Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
36916
Service:
DTV
Call Sign:
KTDO
Channel:
26 (UHF)
File Number:
0000028442
FRN:
0019509470
Date Submitted:
05/05/2022

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

NBC TELEMUNDO LICENSE LLC

Margaret L. Tobey

300 NEW JERSEY AVENUE, NW

SUITE 700

WASHINGTON, DC 20001

United States

+1 (202) 524-6401 margaret.tobey@nbcuni.com Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Margaret L Tobey

NBCUniversal, LLC

300 New Jersey Ave. NW

Suite 700

Washington, DC 20001

United States

+1 (202) 524-6401 Margaret.Tobey@nbcuni.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan The KTDO facility is located on Ranger Peak and the site is only accessible via a tram. Rebuilding KTDO on the new channel will require an interim facility at the accessible Comanche Peak location.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model STVTX16V75
Year 2009
Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power Capacity 16 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model THU9-12 Evo
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 19 kW
Justification for New Transmitter The existing DMT transmitter is no longer manufactured. The major modifications that would be needed for re-tuning from Channel 47 to Channel 26 are not available due to limited parts and support. See attached.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

UHF Kit for Antenna Monitoring System

UHF Kit for Antenna Monitoring System

Removal of DMT Transmitter

Removal of DMT Transmitter

Installation

Installation, Commissioning and Proof-of-Performance

Interim Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Interim
Description of Use N/A
Change Type Purchase
Manufacturer
Model TMU9-1800W
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 1.8 kW
Justification for New Transmitter The KTDO main facility is located on the remote Ranger Peak location that is accessible only by tram. It will take months of work to complete installation. An interim facility is required at a separate accessible location to maintain service to public.

Interim Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A
Inside RF System Is an additional interior RF system required to support this interim transmitter? No

Interim Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Installation

Installation of interim transmitter

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 200.0 kW
Manufacturer
Model SFN-2070-O3-18
Year 2009

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 132.0 kW
Manufacturer
Model TFU-10DSC-R O4
Year 2018
Justification for New Antenna Existing antenna will not function on new channel and cannot be retuned.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna?
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Reducer

Reducer 4-50 to 3-50

Antenna Shipping

Antenna shipping and handling costs

Test Transition

Test Transition 6-50

Install New Main Antenna

Install New Main Antenna

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 200.0 kW
Manufacturer
Model TLP-16B
Year 2018
Justification for New Antenna The KTDO main facility is located on the remote Ranger Peak location that is accessible only by tram. It will take months of work to complete installation. An interim facility is required at a separate accessible location to maintain service to public.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Install Interim Ch 47 antenna

New interim antenna installation

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Flexible Foam
Diameter 1 5/8 inches
Segment Length N/A
Other Segment Length
Number of parallel runs 1
Length 210 feet per run
Justification for New Transmission Line The KTDO main facility is located on the remote Ranger Peak location that is accessible only by tram. It will take months of work to complete installation. An interim facility is required at a separate accessible location to maintain service to public.

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Auxiliary Tower

Back to Top

Add Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Auxiliary (Backup)
Description of Use Interim Facility
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? Unknown
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1047783
Coordinates (NAD83) Latitude (NAD83) 31° 47' 15.0" N-
Longitude (NAD83) 106° 28' 49.0" W-
Overall Structure Height 296.91 feet
Support Structure Height 222.11 feet
Ground Elevation Above Mean Sea Level (AMSL) 4663.00 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner 88 Investments, Inc.
Date Constructed 01/01/1960

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
19117 KCOS DTV

Auxiliary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: No study needed
Tower Reinforcements Please select whether tower reinforcements are needed: No reinforcements needed

Auxiliary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Auxiliary Tower

Back to Top

Other Tower Expenses Not Listed

Information not provided.

