Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
SOUTH CAROLINA EDUCATIONAL TV COMMISSION Doing Business As: SOUTH CAROLINA EDUCATIONAL TV COMMISSION |
Mark Jahnke 1041 GEORGE ROGERS BOULEVARD COLUMBIA, SC 29201 United States |
+1 (803) 737-3486 | mjahnke@scetv.org | Government Entity |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Robert Gehman ConsultingEngineer Kessler and Gehman Associates, Inc. |
Robert Gehman 507 NW 60 Street Suite D Gainesville, FL 32607 United States |
+1 (352) 332-3157 | bob@kesslerandgehman.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Replace transmitter and line using existing antenna. Acquire interim antenna system for continued operation on existing antenna during construction. Map and analyze tower for safety prior to starting tower work. See attached. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | ULXTE-30 | |
Year | 2019 | |
Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power Capacity | 19.2 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTE-30 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 19.2 kW | |
Justification for New Transmitter | Manuafacturer states that existing Harris transmitter cannot be re-tuned for repack channel. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Internal RF System |
Internal RF components to interconnect transmitter to main and interim antennas |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Sigma | |
Year | 2008 | |
Type | Inductive Output Tube | |
IOT Power Type | Single | |
Power Capacity | 20 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTE-30 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 19.2 kW | |
Justification for New Transmitter | The manufacturer of the existing IOT transmitter advises that it cannot be re-tuned to the assigned channel. SCETV has elected to purchase a higher power transmitter for ATSC 3.0 and will pay upgrade costs from SCETV funds. See cover letter. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 3 inches | |
Length | 100.0 feet | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Standby Exciter and Switch |
Standby Exciter with Automatic Change Over Switch |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Retune Existing |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels | 48 | |
Design power capacity in use | 100.0 % | |
Lower Limit | 470.00 MHz | |
Upper Limit | 692.00 MHz | |
Other Antenna Type | N/A | |
ERP: | 250.0 kW | |
Manufacturer | Dielectric | |
Model | TUF-O4-12/48H-1-T | |
Year | 2008 |
Section | Question | Response |
---|---|---|
Sweep Test of Existing Antenna | Do you need a sweep test of existing antenna? | Yes |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 250.0 kW | |
Manufacturer | ||
Model | TFU-WB-8 | |
Year | 2018 | |
Justification for New Antenna | Temporary antenna to continue operation during main transmission line replacements. See attached. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1020 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1020 feet per run | |
Justification for New Transmission Line | The existing primary transmission line is rigid with section lengths that cannot accommodate the assigned channel. |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Flexible Air | |
Diameter | 4 inches | |
Segment Length | N/A | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 600 feet per run | |
Justification for New Transmission Line | An interim transmission line is necessary for the existing antenna to keep station on the air during primary line replacement. Station will attempt to rent if renting is available at time of acquisition. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
ASR Number | ||
Coordinates (NAD83) | Latitude (NAD83) | 34° 07' 07.0" N- |
Longitude (NAD83) | 080° 56' 12.7" W- | |
Overall Structure Height | 1003.60 feet | |
Support Structure Height | 952.74 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 391.73 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | SOUTH CAROLINA EDUCATIONAL TELEVISION | |
Date Constructed | 03/24/2005 |
Facility ID | Call Sign | Service |
---|---|---|
60984 | WLTR | FM |
Users |
---|
WRLK microwave |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Serious Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Foundation Mapping |
Research on existing tower and guy foundations to provide information for structural analysis |
Structural Analysis |
Structural Analysis to check with extra load of interim antenna(s) |
