Facility ID:
25395
Service:
DTV
Call Sign:
WFUP
Channel:
21 (UHF)
File Number:
0000028587
FRN:
0016496481
Date Submitted:
04/21/2022

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

CADILLAC TELECASTING CO.

Doing Business As: CADILLAC TELECASTING CO.

Alexander Bolea

PO Box 627

CADILLAC, MI 49601

United States

+1 (231) 775-3478 JRNBOLEA@AOL.COM Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

William T Godfrey , Jr .

Consulting Engineers

Kessler and Gehman Associates, Inc.

William T Godfrey Jr

Kessler and Gehman Associates, Inc.

507-D NW 60 Street

Gainesville, FL 32607

United States

+1 (352) 332-3157 bill@kesslerandgehman.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan Replace transmitter, main antenna and interim antenna. Re-use main and interim transmission lines. Map and analyze main and interim towers. Modify, strengthen or replace tower(s) as required based on structural analysis reports for main and interim towers

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Diamond
Year 2005
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 3.6 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model UAXTE-8
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 4.8 kW
Justification for New Transmitter The manufacturer of the existing solid state transmitter advises that the transmitter cannot be re-tuned to the assigned channel.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) Yes
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 300 kVA
Rigid Conduit and Wiring Yes
Size 3 inches
Length 100.0 feet
Other Electrical Service Yes
Description Electrical modifications required for new transmitter in building addition. See attached quote and justification statement.
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Heating and Cooling
Size 5 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 576.0 square feet
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Additional Interior RF System

Interior RF System Existing Transmitter to AUX Transmission line

Standby Exciter and Switch

Standby Exciter with Automatic Change Over Switch

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 108.0 kW
Manufacturer
Model ALP24M3-HSOC-45
Year 2005

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 66.0 kW
Manufacturer
Model TFU-24DSB-B/VP
Year 2018
Justification for New Antenna The existing primary antenna is a single channel slotted coaxial which cannot accommodate the assigned channel.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna?
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 3 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

High VSWR troubleshooting

High VSWR troubleshooting

Other Antenna Costs

Other Antenna Costs

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 108.0 kW
Manufacturer
Model TFU-8WB-R S230
Year 2019
Justification for New Antenna Interim antenna on existing interim tower is required on pre-auction channel: 1) To keep station on the air while the new main tower is strengthened; 2) To support new post-auction antenna and while new antenna is installed; and 3) To operate thru phase.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? S
Feed Line Size 3 1/8 inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Reducer

Reducer

Support pole

Support pole

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Utilize Existing
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer ERI
Type Flexible Air
Diameter 5 inches
Other Diameter N/A
Segment Length N/A
Other Segment Length N/A
Number of parallel runs 1
Length 700 feet per run

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Sweep Tests

Sweep tests to verify performance of line on assigned channel

Flex Line

Flex Line 5" Air Dielectric 20 FT

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Flexible Air
Diameter 5 inches
Segment Length N/A
Other Segment Length
Number of parallel runs 1
Length 580 feet per run
Justification for New Transmission Line Required to operate interim facility throughout build-out and assigned phase.

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Auxiliary Tower

Back to Top

Add Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Auxiliary (Backup)
Description of Use Interim Tower
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? No
One or more FM, AM or TV radio broadcaster(s) N/A
Others Types of Users N/A
Is tower documented for structural analysis? No
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1000437
Coordinates (NAD83) Latitude (NAD83) 45° 10' 12.0" N-
Longitude (NAD83) 084° 45' 04.0" W-
Overall Structure Height 498.68 feet
Support Structure Height 469.15 feet
Ground Elevation Above Mean Sea Level (AMSL) 1541.98 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner CADILLAC TELECASTING, CO.
Date Constructed 07/12/1992


Auxiliary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for undocumented/poorly documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Serious Reinforcements needed

Auxiliary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Auxiliary Tower

Back to Top

Other Tower Expenses Not Listed

Information not provided.

