00 | See attached / uploaded PDF file titled "OM Sys 11718 v220810jgv1.pdf" | $10,291.00 | N/A |
Encoder MUX | $25,000.00 | $25,000.00 | See attached / uploaded PDF file titled "OM Sys 11718 v220810jgv1.pdf" | $25,000.00 | N/A |
Equipment Delivery and Handling Charges | $2,100.00 | $2,100.00 | See attached / uploaded PDF file titled "OM Sys 11718 v220810jgv1.pdf" | $2,100.00 | N/A |
UPS | $24,800.00 | $24,800.00 | See attached / uploaded PDF file titled "OM Sys 11718 v220810jgv1.pdf" | $24,800.00 | N/A |
Generator | $11,500.00 | $11,500.00 | See attached / uploaded PDF file titled "OM Sys 11718 v220810jgv1.pdf" | $11,500.00 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
RF Engineer | |
TX Site Conditioning | |
HVAC Installation | |
Travel | |
AV Rack | |
EAS | |
Encoder MUX | |
Equipment Delivery and Handling Charges | |
UPS | |
Generator | |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $627,762.50 | $561,647.50 | $529,174.50 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jeffrey C Gehman Engineering Associate 08/11/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jeffrey C Gehman Engineering Associate 08/11/2022 |