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? Terrain Constrained
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? Unknown
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1202400
Coordinates (NAD83) Latitude (NAD83) 31° 48' 18.9" N-
Longitude (NAD83) 106° 29' 00.7" W-
Overall Structure Height 388.12 feet
Support Structure Height 340.88 feet
Ground Elevation Above Mean Sea Level (AMSL) 5604.92 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner Pinnacle Towers LLC
Date Constructed 01/05/2000

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
49832 KVIA-TV DTV
10202 KSCE DTV
68753 KTFN DTV
67760 KTSM-TV DTV

Other Types of Users

Users
Various Mobile
K26KJ-D 59114

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: No study needed
Tower Reinforcements Please select whether tower reinforcements are needed: No reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Terrain constrained
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Structural Analysis

Structural Analysis

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 1040
Explanation Management of project timeline, contractors, scope, deliverables, reporting, etc.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 2
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 2
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements Yes
Additional Field Engineering Service Yes
Number of Days 20
Justification Site surveys, inspections, etc.

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Project Management: Coordinate Tower Crew and Installation team.

Coordinate tower crew and installation team. Tramway out of commission, causing additional planning, coordination and management of tower crew and installation teams.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application No
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $950,335.62 $589,458.62 N/A $495,961.12 N/A
Total for all systems $2,594,569.54 $1,851,579.41 N/A $1,132,048.91 N/A
Interim Transmitter TMU9-1800W $168,873.92 $118,581.92 $42,873.92
Installation $42,873.92 $42,873.92 Costs more than the predetermined cost because of new installation of electrical panels. $42,873.92 N/A
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW $126,000.00 $75,708.00 N/A $0.00 N/A
Primary Transmitter THU9-12 Evo $781,461.70 $470,876.70 $453,087.20
UHF Kit for Antenna Monitoring System $15,804.50 $15,804.50 N/A $0.00 N/A
Installation $79,672.20 $79,672.20 Install costs more than predetermined because of install of new transformer, coax witch, load, electrical distribution boxes, and filter cooling kits $79,672.20 N/A
Removal of DMT Transmitter $1,985.00 $1,985.00 N/A $0.00 N/A
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW $684,000.00 $373,415.00 N/A $373,415.00 N/A

Components

Actual Information Description File Name
Installation

Component Description:
Interim Transmitter Install including electrical, RF, and Proof
Amount:
$42,873.92

Component Description:
Interim Transmitter Install including electrical, RF, and Proof
Amount:
$42,873.92
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW Information not provided.
UHF Kit for Antenna Monitoring System

Component Description:
KTDO - R&S Invoice for UHF Spinner kit plus tax
Amount:
$15,804.50
Installation

Component Description:
Please see line item 2, main transmitter installation expenses
Amount:
$39,351.68

Component Description:
Control cable to connect the Transmitter
Amount:
$968.84

Component Description:
Main transmitter installation, 2nd payment. please see line item 1.
Amount:
$39,351.68

Component Description:
Main Transmitter install for 1 cabinet w/filter, coax switch & load and Proof. 90 kVA transformer, coax switch, load, new electrical distribution boxes, disconnects, and filter cooling kits included.
Amount:
$39,351.68

Component Description:
Main transmitter install for 1 cabinet with filter, coax and switch load and Proof
Amount:
$39,351.68

Component Description:
Cable to connect transmitter to switch
Amount:
$968.84
Removal of DMT Transmitter

Component Description:
Coordinate removal of DMT transmitter and other RF work
Amount:
$1,985.00

Component Description:
KTDO - ELIAS VENTANILLA Invoice for coordinating removal of DMT transmitter
Amount:
$1,985.00
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW