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? No
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1000438
Coordinates (NAD83) Latitude (NAD83) 45° 10' 12.0" N-
Longitude (NAD83) 084° 45' 04.0" W-
Overall Structure Height 633.19 feet
Support Structure Height 629.91 feet
Ground Elevation Above Mean Sea Level (AMSL) 1534.10 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner CADILLAC TELECASTING, CO
Date Constructed 08/28/1996

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
56073 WGFM FM
84479 WTLI FM

Other Types of Users

Users
Two-way Tenants

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for undocumented/poorly documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Serious Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Weather Days

Weather Days

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 500
Explanation It will be necessary to schedule and coordinate multiple vendors, complete progress reports, and update Schedule 399. Station does not have available personnel or personnel trained in project management for such complex projects.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review Yes
Environmental Assessment Yes
ASR Modification Yes
FAA Consultation (including preparation of FAA Form 7460) Yes
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements Yes
Additional Field Engineering Service Yes
Number of Days 27
Justification It will be necessary to survey the site, plan the equipment, develop specifications for purchasing, and oversee multiple vendor RF projects. Station does not have available personnel or personnel trained in such services.

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Other Engineering Services

Other Engineering Services such as Actual Cost invoice prep & submission, are required.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application No
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Sales Tax

Not included in Widelity; therefore station is budgeting for sales tax.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,647,505.00 $1,325,461.55 N/A $648,685.02 N/A
Total for all systems $5,294,756.19 $4,792,163.30 N/A $1,501,156.91 N/A
Primary Transmitter UAXTE-8 $1,647,505.00 $1,325,461.55 $648,685.02
Standby Exciter and Switch $25,000.00 $25,000.00 N/A N/A N/A
Additional Interior RF System $140,000.00 $140,000.00 N/A N/A N/A
Other -- Building Addition Size: 576.0 $777,117.00 $777,117.00 See UPDATED attached quote and justification, attachment name WFUP bldg justification 20180418jgv1.pdf $488,928.47 N/A
Other Electrical Service: Electrical modifications required for new transmitter in building addition. See attached quote and justification statement. $199,438.00 $199,438.00 See attached quote and justification N/A N/A
3" Rigid Conduit and Wiring (Cost per foot) $5,200.00 $4,900.00 N/A N/A N/A
Transformer 3 phase/480v - 300 KVA $36,800.00 $0.00 Covered under "Other Electrical Service" section in 399 N/A N/A
Switchgear - industrial 800 amp $38,200.00 $0.00 Covered under "Other Electrical Service" section in 399 N/A N/A
Service entrance 3 phase/800 amp/208 volt $14,400.00 $0.00 Covered under "Other Electrical Service" section in 399 N/A N/A
UHF - Air Cooled Solid State Transmitter 4 - 6 kW $236,500.00 $64,900.35 N/A $64,900.35 N/A
Other -- HVAC Service Type: H Size:5 (Other) $19,250.00 $19,250.00 N/A N/A N/A
UHF - Air Cooled Solid State Transmitter 2.501 - 3.999 kW $155,600.00 $94,856.20 ***System Notice: Estimate adjusted and locked because line has been superseded.*** $94,856.20 N/A

Components

Actual Information Description File Name
Standby Exciter and Switch Information not provided.
Additional Interior RF System Information not provided.
Other -- Building Addition Size: 576.0

Component Description:
Orshal WFUP 1 v190604jgv1
Amount:
$184,576.00

Component Description:
Inv 28332 WFUP Professional Services: Building design. 0.9152 percent complete UL20180418jg
Amount:
$716.78

Component Description:
Osborn inv #30464 Prof Srvcs thru 180831 UL20181212jgv1
Amount:
$12,606.17

Component Description:
Osborn inv #30649 Prof Srvcs thru 180928 UL20180801jgv1
Amount:
$10,800.00

