FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
49397
Service:
DTV
Call Sign:
KTKA-TV
Channel:
16 (UHF)
File Number:
0000028777
FRN:
0022106561
Date Submitted:
03/21/2022

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

KTKA Television, LLC

Thomas J. Vaughan

3121 Rivershore Lane

Port Charlotte, FL 33953

United States

+1 (941) 764-6867 glenn.richards@pillsburylaw.com Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Jessica Nyman , Esq .

FCC Counsel

Pillsbury Winthrop Shaw Pittman LLP

Jessica Nyman

1200 Seventeenth Street

Washington, DC 20036

United States

+1 (202) 663-8810 jessica.nyman@pillsburylaw.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan Replace transmitter and antenna using existing line. Acquire interim antenna and line for continued operation during construction and duration of the assigned phase. Map and analyze tower; design and implement modifications if required. See attached.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Auxiliary Transmitter

Back to Top

Add Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use Auxiliary
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Affinity
Year 2002
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 1 kW

Auxiliary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Auxiliary (Backup)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model TMU9evo/3
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 1.15 kW
Justification for New Transmitter The manufacturer of the existing transmitter advises that the transmitter cannot be re-tuned to the assigned channel. See attachment.

Auxiliary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service Yes
Description De-install existing and install new
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Auxiliary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Additional Transmitter Costs

Additional Transmitter Costs

Additional Interior RF System

Interior RF System Existing Transmitter to Interim Transmission line

Transmitter Electrical and Installation

Transmitter Electrical and Installation

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Diamond
Year 2006
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 1.8 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model TMU9evo/6
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 2.3 kW
Justification for New Transmitter The manufacturer of the existing transmitter advises that the transmitter cannot be re-tuned to the assigned channel. See attachment.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 150 kVA
Rigid Conduit and Wiring Yes
Size 2 inches
Length 100.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Additional Interior RF System

Interior RF System Existing Transmitter to Interim Transmission line

RF Combiner Components

RF 42" Riser, Elbow, and 3' Heliax Connector to Complete installation of Combiner. Please see Electronics Research Inc. Proposal # 20200619-864 Attached.

Transmitter Building Drilling

Transmitter Building Drilling to provide access for feed lines and conduit

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Other
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type Travelling Wave
ERP: 89.1 kW
Manufacturer
Model ATW25H3-HTPXU-49H
Year 2001

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 51.0 kW
Manufacturer
Model ATW17H3-HTP230-16L
Year 2019
Justification for New Antenna The existing primary top-mount antenna is a single channel slotted coaxial which cannot accommodate the assigned channel.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna?
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna?
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 89.1 kW
Manufacturer
Model TLP-24J
Year 2019
Justification for New Antenna An interim antenna is necessary to keep station on the air during primary antenna replacement and for the duration of the assigned phase.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? S
Feed Line Size 4 1/16 inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Additional Antenna Costs

Additional Antenna Costs

Combiner and installation

Purchase of combiner and installation required to meet transition deadline

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Waveguide
Diameter N/A
Other Diameter N/A
Segment Length N/A
Other Segment Length N/A
Number of parallel runs 1
Length 1485 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 19 3/4 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1518 feet per run
Justification for New Transmission Line The existing primary transmission line is frequency-specific circular waveguide with a diameter that cannot accommodate the assigned channel.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Additional Transmission Line Components

Additional Transmission Line Components

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Rigid
Diameter 3 1/8 inches
Segment Length 19 ¾ '
Other Segment Length
Number of parallel runs 1
Length 1370 feet per run
Justification for New Transmission Line An interim transmission line is necessary for the interim antenna to keep station on the air during primary antenna replacement and for the duration of the assigned phase.

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Transmission Line Test

Testing of Transmission Line to determine use as temporary and Auxiliary line for antennas. Please see Jeremy Ruck & Associates Quotation # 200501-1 Attached.