Component Description:
KTDO - R&S invoice for transmitter
Amount:
$373,415.00

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $628,937.20 $495,825.20 N/A $424,389.71 N/A
Total for all systems $2,594,569.54 $1,851,579.41 N/A $1,132,048.91 N/A
Interim Antenna TLP-16B $356,190.00 $181,184.00 $159,242.00
Install Interim Ch 47 antenna $154,700.00 $154,700.00 N/A $154,700.00 N/A
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $0.00 N/A $0.00 N/A
Sweep test of existing antenna $6,730.00 $4,542.00 N/A $4,542.00 N/A
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized $189,500.00 $21,942.00 UHF Antenna Side Mount $0.00 N/A
Primary Antenna TFU-10DSC-R O4 $272,747.20 $314,641.20 $265,147.71
Sweep test of existing antenna $6,730.00 $4,542.00 N/A $4,542.00 N/A
Install New Main Antenna $138,370.00 $138,370.00 N/A $138,370.00 N/A
UHF - Lower Power Side Mount, One station antenna - medium power (50-200 kW), horizontally polarized $89,400.00 $141,417.00 Existing antenna is a high-power UHF side mount antenna and will be replaced with a model of similar design $109,643.61 N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $16,425.00 N/A $7,391.25 N/A
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $4,050.00 N/A $2,028.65 N/A
Test Transition $3,578.60 $3,578.60 N/A $2,346.82 N/A
Antenna Shipping $5,000.00 $5,000.00 Antenna shipping and handling costs estimate. N/A N/A
Reducer $1,258.60 $1,258.60 N/A $825.38 N/A

Components

Actual Information Description File Name
Install Interim Ch 47 antenna

Component Description:
2nd installment for the interim removal and installation.
Amount:
$46,410.00

Component Description:
final payment of the Interim antenna removal and installation cost. please see line items 1&4.
Amount:
$61,880.00

Component Description:
1st payment. Install and remove Ch 47 antenna & 3" Flexible transmission line. please see line 1&4 from the attached invoice.
Amount:
$46,410.00

Component Description:
Install Interim Ch 47 antenna and 3" flexible transmission line
Amount:
$36,000.00

Component Description:
Install Interim Ch 47 antenna and 3" flexible transmission line
Amount:
$36,000.00

Component Description:
Install Interim Ch 47 antenna and 3" flexible transmission line
Amount:
$48,000.00
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) Information not provided.
Sweep test of existing antenna

Component Description:
Line item 4, Interim Antenna and Line sweep
Amount:
$4,542.00

Component Description:
This is only for the cost of the interim antenna and line sweep. It does not include any of the other costs associated with this invoice.
Amount:
$4,542.00

Component Description:
This is only for the cost of the interim antenna and line sweep. It does not include any of the other costs associated with this invoice.
Amount:
$2,271.00
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized

Component Description:
line 1 proportional amount, UHF Antenna side mount
Amount:
$12,068.10

Component Description:
Please see line item 1 from the attached invoice.
Amount:
$9,873.90

Component Description:
Line 1 45% due of total unit cost
Amount:
$9,873.90

Component Description:
See Line 1 on memo Side Mount Bracket
Amount:
$12,068.10
Sweep test of existing antenna

Component Description:
Main Antenna and line sweep
Amount:
$2,271.00

Component Description:
2nd payment for the Main antenna and line sweep. please see lien item 2.
Amount:
$2,271.00

Component Description:
This is only for the cost of the main antenna and line sweep. It does not include any of the other costs associated with this invoice.
Amount:
$2,271.00
Install New Main Antenna

Component Description:
Final payment for the main antenna removal and installation. please see lien item 2&3.
Amount:
$55,348.00

Component Description:
please see line item 2&3 from the attached invoice, removal and installation expenses.
Amount:
$41,511.00

Component Description:
Remove existing antenna Ch 47 and install new antenna Ch 26, please see lien item 2&3 from the attached invoice.
Amount:
$41,511.00

Component Description:
Please see Line 3: Install new main Ch 26 antenna
Amount:
$24,000.00

Component Description:
Please see Line 3: Install new main Ch 26 antenna
Amount:
$32,000.00

Component Description:
Please see Line 3: Install new main Ch 26 antenna
Amount:
$24,000.00
UHF - Lower Power Side Mount, One station antenna - medium power (50-200 kW), horizontally polarized

Component Description:
Please see line item 1 proportional amount request from the remaining balance
Amount:
$57,756.36

Component Description:
KTDO - Dielectric invoice for 45% of Antenna
Amount:
$63,677.00

Component Description:
please find attached cover letter and see line item 1
Amount:
$51,667.35

Component Description:
please see line item 1 for the payment request
Amount:
$51,887.25
Side mount brackets for high power antennas (if not included in antenna base cost)