Component Description:
Osborn 35273 v190927jgv1
Amount:
$184.27

Component Description:
Osborn inv #32584 Prof Srvcs 190201 - 190301 UL20190320jgv1
Amount:
$16,894.70

Component Description:
Osborn inv #30200 Prof Srvcs thru 180727 UL20181212jgv1
Amount:
$9,448.90

Component Description:
Osborn 33398 Prof Srvcs thru 190426 Bldg v190522jgv1
Amount:
$227.26

Component Description:
Osborn inv #32955 Prof Srvcs thru 190302-190329 UL20190417jgv1
Amount:
$8,071.39

Component Description:
Orshal WFUP 2 v190823jgv1
Amount:
$245,403.00
Other Electrical Service: Electrical modifications required for new transmitter in building addition. See attached quote and justification statement. Information not provided.
3" Rigid Conduit and Wiring (Cost per foot) Information not provided.
Transformer 3 phase/480v - 300 KVA Information not provided.
Switchgear - industrial 800 amp Information not provided.
Service entrance 3 phase/800 amp/208 volt Information not provided.
UHF - Air Cooled Solid State Transmitter 4 - 6 kW

Component Description:
Gates US0331503 v191101jgv1
Amount:
$64,900.35
Other -- HVAC Service Type: H Size:5 (Other) Information not provided.
UHF - Air Cooled Solid State Transmitter 2.501 - 3.999 kW

Component Description:
Gates JW30004601-1 v190817jgv1
Amount:
$47,428.10

Component Description:
Gates JW30004601-2 v190817jgv1
Amount:
$47,428.10

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $349,569.00 $249,297.00 N/A $235,672.00 N/A
Total for all systems $5,294,756.19 $4,792,163.30 N/A $1,501,156.91 N/A
Interim Antenna TFU-8WB-R S230 $188,239.00 $127,379.00 $127,379.00
Support pole $59,582.00 $59,582.00 See attached Dielectric invoice MAN01314 and associated Quote 900006CMZ-4. $59,582.00 N/A
Reducer $1,777.00 $1,777.00 See attached Dielectric invoice MAN01314 and associated Quote 900006CMZ-4. $1,777.00 N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $2,600.00 See attached Dielectric invoice MAN01314 and associated Quote 900006CMZ-4. $2,600.00 N/A
Elbow complex, single channel, at antenna input, per 3 1/8. feedline (if needed) $7,600.00 $9,100.00 See attached Dielectric invoice MAN01314 and associated Quote 900006CMZ-4. $9,100.00 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $6,400.00 N/A
UHF - Lower Power Side Mount, One station antenna - medium power (50-200 kW), horizontally polarized $89,400.00 $47,920.00 See attached Dielectric invoice MAN01314 and associated Quote 900006CMZ-4. $47,920.00 N/A
Primary Antenna TFU-24DSB-B/VP $161,330.00 $121,918.00 $108,293.00
Other Antenna Costs $6,865.00 $6,865.00 N/A $6,865.00 N/A
High VSWR troubleshooting $8,625.00 $8,625.00 See attached / uploaded PDF file titled "SGP qte SGP0165 v200806jg.pdf" N/A N/A
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $5,000.00 N/A N/A N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $6,008.00 N/A $6,008.00 N/A
Elbow complex, single channel, at antenna input, per 3 1/8. feedline (if needed) $7,600.00 $1,912.00 N/A $1,912.00 N/A
Sweep test of existing antenna $6,730.00 $6,700.00 N/A $6,700.00 Sweep test of antenna-transmission line system for WFUP
UHF - Lower Power Side Mount, One Station antenna . medium power (50-200 kW), elliptically or circularly polarized $103,100.00 $86,808.00 N/A $86,808.00 N/A

Components

Actual Information Description File Name
Support pole

Component Description:
Die MAN01314 Int pole pct pmt 1 v190725jgv1
Amount:
$26,811.90

