Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
KAXT-TV LLC Doing Business As: KAXT-TV LLC |
Norman H. Shapiro 26 NORTH HALSTED STREET CHICAGO, IL 60661 United States |
+1 (312) 705-2600 | nshapiro@wciu.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | See attached Transition Plan Narrative. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | AT71K0-1 | |
Year | 2009 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | THU9evo-3 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 4.9 kW | |
Justification for New Transmitter | Please see attached Transition Plan Narrative. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Establish new 480V/200A service with meter at the new location. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 10 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Transmitter Installation |
Installation of the new Primary transmitter |
Remove Existing Equipment |
Landlord requires the removal of abandoned equipment in the leased space before installation of new. |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Class A |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | PSILPD12AXT-42-CP | |
Year | 2014 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Class A |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 2 | |
Lower Limit | 518.00 MHz | |
Upper Limit | 524.00 MHz | |
Design power capacity in use | 100.0 % | |
Other Antenna Type | N/A | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | TUM-C2-2/4M-1 SM | |
Year | 2018 | |
Justification for New Antenna | See attached Transition Plan Narrative. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Air | |
Diameter | 1 5/8 inches | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 178 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Air | |
Diameter | 3 inches | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 525 feet per run | |
Justification for New Transmission Line | Please see attached Transition Plan Narrative. |
Name | Description |
---|---|
Dehydrator |
Dry Air Dehydrator for new Primary transmission line |
Reducer |
A 3" to 1-5/8" reducer required at the output of the Primary transmitter RF system to the input of the Primary transmission line |
Elbow |
A elbow required for the transition at the base of the tower |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | Candelabra | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1044718 | |
Coordinates (NAD83) | Latitude (NAD83) | 37° 29' 57.0" N- |
Longitude (NAD83) | 121° 52' 20.0" W- | |
Overall Structure Height | 442.91 feet | |
Support Structure Height | 392.06 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 2605.94 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Univision Television Group, Inc. | |
Date Constructed | 02/25/1998 |
Facility ID | Call Sign | Service |
---|---|---|
64987 | KSTS | DTV |
33778 | KDTV-DT | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for tower with candelabra |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Candelabra |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Remove existing equipment |
Remove existing antenna and transmission line from the current tower after the transition. |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 350 | |
Explanation | Please see attached Transition Plan Narrative. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Site Survey |
Required for specifying the final equipment needs and installation planning. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Studio to Transmitter Link |
Additional microwave equipment to facilitate the transition to the new tower site while maintaining operations at the existing site during the interim. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $369,195.00 | $149,971.61 | N/A | $149,971.61 | N/A |
Total for all systems | $1,166,618.17 | $318,387.72 | N/A | $318,387.72 | N/A |
Primary Transmitter THU9evo-3 | $369,195.00 | $149,971.61 | $149,971.61 | ||
Remove Existing Equipment | $0.00 | $0.00 | A technician from Harmonic, Inc took the transmitter and related components, free of charge. | N/A | N/A |
Transmitter Installation | $30,000.00 | $30,000.00 | Installation of the KAXT Primary transmitter | $30,000.00 | N/A |
10 Ton system | $38,900.00 | $12,637.50 | N/A | $12,637.50 | N/A |
UHF - Liquid Cooled Solid State Transmitter 4.9 . 6.5 kW | $273,500.00 | $80,539.11 | N/A | $80,539.11 | N/A |
Other Electrical Service: Establish new 480V/200A service with meter at the new location. | $26,795.00 | $26,795.00 | This is the cost for the material and installation for the electrical related to the Primary transmitter installation. This new space had no electrical infrastructure. As a result, a new build-out from the meter to the transmitter was required. | $26,795.00 | Total |
Actual Information Description | File Name |
---|---|
Remove Existing Equipment | Information not provided. |
Transmitter Installation | |
10 Ton system | |
UHF - Liquid Cooled Solid State Transmitter 4.9 . 6.5 kW | |
Other Electrical Service: Establish new 480V/200A service with meter at the new location. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $35,550.00 | $51,112.00 | N/A | $51,112.00 | N/A |
Total for all systems | $1,166,618.17 | $318,387.72 | N/A | $318,387.72 | N/A |
Primary Antenna TUM-C2-2/4M-1 SM | $35,550.00 | $51,112.00 | $51,112.00 | ||
UHF - Lower Power Side Mount, Class A broadband panel (cost per panel) | $2,520.00 | $0.00 | This is included in the cost of the Primary antenna | N/A | N/A |
UHF - Lower Power Side Mount, Class A One Station antenna -- basic | $26,300.00 | $44,712.00 | This is for the Primary antenna, including shipping and mounts. This is a circularly polarized antenna. | $44,712.00 | Test |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $6,400.00 | N/A |
Actual Information Description | File Name |
---|---|
UHF - Lower Power Side Mount, Class A broadband panel (cost per panel) | Information not provided. |
UHF - Lower Power Side Mount, Class A One Station antenna -- basic | |
Sweep test of existing antenna |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $35,913.17 | $26,843.17 | N/A | $26,843.17 | N/A |
Total for all systems | $1,166,618.17 | $318,387.72 | N/A | $318,387.72 | N/A |
