Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
KTKA Television, LLC |
Thomas J. Vaughan 3121 Rivershore Lane Port Charlotte, FL 33953 United States |
+1 (941) 764-6867 | glenn.richards@pillsburylaw.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Jessica Nyman , Esq . FCC Counsel Pillsbury Winthrop Shaw Pittman LLP |
Jessica Nyman 1200 Seventeenth Street Washington, DC 20036 United States |
+1 (202) 663-8810 | jessica.nyman@pillsburylaw.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Replace transmitter and antenna using existing line. Acquire interim antenna and line for continued operation during construction and duration of the assigned phase. Map and analyze tower; design and implement modifications if required. See attached. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | Auxiliary | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Affinity | |
Year | 2002 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Auxiliary (Backup) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TMU9evo/3 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.15 kW | |
Justification for New Transmitter | The manufacturer of the existing transmitter advises that the transmitter cannot be re-tuned to the assigned channel. See attachment. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | De-install existing and install new | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Additional Transmitter Costs |
Additional Transmitter Costs |
Additional Interior RF System |
Interior RF System Existing Transmitter to Interim Transmission line |
Transmitter Electrical and Installation |
Transmitter Electrical and Installation |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Diamond | |
Year | 2006 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1.8 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TMU9evo/6 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 2.3 kW | |
Justification for New Transmitter | The manufacturer of the existing transmitter advises that the transmitter cannot be re-tuned to the assigned channel. See attachment. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 2 inches | |
Length | 100.0 feet | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Additional Interior RF System |
Interior RF System Existing Transmitter to Interim Transmission line |
RF Combiner Components |
RF 42" Riser, Elbow, and 3' Heliax Connector to Complete installation of Combiner. Please see Electronics Research Inc. Proposal # 20200619-864 Attached. |
Transmitter Building Drilling |
Transmitter Building Drilling to provide access for feed lines and conduit |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Other | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | Travelling Wave | |
ERP: | 89.1 kW | |
Manufacturer | ||
Model | ATW25H3-HTPXU-49H | |
Year | 2001 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 51.0 kW | |
Manufacturer | ||
Model | ATW17H3-HTP230-16L | |
Year | 2019 | |
Justification for New Antenna | The existing primary top-mount antenna is a single channel slotted coaxial which cannot accommodate the assigned channel. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 6 1/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 89.1 kW | |
Manufacturer | ||
Model | TLP-24J | |
Year | 2019 | |
Justification for New Antenna | An interim antenna is necessary to keep station on the air during primary antenna replacement and for the duration of the assigned phase. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | S | |
Feed Line Size | 4 1/16 inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Additional Antenna Costs |
Additional Antenna Costs |
Combiner and installation |
Purchase of combiner and installation required to meet transition deadline |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Waveguide | |
Diameter | N/A | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1485 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 19 3/4 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1518 feet per run | |
Justification for New Transmission Line | The existing primary transmission line is frequency-specific circular waveguide with a diameter that cannot accommodate the assigned channel. |
Name | Description |
---|---|
Additional Transmission Line Components |
Additional Transmission Line Components |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Rigid | |
Diameter | 3 1/8 inches | |
Segment Length | 19 ¾ ' | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 1370 feet per run | |
Justification for New Transmission Line | An interim transmission line is necessary for the interim antenna to keep station on the air during primary antenna replacement and for the duration of the assigned phase. |
Name | Description |
---|---|
Transmission Line Test |
Testing of Transmission Line to determine use as temporary and Auxiliary line for antennas. Please see Jeremy Ruck & Associates Quotation # 200501-1 Attached. |
Additional Transmission Line Components |
Additional Transmission Line Components |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Construct New |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1031887 | |
Coordinates (NAD83) | Latitude (NAD83) | 39° 01' 34.0" N- |
Longitude (NAD83) | 095° 55' 02.0" W- | |
Overall Structure Height | 1439.29 feet | |