Component Description:
Die MAN01315 Int pole pct pmt 2 v190725jgv1
Amount:
$26,811.90

Component Description:
Die 555003 v190726pmv1
Amount:
$5,958.20
Reducer

Component Description:
Die MAN01314 Int reducer pct pmt 1 v190725jgv1
Amount:
$799.65

Component Description:
Die 563033 v200221pmv1
Amount:
$177.70

Component Description:
Die MAN01315 Int reducer pct pmt 2 v190725jgv1
Amount:
$799.65
Side mount brackets for high power antennas (if not included in antenna base cost)

Component Description:
Die MAN01315 Int mt bkts pct pmt 2 v190725jgv1
Amount:
$1,170.00

Component Description:
Die 563033 v200221pmv1
Amount:
$260.00

Component Description:
Die MAN01314 Int mt bkts pct pmt 1 v190725jgv1
Amount:
$1,170.00
Elbow complex, single channel, at antenna input, per 3 1/8. feedline (if needed)

Component Description:
Die MAN01314 Int elbow complex pct pmt 1 v190725jgv1
Amount:
$4,095.00

Component Description:
Die MAN01315 Int elbow complex pct pmt 2 v190725jgv1
Amount:
$4,095.00

Component Description:
Die 563033 v200221pmv1
Amount:
$910.00
Sweep test of existing antenna

Component Description:
Die MAN01314 Int sweep pct pmt 1 v190725jgv1
Amount:
$2,880.00

Component Description:
Die MAN01315 Int sweep pct pmt 2 v190725jgv1
Amount:
$2,880.00

Component Description:
Die 927017 v210309pmv1
Amount:
$640.00
UHF - Lower Power Side Mount, One station antenna - medium power (50-200 kW), horizontally polarized

Component Description:
Die MAN01315 Int TFU-8WB-R S230 45 pct pmt 2 v190725jgv1
Amount:
$21,564.00

Component Description:
Die MAN01314 Int TFU-8WB-R S230 45 pct pmt 1 v190725jgv1
Amount:
$21,564.00

Component Description:
Die 555003 v190726pmv1
Amount:
$4,792.00
Other Antenna Costs

Component Description:
Die 929017 v210309pmv1
Amount:
$6,642.00

Component Description:
Die 947014 v210309pmv1
Amount:
$223.00
High VSWR troubleshooting Information not provided.
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) Information not provided.
Side mount brackets for high power antennas (if not included in antenna base cost)

Component Description:
Die 558008 v190802pmv1
Amount:
$600.80

Component Description:
Die MAN01211 Side mt bkts 45 pct pmt 2 v190725jgv1
Amount:
$2,703.60

Component Description:
Die MAN01131 Side mt bkts 45 pct pmt 1 v190723jgv1
Amount:
$2,703.60
Elbow complex, single channel, at antenna input, per 3 1/8. feedline (if needed)

Component Description:
Die MAN01131 Elbow 45 pct pmt 1 v190723jgv1
Amount:
$860.40

Component Description:
Die 558008 v190802pmv1
Amount:
$191.20

Component Description:
Die MAN01211 Elbow 45 pct pmt 2 v190725jgv1
Amount:
$860.40
Sweep test of existing antenna

Component Description:
WFUP 5 inch and 3 inch heliax transmission line measurements on Aug 21 2017
Amount:
$300.00

Component Description:
Die 927004 v210309pmv1
Amount:
$640.00

Component Description:
Die MAN01211 Sweep 45 pct pmt 2 v190725jgv1
Amount:
$2,880.00

Component Description:
Die MAN01131 Sweep 45 pct pmt 1 v190723jgv1
Amount:
$2,880.00
UHF - Lower Power Side Mount, One Station antenna . medium power (50-200 kW), elliptically or circularly polarized

