Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
KTBS, LLC Doing Business As: KTBS, LLC |
PO Box 44227 SHREVEPORT, LA 71134 United States |
+1 (318) 861-5800 | dcassidy@ktbs.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Samuel Hariton Widelity, Inc. |
Sam Hariton 4031 University Drive Suite 100 Fairfax, VA 22030 United States |
+1 (339) 222-8107 | sam.hariton@widelity.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | KPXJ is planning a direct like-for-like swap on all equipment. KPXJ's new equipment will include upgraded equipment to add VPOL capability. See Narrative for details. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Retune Existing |
Use | Auxiliary (Backup) | |
Ownership | Owned | |
Owner | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | GatesAir |
Model | ULXTD-60 | |
Year | 2016 | |
Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 34.6 kW |
Section | Question | Response |
---|---|---|
New IOT Tubes | Number of Tubes (including accessories) needed | N/A |
New Mask Filter | ||
Power | Other | |
Other Power | 0 kW | |
New Exciter | Is a new exciter needed? | No |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Aux Transmitter - System Sweep Post Retune |
Aux Transmitter - System Sweep Post Retune |
Aux Transmitter - RF System Modifications |
Aux Transmitter - RF System Modifications |
Aux Transmitter - Additional Installation |
Aux Transmitter - Additional Installation |
Aux Transmitter - Proof of Performance |
Aux Transmitter - Proof of Performance |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | DCXP-2 Paragon | |
Year | 2005 | |
Type | Inductive Output Tube | |
IOT Power Type | Two | |
Power Capacity | 50 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTED-120 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 76.0 kW | |
Justification for New Transmitter | The existing transmitter is capable of being retuned, however doing so would require disconnecting the transmitter to have it retuned on site. The retuning process was quoted to take 16 to 20 weeks and during this time the transmitter would be unavailable |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | Yes | |
Power | 300 kVA | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | The new main transmitter will require reconfiguration of the electrical service on site. The electrical work cost has been estimated based on verbal guidance from local electrical contractors. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 5 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Primary Transmitter - Decommission |
Primary Transmitter - Decommission |
Primary Transmitter - RF Accessories |
Primary Transmitter - RF Accessories |
Relocating Ground equipment |
Relocating existing equipment for other stations to make room for new transmitter |
Primary Transmitter - Interior RF and Switching |
Primary Transmitter - Interior RF and Switching |
Building Reconfiguration |
The existing building will need to be reconfigured (walls removed/added) to allow for the new transmitter combiner configuration |
Combiner 5 ton HVAC |
The Combiner will need its own dedicated Cooling only HVAC |
Primary Transmitter - Installation |
Primary Transmitter - Installation |
Primary Transmitter - Generator |
Primary Transmitter - Generator |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | TFU-30DSC-R S20000 | |
Year | 2006 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | TFU-30DSC/VP-R S200 | |
Year | 2017 | |
Justification for New Antenna | A New antenna is necessary because the existing antenna cannot support the new channel. Additionally, KPXJ needs to replace the un-used bottom-stack antenna at the top of the tower due to structural limitations. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 6 1/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Wedding Cake Adapter |
Wedding Cake Adapter |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | Yes | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Slot | |
Number of Stations Supported | 2 | |
Number of Panels/Bays | 24 | |
Lower Limit | 512.00 MHz | |
Upper Limit | 584.00 MHz | |
Design power capacity in use | 50.0 % | |
Other Antenna Type | N/A | |
ERP: | 800.0 kW | |
Manufacturer | ||
Model | TFU-24WB C160 | |
Year | 2017 | |
Justification for New Antenna | This broadband antenna will cover KTBS's channel 28, as well both KPXJ's pre-transition channel 21 and post-transition channel 32. This will drastically reduce the risk of delays or risk of KPXJ not being able to transition channels on schedule. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 3 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | No | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | B | |
Feed Line Size | 6 1/8 inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
RF Channel Number |
---|
21 |
28 |
32 |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 4 1/16 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1731 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Type | Rigid | |
Diameter | 8 3/16 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1760 feet per run | |
