Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
WSOC TELEVISION, LLC Doing Business As: WSOC TELEVISION, LLC |
Legal Department, Cox Media Group 223 Perimeter Center Parkway NE Atlanta, GA 30346 United States |
+1 (470) 508-3472 | alysia.long@cmg.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Ted Hand Director of Engineering Operations WSOC Television, LLC |
Ted Hand 235 West 23rd Street Charlotte, NC 28206 United States |
+1 (704) 335-4732 | ted.hand@cmg.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | WAXN will install the auxiliary transmitter first. It will transmit on that system while the main transmitter is installed. There are separate antennas for main and auxiliary. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | backup to main | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | DCD20PL3 Diamond CD | |
Year | 1999 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 6 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Auxiliary (Backup) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | ULXTE-10 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 6 kW | |
Justification for New Transmitter | Current auxiliary transmitter is tuned to channel 50 and can not be tuned below channel 36 |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | Yes | |
Size | 2 inches | |
Length | 250.0 feet | |
Other Electrical Service | Yes | |
Description | Wiring for water pumps and mask filter blowers | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Coaxial Switch |
Coaxial switch for Main to Aux switching |
Combiner |
Combiner used to combine WAXN Aux and WSOC Aux in to one T/L. Cost is shared with WSOC-TV |
RF Hanging Supplies |
Equipment used to hang RF filters and waveguide in main room |
Plumbing Supplies |
Plumbing pipe and adapters for liquid cooled transmitter |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | DHD15P1 Diamond CD | |
Year | 1999 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 8.5 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTE-24 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 16.1 kW | |
Justification for New Transmitter | Current transmitter is tuned to channel 50 and can not be tuned below channel 36. Upgraded transmitter installed - no reimbursement sought beyond like-for-like equipment |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | Yes | |
Power | 300 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 2 inches | |
Length | 250.0 feet | |
Other Electrical Service | Yes | |
Description | Wiring for water pumps and mask filter blowers. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 15 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 320.0 square feet | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
RF Equipment |
Elbows, hangers, hardware kits, flanges |
Distilled Water |
Distilled water for cooling transmitter |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Top | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 150.0 kW | |
Manufacturer | ||
Model | TFU-25ETT-V/R 4C160 | |
Year | 2009 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Top | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 200.0 kW | |
Manufacturer | ||
Model | TFU-16ETT/VP-R 3C180 | |
Year | 2009 | |
Justification for New Antenna | Current antenna is a single channel slot tuned to channel 50. It can not be retuned. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 6 1/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | backup to main | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | Yes | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 585 feet per run |
Facility ID | Call Sign |
---|---|
74070 | WSOC-TV |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Auxiliary (Backup) |
Description of Use | backup to main | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 585 feet per run | |
Justification for New Transmission Line | Current line is 19 1/2' sections. New assigned channel will not pass in it. |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1070 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1070 feet per run | |
Justification for New Transmission Line | Current transmission line is 19 1/2' and will not pass the new assigned channel. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1004745 | |
Coordinates (NAD83) | Latitude (NAD83) | 35° 15' 42.0" N- |
Longitude (NAD83) | 080° 43' 37.0" W- | |
Overall Structure Height | 1082.01 feet | |
Support Structure Height | 970.13 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 855.96 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | IWG Towers Assets II, LLC | |
Date Constructed | 01/31/2000 |
