Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
GRAY TELEVISION LICENSEE, LLC |
Robert Folliard 4370 Peachtree Rd, NE Atlanta, GA 30319 United States |
+1 (701) 237-5211 | Robert.Folliard@gray.tv | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Samuel Hariton Widelity |
Samuel Hariton 4031 University Drive Suite 100 Fairfax, VA 22030 United States |
+1 (339) 222-8107 | sam.hariton@widelity.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | WOVA-LD is planning to purchase a new like-for-like transmitter, purchase a new like-for-like antenna, utilize its existing transmission line (while adding interior lines) and make modifications on its existing tower (that will be covered by WTAP) |
Question | Response |
---|---|
Sharee Station Facility ID | 130392 |
Call Sign | WIYE-LD |
Type | |
Licensee Name | GRAY TELEVISION LICENSEE, LLC |
Status | LICENSED |
DTS | No |
Community of License | PARKERSBURG, WV |
Pre-auction RF Channel | 26 |
Post-auction RF Channel | |
Neilsen DMA | |
Network Affiliation |
Question | Response |
---|---|
Sharee Station Facility ID | 183797 |
Call Sign | W24DS-D |
Type | |
Licensee Name | EDGE SPECTRUM, INC. |
Status | LICENSED AND SILENT |
DTS | No |
Community of License | PARKERSBURG, WV |
Pre-auction RF Channel | 24 |
Post-auction RF Channel | |
Neilsen DMA | |
Network Affiliation |
Question | Response |
---|---|
Sharee Station Facility ID | 4685 |
Call Sign | WTAP-TV |
Type | Commercial |
Licensee Name | GRAY TELEVISION LICENSEE, LLC |
Status | LICENSED |
DTS | No |
Community of License | PARKERSBURG, WV |
Pre-auction RF Channel | 49 |
Post-auction RF Channel | 35 |
Neilsen DMA | Parkersburg |
Network Affiliation |
Question | Response |
---|---|
Sharee Station Facility ID | 183796 |
Call Sign | W16CV-D |
Type | |
Licensee Name | EDGE SPECTRUM, INC. |
Status | LICENSED AND SILENT |
DTS | No |
Community of License | PARKERSBURG, WV |
Pre-auction RF Channel | 16 |
Post-auction RF Channel | |
Neilsen DMA | |
Network Affiliation |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | TD425K00AX S/N 1105 | |
Year | 2002 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 4.1 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | UAXTE-6R44 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 3 kW | |
Justification for New Transmitter | Existing transmitter is no longer supported by the manufacturer and cannot be retuned. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 1.25 inches | |
Length | 502.0 feet | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Primary Transmitter - Other Expenses |
Other expenses required for primary transmitter |
Ductwork Install and Adjustment |
Ductwork Install and Adjustment |
HVAC Relocation |
HVAC Relocation |
Transmitter Site Road Grading |
Increased traffic to transmitter site has greatly damaged the gravel road leading to the site |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
ERP: | 7.0 kW | |
Manufacturer | ||
Model | AL12-22-PLC | |
Year | 2012 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
ERP: | 5.0 kW | |
Manufacturer | ||
Model | TLP12A/VP-R | |
Year | 2019 | |
Justification for New Antenna | Existing antenna constructed solely for operation on the pre-displacement channel and cannot be retuned |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1239800 | |
Coordinates (NAD83) | Latitude (NAD83) | 39° 20' 59.8" N- |
Longitude (NAD83) | 081° 33' 55.4" W- | |
Overall Structure Height | 462.92 feet | |
Support Structure Height | 459.97 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 970.13 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Gray Television Group, Inc. | |
Date Constructed | 11/21/2003 |
Facility ID | Call Sign | Service |
---|---|---|
4685 | WTAP-TV | DTV |
183797 | W24DS-D | LPT |
183796 | W16CV-D | LPT |
130392 | WIYE-LD | LPD |
Users |
---|
USCG |
T-Mobile |
911 Services |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study need for guyed or free-standing tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 254 | |
Explanation | WOVA-LD requires the aid of outside project management services in order to fulfill the requirements of the repack. WOVA-LD does not have sufficient resource capacity and expertise in house to handle all of the tasks required to complete their transition. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | Yes | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | Yes |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
Use Tax |
Use tax paid to the State of Ohio Treasurer on costs relevant to the repack |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $219,759.22 | $246,135.71 | N/A | $192,760.95 | N/A |
Total for all systems | $390,167.28 | $414,156.77 | N/A | $325,043.95 | N/A |
Primary Transmitter UAXTE-6R44 | $219,759.22 | $246,135.71 | $192,760.95 | ||
Ductwork Install and Adjustment | $6,500.00 | $6,500.00 | Please see WOVA-LD Tri-State Roofing Sheet Metal Company - Ductwork Install and Adjustment Quote | $6,325.26 | N/A |
HVAC Relocation | $3,625.67 | $3,625.67 | Please see WOVA-LD Primary Transmitter - HVAC Relocation Budget Revision Justification Letter | $3,625.67 | N/A |
