Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Replace the transmitter and antenna per the channel reassignment project using reasonable and customary engineering and business practices. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | 800W | |
Year | 2012 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 800 W |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TRN-U-2000-FA | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 2.2 kW | |
Justification for New Transmitter | New transmitter required for new channel. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 5 tons | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Site Prep |
Prepare site for new transmitter |
Decommission |
De-install old transmitter |
Taxes |
Estimated sales tax |
Encoder |
Encoder for new channel |
Converter |
Converter for new channel |
Shipping |
Estimated shipping |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | 16-bay | |
Year | 2012 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | ATC-BCH416M-25 | |
Year | 2019 | |
Justification for New Antenna | New antenna required for new channel. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Taxes |
Estimated sales tax |
Shipping |
Estimated shipping and freight |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1050552 | |
Coordinates (NAD83) | Latitude (NAD83) | 33° 50' 42.0" N- |
Longitude (NAD83) | 087° 18' 26.0" W- | |
Overall Structure Height | 606.95 feet | |
Support Structure Height | 606.95 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 390.42 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Combs Broadcasting, Inc. | |
Date Constructed | 01/01/1968 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Tower mapping and report for structural engineer |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 100 | |
Explanation | Required to assist in the turnkey management of the channel relocation project in order that the existing internal personnel can maintain and operate the stations daily operational requirements and plans. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Prepare Form 601 | Yes | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 5 | |
Justification | Estimated field engineering services during transition activities. |
Name | Description |
---|---|
A and E walk |
Site walk coordinated with A&E firm |
Building Permit Application |
Flat fee for preparation of BP application |
Co-location application |
Flat fee for preparation of co-location application |
Complex zoning |
Potential for complex zoning with hearing |
Construction drawings |
Construction drawings |
Field and Technical Project Management |
Field and Technical Project Management pertaining to REPACK |
Fully executed amendment with non-MLA landlord |
Flat fee service for completion of amendment |
General Engineering |
Engineering consultations pertaining to REPACK |
Landlord NTP |
Flat fee for landlord approval to proceed |
Leasing audit |
Entitlement review of existing lease documents |
NEPA and SHPO compliance |
NEPA/SHPO compliance |
Negotiation of co-location lease |
Negotiation of co-location lease by telecom consultant |
Permit Pickup |
Flat fee for picking up permit |
Zoning and Permitting Determination |
Flat fee service for zoning/permitting determination |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | Yes |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $135,523.76 | $109,315.76 | N/A | $74,148.04 | N/A |
Total for all systems | $508,703.76 | $373,926.76 | N/A | $166,750.64 | N/A |
Primary Transmitter TRN-U-2000-FA | $135,523.76 | $109,315.76 | $74,148.04 | ||
Shipping | $1,200.00 | $1,200.00 | Estimated shipping costs not included on quote. Actual costs to be determined. | $1,200.00 | N/A |
Converter | $1,352.00 | $1,352.00 | Actual cost of invoice | $0.00 | N/A |
Encoder | $8,065.72 | $8,065.72 | Actual cost of invoice | $0.00 | N/A |
Taxes | $2,000.00 | $2,000.00 | 3/30/2020- Working to obtain quote which may be delayed due to coronavirus pandemic | $0.00 | N/A |
Site Prep | $5,156.04 | $5,156.04 | 3/30/2020- Working to obtain quote which may be delayed due to coronavirus pandemic | $5,156.04 | N/A |
Decommission | $3,500.00 | $3,500.00 | Estimated costs to de-install, disconnect and decommission old transmitter in preparation for new transmitter. | $0.00 | N/A |
Transmitter Building Site Survey/Installation | $10,000.00 | $11,500.00 | Cost determined by invoices. | $11,500.00 | N/A |
5 Ton system | $20,250.00 | $20,250.00 | 3/30/2020- Working to obtain quote which may be delayed due to coronavirus pandemic | $0.00 | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $56,292.00 | Cost determined by invoice | $56,292.00 | N/A |
Actual Information Description | File Name |
---|---|
Shipping | |
Converter | |
Encoder | |
Taxes | Information not provided. |
Site Prep | |
Decommission | Information not provided. |
Transmitter Building Site Survey/Installation | |
5 Ton system | Information not provided. |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $31,355.00 | $31,355.00 | N/A | $18,000.00 | N/A |
Total for all systems | $508,703.76 | $373,926.76 | N/A | $166,750.64 | N/A |
Primary Antenna ATC-BCH416M-25 | $31,355.00 | $31,355.00 | $18,000.00 | ||
Sweep test of transmission line and antenna | $5,730.00 | $5,730.00 | N/A | N/A | N/A |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Horizontal | $18,000.00 | $18,000.00 | Per attached Alive quote. | $18,000.00 | N/A |
Shipping | $1,000.00 | $1,000.00 | Estimated shipping costs not included on quote. Actual costs to be determined. | $0.00 | N/A |
Taxes | $2,000.00 | $2,000.00 | Estimated sales tax | N/A | N/A |
Side Mount antenna brackets | $4,625.00 | $4,625.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Sweep test of transmission line and antenna | Information not provided. |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Horizontal | |