Facility ID | Call Sign | Service |
---|---|---|
74070 | WSOC-TV | DTV |
20339 | WSOC-FM | FM |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Tower Modifications |
Labor to modify tower |
Engineering Study |
Modification on antenna mount and structure change |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 25 | |
Explanation | Project manager hired to coordinate crews and materials. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
LPB Work |
LPB Consulting, Remediation |
County Permits |
Permits to make modification tower |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,488,641.18 | $694,604.32 | N/A | $611,357.67 | N/A |
Total for all systems | $2,917,650.79 | $2,074,074.88 | N/A | $1,703,747.88 | N/A |
Primary Transmitter ULXTE-24 | $1,172,541.18 | $415,791.18 | $388,729.07 | ||
Distilled Water | $1,300.00 | $1,300.00 | N/A | $0.00 | N/A |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | $684,000.00 | $0.00 | Please see attached GatesAir Quote GA-00024824. This is the upgraded transmitter installed for WAXN - all like-for-like reimbursements processed under a different category. | $0.00 | N/A |
RF Equipment | $10,000.00 | $10,000.00 | RF equipment needed to move WAXN aux transmitter to make room for new transmitter. | $3,331.58 | N/A |
Other -- Building Addition Size: 320.0 | $20,600.00 | $20,600.00 | N/A | $15,328.31 | N/A |
15 Ton system | $55,800.00 | $14,000.00 | Cost to move current unit. Shared cost with WSOC-TV 74070 | $13,288.00 | N/A |
Other Electrical Service: Wiring for water pumps and mask filter blowers. | $31,800.00 | $31,800.00 | N/A | $24,940.00 | N/A |
2" Rigid Conduit and Wiring (Cost per foot) | $6,500.00 | $6,250.00 | N/A | $0.00 | N/A |
Transformer 3 phase/480v - 300 KVA | $36,800.00 | $6,100.00 | Actual cost lower than estimated. | $6,100.00 | N/A |
UHF - Liquid Cooled Solid State Transmitter 8 kW | $325,741.18 | $325,741.18 | ***System Notice: Estimate adjusted and locked because line has been superseded.*** | $325,741.18 | N/A |
Auxiliary Transmitter ULXTE-10 | $316,100.00 | $278,813.14 | $222,628.60 | ||
Combiner | $8,300.00 | $8,300.00 | This is half the cost. Shared with WSOC-TV | $8,293.12 | based on actual invoice |
Coaxial Switch | $4,700.00 | $4,700.00 | N/A | N/A | N/A |
Plumbing Supplies | $3,500.00 | $3,500.00 | N/A | $1,531.53 | N/A |
RF Hanging Supplies | $8,000.00 | $8,000.00 | N/A | $1,880.37 | N/A |
2" Rigid Conduit and Wiring (Cost per foot) | $6,500.00 | $6,250.00 | N/A | $0.00 | N/A |
UHF - Liquid Cooled Solid State Transmitter 4.9 . 6.5 kW | $273,500.00 | $236,463.14 | N/A | $210,923.58 | N/A |
Other Electrical Service: Wiring for water pumps and mask filter blowers | $11,600.00 | $11,600.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Distilled Water | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | Information not provided. |
RF Equipment | |
Other -- Building Addition Size: 320.0 | |
15 Ton system | |
Other Electrical Service: Wiring for water pumps and mask filter blowers. | |
2" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Transformer 3 phase/480v - 300 KVA | |
UHF - Liquid Cooled Solid State Transmitter 8 kW | |
Combiner | |
Coaxial Switch | Information not provided. |
Plumbing Supplies | |
RF Hanging Supplies | |
2" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 4.9 . 6.5 kW | |
Other Electrical Service: Wiring for water pumps and mask filter blowers | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $308,530.00 | $309,900.00 | N/A | $215,905.00 | N/A |
Total for all systems | $2,917,650.79 | $2,074,074.88 | N/A | $1,703,747.88 | N/A |
Primary Antenna TFU-16ETT/VP-R 3C180 | $308,530.00 | $309,900.00 | $215,905.00 | ||
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | $12,300.00 | $28,500.00 | Based on actually invoices | $10,458.00 | Based on actually cost |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $640.00 | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | $289,500.00 | $275,000.00 | N/A | $204,807.00 | N/A |
Actual Information Description | File Name |
---|---|
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | |
Sweep test of existing antenna | |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $334,310.00 | $279,320.00 | N/A | $219,336.55 | N/A |
Total for all systems | $2,917,650.79 | $2,074,074.88 | N/A | $1,703,747.88 | N/A |
Primary Transmission Line | $216,140.00 | $167,000.00 | $162,202.16 | ||
Rigid Transmission Line - copper, 6 1/8" | $216,140.00 | $167,000.00 | N/A | $162,202.16 | Based on actually cost / invoices |
Auxiliary Transmission Line | $118,170.00 | $112,320.00 | $57,134.39 | ||