Justification for New Transmission Line | The existing line is not capable of supporting the new channel. Additionally, the new main antenna will be installed in a different location than the existing main antenna. |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Segment Length | Broadband | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 1560 feet per run | |
Justification for New Transmission Line | The interim line is needed to connect the combiner system on the ground with the new interim antenna. The Line needs to support two stations of power as well as be broadband to allow all channel combinations to operate on the same line. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | Terrain Constrained | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1020877 | |
Coordinates (NAD83) | Latitude (NAD83) | 32° 41' 08.5" N- |
Longitude (NAD83) | 093° 56' 00.6" W- | |
Overall Structure Height | 1825.77 feet | |
Support Structure Height | 1822.48 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 249.01 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | KTBS, LLC | |
Date Constructed | 06/25/2013 |
Facility ID | Call Sign | Service |
---|---|---|
1304 | KRMD-FM | FM |
35652 | KTBS-TV | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Serious Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Terrain constrained |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Field Verifications |
Field Verification for Actual mechanicals for existing antennas prior to antenna ordering. |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 2562 | |
Explanation | See attached Narrative | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
NEPA Section 106 environmental review | Yes | |
Environmental Assessment | Yes | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | Yes | |
Number of Days | 20 | |
Justification | Field investigation of tower site and building status will be needed in order to design and scope project. |
Name | Description |
---|---|
Attorney - Other Matters |
Legal Services |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Road Repairs |
Repairs required to fix damage done by equipment during repack |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $3,744,228.77 | $3,756,183.77 | N/A | $2,144,836.68 | N/A |
Total for all systems | $8,387,002.90 | $8,578,574.70 | N/A | $5,827,166.97 | N/A |
Primary Transmitter ULXTED-120 | $3,341,783.90 | $3,338,983.90 | $1,762,675.49 | ||
Primary Transmitter - RF Accessories | $101,238.92 | $101,238.92 | Please see Technical Services Group, Inc. estimate 2015865-RF | $38,288.03 | N/A |
Primary Transmitter - Generator | $206,169.93 | $206,169.93 | Please see TSG Estimate 2015865F | $0.00 | N/A |
Primary Transmitter - Installation | $98,812.50 | $98,812.50 | Please see TSG Estimate #20158651 and Invoice #20158651.pdf | $98,812.50 | N/A |
Combiner 5 ton HVAC | $15,333.33 | $15,333.33 | See attached TSG Quote “Sec 1 Main TX” line 63 | $0.00 | N/A |
Building Reconfiguration | $20,000.00 | $20,000.00 | N/A | $0.00 | N/A |
Primary Transmitter - Interior RF and Switching | $101,238.92 | $101,238.92 | Please see TSG Estimate #2015865-RF and Invoice #2015865-RF | $0.00 | N/A |
Primary Transmitter - Decommission | $32,381.20 | $32,381.20 | Please see Line 1 on Technical Services Group, Inc. estimate 2015865-9A | $32,381.20 | N/A |
5 Ton system | $20,250.00 | $19,250.00 | N/A | $0.00 | N/A |
Other Electrical Service: The new main transmitter will require reconfiguration of the electrical service on site. The electrical work cost has been estimated based on verbal guidance from local electrical contractors. | $75,000.00 | $75,000.00 | N/A | $40,250.00 | N/A |
Transformer 3 phase/480v - 300 KVA | $36,800.00 | $35,000.00 | N/A | $0.00 | N/A |
UHF - Liquid Cooled Solid State Transmitter 76.0 kW | $2,614,559.10 | $2,614,559.10 | see Estimated Cost Justification KPXJ-110-Primary Transmitter - UHF liquid-cooled 76 kW v0 | $1,552,943.76 | N/A |
Relocating Ground equipment | $20,000.00 | $20,000.00 | N/A | $0.00 | N/A |
Auxiliary Transmitter ULXTD-60 | $402,444.87 | $417,199.87 | $382,161.19 | ||
Aux Transmitter - Proof of Performance | $24,000.00 | $24,000.00 | Please see TSG Estimate 2015865G | $24,000.00 | N/A |
Aux Transmitter - Additional Installation | $93,163.68 | $93,163.68 | Please see TSG Estimate 2015865G | $58,125.00 | N/A |
Aux Transmitter - RF System Modifications | $173,681.19 | $173,681.19 | Please see TSG Estimate 2015865G and Cost Reconciliation | $173,681.19 | N/A |
Aux Transmitter - System Sweep Post Retune | $6,400.00 | $6,400.00 | Please see TSG Estimate 2015865G | $6,400.00 | N/A |
Other 0 kW mask filter | $0.00 | $0.00 | No new mask filter required - this category is only present because LMS requires that it be here. | N/A | N/A |
UHF and VHF - minor banding issues | $105,200.00 | $119,955.00 | Please see TSG Estimate 2015865G and Cost Reconciliation | $119,955.00 | N/A |
Actual Information Description | File Name |
---|---|
Primary Transmitter - RF Accessories | |
Primary Transmitter - Generator | |
Primary Transmitter - Installation | |
Combiner 5 ton HVAC | Information not provided. |
Building Reconfiguration | Information not provided. |
Primary Transmitter - Interior RF and Switching | |