Additional Transmission Line Components

Additional Transmission Line Components

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Construct New
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? No
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1031887
Coordinates (NAD83) Latitude (NAD83) 39° 01' 34.0" N-
Longitude (NAD83) 095° 55' 02.0" W-
Overall Structure Height 1439.29 feet
Support Structure Height 1381.22 feet
Ground Elevation Above Mean Sea Level (AMSL) 1109.89 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner Nexstar Broadcasting, Inc.
Date Constructed 01/01/1984

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
67334 KTPK FM
18055 KSAJ-FM FM

Other Types of Users

Users
4 mwave ant
1 RPU antenna

Primary Tower

Back to Top

Tower Construction Costs

Section Question Response
Construct New Tower Use Primary (Main)
Description of Use N/A
Is this a request for upgraded equipment? No
Height 1387.00 feet
Justification for New Tower See attached engineering technical statement, ERI structural analysis and ERI letter of recommendation to construct a new tower

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Other
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Tower Fence, Gate and Caging

Tower Fence, Gate and Caging needed to secure tower area; see Kansas Fencing quotes

Weather Delays

Weather delays

Combiner and Antenna installation

Install combiner and interim antenna on old tower to meet transition deadline

ENG Dish Removal and Re-Installation

ENG dish removal from old tower and installation on new tower. Please see Electronics Research Proposal # 20200710-996

Crane Pad for Tower Installation

200 Ton Crane Pad needed to erect new tower at the site. Please see Meiert Industries LLC Estimate # 35 Attached

Electrical Service for Tower Lighting

120V & 208V Electrical Service for LED Tower Lighting. Please see McElroy Electric Inc. Proposal # 200810-0007 attached.

Additional Tower Work

Additional Tower Work

Ice Bridge

20' of Additional Ice Bridge to new tower and re-use of 30' from old tower., Please see Attached ERI Change Order # 35662P

Structural Analysis

Structural analysis

Tower Disposal Costs

Tower Disposal Costs

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 1000
Explanation It will be necessary to schedule and coordinate multiple vendors, complete progress reports, and update Schedule 399. Station does not have available personnel or personnel trained in project management for such complex projects.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review Yes
Environmental Assessment Yes
ASR Modification Yes
FAA Consultation (including preparation of FAA Form 7460) Yes
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service Yes
Number of Days 20
Justification It will be necessary to survey the site, plan the equipment, develop specifications for purchasing, and oversee multiple vendor RF projects. Station does not have available personnel or personnel trained in such services.

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Information not provided.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning Yes
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application No
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Land Survey for New Tower Construction

Tower Site Land Survey and Site Plan Development for ERI New Tower Build and installation

Pack and Secure Material for Shipping

Secure Packing and shipment of 6 and one eigth Feedline TFU24WB Antenna and associated Hardware to PCI in Grove OK. Please see Deep South Communications quote of April 30 2020 attached.

Sales and Use Tax Due

Sales and Use Tax Due

Waste Management and Toilet Rental Expenses

Rental Expenses during Tower Work for RePack.

Tower Road Access Preparation

Tower Road Access Preparation - Gravel required to prepare road for tower equipment

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $452,164.01 $329,814.01 N/A $183,428.00 N/A
Total for all systems $6,397,323.56 $5,397,358.19 N/A $4,996,060.69 N/A
Primary Transmitter TMU9evo/6 $264,586.01 $219,786.01 $83,400.00
Transmitter Building Drilling $500.00 $500.00 See related invoice $500.00 N/A
RF Combiner Components $1,736.01 $1,736.01 RF 42" Riser, Elbow, and 3' Heliax Connector to Complete installation of Combiner. Please see Electronics Research Inc. Proposal # 20200619-864 Attached. N/A N/A
Additional Interior RF System $70,000.00 $70,000.00 N/A N/A N/A
Switchgear - industrial 800 amp $38,200.00 $37,150.00 N/A N/A N/A
Transformer 3 phase/480v - 150 KVA $25,550.00 $24,900.00 N/A N/A N/A
2" Rigid Conduit and Wiring (Cost per foot) $2,600.00 $2,600.00 N/A N/A N/A
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW $126,000.00 $82,900.00 See Rohde & Schwarz quote 230143.0 $82,900.00 N/A
Auxiliary Transmitter TMU9evo/3 $187,578.00 $110,028.00 $100,028.00
Transmitter Electrical and Installation $30,977.00 $30,977.00 See Land Communications Estimate 1111 $30,977.00 N/A
Additional Interior RF System $0.00 $0.00 See Transmitter Electrical and Installation N/A N/A
Other Electrical Service: De-install existing and install new $10,000.00 $10,000.00 N/A N/A N/A
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW $126,000.00 $48,450.00 See Rohde & Schwarz quote 235153.0 $48,450.00 N/A
Additional Transmitter Costs $20,601.00 $20,601.00 See Rohde & Schwarz quote 304846.1 $20,601.00 N/A