Component Description:
Die MAN01131 TFU-24DSB-B/VP 45 pct pmt 1 v190723jgv1
Amount:
$39,063.60

Component Description:
Die MAN01211 TFU-24DSB-B/VP 45 pct pmt 2 v190725jgv1
Amount:
$39,063.60

Component Description:
Die 558008 v190802pmv1
Amount:
$8,680.80

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $83,273.81 $71,231.37 N/A $64,831.37 N/A
Total for all systems $5,294,756.19 $4,792,163.30 N/A $1,501,156.91 N/A
Interim Transmission Line $60,900.00 $48,857.56 $48,857.56
Flexible Air Transmission Line - dielectric, 5" $60,900.00 $48,857.56 See attached Dielectric invoice MAN01314 and associated Quote 900006CMZ-4. $48,857.56 N/A
Primary Transmission Line $22,373.81 $22,373.81 $15,973.81
Flex Line $15,973.81 $15,973.81 See attached Dielectric Invoice MAN01131 and associated Quote 900007CMZ-1 $15,973.81 N/A
Sweep Tests $6,400.00 $6,400.00 N/A $0.00 Transmission Line Sweep

Components

Actual Information Description File Name
Flexible Air Transmission Line - dielectric, 5"

Component Description:
Die MAN01315 Int flex line pct pmt 2 v190725jgv1
Amount:
$21,985.90

Component Description:
Die MAN01314 Int flex line pct pmt 1 v190725jgv1
Amount:
$21,985.90

Component Description:
Die 563033 v200221pmv1
Amount:
$4,885.76
Flex Line

Component Description:
Die 927004 v210309pmv1
Amount:
$1,597.39

Component Description:
Die MAN01131 Flex line 45 pct pmt 1 v190723jgv1
Amount:
$7,188.21

Component Description:
Die MAN01211 Flex line 45 pct pmt 2 v190725jgv1
Amount:
$7,188.21
Sweep Tests

Component Description:
Inv: WFUP Line sweeps UL20180329 rev'd 20180330jg
Amount:
$300.00

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $2,513,310.00 $2,392,010.00 N/A $271,712.68 N/A
Total for all systems $5,294,756.19 $4,792,163.30 N/A $1,501,156.91 N/A
Auxiliary Tower TOWER $1,162,500.00 $1,105,000.00 $11,159.00
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study $26,300.00 $25,000.00 N/A $11,159.00 N/A
Short Tower (less than 500') $84,200.00 $80,000.00 N/A N/A N/A
Serious tower reinforcement/modifications $1,052,000.00 $1,000,000.00 N/A N/A N/A
Primary Tower TOWER $1,350,810.00 $1,287,010.00 $260,553.68
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study $26,300.00 $25,000.00 N/A $5,700.00 N/A
Serious tower reinforcement/modifications $1,052,000.00 $1,000,000.00 N/A $192,843.68 N/A
Tall Tower (greater than 500') $210,500.00 $200,000.00 N/A N/A N/A
Weather Days $62,010.00 $62,010.00 See attached/uploaded PDF file titled "Spartacus SGP0097B v191125jgv2.pdf" $62,010.00 N/A

Components

Actual Information Description File Name
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study

Component Description:
WFUP Vert Structures inv #20181550 Structural Analysis Aux twr UL20181019jgv1
Amount:
$5,700.00

Component Description:
Spartacus SGP0037 v191003jgv1
Amount:
$1,696.00

Component Description:
Spartacus SGP0038 v191003jgv1
Amount:
$3,763.00
Short Tower (less than 500') Information not provided.
Serious tower reinforcement/modifications Information not provided.
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study

Component Description:
WFUP Vert Structures inv #20181549 Structural Analysis Main twr UL20181019jgv1
Amount:
$5,700.00
Serious tower reinforcement/modifications

Component Description:
Spartacus SGP0016 REV 1 v190520jgv3
Amount:
$96,421.84

Component Description:
Spartacus SGP0086 v191025jgv2
Amount:
$96,421.84
Tall Tower (greater than 500') Information not provided.
Weather Days

