Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
IHM LICENSES, LLC Doing Business As: IHM LICENSES, LLC |
FCC Contact 7136 S. YALE AVENUE SUITE 501 TULSA, OK 74136 United States |
+1 (918) 664-4581 | FCCCONTACT@IHEARTMEDIA.COM | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | WKSJ_FM has no Aux. A new shared Aux Facility has been will allow the station to continue service during repack tower work. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Broadband Panel | |
Number of Stations Supported | 4 | |
Number of Panels | 27 | |
Design power capacity in use | 99.0 % | |
Lower Limit | 92.90 MHz | |
Upper Limit | 104.10 MHz | |
ERP: | 100.0 kW | |
Manufacturer | ||
Model | DCBR-03-9FM/27H-2-N | |
Year | 2006 |
Facility ID | Call Sign |
---|---|
8680 | WDLT-FM |
12143 | WJTQ |
2540 | WBLX-FM |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | Yes | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Cross Dipole | |
ERP: | 60.0 kW | |
Manufacturer | ||
Model | SHPXA-12BC-HW-SP | |
Year | 2019 | |
Justification for New Antenna | To allow station to stay on air by use of shared aux |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
FM Band Pass Filters | Do you require an FM band pass filter? | No |
Notch Filter | Do you require a Notch filter? | No |
De-Icers | Do you require De-Icers? | No |
Radomes | Do you require Radomes? | No |
Name | Description |
---|---|
Equipment Delivery and Handling Charges |
Equipment Delivery and Handling Charges |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | Yes | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Segment Length | 20 inches | |
Number of parallel runs | 1 | |
Length | 1790 feet per run |
Facility ID | Call Sign |
---|---|
2540 | WBLX-FM |
12143 | WJTQ |
8680 | WDLT-FM |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 4 1/16 inches | |
Segment Length | 20 inches | |
Number of parallel runs | 1 | |
Length | 1620 feet per run | |
Justification for New Transmission Line | To support new combined aux | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | Yes |
Does the Installation of the Transmission Line require additional or replacement Inside RF system elbows, fitting, hangers, etc.? | No |
Name | Description |
---|---|
Equipment Delivery and Handling Charges |
Equipment Delivery and Handling Charges |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1064671 | |
Coordinates (NAD83) | Latitude (NAD83) | 30° 36' 41.0" N- |
Longitude (NAD83) | 087° 36' 26.4" W- | |
Overall Structure Height | 1894.01 feet | |
Support Structure Height | 1804.44 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 105.97 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | SpectraSite Communications, LLC. through American Towers, LLC. | |
Date Constructed | 04/06/2001 |
Facility ID | Call Sign | Service |
---|---|---|
8680 | WDLT-FM | FM |
2540 | WBLX-FM | FM |
12143 | WJTQ | FM |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study need for guyed or free-standing tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Prepare engineering section of Form FCC Construction Permit Application | No |
Prepare engineering section of Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
Prepare and file Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | No | |
Form 399 assistance or other program management costs | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
Prepare and or review reimbursement form |
Prepare and or review reimbursement form |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No | |
1 pair IP-only Codecs for fiber, internet or IP microwave systems | Yes |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $9,607.09 | $54,923.70 | N/A | $54,923.70 | N/A |
Total for all systems | $399,354.42 | $155,739.46 | N/A | $146,522.39 | N/A |
Primary Antenna SHPXA-12BC-HW-SP | $9,607.09 | $54,923.70 | $54,923.70 | ||
Equipment Delivery and Handling Charges | $7.09 | $7.09 | See attached invoice. | $7.09 | N/A |
High Power 51 - 100 kW Circularly-polarized | $9,600.00 | $54,916.61 | Shared site for WKSJ, WRGV, and WTKX. This amount reflects 1/3 of the total cost of this item. See Quote. | $54,916.61 | Sales tax and minor items had not been included in estimated costs |
Actual Information Description | File Name |
---|---|
Equipment Delivery and Handling Charges | |
High Power 51 - 100 kW Circularly-polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $215,769.33 | $16,509.33 | N/A | $16,509.36 | N/A |
Total for all systems | $399,354.42 | $155,739.46 | N/A | $146,522.39 | N/A |
Primary Transmission Line | $215,769.33 | $16,509.33 | $16,509.36 | ||
Equipment Delivery and Handling Charges | $167.62 | $167.62 | See attached invoices. | $167.62 | N/A |
Interior RF Systems: Inside RF system including switching, patch panels and dehydrators | $16,341.71 | $16,341.71 | Shared site for WKSJ, WRGV, and WTKX. This amount reflects 1/3 of the total cost of this item. See Quotes. | $16,341.74 | Minor difference in tax/ship pricing |
Rigid Transmission Line - copper, 4 1/16" | $199,260.00 | $0.00 | Re-used existing line on tower. | N/A | N/A |
Actual Information Description | File Name |
---|---|
Equipment Delivery and Handling Charges | |
Interior RF Systems: Inside RF system including switching, patch panels and dehydrators | |
Rigid Transmission Line - copper, 4 1/16" | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $166,450.00 | $73,611.33 | N/A | $73,611.33 | N/A |
Total for all systems | $399,354.42 | $155,739.46 | N/A | $146,522.39 | N/A |
Primary Tower GTOWER | $166,450.00 | $73,611.33 | $73,611.33 | ||
Study needed for guyed or free-standing tower | $8,700.00 | $1,144.67 | See attached invoices. | $1,144.67 | N/A |
Tower Rigging Tall Tower (greater than 500') | $157,750.00 | $72,466.66 | Shared site for WKSJ, WRGV, and WTKX. This amount reflects 1/3 of the total cost of this item. See Quote. | $72,466.66 | N/A |
Actual Information Description | File Name |
---|---|
Study needed for guyed or free-standing tower | |
Tower Rigging Tall Tower (greater than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,478.00 | $1,478.00 | N/A | $1,478.00 | N/A |
Total for all systems | $399,354.42 | $155,739.46 | N/A | $146,522.39 | N/A |
Outside Professional Services | $1,478.00 | $1,478.00 | $1,478.00 | ||
Prepare and or review reimbursement form | $1,478.00 | $1,478.00 | See attached invoices. | $1,478.00 | N/A |
Actual Information Description | File Name |
---|---|
Prepare and or review reimbursement form |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $6,050.00 | $9,217.10 | N/A | $0.00 | N/A |
Total for all systems | $399,354.42 | $155,739.46 | N/A | $146,522.39 | N/A |
Other Expenses | $6,050.00 | $9,217.10 | $0.00 | ||
Point to Point Microwave (STL/ICR): 1 pair IP-only Codecs for fiber, internet or IP microwave systems | $5,850.00 | $8,117.10 | GatesAir Invoice Attached | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $200.00 | $1,100.00 | FCC 301 for Radio | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $399,354.42 | $155,739.46 | $146,522.39 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jeffrey C Gehman Engineering Associate 05/19/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jeffrey C Gehman Engineering Associate 05/19/2022 |