Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
LOUISIANA TELEVISION BROADCASTING, L.L.C. Doing Business As: LOUISIANA TELEVISION BROADCASTING, L.L.C. |
Robert Bernard P. O. BOX 2906 BATON ROUGE, LA 70821 United States |
+1 (225) 387-2222 | Programs@WBRZ.COM | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Arthur M Hoover , III . President Technical Consultant Technical Services Group, Inc. |
12015 Cloverland Court Baton Rouge, LA 70809 United States |
+1 (225) 751-9800 | amh@tsgcom.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | See attached Narrative |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | UAXT-2R37 Maxiva | |
Year | 2014 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1.8 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | UAXTE-6R44 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 3.0 kW | |
Justification for New Transmitter | KBTR is installing a new lower gain antenna for structural reasons. A higher TPO transmitter will be needed to meet the necessary ERP. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | Yes | |
Size | 2 inches | |
Length | 100.0 feet | |
Other Electrical Service | Yes | |
Description | Panel board expansion for operation of interim and replacement transmitters, and installation of new circuit breaker panel | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 5 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Primary Transmitter - Reconfiguration |
Primary Transmitter - Reconfiguration |
Primary transmitter- Other Parts |
Other transmitter parts required for repack |
Primary Transmitter - Surge Suppressor |
Surge suppressor for primary transmitter |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 13.6 kW | |
Manufacturer | ||
Model | PSILP120I | |
Year | 2009 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Class A |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | ATC-BCE312M-V3-24 | |
Year | 2019 | |
Justification for New Antenna | KBTR current antenna is a single frequency Ch. 41 and is not capable of operating on the new 36 assignment |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Interim Pattern Scatter Analysis |
After the existing main antenna is moved to new interim position and reconnected to existing main line, A pattern scatter analysis will benecessary. |
Interim Side Mount Brackets |
New side mount brackets will be necessary to install the existing main antenna to it's interim position on the tower. |
Interim Sweep tests |
After the existing main antenna is moved to new interim position and reconnected to existing main line, sweep tests will be necessary. |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Air | |
Diameter | 1 5/8 inches | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 680 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Air | |
Diameter | 1 5/8 inches | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 685 feet per run | |
Justification for New Transmission Line | KBTRs request for new main transmission line is required to facilitate installation of the new antenna while the old line remains on the tower for interim operation on current frequency. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | No | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1019301 | |
Coordinates (NAD83) | Latitude (NAD83) | 30° 25' 57.0" N- |
Longitude (NAD83) | 091° 11' 07.0" W- | |
Overall Structure Height | 769.02 feet | |
Support Structure Height | 768.04 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 47.90 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | LOUISIANA TELEVISION BROADCASTING CORP DBA = WBRZ TV | |
Date Constructed | 01/01/1954 |
Users |
---|
Public Safety |
Many 2-way pagi |
K249DV FX |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Structural Analysis |
After the tower mapping is complete, the structural analysis will need to be run. |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 1192 | |
Explanation | Current internal personnel insufficient to ensure safe, timely transition for project of this scope. As such, KBTR will hire an outside firm to facilitate and support KBTR in these tasks and others to ensure a timely and well managed transition. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | Yes | |
Environmental Assessment | Yes | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | Yes | |
Additional Field Engineering Service | Yes | |
Number of Days | 8 | |
Justification | planning, design, and field verification |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellan |
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellaneous non-catalog legal fees |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $251,774.61 | $231,315.32 | N/A | $191,491.57 | N/A |
Total for all systems | $1,168,560.61 | $1,247,125.90 | N/A | $791,123.45 | N/A |
Primary Transmitter UAXTE-6R44 | $251,774.61 | $231,315.32 | $191,491.57 | ||
Primary Transmitter - Surge Suppressor | $2,373.09 | $2,373.09 | Please see Estimated Cost Justification KBTR-110-1st Primary Transmitter - Surge Suppressor v0 | $2,373.08 | N/A |
5 Ton system | $20,250.00 | $20,250.00 | N/A | $11,460.00 | N/A |
Primary transmitter- Other Parts | $65.54 | $65.54 | Please see TSG KBTR Primary Transmitter- other parts Budget Justification Cover Letter | $65.54 | N/A |
Primary Transmitter - Reconfiguration | $7,685.98 | $7,685.98 | Please see TSG Estimate # KBTR-1.5 | $7,685.98 | N/A |
Other Electrical Service: Panel board expansion for operation of interim and replacement transmitters, and installation of new circuit breaker panel | $25,000.00 | $25,000.00 | N/A | $1,050.00 | N/A |
2" Rigid Conduit and Wiring (Cost per foot) | $2,600.00 | $2,600.00 | N/A | $550.00 | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $5,033.73 | Please see TSG Estimate KBTR-1.4, line items 14 and 15 | $5,033.73 | N/A |
UHF - Air Cooled Solid State Transmitter 2.501 - 3.999 kW | $155,600.00 | $168,306.98 | Please see KBTR TSG Estimate KBTR-1.4 and KBTR UAXTE Req TPO RevJ-06182018 | $163,273.24 | N/A |
Actual Information Description | File Name |
---|---|
Primary Transmitter - Surge Suppressor | |
5 Ton system | |
Primary transmitter- Other Parts | |
Primary Transmitter - Reconfiguration | |
Other Electrical Service: Panel board expansion for operation of interim and replacement transmitters, and installation of new circuit breaker panel | |