Component Description:
please see line item 2 for the Side Antenna Mounting Brackets
Amount:
$7,391.25
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost)

Component Description:
Please see line item 5 proportional amount request from the remaining balance
Amount:
$2,028.65

Component Description:
please see line item 5 for the scatter study cost
Amount:
$4,050.00
Test Transition

Component Description:
Please see line item 6 for this invoice
Amount:
$1,110.60

Component Description:
Please see line item 4, proportional amount request from the remaining balance
Amount:
$1,236.22

Component Description:
please see line item 4 from the attached invoice
Amount:
$2,468.00
Antenna Shipping Information not provided.
Reducer

Component Description:
Please see line item 3, proportional amount request from the remaining balance
Amount:
$434.78

Component Description:
please line item 5 for the Reducer
Amount:
$390.60

Component Description:
Please see line item 3.
Amount:
$868.00

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $5,040.00 $22,443.87 N/A $5,269.29 N/A
Total for all systems $2,594,569.54 $1,851,579.41 N/A $1,132,048.91 N/A
Interim Transmission Line $5,040.00 $22,443.87 $5,269.29
Flexible Foam Transmission Line - dielectric, 1 5/8" $5,040.00 $22,443.87 Ordered from Dielectric Elbow 6-50 digit 9*18 STD $5,269.29 N/A

Components

Actual Information Description File Name
Flexible Foam Transmission Line - dielectric, 1 5/8"

Component Description:
Please see line item 2, proportional amount request from the remaining balance
Amount:
$2,411.34

Component Description:
please see line item 2
Amount:
$6,499.74

Component Description:
Please see line item 2, proportional amount requested for the remaining balance.
Amount:
$7,944.13

Component Description:
See Line 2
Amount:
$6,499.74

Component Description:
please see line item 2 for the payment request
Amount:
$4,814.00

Component Description:
please see line 3 and 4 for the payment request
Amount:
$2,857.95

Component Description:
Flex Transmission Line - 3' Air Dielectric
Amount:
$7,944.13

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $507,200.00 $294,820.00 N/A $4,250.00 N/A
Total for all systems $2,594,569.54 $1,851,579.41 N/A $1,132,048.91 N/A
Auxiliary Tower TOWER $84,200.00 $92,820.00 $0.00
Short Tower (less than 500') $84,200.00 $92,820.00 Cost of work to remove and install new interim antennae was much more expensive than originally anticipated. $0.00 N/A
Primary Tower TOWER $423,000.00 $202,000.00 $4,250.00
Structural Analysis $2,000.00 $2,000.00 N/A N/A N/A
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $200,000.00 N/A $4,250.00 N/A

Components

Actual Information Description File Name
Short Tower (less than 500')

Component Description:
This is the cost for the install and removal of the interim antenna. It does not include the cost of the install and removal of the main antenna.
Amount:
$46,410.00

Component Description:
This is the second invoice to cover the cost of the install and removal of the interim antenna. It does not include the cost of install and removal of the main antenna.
Amount:
$46,410.00
Structural Analysis

Component Description:
Structural analysis
Amount:
$2,000.00
Complex Tower (includes, for example, those with candelabras and/or stacked antennas)

Component Description:
Modification Design
Amount:
$4,250.00

Component Description:
KTDO Tower Modification Contribution for Ranger Peak Tower
Amount:
$4,250.00

Component Description:
This is the second invoice for this work. This covers the cost of the install and removal of the main antenna. It does not include the cost of the install and removal of the interim antenna.
Amount:
$41,511.00

Component Description:
KTDO Tower Modification Contribution for Ranger Peak Tower
Amount:
$52,146.00