Components

Actual Information Description File Name
Transmitter Building Drilling

Component Description:
Drill holes in wall to accommodate feed lines and conduit
Amount:
$500.00
RF Combiner Components Information not provided.
Additional Interior RF System Information not provided.
Switchgear - industrial 800 amp Information not provided.
Transformer 3 phase/480v - 150 KVA Information not provided.
2" Rigid Conduit and Wiring (Cost per foot) Information not provided.
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW

Component Description:
Transmitter, installment #1
Amount:
$20,725.00

Component Description:
Transmitter, installment #2
Amount:
$62,175.00
Transmitter Electrical and Installation

Component Description:
Auxiliary transmitter electrical and installation
Amount:
$30,977.00
Additional Interior RF System Information not provided.
Other Electrical Service: De-install existing and install new Information not provided.
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW

Component Description:
Aux transmitter, installment #1
Amount:
$12,112.50

Component Description:
Aux transmitter, installment #2
Amount:
$36,337.50
Additional Transmitter Costs

Component Description:
Additional transmitter components
Amount:
$20,601.00

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $414,215.00 $215,800.75 N/A $155,438.33 N/A
Total for all systems $6,397,323.56 $5,397,358.19 N/A $4,996,060.69 N/A
Interim Antenna TLP-24J $148,185.00 $69,202.75 $19,288.33
Combiner and installation $12,000.00 $12,000.00 Combiner required to connect with single interim antenna for both KTKA and KTMJ to meet transition deadline; 50% shared cost with KTMJ $10,815.00 N/A
Additional Antenna Costs $2,075.00 $2,075.00 See related invoices $2,073.33 a
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $5,120.00 N/A N/A N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $4,788.00 See Dielectric Quote Number 700438CMZ N/A N/A
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) $9,570.00 $9,320.00 N/A N/A N/A
Sweep test of existing antenna $6,730.00 $6,400.00 See Dielectric Quote Number 700438CMZ $6,400.00 N/A
UHF - Lower Power Side Mount, One station antenna - medium power (50-200 kW), horizontally polarized $89,400.00 $29,499.75 See Dielectric Quote Number 700438CMZ N/A N/A
Primary Antenna ATW17H3-HTP230-16L $266,030.00 $146,598.00 $136,150.00
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) $12,300.00 $10,298.00 See Dielectric Quote Number DMS153-4 N/A N/A
Sweep test of existing antenna $6,730.00 $6,400.00 See Dielectric Quote Number DMS153-4 $6,250.00 N/A
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized $247,000.00 $129,900.00 See Electronics Research quote 20181228-237 Rev C $129,900.00 N/A

Components

Actual Information Description File Name
Combiner and installation

Component Description:
Combiner, installment #2, 50% shared cost with KTMJ
Amount:
$5,407.50

Component Description:
Combiner, installment #1, 50% shared cost with KTMJ
Amount:
$5,407.50
Additional Antenna Costs

Component Description:
Hanger kit, 50% shared cost with KTMJ
Amount:
$462.82

Component Description:
Additional antenna components, 50% shared cost with KTMJ
Amount:
$742.50

Component Description:
Additional antenna components, 50% shared cost with KTMJ
Amount:
$868.01
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) Information not provided.
Side mount brackets for high power antennas (if not included in antenna base cost) Information not provided.
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) Information not provided.
Sweep test of existing antenna

Component Description:
Interim antenna sweep test
Amount:
$6,400.00
UHF - Lower Power Side Mount, One station antenna - medium power (50-200 kW), horizontally polarized Information not provided.
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) Information not provided.
Sweep test of existing antenna