Primary Transmitter - Decommission | |
5 Ton system | Information not provided. |
Other Electrical Service: The new main transmitter will require reconfiguration of the electrical service on site. The electrical work cost has been estimated based on verbal guidance from local electrical contractors. | |
Transformer 3 phase/480v - 300 KVA | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 76.0 kW | |
Relocating Ground equipment | Information not provided. |
Aux Transmitter - Proof of Performance | |
Aux Transmitter - Additional Installation | |
Aux Transmitter - RF System Modifications | |
Aux Transmitter - System Sweep Post Retune | |
Other 0 kW mask filter | Information not provided. |
UHF and VHF - minor banding issues |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,026,678.30 | $1,063,932.16 | N/A | $614,835.28 | N/A |
Total for all systems | $8,387,002.90 | $8,578,574.70 | N/A | $5,827,166.97 | N/A |
Interim Antenna TFU-24WB C160 | $401,869.30 | $584,058.60 | $262,321.36 | ||
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $22,000.00 | N/A | $0.00 | N/A |
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | $13,700.00 | $13,000.00 | N/A | N/A | N/A |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 800 kW input, horizontally polarized | $268,829.30 | $268,829.30 | see Justifying Quote KPXJ-280-Interim Antenna - High Power Side Mount TSG proposal for Job 2015865A | $262,321.36 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
New combiner, cost per channel (without antenna) | $84,200.00 | $268,829.30 | Based on Quote. | $0.00 | N/A |
Primary Antenna TFU-30DSC/VP-R S200 | $624,809.00 | $479,873.56 | $352,513.92 | ||
Wedding Cake Adapter | $33,314.78 | $33,314.78 | Please see TSG Estimate and Invoice #2015865W.pdf | $33,314.77 | N/A |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $31,969.11 | see Estimated Cost Justification KPXJ-210-Primary Antenna - Side Mount Brackets - Custom Mount Brackets v0 | $31,906.19 | N/A |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | $12,300.00 | $11,700.00 | N/A | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
UHF - High Power, Side Mount, basic slot antenna, 1000 kW input, directional,, elliptically or circularly polarized | $254,554.22 | $254,554.22 | Per Dielectric quote 513326JKT Rev 5. Vpol adder is not included here. Previous superseded component has $136,935.45 forwarded for payment. | $150,357.51 | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | $289,500.00 | $136,935.45 | ***System Notice: Estimate adjusted and locked because line has been superseded.*** | $136,935.45 | N/A |
Actual Information Description | File Name |
---|---|
Side mount brackets for high power antennas (if not included in antenna base cost) | Information not provided. |
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | Information not provided. |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | Information not provided. |
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 800 kW input, horizontally polarized | |
Sweep test of existing antenna | Information not provided. |
New combiner, cost per channel (without antenna) | Information not provided. |
Wedding Cake Adapter | |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | Information not provided. |
Side mount brackets for high power antennas (if not included in antenna base cost) | |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | Information not provided. |
Sweep test of existing antenna | Information not provided. |
UHF - High Power, Side Mount, basic slot antenna, 1000 kW input, directional,, elliptically or circularly polarized | |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,328,160.00 | $1,351,418.61 | N/A | $1,032,845.51 | N/A |
Total for all systems | $8,387,002.90 | $8,578,574.70 | N/A | $5,827,166.97 | N/A |
Interim Transmission Line | $361,920.00 | $548,493.77 | $548,493.77 | ||
Rigid Transmission Line - copper, 6 1/8" broadband | $361,920.00 | $548,493.77 | per KPXJ-380-Interim Transmission Line - 6 1-8 Rigid Copper, Broadband Budget Increase Justification v0 | $548,493.77 | N/A |
Primary Transmission Line | $966,240.00 | $802,924.84 | $484,351.74 | ||
Rigid Transmission Line - copper, 8 3/16" | $610,720.00 | $565,433.18 | See attached TSG Sec 7 Main Coax Price Quote. Previous transmission line category erroneously labelled at a diameter of 6 1/8". The correct 8 3/16" line has already been partially reimbursed per the invoice 202986. Actual costs will reflect this. | $246,860.08 | N/A |
Rigid Transmission Line - copper, 6 1/8" | $355,520.00 | $237,491.66 | ***System Notice: Estimate adjusted and locked because line has been superseded.***See attached TSG “Sec 7 Main Coax” price quote; | $237,491.66 | Please reject 203254 from this component |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 6 1/8" broadband | |
Rigid Transmission Line - copper, 8 3/16" | |
Rigid Transmission Line - copper, 6 1/8" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,490,600.00 | $1,598,823.88 | N/A | $1,497,073.78 | N/A |
Total for all systems | $8,387,002.90 | $8,578,574.70 | N/A | $5,827,166.97 | N/A |
Primary Tower GTOWER | $1,490,600.00 | $1,598,823.88 | $1,497,073.78 | ||
