Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
STATION VENTURE OPERATIONS, LP |
Margaret L. Tobey C/O NBCUNIVERSAL 300 NEW JERSEY AVENUE, N.W., SUITE 700 WASHINGTON, DC 20001 United States |
+1 (202) 524-6401 | MARGARET.TOBEY@NBCUNI.COM | Limited Partnership |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Margaret L Tobey NBCUniversal, LLC |
300 New Jersey Ave. NW Suite 700 Washington, DC 20001 United States |
+1 (202) 524-6401 | Margaret.Tobey@nbcuni.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Install new antenna in place of existing analog antenna and new transmitter for new channel. The old transmitter and antenna will remain in place for interim use until the cut-over. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Retune Existing |
Use | Auxiliary (Backup) | |
Ownership | Owned | |
Owner | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | Linear |
Model | AT75-2K5-11 | |
Year | 2019 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 3 kW |
Section | Question | Response |
---|---|---|
New IOT Tubes | Number of Tubes (including accessories) needed | N/A |
New Mask Filter | ||
Power | 3 kW | |
Other Power | N/A | |
New Exciter | Is a new exciter needed? | No |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Retuning of existing AT75-2K5-11 UHF Air cooled digital Transmitter for KNSD | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | CTT--U-DXCP-2 | |
Year | 2012 | |
Type | Inductive Output Tube | |
IOT Power Type | Two | |
Power Capacity | 53 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | THU9-20 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 29.46 kW | |
Justification for New Transmitter | Attached quote to retune DXCP-2 transmitter shows cost exceeds cost of new solid state transmitter Existing transmitter has 400% headroom. Solid state replacement is one level higher than that required to provide FCC allocated ERP. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Electrical Design, Labor, Materials, and Equipment for transmitter room | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Transmitter Installation |
Transmitter Installation |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 370.0 kW | |
Manufacturer | ||
Model | ALP16M4-HSPX-40 | |
Year | 2017 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 225.0 kW | |
Manufacturer | ||
Model | TFU-16ETT/VP-R C180 | |
Year | 2017 | |
Justification for New Antenna | Installation of new top mount antenna in location occupied by old analog antenna will allow use of existing pre-auction antenna during repack work and avoids cost for installation of an interim antenna, transmission line, and additional tower upgrades. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 4 1/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Antenna Install |
Installation of Antenna at KNSD |
Vertical Component |
Additional Vertical Pole Component |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 171 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 4 1/16 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 185 feet per run | |
Justification for New Transmission Line | Existing line is wrong segment length. Existing line will be required to maintain operation on existing channel during repack. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
One or more FM, AM or TV radio broadcaster(s) | N/A | |
Others Types of Users | N/A | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
ASR Number | ||
Coordinates (NAD83) | Latitude (NAD83) | 32° 41' 48.2" N- |
Longitude (NAD83) | 116° 56' 09.1" W- | |
Overall Structure Height | 187.00 feet | |
Support Structure Height | 129.60 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 2641.00 feet | |
Structure Type | LTOWER - Lattice Tower | |
Tower Owner | American Tower | |
Date Constructed | 01/01/1977 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 1200 | |
Explanation | Project oversight of transmitter install, electrical connectivity, tower work, and antenna installation. Additional time will be spent tracking financial and legal process and coordinating with other broadcasters. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | No |
Prepare engineering section of Form FCC Construction Permit Application | No | |
For Auxiliary Facility | N/A | |
For Main Facility | N/A | |
Prepare engineering section of Form FCC License to Cover Application | No | |
For Auxiliary Facility | N/A | |
For Main Facility | N/A | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | Yes | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | Yes | |
Number of Days | 20 | |
Justification | Ground Level RF System Design |
Name | Description |
---|---|
Site Coordination Meeting |
Site Coordination Meeting |
Internal Reimbursement |
Internal Reimbursement for hours spent of FCC Repack Project |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
DAC Monitoring System |
DAC Monitoring System |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,204,661.97 | $503,715.15 | N/A | $498,985.57 | N/A |
Total for all systems | $2,464,920.44 | $1,535,273.92 | N/A | $1,307,282.32 | N/A |
Primary Transmitter THU9-20 | $1,077,759.97 | $476,013.15 | $476,013.15 | ||
Other Electrical Service: Electrical Design, Labor, Materials, and Equipment for transmitter room | $63,413.57 | $63,413.57 | ***System Notice: Estimate adjusted and locked because line has been superseded.*** | $63,413.57 | N/A |
Transmitter Installation | $67,346.40 | $67,346.40 | ***System Notice: Estimate adjusted and locked because line has been superseded.***See lines 3 & 4 of Electron Dynamics quote, plus charge for Electron Dynamics second visit quote | $67,346.40 | N/A |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW | $947,000.00 | $345,253.18 | N/A | $345,253.18 | N/A |
Auxiliary Transmitter AT75-2K5-11 | $126,902.00 | $27,702.00 | $22,972.42 | ||
3 kW mask filter | $4,155.00 | $4,155.00 | N/A | $0.00 | N/A |
UHF and VHF - minor banding issues | $105,200.00 | $6,000.00 | N/A | $5,429.04 | N/A |
Other Electrical Service: Retuning of existing AT75-2K5-11 UHF Air cooled digital Transmitter for KNSD | $17,547.00 | $17,547.00 | Retuning Existing Transmitter cost estimation | $17,543.38 | N/A |
Actual Information Description | File Name |
---|---|
Other Electrical Service: Electrical Design, Labor, Materials, and Equipment for transmitter room | |