Component Description:
Sweep test, installment #1
Amount:
$1,875.00

Component Description:
Sweep test, installment #2
Amount:
$1,875.00

Component Description:
Sweep test, balance due
Amount:
$625.00

Component Description:
Sweep test, installment #3
Amount:
$1,875.00
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized

Component Description:
Antenna, balance due
Amount:
$12,990.00

Component Description:
Main antenna, installment #2
Amount:
$38,970.00

Component Description:
Antenna, installment #2
Amount:
$38,970.00

Component Description:
Antenna, installment #1
Amount:
$38,970.00

Component Description:
Main antenna, installment #1
Amount:
$38,970.00

Component Description:
Antenna, installment #3
Amount:
$38,970.00

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $464,516.00 $282,298.88 N/A $276,768.79 N/A
Total for all systems $6,397,323.56 $5,397,358.19 N/A $4,996,060.69 N/A
Interim Transmission Line $156,880.00 $94,298.88 $92,877.66
Additional Transmission Line Components $8,000.00 $8,000.00 See related invoices $7,858.24 N/A
Transmission Line Test $6,400.00 $6,400.00 Testing of Transmission Line to determine use as temporary and Auxiliary line for antennas. Please see Jeremy Ruck & Associates Quotation # 200501-5 Attached. $6,400.00 N/A
Rigid Transmission Line - copper, 3 1/8" $142,480.00 $79,898.88 See ERI proposal 20200917-489 $78,619.42 N/A
Primary Transmission Line $307,636.00 $188,000.00 $183,891.13
Additional Transmission Line Components $1,000.00 $1,000.00 See related invoice $690.00 N/A
Rigid Transmission Line - copper, 6 1/8" $306,636.00 $187,000.00 See Electronic Research quote 20181228-237 Rev C $183,201.13 N/A

Components

Actual Information Description File Name
Additional Transmission Line Components

Component Description:
Aux transmission line dehydrator, installment #2
Amount:
$3,929.12

Component Description:
Aux transmission line dehydrator, installment #1
Amount:
$3,929.12
Transmission Line Test

Component Description:
Sweep test
Amount:
$6,400.00
Rigid Transmission Line - copper, 3 1/8"

Component Description:
Aux transmission line, installment #2
Amount:
$38,669.98

Component Description:
Aux transmission line, installment #1
Amount:
$39,949.44
Additional Transmission Line Components

Component Description:
Additional transmission line components
Amount:
$690.00
Rigid Transmission Line - copper, 6 1/8"

Component Description:
Transmission line, balance due
Amount:
$18,700.00

Component Description:
Return unused transmission line
Amount:
($3,798.87)

Component Description:
Transmission line, installment #2
Amount:
$56,100.00

Component Description:
Transmission line, installment #1
Amount:
$56,100.00

Component Description:
Transmission line, installment #1
Amount:
$56,100.00

Component Description:
Transmission line, installment #2
Amount:
$56,100.00

Component Description:
Transmission line, installment #3
Amount:
$56,100.00

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $4,286,400.35 $3,915,591.35 N/A $3,914,906.92 N/A
Total for all systems $6,397,323.56 $5,397,358.19 N/A $4,996,060.69 N/A
Primary Tower TOWER $0.00 $0.00 $0.00
Primary Tower $4,286,400.35 $3,915,591.35 $3,914,906.92
Electrical Service for Tower Lighting $3,326.35 $3,326.35 120V & 208V Electrical Service for LED Tower Lighting. Please see McElroy Electric Inc. Proposal # 200810-0007 attached. $3,089.96 N/A
Structural Analysis $43,850.00 $43,850.00 Structural analysis and mapping required to determine tower requirements; see proposals from ERI $14320; $3750 and $25530, and Bartlett & West $8700 $43,850.00 N/A
Weather Delays $25,350.00 $25,350.00 See related invoices $25,350.00 N/A
New tower between 1000' and 1500' without elevator, presumptive soil conditions $3,647,810.00 $3,382,144.00 See attached ERI Proposal Number 20181210-098 REV C $3,382,144.00 N/A
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $315,857.00 See Electronics Research Proposal 20190410-188 Rev A and 20200917-489 $315,857.00 N/A
Crane Pad for Tower Installation $8,800.00 $8,800.00 200 Ton Crane Pad needed to erect new tower at the site. Please see Meier Industries LLC Estimate # 35 Attached $8,716.58 N/A
Additional Tower Work $3,600.00 $3,600.00 See ERI Change orders and related invoices $3,600.00 N/A
Ice Bridge $26,100.00 $26,100.00 Additional 20" of Ice Bridge to meet 30" of Existing Bridge. Please See ERI Change Order #35662P and Change Order 35662D-1 $26,100.00 N/A
Tower Disposal Costs $36,000.00 $36,000.00 See ERI change order and related invoice $36,000.00 N/A
Tower Fence, Gate and Caging $31,500.00 $31,500.00 See Kansas Fencing quotes $31,136.34 N/A
ENG Dish Removal and Re-Installation $36,504.00 $36,504.00 ENG dish removal from old tower and installation on new tower. Please see Electronics Research Proposal # 20200710-996 and 20190912-732 Rev B and related invoices $36,503.04 N/A
Combiner and Antenna installation $2,560.00 $2,560.00 Install combiner and temporary antenna on old tower to meet transition deadline; 50% shared cost with KTMJ $2,560.00 N/A