Component Description:
Spartacus SGP0097C v200210jgv3
Amount:
$62,010.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $352,446.74 $406,061.74 N/A $253,205.97 N/A
Total for all systems $5,294,756.19 $4,792,163.30 N/A $1,501,156.91 N/A
Outside Professional Services $352,446.74 $406,061.74 $253,205.97
Other Engineering Services $54,551.74 $54,551.74 Cost estimate for other engineering services such as RF calculations, evolving transition plan calculations, bid spec prep / distribution / award recommendation / etc and discussion, etc. $54,551.74 N/A
Additional Field Engineering Service, 27 Days $54,000.00 $54,000.00 N/A $0.00 N/A
RF Exposure Measurements $21,050.00 $20,000.00 N/A N/A N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $80,000.00 N/A $39,971.14 N/A
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase $2,105.00 $2,000.00 N/A $550.00 N/A
ASR modification (prepare FCC Form 854) $2,105.00 $2,000.00 N/A N/A N/A
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet $10,520.00 $10,000.00 N/A N/A N/A
NEPA Section 106 environmental review, if needed $6,310.00 $6,000.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application $4,210.00 $4,000.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A $2,500.00 Prepare Legal Portion of CP application
Prepare request for Special Temporary Authorization $2,050.00 $1,500.00 N/A $1,500.00 N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application $1,580.00 $1,500.00 N/A $675.00 N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A $675.00 N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application $2,105.00 $2,000.00 N/A $2,000.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $3,000.00 FCC CP application for Main Facility
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $7,000.00 Engineering Study for new channel assignment and antenna development
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A
Project management of the transition $79,000.00 $120,000.00 See attached Invoices and Quotes, and the Estimate Cost has been increased above the current $108,323.09 total of those to $120,000. $117,023.09 Project Management of the Transition WFUP
Prepare and or review reimbursement form $2,630.00 $23,760.00 The Estimated Cost includes Form 399 submissions including ongoing Actual Cost invoice prep and submission, and amendments as needed. $23,760.00 N/A

Components

Actual Information Description File Name
Other Engineering Services

Component Description:
Osborn 32890 v190611jgv2
Amount:
$35,050.00

Component Description:
Osborn 37285 v200331jgv1
Amount:
$14,026.74

Component Description:
Osborn inv #32192 Prof Srvcs 190101 - 190131 Actual Cost invoices UL20190227jgv1
Amount:
$950.00

Component Description:
KGA 960-18 v200921jgv2
Amount:
$4,525.00
Additional Field Engineering Service, 27 Days

Component Description:
Osborn inv 27268 withdrawal Cover Letter v1
Amount:
N/A
RF Exposure Measurements Information not provided.
Comprehensive coverage verification via field study, if needed

Component Description:
Osborn 41618 v210323jgv2
Amount:
$2,171.14

Component Description:
Osborn 42049 v210323jgv1
Amount:
$37,800.00
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase

Component Description:
Osborn 37285 v200331jgv1
Amount:
$550.00
ASR modification (prepare FCC Form 854) Information not provided.
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet Information not provided.
NEPA Section 106 environmental review, if needed Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
KGA Inv 918-68 Prepare Legal Portion of WFUP CP application
Amount:
$2,500.00
Prepare request for Special Temporary Authorization

Component Description:
Osborn 35592 Prof Srvcs thru 190831-190927 STA v191023jgv1
Amount:
$1,500.00
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application

Component Description:
Osborn 36104 Lic to Cov Aux v191126jgv1
Amount:
$675.00
Prepare engineering section of FCC Form 2100 (main), License to Cover Application

Component Description:
Osborn 36104 Lic to Cov Main v191126jgv1
Amount:
$675.00
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application