Support Structure Height | 1381.22 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 1109.89 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Nexstar Broadcasting, Inc. | |
Date Constructed | 01/01/1984 |
Facility ID | Call Sign | Service |
---|---|---|
67334 | KTPK | FM |
18055 | KSAJ-FM | FM |
Users |
---|
4 mwave ant |
1 RPU antenna |
Section | Question | Response |
---|---|---|
Construct New Tower | Use | Primary (Main) |
Description of Use | N/A | |
Is this a request for upgraded equipment? | No | |
Height | 1387.00 feet | |
Justification for New Tower | See attached engineering technical statement, ERI structural analysis and ERI letter of recommendation to construct a new tower |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Other |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Tower Fence, Gate and Caging |
Tower Fence, Gate and Caging needed to secure tower area; see Kansas Fencing quotes |
Weather Delays |
Weather delays |
Combiner and Antenna installation |
Install combiner and interim antenna on old tower to meet transition deadline |
ENG Dish Removal and Re-Installation |
ENG dish removal from old tower and installation on new tower. Please see Electronics Research Proposal # 20200710-996 |
Crane Pad for Tower Installation |
200 Ton Crane Pad needed to erect new tower at the site. Please see Meiert Industries LLC Estimate # 35 Attached |
Electrical Service for Tower Lighting |
120V & 208V Electrical Service for LED Tower Lighting. Please see McElroy Electric Inc. Proposal # 200810-0007 attached. |
Additional Tower Work |
Additional Tower Work |
Ice Bridge |
20' of Additional Ice Bridge to new tower and re-use of 30' from old tower., Please see Attached ERI Change Order # 35662P |
Structural Analysis |
Structural analysis |
Tower Disposal Costs |
Tower Disposal Costs |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 1000 | |
Explanation | It will be necessary to schedule and coordinate multiple vendors, complete progress reports, and update Schedule 399. Station does not have available personnel or personnel trained in project management for such complex projects. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | Yes | |
Environmental Assessment | Yes | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | Yes | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 20 | |
Justification | It will be necessary to survey the site, plan the equipment, develop specifications for purchasing, and oversee multiple vendor RF projects. Station does not have available personnel or personnel trained in such services. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Land Survey for New Tower Construction |
Tower Site Land Survey and Site Plan Development for ERI New Tower Build and installation |
Pack and Secure Material for Shipping |
Secure Packing and shipment of 6 and one eigth Feedline TFU24WB Antenna and associated Hardware to PCI in Grove OK. Please see Deep South Communications quote of April 30 2020 attached. |
Sales and Use Tax Due |
Sales and Use Tax Due |
Waste Management and Toilet Rental Expenses |
Rental Expenses during Tower Work for RePack. |
Tower Road Access Preparation |
Tower Road Access Preparation - Gravel required to prepare road for tower equipment |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $452,164.01 | $329,814.01 | N/A | $183,428.00 | N/A |
Total for all systems | $6,397,323.56 | $5,397,358.19 | N/A | $4,996,060.69 | N/A |
Primary Transmitter TMU9evo/6 | $264,586.01 | $219,786.01 | $83,400.00 | ||
Transmitter Building Drilling | $500.00 | $500.00 | See related invoice | $500.00 | N/A |
RF Combiner Components | $1,736.01 | $1,736.01 | RF 42" Riser, Elbow, and 3' Heliax Connector to Complete installation of Combiner. Please see Electronics Research Inc. Proposal # 20200619-864 Attached. | N/A | N/A |
Additional Interior RF System | $70,000.00 | $70,000.00 | N/A | N/A | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $37,150.00 | N/A | N/A | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $24,900.00 | N/A | N/A | N/A |
2" Rigid Conduit and Wiring (Cost per foot) | $2,600.00 | $2,600.00 | N/A | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $126,000.00 | $82,900.00 | See Rohde & Schwarz quote 230143.0 | $82,900.00 | N/A |
Auxiliary Transmitter TMU9evo/3 | $187,578.00 | $110,028.00 | $100,028.00 | ||
Transmitter Electrical and Installation | $30,977.00 | $30,977.00 | See Land Communications Estimate 1111 | $30,977.00 | N/A |
Additional Interior RF System | $0.00 | $0.00 | See Transmitter Electrical and Installation | N/A | N/A |
Other Electrical Service: De-install existing and install new | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $126,000.00 | $48,450.00 | See Rohde & Schwarz quote 235153.0 | $48,450.00 | N/A |
Additional Transmitter Costs | $20,601.00 | $20,601.00 | See Rohde & Schwarz quote 304846.1 | $20,601.00 | N/A |
Actual Information Description | File Name |
---|---|
Transmitter Building Drilling | |
RF Combiner Components | Information not provided. |
Additional Interior RF System | Information not provided. |
Switchgear - industrial 800 amp | Information not provided. |
Transformer 3 phase/480v - 150 KVA | Information not provided. |
2" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | |
Transmitter Electrical and Installation | |