Components

Actual Information Description File Name
Electrical Service for Tower Lighting

Component Description:
Electrical services for tower light power
Amount:
$3,089.96
Structural Analysis

Component Description:
Structural analysis
Amount:
$3,750.00

Component Description:
Reinforcement and foundation mapping, installment #1
Amount:
$12,765.00

Component Description:
Structural analysis, installment #2
Amount:
$7,160.00

Component Description:
Structural analysis, installment #1
Amount:
$7,160.00

Component Description:
Reinforcement and foundation mapping, installment #2
Amount:
$6,490.00

Component Description:
Structural analysis
Amount:
$6,525.00
Weather Delays

Component Description:
Tower installation weather delays
Amount:
$15,600.00

Component Description:
Tower installation weather delays
Amount:
$9,750.00
New tower between 1000' and 1500' without elevator, presumptive soil conditions

Component Description:
Guyed Tower, installment #3
Amount:
$191,029.80

Component Description:
Guyed Tower, installment #2
Amount:
$1,500,042.20

Component Description:
Guyed Tower, installment #1
Amount:
$1,691,072.00
Complex Tower (includes, for example, those with candelabras and/or stacked antennas)

Component Description:
Aux transmission line installation, installment #2
Amount:
$33,360.50

Component Description:
Antenna installation, installment #2
Amount:
$74,740.80

Component Description:
Antenna installation, installment #3
Amount:
$74,740.80

Component Description:
Antenna installation, installment #1
Amount:
$74,740.80

Component Description:
Aux transmission line installation, installment #1
Amount:
$33,360.50

Component Description:
Antenna installation, balance due
Amount:
$24,913.60
Crane Pad for Tower Installation

Component Description:
Crane pad for antenna erection
Amount:
$8,716.58
Additional Tower Work

Component Description:
Labor and materials to remove anchors
Amount:
$3,600.00
Ice Bridge

Component Description:
Transmission line bridge
Amount:
$20,500.00

Component Description:
Transmission line bridge
Amount:
$5,600.00
Tower Disposal Costs

Component Description:
Tower disposal costs
Amount:
$36,000.00
Tower Fence, Gate and Caging

Component Description:
Cages for guy cables, installment #2
Amount:
$10,259.89

Component Description:
Tower fence and gate, installment #2
Amount:
$2,376.45

Component Description:
Tower fence and gate, installment #1
Amount:
$4,500.00

Component Description:
Cages for guy cables, installment #1
Amount:
$14,000.00
ENG Dish Removal and Re-Installation

Component Description:
Dish mount assembly
Amount:
$450.00

Component Description:
Dish removal and re-installation, installment #1
Amount:
$9,056.52

Component Description:
Dish removal and reinstallation
Amount:
$17,940.00

Component Description:
Dish removal and re-installation, installment #2
Amount:
$9,056.52
Combiner and Antenna installation

Component Description:
Combiner and temporary antenna installation, installment #2, 50% shared cost with KTMJ
Amount:
$1,280.00