2" Rigid Conduit and Wiring (Cost per foot) | |
Switchgear - industrial 800 amp | |
UHF - Air Cooled Solid State Transmitter 2.501 - 3.999 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $56,430.00 | $43,990.42 | N/A | $28,116.41 | N/A |
Total for all systems | $1,168,560.61 | $1,247,125.90 | N/A | $791,123.45 | N/A |
Primary Antenna ATC-BCE312M-V3-24 | $56,430.00 | $43,990.42 | $28,116.41 | ||
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $6,400.00 | N/A |
UHF - Lower Power Side Mount, Class A One Station antenna -- basic | $26,300.00 | $14,190.42 | Please see Estimated Cost Justification KBTR-210-Primary Antenna - UHF Lower Power Side Mount, Class A Station v1 | $14,190.42 | N/A |
Interim Sweep tests | $6,400.00 | $6,400.00 | N/A | $6,400.00 | N/A |
Interim Pattern Scatter Analysis | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Interim Side Mount Brackets | $12,000.00 | $12,000.00 | N/A | $1,125.99 | N/A |
Actual Information Description | File Name |
---|---|
Sweep test of existing antenna | |
UHF - Lower Power Side Mount, Class A One Station antenna -- basic | |
Interim Sweep tests | |
Interim Pattern Scatter Analysis | Information not provided. |
Interim Side Mount Brackets |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $22,605.00 | $21,235.00 | N/A | $21,025.42 | N/A |
Total for all systems | $1,168,560.61 | $1,247,125.90 | N/A | $791,123.45 | N/A |
Primary Transmission Line | $22,605.00 | $21,235.00 | $21,025.42 | ||
Flexible Air Transmission Line - dielectric, 1 5/8" | $22,605.00 | $21,235.00 | N/A | $21,025.42 | N/A |
Actual Information Description | File Name |
---|---|
Flexible Air Transmission Line - dielectric, 1 5/8" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $412,925.00 | $528,168.83 | N/A | $383,547.68 | N/A |
Total for all systems | $1,168,560.61 | $1,247,125.90 | N/A | $791,123.45 | N/A |
Primary Tower TOWER | $412,925.00 | $528,168.83 | $383,547.68 | ||
Tall Tower (greater than 500') | $210,500.00 | $200,000.00 | N/A | $71,003.87 | N/A |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $25,000.00 | N/A | $9,375.00 | N/A |
Structural Analysis | $18,125.00 | $18,125.00 | Please see Estimated Cost Justification KBTR-410-Existing Primary Tower - Structural Analysis v0 | $18,125.00 | N/A |
Minor tower reinforcement/modifications | $158,000.00 | $285,043.83 | Please see Estimated Cost Justification KBTR-410-Existing Primary Tower - Minor Tower Reinforcements/Modifications v0 | $285,043.81 | N/A |
Actual Information Description | File Name |
---|---|
Tall Tower (greater than 500') | |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | |
Structural Analysis | |
Minor tower reinforcement/modifications |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $277,136.00 | $275,331.33 | N/A | $138,643.73 | N/A |
Total for all systems | $1,168,560.61 | $1,247,125.90 | N/A | $791,123.45 | N/A |
Outside Professional Services | $277,136.00 | $275,331.33 | $138,643.73 | ||
Project management of the transition | $188,336.00 | $157,618.90 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $91,418.90 | N/A |
Additional Field Engineering Service, 8 Days | $16,000.00 | $16,000.00 | N/A | N/A | N/A |
RF Exposure Measurements | $21,050.00 | $20,000.00 | N/A | N/A | N/A |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | $10,520.00 | $10,000.00 | N/A | N/A | N/A |
NEPA Section 106 environmental review, if needed | $6,310.00 | $6,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $3,500.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $3,466.03 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $3,466.03 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $762.40 | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $40,000.00 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $40,000.00 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,996.40 | see Estimated Cost Justification KBTR-590-Prepare and_or Review Reimbursement Form v0 | $2,996.40 | N/A |
Actual Information Description | File Name |
---|---|
Project management of the transition | |
Additional Field Engineering Service, 8 Days | Information not provided. |
RF Exposure Measurements | Information not provided. |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | Information not provided. |
NEPA Section 106 environmental review, if needed | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Prepare and or review reimbursement form |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $147,690.00 | $147,085.00 | N/A | $28,298.64 | N/A |
Total for all systems | $1,168,560.61 | $1,247,125.90 | N/A | $791,123.45 | N/A |
Other Expenses | $147,690.00 | $147,085.00 | $28,298.64 | ||
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellan | $0.00 | $0.00 | N/A | N/A | N/A |
MVPD Notification of Channel Change | $2,000.00 | $2,000.00 | N/A | N/A | N/A |
Develop and air announcement of upcoming channel change | $15,000.00 | $15,000.00 | N/A | N/A | N/A |
Equipment Storage | $30,000.00 | $30,000.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $35,000.00 | $35,000.00 | N/A | $6,650.00 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $37,500.00 | $37,500.00 | N/A | $16,463.89 | N/A |
Non-zoning permits | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Local Zoning | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,070.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $11,000.00 | N/A | $5,184.75 | N/A |
Actual Information Description | File Name |
---|---|
Non-Catalog Legal Services such as review of quarterly transition status reports and other miscellan | Information not provided. |
MVPD Notification of Channel Change | Information not provided. |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Storage | Information not provided. |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
Non-zoning permits | Information not provided. |
Local Zoning | Information not provided. |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
DTV Medical Facility Notification |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $1,168,560.61 | $1,247,125.90 | $791,123.45 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Joey Verrett Director Of Operations 06/06/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Joey Verrett Director Of Operations 06/06/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Joey Verrett Director Of Operations 06/06/2022 |