Rigid Transmission Line - copper, 6 1/8" | $118,170.00 | $112,320.00 | This is half the cost. The other half in on WSOC-TV's Form 399. | $57,134.39 | N/A |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 6 1/8" | |
Rigid Transmission Line - copper, 6 1/8" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $519,100.00 | $504,501.00 | N/A | $500,772.50 | N/A |
Total for all systems | $2,917,650.79 | $2,074,074.88 | N/A | $1,703,747.88 | N/A |
Primary Tower TOWER | $519,100.00 | $504,501.00 | $500,772.50 | ||
Minor tower reinforcement/modifications | $158,000.00 | $1.00 | N/A | $0.00 | N/A |
Tower Modifications | $131,000.00 | $131,000.00 | N/A | $130,303.00 | N/A |
Tall Tower (greater than 500') | $210,500.00 | $360,000.00 | This is half the cost. The other half is on WSOC-TV's Form 399. Based on actually cost includes main and aux systems. | $357,132.00 | N/A |
Structural engineering tower load study for well documented tower | $12,600.00 | $6,500.00 | N/A | $6,437.50 | N/A |
Engineering Study | $7,000.00 | $7,000.00 | N/A | $6,900.00 | N/A |
Actual Information Description | File Name |
---|---|
Minor tower reinforcement/modifications | Information not provided. |
Tower Modifications | |
Tall Tower (greater than 500') | |
Structural engineering tower load study for well documented tower | |
Engineering Study |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $146,285.00 | $172,554.95 | N/A | $56,844.75 | N/A |
Total for all systems | $2,917,650.79 | $2,074,074.88 | N/A | $1,703,747.88 | N/A |
Outside Professional Services | $146,285.00 | $172,554.95 | $56,844.75 | ||
RF Exposure Measurements | $21,050.00 | $20,000.00 | N/A | $712.50 | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $80,000.00 | N/A | $0.00 | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $5,110.00 | Please see WAXN-TV Attorney - Other Matters Budget Revision Justification Letter. The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $4,885.00 | see submitted invoices |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | $95.90 | N/A |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | $4,210.00 | $4,000.00 | N/A | $2,608.30 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $4,755.70 | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | $2,105.00 | $2,000.00 | N/A | $450.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $15,050.00 | Actual Engineering Cost. See attached. | $12,660.50 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $314.00 | Please see WAXN-TV Attorney - Transition Timing and Coordination Budget Revision Justification Letter | $314.00 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $31.90 | N/A |
Project management of the transition | $3,950.00 | $30,330.95 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $30,330.95 | N/A |
Actual Information Description | File Name |
---|---|
RF Exposure Measurements | |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | |
Prepare and or review reimbursement form | |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $120,784.61 | $113,194.61 | N/A | $99,531.41 | N/A |
Total for all systems | $2,917,650.79 | $2,074,074.88 | N/A | $1,703,747.88 | N/A |
Other Expenses | $120,784.61 | $113,194.61 | $99,531.41 | ||
County Permits | $4,625.00 | $4,625.00 | N/A | $4,625.00 | N/A |
LPB Work | $90,000.00 | $90,000.00 | N/A | $88,800.00 | N/A |
MVPD Notification of Channel Change | $2,000.00 | $2,000.00 | N/A | N/A | N/A |
Develop and air announcement of upcoming channel change | $1,500.00 | $1,500.00 | N/A | N/A | N/A |
Equipment Storage | $2,600.00 | $2,600.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $3,564.61 | $3,564.61 | Estimated Cost Justification WAXN-TV-610-Equipment and Handling v1 | $2,496.41 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $3,500.00 | $3,500.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | per Estimated Cost Justification WAXN-TV-610-FCC Filing Fee - License to Cover Application V0 | $335.00 | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,070.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $4,000.00 | N/A | $3,275.00 | N/A |
Actual Information Description | File Name |
---|---|
County Permits | |
LPB Work | |
MVPD Notification of Channel Change | Information not provided. |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Storage | Information not provided. |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
DTV Medical Facility Notification |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $2,917,650.79 | $2,074,074.88 | $1,703,747.88 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Ted Hand Director of Engineering/Operations 07/21/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Ted Hand Director of Engineering/Operations 07/21/2022 |