Component Description:
Combiner and and temporary antenna installation, installment #1, 50% shared cost with KTMJ
Amount:
$1,280.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $317,750.00 $191,875.00 N/A $50,105.50 N/A
Total for all systems $6,397,323.56 $5,397,358.19 N/A $4,996,060.69 N/A
Outside Professional Services $317,750.00 $191,875.00 $50,105.50
Project management of the transition $158,000.00 $32,500.00 See related invoice $32,305.50 N/A
Additional Field Engineering Service, 20 Days $108,000.00 $108,000.00 N/A N/A N/A
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase $2,105.00 $2,050.00 N/A $275.00 N/A
ASR modification (prepare FCC Form 854) $2,105.00 $2,050.00 N/A $1,375.00 N/A
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet $10,520.00 $10,240.00 N/A N/A N/A
NEPA Section 106 environmental review, if needed $6,310.00 $6,140.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,585.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,305.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,120.00 N/A N/A N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,535.00 N/A $1,500.00 N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,535.00 N/A $625.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $4,525.00 See related invoices $4,525.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,170.00 N/A $7,000.00 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,560.00 N/A N/A N/A
Prepare and or review reimbursement form $2,630.00 $2,560.00 N/A $2,500.00 N/A

Components

Actual Information Description File Name
Project management of the transition

Component Description:
Project management services, item 1 from invoice summary
Amount:
$2,625.00

Component Description:
Prepare FCC Schedule 387, item 5 from invoice summary
Amount:
$300.00

Component Description:
Prepare FCC Schedule 387, item 7 from invoice summary
Amount:
$150.00

Component Description:
Prepare FCC Schedule 387, item 6 from invoice summary
Amount:
$150.00

Component Description:
Various project management services, item 8 from invoice summary
Amount:
$2,862.00

Component Description:
Project management services
Amount:
$553.00

Component Description:
Project management services April 2019
Amount:
$123.50

Component Description:
Project management services 12.1.18 through 12.31.18
Amount:
$150.00

Component Description:
Project management services 2.1.19 through 3.1.19
Amount:
$450.00

Component Description:
Project management services January 2019
Amount:
$65.00

Component Description:
Project management services May 2019
Amount:
$150.00

Component Description:
Project management services Jun 2019
Amount:
$162.50

Component Description:
Project management services 10.26.19 through 11.29.19
Amount:
$158.00

Component Description:
Project management services 1.1.19 through 1.31.19
Amount:
$750.00

Component Description:
Project management services
Amount:
$150.00

Component Description:
Project management services 6.1.19 through 6.28.19
Amount:
$450.00

Component Description:
Project management services
Amount:
$158.00

Component Description:
Project management services March 2019
Amount:
$143.00

Component Description:
Project management services August 2018
Amount:
$50.00

Component Description:
Project management services February 2019
Amount:
$60.00

Component Description:
Prepare Q2 2020 Form 387
Amount:
$250.00

Component Description:
Project management services 3.2.19 through 3.29.19
Amount:
$825.00

Component Description:
Project management services 10.27.18 through 11.30.18
Amount:
$500.00

Component Description:
Project management services 5.26.18 through 6.29.18
Amount:
$600.00

Component Description:
Project management services 3.30.19 through 4.26.19
Amount:
$375.00

Component Description:
Project management services, items 1, 3-8 from invoice summary
Amount:
$1,834.00

Component Description:
Project management services Nov 2019
Amount:
$60.00

Component Description:
Project management services 6.30.18 through 7.27.18
Amount:
$1,275.00

Component Description:
Project management services 4.27.19 through 5.31.19
Amount:
$75.00

Component Description:
Project management services
Amount:
$15,352.50

Component Description:
Project management services 9.29.18 through 10.26.18
Amount:
$300.00

Component Description:
Project management services 7.28.18 through 9.28.18
Amount:
$225.00

Component Description:
Project management services
Amount:
$474.00

Component Description:
Prepare Form 387 (10 Days After)
Amount:
$250.00

Component Description:
Project management services
Amount:
$250.00
Additional Field Engineering Service, 20 Days Information not provided.
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase

Component Description:
Prepare Form 7460-1
Amount:
$275.00
ASR modification (prepare FCC Form 854)