Transmitter Site Road Grading | $15,000.00 | $15,000.00 | Please see attached easement from Bosley Construction | N/A | N/A |
Primary Transmitter - Other Expenses | $10,616.72 | $10,616.72 | Please see Estimated Cost Justification WOVA-LD-110-Primary Transmitter - Other Expenses V1 | $10,616.72 | N/A |
1.25" Rigid Conduit and Wiring | $13,966.83 | $13,966.83 | see Estimated Cost Justification WOVA-LD-110-Primary Transmitter - 1.25in Rigid Conduit and Wiring v0 | $13,966.83 | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $2,230.80 | see Estimated Cost Justification WOVA-LD-110-Primary Transmitter - Transformer v1 | $2,230.80 | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $38,200.00 | N/A | $0.00 | N/A |
UHF - Air Cooled Solid State Transmitter 2.501 - 3.999 kW | $106,300.00 | $155,995.69 | see Estimated Cost Justification WOVA-LD-110-Primary Transmitter - UHF Air Cooled Solid State, 2.5-3.99 kW v1 | $155,995.67 | N/A |
Actual Information Description | File Name |
---|---|
Ductwork Install and Adjustment | |
HVAC Relocation | |
Transmitter Site Road Grading | Information not provided. |
Primary Transmitter - Other Expenses | |
1.25" Rigid Conduit and Wiring | |
Transformer 3 phase/480v - 150 KVA | |
Switchgear - industrial 800 amp | Information not provided. |
UHF - Air Cooled Solid State Transmitter 2.501 - 3.999 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $42,379.50 | $38,659.50 | N/A | $38,659.50 | N/A |
Total for all systems | $390,167.28 | $414,156.77 | N/A | $325,043.95 | N/A |
Primary Antenna TLP12A/VP-R | $42,379.50 | $38,659.50 | $38,659.50 | ||
Sweep test of transmission line and antenna | $5,730.00 | $2,010.00 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $2,010.00 | N/A |
UHF-Low Power, Side Mount, Slotted Coaxial, 5.0kW input, Elliptical | $36,649.50 | $36,649.50 | Please see attached Dielectric Quote 513588JKT | $36,649.50 | N/A |
Actual Information Description | File Name |
---|---|
Sweep test of transmission line and antenna | |
UHF-Low Power, Side Mount, Slotted Coaxial, 5.0kW input, Elliptical |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $64,890.00 | $49,835.00 | N/A | $45,135.00 | N/A |
Total for all systems | $390,167.28 | $414,156.77 | N/A | $325,043.95 | N/A |
Primary Tower TOWER | $64,890.00 | $49,835.00 | $45,135.00 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $45,135.00 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $45,135.00 | N/A |
Study needed for guyed or free-standing tower | $8,700.00 | $4,700.00 | Please see attached Hodge Proposal WTAP-0516-N-rev1 | N/A | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Short Tower (less than 500') | |
Study needed for guyed or free-standing tower | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $38,819.50 | $55,207.50 | N/A | $36,944.20 | N/A |
Total for all systems | $390,167.28 | $414,156.77 | N/A | $325,043.95 | N/A |
Outside Professional Services | $38,819.50 | $55,207.50 | $36,944.20 | ||
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | N/A | N/A |
Prepare Form 601 | $755.00 | $755.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | N/A | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | N/A | N/A |
Perform engineering study for displacement application | $1,800.00 | $3,075.00 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $3,075.00 | N/A |
Project management of the transition | $26,797.00 | $41,910.00 | Please see attached Widelity Quote | $33,869.20 | N/A |
Actual Information Description | File Name |
---|---|
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare Form 601 | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare/ Review 399 reimbursement form | Information not provided. |
Perform engineering study for displacement application | |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $24,319.06 | $24,319.06 | N/A | $11,544.30 | N/A |
Total for all systems | $390,167.28 | $414,156.77 | N/A | $325,043.95 | N/A |
Other Expenses | $24,319.06 | $24,319.06 | $11,544.30 | ||
Use Tax | $3,499.17 | $3,499.17 | Please See: WOVA-LD Use Tax Budget Revision Justification Cover Letter and Invoice WOVA USE TAX 02.25.2021.pdf | $3,499.15 | N/A |
Equipment Storage | $760.00 | $760.00 | Please see attached Atlas Trailer Rentals Quote | N/A | N/A |
Equipment Delivery and Handling Charges | $9,533.18 | $9,533.18 | Please see Estimated Cost Justification WOVA-LD-610-Equipment Delivery and Handling v1 | $7,875.15 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $4,121.71 | $4,121.71 | Please see attached Wood County Waste Proposal | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | $170.00 | N/A |
FCC Filing Fees - Form 2100 Major change CP application | $4,960.00 | $4,960.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Use Tax | |
Equipment Storage | Information not provided. |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | |
FCC Filing Fees - Form 2100 Major change CP application | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $390,167.28 | $414,156.77 | $325,043.95 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Robert Folliard , III . Assistant Secretary 08/08/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Robert Folliard , III . Assistant Secretary 08/08/2022 |