Serious tower reinforcement/modifications | $1,052,000.00 | $1,257,188.88 | KPXJ-410-Existing Primary Tower - Serious Tower Reinforcement and modifications Verified Budget Increase Justification v1 | $1,239,688.78 | N/A |
Structural engineering tower load study for well documented tower | $12,600.00 | $13,820.00 | Invoices total this amount. | $13,820.00 | N/A |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $322,815.00 | TCI proposals TCI-17-149E, TCI-18-025B, and JRTarver Quote Q-7015. Please see KPXJ_TowerRigging_CostEstimate_cover letter for more information. | $243,565.00 | N/A |
Field Verifications | $5,000.00 | $5,000.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Serious tower reinforcement/modifications | |
Structural engineering tower load study for well documented tower | |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | |
Field Verifications | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $609,532.25 | $621,302.70 | N/A | $439,827.70 | N/A |
Total for all systems | $8,387,002.90 | $8,578,574.70 | N/A | $5,827,166.97 | N/A |
Outside Professional Services | $609,532.25 | $621,302.70 | $439,827.70 | ||
Attorney - Other Matters | $2,531.25 | $2,531.25 | Please see Estimated Cost Justification KPXJ-550-Attorney - Other Matters v1 | $2,531.25 | N/A |
RF Exposure Measurements | $21,050.00 | $20,000.00 | N/A | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $80,000.00 | N/A | N/A | N/A |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | $10,520.00 | $10,000.00 | N/A | N/A | N/A |
NEPA Section 106 environmental review, if needed | $6,310.00 | $6,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $7,360.00 | $7,000.00 | N/A | $375.00 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $3,162.50 | see Estimated Cost Justification KPXJ-550-Attorney - Prepare and File License to Cover Application (Main) v0 | $3,162.50 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $3,500.00 | N/A |
Prepare request for Special Temporary Authorization | $4,100.00 | $3,000.00 | N/A | $0.00 | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | $1,580.00 | $1,500.00 | N/A | $0.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | $750.00 | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | $2,105.00 | $2,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $1,750.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $650.00 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,750.00 | see Estimated Cost Justification KPXJ-590-Prepare and Review Reimbursement Form v0 | $2,750.00 | N/A |
Project management of the transition | $404,796.00 | $424,358.95 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $424,358.95 | N/A |
Additional Field Engineering Service, 20 Days | $40,000.00 | $40,000.00 | N/A | N/A | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Attorney - Other Matters | |
RF Exposure Measurements | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | Information not provided. |
NEPA Section 106 environmental review, if needed | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Prepare and or review reimbursement form | |
Project management of the transition | |
Additional Field Engineering Service, 20 Days | Information not provided. |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $187,803.58 | $186,913.58 | N/A | $97,748.02 | N/A |
Total for all systems | $8,387,002.90 | $8,578,574.70 | N/A | $5,827,166.97 | N/A |
Other Expenses | $187,803.58 | $186,913.58 | $97,748.02 | ||
Equipment Delivery and Handling Charges | $20,000.00 | $20,000.00 | See attached TSG “Sec 11 Other Expenses” quote, Item 11; | $4,956.32 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $50,000.00 | $50,000.00 | See attached TSG “Sec 11 Other Expenses” quote, item 9; | $13,172.05 | N/A |
Non-zoning permits | $5,000.00 | $5,000.00 | N/A | $0.00 | N/A |
Local Zoning | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $0.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $11,000.00 | N/A | $5,316.25 | N/A |
Road Repairs | $53,723.58 | $53,723.58 | Please see Technical Services Group, Inc. estimate 2015865R | $53,723.58 | N/A |
MVPD Notification of Channel Change | $2,000.00 | $2,000.00 | N/A | $625.00 | N/A |
Develop and air announcement of upcoming channel change | $15,000.00 | $15,000.00 | N/A | $93.75 | N/A |
Equipment Storage | $20,000.00 | $20,000.00 | N/A | $19,861.07 | N/A |
Actual Information Description | File Name |
---|---|
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
Non-zoning permits | Information not provided. |
Local Zoning | Information not provided. |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
DTV Medical Facility Notification | |
Road Repairs | |
MVPD Notification of Channel Change | |
Develop and air announcement of upcoming channel change | |
Equipment Storage |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $8,387,002.90 | $8,578,574.70 | $5,827,166.97 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Dale E. Cassidy Chief Engineer 04/05/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Dale E. Cassidy Chief Engineer 04/05/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Dale E. Cassidy Chief Engineer 04/05/2022 |