Component Description:
Only including the cost to remove the main antenna and install the new main antenna. This does not include the install or removal of the interim antenna.
Amount:
$41,511.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $345,220.00 $291,750.00 N/A $151,107.07 N/A
Total for all systems $2,594,569.54 $1,851,579.41 N/A $1,132,048.91 N/A
Outside Professional Services $345,220.00 $291,750.00 $151,107.07
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $10,000.00 Includes site visit, see attached proposal N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
Prepare request for Special Temporary Authorization $4,100.00 $3,000.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A $1,800.00 N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $4,000.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $7,360.00 $7,000.00 N/A N/A N/A
Project Management: Coordinate Tower Crew and Installation team. $25,000.00 $25,000.00 N/A $25,000.00 N/A
Additional Field Engineering Service, 20 Days $10,000.00 $10,000.00 See attached site survey quote $10,000.00 N/A
RF Exposure Measurements $21,050.00 $20,000.00 RF exposure may be necessary due to the transmitter site location in the Franklin Mountains State Park, which is accessible to the public via trails and the aerial tramway. $8,950.00 N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $40,000.00 N/A $0.00 N/A
Project management of the transition $164,320.00 $156,000.00 N/A $104,927.02 N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A $430.05 N/A

Components

Actual Information Description File Name
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Perform engineering study for new channel assignment and antenna development Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
Prepare request for Special Temporary Authorization Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application

Component Description:
Attorney Fees for Station KTDO
Amount:
$1,035.00

Component Description:
Attorney Fees for Station KTDO
Amount:
$540.00

Component Description:
Attorney Fees for Station KTDO
Amount:
$225.00
Attorney Fees - Negotiation of lease and other matters for shared locations Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Project Management: Coordinate Tower Crew and Installation team.

Component Description:
Project management, please see line item 3.
Amount:
$11,475.00

Component Description:
Please see line 3: Project Management: Coordinate tower crew and installation team. Tramway out of commission, causing additional planning, coordination and management of tower crew and installation teams.
Amount:
$11,475.00

Component Description:
Coordinate tower crew and installation team. Tramway out of commission, causing additional planning, coordination and management of tower crew and installation teams.
Amount:
$13,525.00
Additional Field Engineering Service, 20 Days

Component Description:
Engineering Site Survey
Amount:
$10,000.00
RF Exposure Measurements

Component Description:
Consultation on RF exposure measurements_revised
Amount:
$8,950.00

Component Description:
Consultation on RF exposure measurements
Amount:
$8,950.00
Comprehensive coverage verification via field study, if needed

Component Description:
Field Survey Study, field strength measurements expenses
Amount:
$30,670.00

Component Description:
Field Study and Measurements
Amount:
$30,670.00

Component Description:
Structural Analysis and Site Inspection Fee for Ranger Peak
Amount:
$2,000.00
Project management of the transition

Component Description:
Project Management Services for KTDO Stations
Amount:
$6,292.00

Component Description:
Project Management Services for KTDO Station
Amount:
$2,370.00

Component Description:
Project management Services for KTDO Stations
Amount:
$7,922.50

Component Description:
Project Management services for KTDO Stations
Amount:
$1,635.00

Component Description:
Point B Project Management January 2019
Amount:
$17,440.00

Component Description:
KTDO- El Paso-Repack Finance Resource-Project Management Services-36916- Revised
Amount:
$1,264.00

Component Description:
KTDO- El Paso-Engagement Leader-Project Management Services- 36916
Amount:
$1,264.00

Component Description:
KTDO AFF Consulting January 2019 Invoice - Research
Amount:
$450.00

Component Description:
Repack Finance Resource-Project Management Services for KTDO
Amount:
$948.00

Component Description:
Project Management Invoice
Amount:
$10,432.52

Component Description:
KTDO-Project Management Services- 36916
Amount:
$474.00

Component Description:
Point B Project Management September 2019 at KNTV
Amount:
$2,607.00

Component Description:
Point B Project Management October 2019 at KNTV
Amount:
$1,422.00

Component Description:
KTDO- El Paso-Repack Finance Resource- Project Management Services- 36916
Amount:
$316.00

Component Description:
Project Management Services for KTDO Station
Amount:
$2,212.00

Component Description:
Project Management Services for KTDO Stations
Amount:
$3,095.00

Component Description:
Point B Project Management
Amount:
$19,090.00

Component Description:
Project Management
Amount:
$2,250.00

Component Description:
Point B Project Management services for the month of February 2019. See line items.
Amount:
$16,110.00

Component Description:
Project Management Services for KTDO Station
Amount:
$7,333.00
Prepare and or review reimbursement form