Geotechnical Report |
Geotechnical Report to provide ground information for structural analysis |
Post Mod Inspection |
Post Modification Inspection to be sure mods were done to specs |
Structural Upgrade Plans |
Develop plans to bring tower up to code with additional load of interim antenna(s) |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 102 | |
Explanation | It will be necessary to schedule and coordinate multiple vendors and complete progress reports. Station does not have available personnel or personnel trained in project management for such complex projects. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 10 | |
Justification | It will be necessary to plan the installation, develop specifications for purchasing, and perform final inspections of this RF project. Station does not have available personnel or personnel trained in such services. |
Name | Description |
---|---|
Misc Legal Services |
Misc legal services related to repack and not covered elsewhere |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Billboard Ads for Transition |
Billboard ads for Repack channel change |
Move power line |
Move power line to make room for tower rigging |
Install TV Interim antenna |
Installation of TV interim antenna |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,059,200.00 | $1,293,953.19 | N/A | $595,636.71 | N/A |
Total for all systems | $4,065,640.00 | $2,485,407.19 | N/A | $1,451,371.21 | N/A |
Primary Transmitter ULXTE-30 | $728,250.00 | $329,421.16 | $44,011.53 | ||
Internal RF System | $44,250.00 | $44,250.00 | N/A | $44,011.53 | N/A |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | $684,000.00 | $285,171.16 | N/A | $0.00 | N/A |
Primary Transmitter ULXTE-30 | $1,330,950.00 | $964,532.03 | $551,625.18 | ||
3" Rigid Conduit and Wiring (Cost per foot) | $5,200.00 | $0.00 | N/A | N/A | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $5,000.00 | N/A | $3,649.98 | N/A |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | $684,000.00 | $684,000.00 | N/A | $272,443.17 | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $0.00 | N/A | N/A | N/A |
Standby Exciter and Switch | $0.00 | $0.00 | N/A | N/A | N/A |
Single IOT system (20 kW) | $578,000.00 | $275,532.03 | ***System Notice: Estimate adjusted and locked because line has been superseded.***The purchase price of the new transmitter is based on a Proposal from Comark for a 25 kW MSDC IOT as suggested by the FCC. See attachment. | $275,532.03 | N/A |
Actual Information Description | File Name |
---|---|
Internal RF System | |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | |
3" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Transformer 3 phase/480v - 150 KVA | |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | |
Switchgear - industrial 800 amp | Information not provided. |
Standby Exciter and Switch | Information not provided. |
Single IOT system (20 kW) |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $216,660.00 | $205,800.00 | N/A | $53,437.00 | N/A |
Total for all systems | $4,065,640.00 | $2,485,407.19 | N/A | $1,451,371.21 | N/A |
Interim Antenna TFU-WB-8 | $196,230.00 | $186,400.00 | $51,325.00 | ||
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $6,400.00 | N/A |
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized | $189,500.00 | $180,000.00 | N/A | $44,925.00 | N/A |
Primary Antenna TUF-O4-12/48H-1-T | $20,430.00 | $19,400.00 | $2,112.00 | ||
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $2,112.00 | N/A |
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | $13,700.00 | $13,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Sweep test of existing antenna | |
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized | |
Sweep test of existing antenna | |
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $250,440.00 | $228,840.00 | N/A | $167,767.00 | N/A |
Total for all systems | $4,065,640.00 | $2,485,407.19 | N/A | $1,451,371.21 | N/A |
Interim Transmission Line | $44,400.00 | $33,000.00 | $32,074.30 | ||
Flexible Air Transmission Line - dielectric, 4" | $44,400.00 | $33,000.00 | N/A | $32,074.30 | N/A |
Primary Transmission Line | $206,040.00 | $195,840.00 | $135,692.70 | ||
Rigid Transmission Line - copper, 6 1/8" | $206,040.00 | $195,840.00 | N/A | $135,692.70 | N/A |
Actual Information Description | File Name |
---|---|
Flexible Air Transmission Line - dielectric, 4" | |
Rigid Transmission Line - copper, 6 1/8" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,312,050.00 | $568,250.00 | N/A | $510,227.35 | N/A |