Shipping | Information not provided. |
Taxes | Information not provided. |
Side Mount antenna brackets | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $188,750.00 | $64,300.00 | N/A | $54,300.00 | N/A |
Total for all systems | $508,703.76 | $373,926.76 | N/A | $166,750.64 | N/A |
Primary Tower TOWER | $188,750.00 | $64,300.00 | $54,300.00 | ||
Tower Rigging Tall Tower (greater than 500') | $157,750.00 | $29,050.00 | Per submitted invoice | $29,050.00 | N/A |
Minor tower reinforcement/modifications | $10,000.00 | $10,000.00 | 3/30/2020- Working to obtain quote which may be delayed due to coronavirus pandemic | N/A | N/A |
Tower mapping and report for structural engineer | $21,000.00 | $25,250.00 | Estimate determined by invoices. | $25,250.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Tall Tower (greater than 500') | |
Minor tower reinforcement/modifications | Information not provided. |
Tower mapping and report for structural engineer |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $139,865.00 | $155,746.00 | N/A | $20,302.60 | N/A |
Total for all systems | $508,703.76 | $373,926.76 | N/A | $166,750.64 | N/A |
Outside Professional Services | $139,865.00 | $155,746.00 | $20,302.60 | ||
Zoning and Permitting Determination | $650.00 | $650.00 | N/A | N/A | N/A |
Permit Pickup | $700.00 | $700.00 | N/A | N/A | N/A |
Negotiation of co-location lease | $1,750.00 | $1,750.00 | N/A | N/A | N/A |
NEPA and SHPO compliance | $2,500.00 | $2,500.00 | N/A | N/A | N/A |
Leasing audit | $625.00 | $625.00 | N/A | N/A | N/A |
Landlord NTP | $1,000.00 | $1,000.00 | N/A | N/A | N/A |
General Engineering | $3,100.00 | $3,100.00 | Cost determined by invoices | $3,100.00 | N/A |
Field and Technical Project Management | $10,000.00 | $10,000.00 | Cost determined by invoices. Estimate based on scope of work required. | $1,026.60 | Actual costs only submitted |
Complex zoning | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Co-location application | $700.00 | $700.00 | N/A | N/A | N/A |
Building Permit Application | $1,500.00 | $1,500.00 | N/A | N/A | N/A |
A and E walk | $4,500.00 | $4,500.00 | N/A | N/A | N/A |
Additional Field Engineering Service, 5 Days | $12,500.00 | $12,500.00 | Estimated field engineering services during transition activities. | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $52,600.00 | $52,600.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $2,235.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $3,262.50 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | N/A | N/A |
Prepare Form 601 | $755.00 | $755.00 | 3/30/2020- Working to obtain quote which may be delayed due to coronavirus pandemic | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $1,280.00 | $1,280.00 | N/A | N/A | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | N/A | N/A | N/A |
Form 399 assistance or other Program Management costs | $5,890.00 | $5,890.00 | Per attached Anywave quote. | $500.00 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $12,741.00 | Cost determined by invoices. | $12,741.00 | N/A |
Project management of the transition | $10,550.00 | $15,400.00 | Estimated 100 hours at $154/hour | $2,935.00 | N/A |
Construction drawings | $3,500.00 | $3,500.00 | N/A | N/A | N/A |
Fully executed amendment with non-MLA landlord | $4,000.00 | $4,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Zoning and Permitting Determination | Information not provided. |
Permit Pickup | Information not provided. |
Negotiation of co-location lease | Information not provided. |
NEPA and SHPO compliance | Information not provided. |
Leasing audit | Information not provided. |
Landlord NTP | Information not provided. |
General Engineering | |
Field and Technical Project Management | |
Complex zoning | Information not provided. |
Co-location application | Information not provided. |
Building Permit Application | Information not provided. |
A and E walk | Information not provided. |
Additional Field Engineering Service, 5 Days | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare Form 601 | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
Perform engineering study for displacement application | Information not provided. |
Form 399 assistance or other Program Management costs | |
Prepare/ Review 399 reimbursement form | |
Project management of the transition | |
Construction drawings | Information not provided. |
Fully executed amendment with non-MLA landlord | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $13,210.00 | $13,210.00 | N/A | $0.00 | N/A |
Total for all systems | $508,703.76 | $373,926.76 | N/A | $166,750.64 | N/A |
Other Expenses | $13,210.00 | $13,210.00 | $0.00 | ||
Equipment Delivery and Handling Charges | $2,500.00 | $2,500.00 | Transport, forklift rental and handling fees from staging area to transmitter site. | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $2,000.00 | $2,000.00 | 4-6 yard disposal bin on site to capture all waste from on site system integration and tower vendors. | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $305.00 | $305.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 Major change CP application | $4,960.00 | $4,960.00 | 3/30/2020- Working to obtain quote which may be delayed due to coronavirus pandemic | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
Equipment Storage | $2,000.00 | $2,000.00 | Expecting multiple staggered equipment deliveries from different vendors and need to store and stage new equipment prior to installation date. Anticipate 6-24 months of storage time. | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $508,703.76 | $373,926.76 | $166,750.64 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Tommy Combs CEO 04/01/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Tommy Combs CEO 04/01/2022 |