Component Description:
Osborn inv #32954 Aux CP app UL20190417jgv1
Amount:
$2,000.00
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
KGA Inv 918-63 Form 2100 CP application for main facility
Amount:
$3,000.00
Perform engineering study for new channel assignment and antenna development

Component Description:
KGA Inv 918-63 Eng Study for new channel assignment & antenna development
Amount:
$7,000.00
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Project management of the transition

Component Description:
Osborn inv #32192 Prof Srvcs 190101 - 190131 UL20190227jgv1
Amount:
$9,150.00

Component Description:
Osborn inv #30462R Prof Srvcs thru 180831 UL20190102jgv1
Amount:
$2,325.00

Component Description:
WFUP Osborn inv #27268 Proj Mgt UL20180904jgv6
Amount:
$15,969.64

Component Description:
Osborn inv #30200 Prof Srvcs thru 180727 UL20181212jgv1
Amount:
$9,448.90

Component Description:
Osborn inv #29844R Prof Srvcs thru 180629 UL20190227jgv3
Amount:
$22,315.60

Component Description:
Osborn 35271 v190927jgv1
Amount:
$1,425.00

Component Description:
Osborn inv #32954 Prof Srvcs thru 190302-190329 Reimbusables UL20190417jgv1
Amount:
$0.30

Component Description:
Osborn inv #32583 Prof Srvcs 190201 - 190301 UL20190320jgv1
Amount:
$1,952.10

Component Description:
Osborn 33397 Prof Srvcs thru 190426 PM v190328jgv1
Amount:
$1,807.30

Component Description:
Osborn 36104 PM v191126jgv1
Amount:
$1,500.00

Component Description:
Osborn inv #32191 Prof Srvcs 190101-190131 UL20190227jgv1
Amount:
$3,173.13

Component Description:
Osborn inv #31099R Prof Srvcs thru 181026 UL20190102jgv1
Amount:
$375.00

Component Description:
Osborn inv #31629 Prof Srvcs 181027 - 181130 UL20190109jgv1
Amount:
$2,325.00

Component Description:
Osborn inv #32954 Prof Srvcs thru 190302-190329 UL20190417jgv1
Amount:
$2,400.00

Component Description:
Osborn 34243 Prof Srvcs 19601 - 190628 PM v190726jgv1
Amount:
$1,575.00

Component Description:
Osborn 33898 v190618jgv1
Amount:
$2,025.00

Component Description:
WFUP Osborn inv #29843 Prof Srvcs thru 180629 UL20180907jgv2
Amount:
$23,342.53

Component Description:
Osborn 36104 PM 387 2019 Q3 v191126jgv1
Amount:
$300.00

Component Description:
Osborn inv #31742 Prof Srvcs 181201 - 181231 UL20190109jgv1
Amount:
$225.00

Component Description:
Osborn 34786 v190927jgv1
Amount:
$2,175.00

Component Description:
Osborn 37285 v200331jgv1
Amount:
$600.00

Component Description:
Osborn 35592 Prof Srvcs thru 190831-190927 PM v191023jgv1
Amount:
$1,125.00

Component Description:
PM Labor $19,860.00 PM Expenses $1,077.49
Amount:
$20,937.49

Component Description:
Osborn inv #30464 Prof Srvcs thru 180831 UL20181212jgv1
Amount:
$12,606.17
Prepare and or review reimbursement form

Component Description:
KGA 960-09 v200706jgv1
Amount:
$1,375.00

Component Description:
KGA 960-19 v200804jgv1
Amount:
$3,460.00

Component Description:
KGA 960-16 v200706jgv1
Amount:
$195.00

Component Description:
KGA 960-34 v210406jgv1
Amount:
$2,240.00

Component Description:
Osborn inv #32954 Prof Srvcs 190101 - 190131 Actual Cost invs Jan 2019 UL20190417jgv1
Amount:
$750.00