Total for all systems | $4,065,640.00 | $2,485,407.19 | N/A | $1,451,371.21 | N/A |
Primary Tower TOWER | $1,312,050.00 | $568,250.00 | $510,227.35 | ||
Serious tower reinforcement/modifications | $1,052,000.00 | $320,000.00 | N/A | $315,394.00 | N/A |
Tall Tower (greater than 500') | $210,500.00 | $200,000.00 | N/A | $188,693.00 | N/A |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $25,000.00 | N/A | $3,140.35 | N/A |
Foundation Mapping | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Structural Analysis | $5,000.00 | $5,000.00 | N/A | $3,000.00 | N/A |
Geotechnical Report | $4,500.00 | $4,500.00 | N/A | N/A | N/A |
Structural Upgrade Plans | $5,000.00 | $5,000.00 | N/A | $0.00 | N/A |
Post Mod Inspection | $3,750.00 | $3,750.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Serious tower reinforcement/modifications | |
Tall Tower (greater than 500') | |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | |
Foundation Mapping | Information not provided. |
Structural Analysis | |
Geotechnical Report | Information not provided. |
Structural Upgrade Plans | |
Post Mod Inspection |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $156,026.00 | $117,850.00 | N/A | $72,349.42 | N/A |
Total for all systems | $4,065,640.00 | $2,485,407.19 | N/A | $1,451,371.21 | N/A |
Outside Professional Services | $156,026.00 | $117,850.00 | $72,349.42 | ||
Misc Legal Services | $5,000.00 | $5,000.00 | N/A | $1,176.00 | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $42,000.00 | Sixarms quote uploaded | $38,872.20 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $3,500.00 | N/A | $168.00 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | $420.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $210.00 | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $1,600.00 | N/A | $1,553.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | $750.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $2,000.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $3,250.00 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | $0.00 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $2,500.00 | N/A |
Project management of the transition | $16,116.00 | $22,000.00 | With ten stations, 399 reimbursement filings are taking longer than expected. | $21,450.22 | With ten stations, submitting all 399 invoices is taking longer than expected. |
Additional Field Engineering Service, 10 Days | $20,000.00 | $20,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Misc Legal Services | |
Comprehensive coverage verification via field study, if needed | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | |
Prepare and or review reimbursement form | |
Project management of the transition | |
Additional Field Engineering Service, 10 Days | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $71,264.00 | $70,714.00 | N/A | $51,953.73 | N/A |
Total for all systems | $4,065,640.00 | $2,485,407.19 | N/A | $1,451,371.21 | N/A |
Other Expenses | $71,264.00 | $70,714.00 | $51,953.73 | ||
Move power line | $2,300.00 | $2,300.00 | N/A | $2,257.00 | N/A |
Billboard Ads for Transition | $1,200.00 | $1,200.00 | N/A | $1,200.00 | N/A |
MVPD Notification of Channel Change | $714.00 | $714.00 | N/A | $714.00 | N/A |
Develop and air announcement of upcoming channel change | $2,500.00 | $2,500.00 | N/A | $2,496.00 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $11,000.00 | N/A | $2,950.00 | N/A |
Equipment Delivery and Handling Charges | $22,000.00 | $22,000.00 | Tower modification materials shipping costs more than expected | $21,336.73 | N/A |
Install TV Interim antenna | $21,000.00 | $21,000.00 | N/A | $21,000.00 | N/A |
Actual Information Description | File Name |
---|---|
Move power line | |
Billboard Ads for Transition | |
MVPD Notification of Channel Change | |
Develop and air announcement of upcoming channel change | |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
DTV Medical Facility Notification | |
Equipment Delivery and Handling Charges | |
Install TV Interim antenna |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $4,065,640.00 | $2,485,407.19 | $1,451,371.21 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Hap Griffin Repack Project Manager 06/08/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Hap Griffin Repack Project Manager 06/08/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Hap Griffin Repack Project Manager 06/08/2022 |