Component Description:
Preparation of Forms 7460-1 and 854
Amount:
$1,050.00

Component Description:
Prepare Form 854
Amount:
$325.00
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet Information not provided.
NEPA Section 106 environmental review, if needed Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare request for Special Temporary Authorization

Component Description:
Prepare STA
Amount:
$1,500.00
Prepare engineering section of FCC Form 2100 (main), License to Cover Application

Component Description:
Prepare License to Cover Application
Amount:
$625.00
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Prepare Minor Modification of CP Application
Amount:
$1,525.00

Component Description:
Prepare engineering sections of Form 2100, item 4 from invoice summary
Amount:
$3,000.00
Perform engineering study for new channel assignment and antenna development

Component Description:
Perform engineering study for new channel assignment, item 3 from invoice summary
Amount:
$7,000.00
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Prepare and or review reimbursement form

Component Description:
Prepare reimbursement form, item 2 from invoice summary
Amount:
$2,500.00

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $462,278.20 $461,978.20 N/A $415,413.15 N/A
Total for all systems $6,397,323.56 $5,397,358.19 N/A $4,996,060.69 N/A
Other Expenses $462,278.20 $461,978.20 $415,413.15
Pack and Secure Material for Shipping $5,023.20 $5,023.20 Secure Packing and shipment of 6 and one eigth Feedline TFU24WB Antenna and associated Hardware to PCI in Grove OK. Please see Deep South Communications quote of April 30 2020 attached. $3,469.10 N/A
Sales and Use Tax Due $298,000.00 $298,000.00 Estimated taxes $297,022.11 N/A
Tower Road Access Preparation $28,205.00 $28,205.00 Costs to prep the access road to the tower site; See ERI change order and related invoice $28,205.00 N/A
Waste Management and Toilet Rental Expenses $9,000.00 $9,000.00 Monthly Rental Fees for Waste Management Dumpster and Porta Johnny at Remote Tower Site $8,449.06 N/A
Land Survey for New Tower Construction $9,000.00 $9,000.00 N/A $3,464.75 N/A
MVPD Notification of Channel Change $2,000.00 $2,000.00 N/A N/A N/A
Develop and air announcement of upcoming channel change $1,500.00 $1,500.00 Costs to produce spots and crawls for viewer notification. N/A N/A
Equipment Storage $25,000.00 $25,000.00 N/A $10,358.00 N/A
Equipment Delivery and Handling Charges $51,500.00 $51,500.00 See related invoices $51,426.13 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $8,000.00 $8,000.00 See USA Commercial Removal quote 56 $8,000.00 N/A
Non-zoning permits $3,500.00 $3,500.00 Tower building permit fee $3,091.00 N/A
Local Zoning $10,000.00 $10,000.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $11,250.00 N/A $1,928.00 N/A

Components

Actual Information Description File Name
Pack and Secure Material for Shipping

Component Description:
Pack and ship interim antenna, 50% shared cost with KTMJ
Amount:
$2,511.60

Component Description:
Pack and ship interim antenna, 50% shared cost with KTMJ
Amount:
$957.50
Sales and Use Tax Due

Component Description:
Tax on toilet rental June 2020
Amount:
$7.65

Component Description:
Kansas Use Tax Due
Amount:
$296,142.00

Component Description:
Tax on drilling services
Amount:
$45.75

Component Description:
Tax on electrical services
Amount:
$236.39

Component Description:
Tax on toilet rental October 2020
Amount:
$7.65

Component Description:
Tax on toilet rental August 2020
Amount:
$7.65

Component Description:
Tax on toilet rental May 2020
Amount:
$7.65

Component Description:
Tax on rock base materials
Amount:
$536.77

Component Description:
Tax on toilet rental July 2020
Amount:
$7.65

Component Description:
Tax on toilet rental September 2020
Amount:
$7.65

Component Description:
Tax on toilet rental December 2020
Amount:
$7.65

Component Description:
Tax on toilet rental November 2020
Amount:
$7.65
Tower Road Access Preparation

Component Description:
Prep tower site access road for tower and heavy equipment
Amount:
$28,205.00
Waste Management and Toilet Rental Expenses