Primary Transmission Line | $35,913.17 | $26,843.17 | $26,843.17 | ||
Elbow | $1,504.13 | $1,504.13 | A elbow required for the transition at the base of the tower | $1,504.13 | N/A |
Reducer | $660.04 | $660.04 | A 3" to 1-5/8" reducer required at the output of the Primary transmitter RF system to the input of the Primary transmission line | $660.04 | N/A |
Dehydrator | $2,774.00 | $2,774.00 | Dry Air Dehydrator for new Primary transmission line | $2,774.00 | N/A |
Flexible Air Transmission Line - dielectric, 3" | $30,975.00 | $21,905.00 | N/A | $21,905.00 | N/A |
Actual Information Description | File Name |
---|---|
Elbow | |
Reducer | |
Dehydrator | |
Flexible Air Transmission Line - dielectric, 3" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $599,000.00 | $66,418.74 | N/A | $66,418.74 | N/A |
Total for all systems | $1,166,618.17 | $318,387.72 | N/A | $318,387.72 | N/A |
Primary Tower TOWER | $599,000.00 | $66,418.74 | $66,418.74 | ||
Remove existing equipment | $0.00 | $0.00 | Remove existing antenna and transmission line from the current tower after the transition. | N/A | N/A |
Structural engineering tower load study for a documented tower with candelabra | $20,000.00 | $0.00 | This was included as part of another analysis prior to Weigel's acquisition of KAXT. | N/A | N/A |
Minor tower reinforcement/modifications | $158,000.00 | $0.00 | No tower work was needed. Only the antenna and line installation was required, which was covered under the Complex Tower line item. | N/A | N/A |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $66,418.74 | N/A | $66,418.74 | N/A |
Actual Information Description | File Name |
---|---|
Remove existing equipment | Information not provided. |
Structural engineering tower load study for a documented tower with candelabra | Information not provided. |
Minor tower reinforcement/modifications | Information not provided. |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $111,270.00 | $18,592.20 | N/A | $18,592.20 | N/A |
Total for all systems | $1,166,618.17 | $318,387.72 | N/A | $318,387.72 | N/A |
Outside Professional Services | $111,270.00 | $18,592.20 | $18,592.20 | ||
Site Survey | $0.00 | $0.00 | Weigel managed this in-house. | $0.00 | N/A |
RF Exposure Measurements | $21,050.00 | $0.00 | This was not needed, as it was conducted by the tower owner. | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $8,208.00 | KAXT was scheduled for Phase 9. However, due to delays caused by the COVID pandemic, KAXT was not able to complete the buildout. As a result, a waiver and related STA was requested and granted to move to Phase 10. | $8,208.00 | Test |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $0.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $1,122.00 | N/A | $1,122.00 | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $0.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $125.00 | N/A | $125.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $2,250.00 | N/A | $2,250.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $3,150.00 | N/A | $3,150.00 | The engineering study requirements were more than originally estimated. |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $0.00 | The San Francisco market conducted a coordinated effort led by KGO. All of the local broadcasters participated and coordinated among themselves. | N/A | N/A |
Prepare and or review reimbursement form | $2,630.00 | $3,312.70 | N/A | $3,312.70 | The estimated cost was for the work of our consulting engineers and did not include attorney's fees. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $387.00 | N/A | $387.00 | N/A |
Project management of the transition | $55,300.00 | $37.50 | N/A | $37.50 | N/A |
Actual Information Description | File Name |
---|---|
Site Survey | |
RF Exposure Measurements | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Prepare request for Special Temporary Authorization | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Prepare and or review reimbursement form | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $15,690.00 | $5,450.00 | N/A | $5,450.00 | N/A |
Total for all systems | $1,166,618.17 | $318,387.72 | N/A | $318,387.72 | N/A |
Other Expenses | $15,690.00 | $5,450.00 | $5,450.00 | ||
Studio to Transmitter Link | $0.00 | $0.00 | N/A | N/A | N/A |
MVPD Notification of Channel Change | $0.00 | $0.00 | Weigel handled this in-house. | N/A | N/A |
Develop and air announcement of upcoming channel change | $0.00 | $0.00 | This was handled by Weigel in-house at no cost | N/A | N/A |
Equipment Storage | $0.00 | $0.00 | Equipment was stored on site at no cost. | N/A | N/A |
Equipment Delivery and Handling Charges | $0.00 | $0.00 | Equipment was offloaded on site as part of the shipping costs already submitted. | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $0.00 | $0.00 | The tower owner provided dumpster services for KAXT at no cost. | N/A | N/A |
Non-zoning permits | $2,500.00 | $2,500.00 | Permits were required for the Primary antenna installation. | $2,500.00 | N/A |
Local Zoning | $0.00 | $0.00 | Local zoning was not required. | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $0.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $0.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $0.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $2,950.00 | N/A | $2,950.00 | N/A |
Actual Information Description | File Name |
---|---|
Studio to Transmitter Link | Information not provided. |
MVPD Notification of Channel Change | Information not provided. |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Storage | Information not provided. |
Equipment Delivery and Handling Charges | Information not provided. |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Non-zoning permits | |
Local Zoning | Information not provided. |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
DTV Medical Facility Notification |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $1,166,618.17 | $318,387.72 | $318,387.72 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Kyle Walker VP, Technology 03/18/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Kyle Walker VP, Technology 03/18/2022 |