Additional Interior RF System | Information not provided. |
Other Electrical Service: De-install existing and install new | Information not provided. |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | |
Additional Transmitter Costs |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $414,215.00 | $215,800.75 | N/A | $155,438.33 | N/A |
Total for all systems | $6,397,323.56 | $5,397,358.19 | N/A | $4,996,060.69 | N/A |
Interim Antenna TLP-24J | $148,185.00 | $69,202.75 | $19,288.33 | ||
Combiner and installation | $12,000.00 | $12,000.00 | Combiner required to connect with single interim antenna for both KTKA and KTMJ to meet transition deadline; 50% shared cost with KTMJ | $10,815.00 | N/A |
Additional Antenna Costs | $2,075.00 | $2,075.00 | See related invoices | $2,073.33 | a |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $5,120.00 | N/A | N/A | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $4,788.00 | See Dielectric Quote Number 700438CMZ | N/A | N/A |
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) | $9,570.00 | $9,320.00 | N/A | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | See Dielectric Quote Number 700438CMZ | $6,400.00 | N/A |
UHF - Lower Power Side Mount, One station antenna - medium power (50-200 kW), horizontally polarized | $89,400.00 | $29,499.75 | See Dielectric Quote Number 700438CMZ | N/A | N/A |
Primary Antenna ATW17H3-HTP230-16L | $266,030.00 | $146,598.00 | $136,150.00 | ||
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | $12,300.00 | $10,298.00 | See Dielectric Quote Number DMS153-4 | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | See Dielectric Quote Number DMS153-4 | $6,250.00 | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized | $247,000.00 | $129,900.00 | See Electronics Research quote 20181228-237 Rev C | $129,900.00 | N/A |
Actual Information Description | File Name |
---|---|
Combiner and installation | |
Additional Antenna Costs | |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | Information not provided. |
Side mount brackets for high power antennas (if not included in antenna base cost) | Information not provided. |
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) | Information not provided. |
Sweep test of existing antenna | |
UHF - Lower Power Side Mount, One station antenna - medium power (50-200 kW), horizontally polarized | Information not provided. |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | Information not provided. |
Sweep test of existing antenna | |
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $464,516.00 | $282,298.88 | N/A | $276,768.79 | N/A |
Total for all systems | $6,397,323.56 | $5,397,358.19 | N/A | $4,996,060.69 | N/A |
Interim Transmission Line | $156,880.00 | $94,298.88 | $92,877.66 | ||
Additional Transmission Line Components | $8,000.00 | $8,000.00 | See related invoices | $7,858.24 | N/A |
Transmission Line Test | $6,400.00 | $6,400.00 | Testing of Transmission Line to determine use as temporary and Auxiliary line for antennas. Please see Jeremy Ruck & Associates Quotation # 200501-5 Attached. | $6,400.00 | N/A |
Rigid Transmission Line - copper, 3 1/8" | $142,480.00 | $79,898.88 | See ERI proposal 20200917-489 | $78,619.42 | N/A |
Primary Transmission Line | $307,636.00 | $188,000.00 | $183,891.13 | ||
Additional Transmission Line Components | $1,000.00 | $1,000.00 | See related invoice | $690.00 | N/A |
Rigid Transmission Line - copper, 6 1/8" | $306,636.00 | $187,000.00 | See Electronic Research quote 20181228-237 Rev C | $183,201.13 | N/A |
Actual Information Description | File Name |
---|---|
Additional Transmission Line Components | |
Transmission Line Test | |
Rigid Transmission Line - copper, 3 1/8" | |
Additional Transmission Line Components | |
Rigid Transmission Line - copper, 6 1/8" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $4,286,400.35 | $3,915,591.35 | N/A | $3,914,906.92 | N/A |
Total for all systems | $6,397,323.56 | $5,397,358.19 | N/A | $4,996,060.69 | N/A |
Primary Tower TOWER | $0.00 | $0.00 | $0.00 | ||
Primary Tower | $4,286,400.35 | $3,915,591.35 | $3,914,906.92 | ||
Electrical Service for Tower Lighting | $3,326.35 | $3,326.35 | 120V & 208V Electrical Service for LED Tower Lighting. Please see McElroy Electric Inc. Proposal # 200810-0007 attached. | $3,089.96 | N/A |
Structural Analysis | $43,850.00 | $43,850.00 | Structural analysis and mapping required to determine tower requirements; see proposals from ERI $14320; $3750 and $25530, and Bartlett & West $8700 | $43,850.00 | N/A |
Weather Delays | $25,350.00 | $25,350.00 | See related invoices | $25,350.00 | N/A |
New tower between 1000' and 1500' without elevator, presumptive soil conditions | $3,647,810.00 | $3,382,144.00 | See attached ERI Proposal Number 20181210-098 REV C | $3,382,144.00 | N/A |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $315,857.00 | See Electronics Research Proposal 20190410-188 Rev A and 20200917-489 | $315,857.00 | N/A |
Crane Pad for Tower Installation | $8,800.00 | $8,800.00 | 200 Ton Crane Pad needed to erect new tower at the site. Please see Meier Industries LLC Estimate # 35 Attached | $8,716.58 | N/A |
Additional Tower Work | $3,600.00 | $3,600.00 | See ERI Change orders and related invoices | $3,600.00 | N/A |