Component Description:
Osborn 34243 Prof Srvcs 19601 - 190628 PRRF v190726jgv1
Amount:
$1,250.00

Component Description:
Osborn inv #32954 Prof Srvcs 190101 - 190131 Actual Cost invs Feb 2019 UL20190417jgv1
Amount:
$625.00

Component Description:
KGA 960-08 v200320jgv1
Amount:
$830.00

Component Description:
Osborn 37285 v200331jgv1
Amount:
$2,425.00

Component Description:
KGA 960-13 v200804jgv1
Amount:
$225.00

Component Description:
Osborn 34786 v190927jgv1
Amount:
$1,200.00

Component Description:
Osborn 33898 v190618jgv1
Amount:
$800.00

Component Description:
Prepare original FCC Form 399 for reimbursement
Amount:
$2,500.00

Component Description:
KGA 960-35 v210628jgv1
Amount:
$100.00

Component Description:
KGA 960-11 v200514jgv1
Amount:
$100.00

Component Description:
Osborn 36104 PRRF v191126jgv1
Amount:
$550.00

Component Description:
Osborn 33397 Prof Srvcs thru 190426 PRRF v190522jgv1
Amount:
$625.00

Component Description:
KGA 960-17 v200804jgv1
Amount:
$2,375.00

Component Description:
Osborn 35592 Prof Srvcs thru 190831-190927 PRRF v191023jgv1
Amount:
$2,135.00

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $348,651.64 $348,101.64 N/A $27,049.87 N/A
Total for all systems $5,294,756.19 $4,792,163.30 N/A $1,501,156.91 N/A
Other Expenses $348,651.64 $348,101.64 $27,049.87
MVPD Notification of Channel Change $5,000.00 $5,000.00 N/A $2,000.00 N/A
Develop and air announcement of upcoming channel change $3,000.00 $3,000.00 N/A N/A N/A
Non-zoning permits $15,000.00 $15,000.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A $3,000.00 N/A
Sales Tax $249,101.64 $249,101.64 N/A N/A N/A
Equipment Storage $15,000.00 $15,000.00 N/A N/A N/A
Equipment Delivery and Handling Charges $25,000.00 $25,000.00 N/A $22,049.87 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $25,000.00 $25,000.00 N/A N/A N/A

Components

Actual Information Description File Name
MVPD Notification of Channel Change

Component Description:
Osborn 34243 Prof Srvcs 19601 - 190628 MVPD notifs v190726jgv1
Amount:
$2,000.00
Develop and air announcement of upcoming channel change Information not provided.
Non-zoning permits Information not provided.
DTV Medical Facility Notification

Component Description:
Osborn 34243 Prof Srvcs 19601 - 190628 Med notifs v190726jgv1
Amount:
$3,000.00
Sales Tax Information not provided.
Equipment Storage Information not provided.
Equipment Delivery and Handling Charges

Component Description:
Die 610016 v191028pmv1
Amount:
$5,831.25

Component Description:
Die 611007 v191028pmv1
Amount:
$4,955.00

Component Description:
Smith Equip 709 v200313jgv4
Amount:
$10,918.00

Component Description:
Die 947014 v210309pmv1
Amount:
$58.99

Component Description:
Die 931005 v210309pmv1
Amount:
$286.63
Disposal Costs (for equipment and other waste, net of any salvage value) Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $5,294,756.19 $4,792,163.30 $1,501,156.91

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. Yes
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. Yes

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Jeffrey C Gehman

Engineering Associate


04/21/2022

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Jeffrey C Gehman

Engineering Associate


04/21/2022

Certification

Back to Top
Section Question Response
Submission of Final Allocation or Accounting Information Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  2. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  3. The above-named entity certifies that all costs identified as "actual costs" herein accurately represent the costs actually paid by the above-named entity, including any discounts, refunds, or rebates.

  4. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  5. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  6. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Jeffrey C Gehman

Engineering Associate


04/21/2022