Component Description:
Attorney Fees for Station KTDO
Amount:
$35.70

Component Description:
Attorney Fees for Station KTDO
Amount:
$315.00

Component Description:
Attorney Fees for Station KTDO
Amount:
$35.70

Component Description:
Attorney Fees for Station KTDO
Amount:
$43.65

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $157,836.72 $157,281.72 N/A $49,071.72 N/A
Total for all systems $2,594,569.54 $1,851,579.41 N/A $1,132,048.91 N/A
Other Expenses $157,836.72 $157,281.72 $49,071.72
MVPD Notification of Channel Change $2,500.00 $2,500.00 Required notifications to cable and satellite carriers of the channel change to avoid any interruptions in service to existing viewers. N/A N/A
Develop and air announcement of upcoming channel change $2,500.00 $2,500.00 Development and airing of announcement to over-the-air viewers of the channel changes to avoid any service interruptions during the lengthy transition to the new channel. N/A N/A
Equipment Delivery and Handling Charges $6,592.00 $6,592.00 Due to the limitations on the size of the truck that can access the tramway base location, it is necessary to transfer cargo to smaller trucks, which then also adds to the number of trips needed to complete deliveries to the base. $6,592.00 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $132,599.72 $132,599.72 Removal of equipment and other waste from the site includes expenses for: other stations to lower power or shut down operations; labor for removal; and labor, crew and operation of state-owned tramway. $39,529.72 N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $190.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A $2,950.00 N/A
Equipment Storage $1,900.00 $1,900.00 Due to the limitations on access to the site and space at the site, a temporary container must be placed at the base to store deliveries. N/A N/A

Components

Actual Information Description File Name
MVPD Notification of Channel Change Information not provided.
Develop and air announcement of upcoming channel change Information not provided.
Equipment Delivery and Handling Charges

Component Description:
Shipping charges w/packing slips_ Revised
Amount:
$3,546.00

Component Description:
Shipping and handling charges with back up docs
Amount:
$3,046.00

Component Description:
Additional Shipping and Handling charges
Amount:
$3,046.00

Component Description:
Shipping and Handling charges
Amount:
$3,546.00
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
Disposal cost, please see lien item 1.
Amount:
$39,529.72

Component Description:
Please see Line 4: excluding subtotal lines: Remove Interim Ch 47 antenna and 3" flexible line after cutover
Amount:
$13,880.00

Component Description:
Please see Line 2: Remove existing main Ch 47 antenna
Amount:
$17,511.00

Component Description:
Please see Line 2: Remove existing main Ch 47 antenna
Amount:
$23,348.00

Component Description:
Please see line 2: Remove existing main Ch 47 antenna
Amount:
$17,511.00

Component Description:
Please see line 4: excluding lines with subtotals: Remove Interim Ch 47 antenna and 3" flexible line after cutover
Amount:
$10,410.00

Component Description:
Please see Line 4: excluding subtotal lines: Remove Interim Ch 47 antenna and 3" flexible line after cutover
Amount:
$10,410.00

Component Description:
Disposal costs to remove 2 cabinet DMT Systems with cooling, RF, and electrical
Amount:
$39,529.72
FCC Filing Fees - Special Temporary Authorization request Information not provided.
DTV Medical Facility Notification

Component Description:
Medical Notification Mailing Complete per FCC Repack
Amount:
$2,950.00

Component Description:
Medical Notification
Amount:
$2,950.00
Equipment Storage Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $2,594,569.54 $1,851,579.41 $1,132,048.91

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. Yes
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. Yes

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Margaret L. Tobey

Assistant Secretary


05/05/2022

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Margaret L. Tobey

Assistant Secretary


05/05/2022

Certification

Back to Top
Section Question Response
Submission of Final Allocation or Accounting Information Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  2. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  3. The above-named entity certifies that all costs identified as "actual costs" herein accurately represent the costs actually paid by the above-named entity, including any discounts, refunds, or rebates.

  4. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  5. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  6. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Margaret L. Tobey

Assistant Secretary


05/05/2022

Attachments

Back to Top