Transmitter Installation | |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW | |
3 kW mask filter | Information not provided. |
UHF and VHF - minor banding issues | |
Other Electrical Service: Retuning of existing AT75-2K5-11 UHF Air cooled digital Transmitter for KNSD |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $456,055.00 | $351,739.00 | N/A | $300,327.25 | N/A |
Total for all systems | $2,464,920.44 | $1,535,273.92 | N/A | $1,307,282.32 | N/A |
Primary Antenna TFU-16ETT/VP-R C180 | $456,055.00 | $351,739.00 | $300,327.25 | ||
Vertical Component | $15,900.00 | $15,900.00 | Additional Cost of Vertical Components | $0.00 | N/A |
Antenna Install | $134,355.00 | $134,355.00 | N/A | $134,355.00 | N/A |
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) | $9,570.00 | $8,055.00 | N/A | $7,249.50 | N/A |
Sweep test of existing antenna | $6,730.00 | $10,000.00 | Includes testing, commissioning, and supervision of antenna/line install. See Electron Dynamics quote | $10,000.00 | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | $289,500.00 | $183,429.00 | See attached proposal, line 1. Vertical Polarization costs of $15,900 have been subtracted from the above estimate. | $148,722.75 | N/A |
Actual Information Description | File Name |
---|---|
Vertical Component | |
Antenna Install | |
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) | |
Sweep test of existing antenna | |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $26,270.00 | $30,806.30 | N/A | $29,110.78 | N/A |
Total for all systems | $2,464,920.44 | $1,535,273.92 | N/A | $1,307,282.32 | N/A |
Primary Transmission Line | $26,270.00 | $30,806.30 | $29,110.78 | ||
Rigid Transmission Line - copper, 4 1/16" | $26,270.00 | $30,806.30 | Price includes hangers, based on quote from Dielectric (attached) | $29,110.78 | N/A |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 4 1/16" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $268,500.00 | $155,335.00 | N/A | $105,344.00 | N/A |
Total for all systems | $2,464,920.44 | $1,535,273.92 | N/A | $1,307,282.32 | N/A |
Primary Tower LTOWER | $268,500.00 | $155,335.00 | $105,344.00 | ||
Minor tower reinforcement/modifications | $158,000.00 | $50,000.00 | N/A | $49,459.00 | N/A |
Short Tower (less than 500') | $84,200.00 | $88,900.00 | Includes tower charge in WIS budget worksheet. Plus supervision, testing, and commissioning in Electron Dynamics Quote. | $39,450.00 | N/A |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $16,435.00 | See first line of proposal "KNSD ATC PO Request" | $16,435.00 | N/A |
Actual Information Description | File Name |
---|---|
Minor tower reinforcement/modifications | |
Short Tower (less than 500') | |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $354,570.00 | $346,625.00 | N/A | $261,611.30 | N/A |
Total for all systems | $2,464,920.44 | $1,535,273.92 | N/A | $1,307,282.32 | N/A |
Outside Professional Services | $354,570.00 | $346,625.00 | $261,611.30 | ||
Internal Reimbursement | $5,000.00 | $5,000.00 | N/A | $0.00 | N/A |
Site Coordination Meeting | $5,000.00 | $5,000.00 | See budget worksheet attached to invoice | $5,000.00 | N/A |
Additional Field Engineering Service, 20 Days | $20,000.00 | $20,000.00 | N/A | $5,000.39 | N/A |
RF Exposure Measurements | $21,050.00 | $15,000.00 | N/A | $0.00 | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $91,855.00 | Estimated cost if higher than predetermined cost. See quote attached to invoice to see how vendor came to the total cost for the field study | $91,855.00 | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $500.00 | N/A | $0.00 | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $4,000.00 | N/A | $867.60 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | $0.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $995.40 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $5,000.00 | Cost quoted by ATC | $0.00 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $1,595.52 | N/A |
Project management of the transition | $189,600.00 | $180,000.00 | $24480.00 / American Tower $250 Anthony Flores Other - undocumented | $156,297.39 | N/A |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | $10,520.00 | $10,520.00 | Migratory bird assessment per ATC quote | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Internal Reimbursement | |
Site Coordination Meeting | |
Additional Field Engineering Service, 20 Days | |
RF Exposure Measurements | Information not provided. |
Comprehensive coverage verification via field study, if needed | |
ASR modification (prepare FCC Form 854) | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Prepare and or review reimbursement form | |
Project management of the transition | |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $154,863.47 | $147,053.47 | N/A | $111,903.42 | N/A |
Total for all systems | $2,464,920.44 | $1,535,273.92 | N/A | $1,307,282.32 | N/A |
Other Expenses | $154,863.47 | $147,053.47 | $111,903.42 | ||
DAC Monitoring System | $14,800.00 | $14,800.00 | N/A | $0.00 | N/A |
Non-zoning permits | $5,200.00 | $5,200.00 | N/A | N/A | N/A |
Local Zoning | $4,700.00 | $4,700.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $3,750.00 | N/A | $3,750.00 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $72,085.91 | $72,085.91 | Disposal of old transmission line, antenna, and transmitter; cost to rent on-site dumpster | $72,059.21 | N/A |
Develop and air announcement of upcoming channel change | $0.00 | $0.00 | N/A | $0.00 | N/A |
MVPD Notification of Channel Change | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $36,192.56 | $36,192.56 | N/A | $36,094.21 | N/A |
Actual Information Description | File Name |
---|---|
DAC Monitoring System | |
Non-zoning permits | Information not provided. |
Local Zoning | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
DTV Medical Facility Notification | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
Develop and air announcement of upcoming channel change | Information not provided. |
MVPD Notification of Channel Change | Information not provided. |
Equipment Delivery and Handling Charges |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $2,464,920.44 | $1,535,273.92 | $1,307,282.32 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Margaret L. Tobey Assistant Secretary 05/04/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Margaret L. Tobey Assistant Secretary 05/04/2022 |