Component Description:
Dumpster rental 5/1/20-5/15/20
Amount:
$254.07

Component Description:
Toilet Rental June 2020
Amount:
$100.00

Component Description:
Dumpster rental 11/1/20-11/15/20
Amount:
$471.55

Component Description:
Dumpster rental 5/16/20-5/31/20
Amount:
$181.50

Component Description:
Dumpster rental 9/16/20-9/30/20
Amount:
$1,035.68

Component Description:
Dumpster rental 6/16/20-6/30/20
Amount:
$481.50

Component Description:
Dumpster rental 7/1/20-7/31/20
Amount:
$781.50

Component Description:
Toilet Rental November 2020
Amount:
$100.00

Component Description:
Dumpster rental 6/1/20-6/15/20
Amount:
$583.60

Component Description:
Dumpster rental 6/16/20-6/30/20
Amount:
$487.85

Component Description:
Dumpster rental 8/1/20-8/15/20
Amount:
$336.48

Component Description:
Dumpster rental 10/1/20-10/15/20
Amount:
$335.88

Component Description:
Dumpster rental 9/1/20-9/15/20
Amount:
$336.28

Component Description:
Dumpster rental final invoice
Amount:
$381.64

Component Description:
Toilet Rental December 2020
Amount:
$99.94

Component Description:
Dumpster rental 8/16/20-8/31/20
Amount:
$706.50

Component Description:
Toilet Rental August 2020
Amount:
$100.00

Component Description:
Dumpster rental 11/16/20-11/30/20
Amount:
$706.50

Component Description:
Toilet Rental July 2020
Amount:
$100.00

Component Description:
Toilet Rental September 2020
Amount:
$100.00

Component Description:
Toilet Rental May 2020
Amount:
$99.94

Component Description:
Toilet Rental October 2020
Amount:
$100.00

Component Description:
Dumpster rental 10/16/20-10/31/20
Amount:
$1,056.50
Land Survey for New Tower Construction

Component Description:
Surveying services
Amount:
$2,807.75

Component Description:
Surveying services
Amount:
$657.00
MVPD Notification of Channel Change Information not provided.
Develop and air announcement of upcoming channel change Information not provided.
Equipment Storage

Component Description:
Main transmitter storage
Amount:
$9,613.00

Component Description:
Main transmitter storage
Amount:
$375.00

Component Description:
Aux transmitter storage
Amount:
$370.00
Equipment Delivery and Handling Charges

Component Description:
Main transmitter consolidation services
Amount:
$10,631.00

Component Description:
Aux transmitter consolidation services
Amount:
$10,465.00

Component Description:
Hanger kit shipping, 50% shared cost with KTMJ
Amount:
$5.03

Component Description:
Freight costs
Amount:
$77.32

Component Description:
Main transmission line freight
Amount:
$537.96

Component Description:
Antenna components freight, 50% shared cost with KTMJ
Amount:
$62.60

Component Description:
Transmission line shipping
Amount:
$856.75

Component Description:
Antenna freight
Amount:
$1,991.28

Component Description:
Aux transmission line freight
Amount:
$4,713.44

Component Description:
Main transmitter consolidation services
Amount:
$11,006.00

Component Description:
Auxiliary transmitter consolidation services
Amount:
$10,835.00

Component Description:
Guyed tower freight cost
Amount:
$22,085.75
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
Disposal costs
Amount:
$8,000.00
Non-zoning permits

Component Description:
Tower building permit application fee
Amount:
$3,091.00
Local Zoning Information not provided.
DTV Medical Facility Notification

Component Description:
Notification of medical facilities
Amount:
$1,928.00

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $6,397,323.56 $5,397,358.19 $4,996,060.69

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. Yes
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. Yes

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Thomas J. Vaughan

Manager


03/21/2022

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Thomas J. Vaughan

Manager


03/21/2022

Certification

Back to Top
Section Question Response
Submission of Final Allocation or Accounting Information Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  2. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  3. The above-named entity certifies that all costs identified as "actual costs" herein accurately represent the costs actually paid by the above-named entity, including any discounts, refunds, or rebates.

  4. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  5. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  6. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Thomas J. Vaughan

Manager


03/21/2022