Ice Bridge | $26,100.00 | $26,100.00 | Additional 20" of Ice Bridge to meet 30" of Existing Bridge. Please See ERI Change Order #35662P and Change Order 35662D-1 | $26,100.00 | N/A |
Tower Disposal Costs | $36,000.00 | $36,000.00 | See ERI change order and related invoice | $36,000.00 | N/A |
Tower Fence, Gate and Caging | $31,500.00 | $31,500.00 | See Kansas Fencing quotes | $31,136.34 | N/A |
ENG Dish Removal and Re-Installation | $36,504.00 | $36,504.00 | ENG dish removal from old tower and installation on new tower. Please see Electronics Research Proposal # 20200710-996 and 20190912-732 Rev B and related invoices | $36,503.04 | N/A |
Combiner and Antenna installation | $2,560.00 | $2,560.00 | Install combiner and temporary antenna on old tower to meet transition deadline; 50% shared cost with KTMJ | $2,560.00 | N/A |
Actual Information Description | File Name |
---|---|
Electrical Service for Tower Lighting | |
Structural Analysis | |
Weather Delays | |
New tower between 1000' and 1500' without elevator, presumptive soil conditions | |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | |
Crane Pad for Tower Installation | |
Additional Tower Work | |
Ice Bridge | |
Tower Disposal Costs | |
Tower Fence, Gate and Caging | |
ENG Dish Removal and Re-Installation | |
Combiner and Antenna installation |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $317,750.00 | $191,875.00 | N/A | $50,105.50 | N/A |
Total for all systems | $6,397,323.56 | $5,397,358.19 | N/A | $4,996,060.69 | N/A |
Outside Professional Services | $317,750.00 | $191,875.00 | $50,105.50 | ||
Project management of the transition | $158,000.00 | $32,500.00 | See related invoice | $32,305.50 | N/A |
Additional Field Engineering Service, 20 Days | $108,000.00 | $108,000.00 | N/A | N/A | N/A |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | $2,105.00 | $2,050.00 | N/A | $275.00 | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $2,050.00 | N/A | $1,375.00 | N/A |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | $10,520.00 | $10,240.00 | N/A | N/A | N/A |
NEPA Section 106 environmental review, if needed | $6,310.00 | $6,140.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $3,585.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,305.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,120.00 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $1,535.00 | N/A | $1,500.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,535.00 | N/A | $625.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $4,525.00 | See related invoices | $4,525.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,170.00 | N/A | $7,000.00 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,560.00 | N/A | N/A | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,560.00 | N/A | $2,500.00 | N/A |
Actual Information Description | File Name |
---|---|
Project management of the transition | |
Additional Field Engineering Service, 20 Days | Information not provided. |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | |
ASR modification (prepare FCC Form 854) | |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | Information not provided. |
NEPA Section 106 environmental review, if needed | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare request for Special Temporary Authorization | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Prepare and or review reimbursement form |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $462,278.20 | $461,978.20 | N/A | $415,413.15 | N/A |
Total for all systems | $6,397,323.56 | $5,397,358.19 | N/A | $4,996,060.69 | N/A |
Other Expenses | $462,278.20 | $461,978.20 | $415,413.15 | ||
Pack and Secure Material for Shipping | $5,023.20 | $5,023.20 | Secure Packing and shipment of 6 and one eigth Feedline TFU24WB Antenna and associated Hardware to PCI in Grove OK. Please see Deep South Communications quote of April 30 2020 attached. | $3,469.10 | N/A |
Sales and Use Tax Due | $298,000.00 | $298,000.00 | Estimated taxes | $297,022.11 | N/A |
Tower Road Access Preparation | $28,205.00 | $28,205.00 | Costs to prep the access road to the tower site; See ERI change order and related invoice | $28,205.00 | N/A |
Waste Management and Toilet Rental Expenses | $9,000.00 | $9,000.00 | Monthly Rental Fees for Waste Management Dumpster and Porta Johnny at Remote Tower Site | $8,449.06 | N/A |
Land Survey for New Tower Construction | $9,000.00 | $9,000.00 | N/A | $3,464.75 | N/A |
MVPD Notification of Channel Change | $2,000.00 | $2,000.00 | N/A | N/A | N/A |
Develop and air announcement of upcoming channel change | $1,500.00 | $1,500.00 | Costs to produce spots and crawls for viewer notification. | N/A | N/A |
Equipment Storage | $25,000.00 | $25,000.00 | N/A | $10,358.00 | N/A |
Equipment Delivery and Handling Charges | $51,500.00 | $51,500.00 | See related invoices | $51,426.13 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $8,000.00 | $8,000.00 | See USA Commercial Removal quote 56 | $8,000.00 | N/A |
Non-zoning permits | $3,500.00 | $3,500.00 | Tower building permit fee | $3,091.00 | N/A |
Local Zoning | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $11,250.00 | N/A | $1,928.00 | N/A |
Actual Information Description | File Name |
---|---|
Pack and Secure Material for Shipping | |
Sales and Use Tax Due | |
Tower Road Access Preparation | |
Waste Management and Toilet Rental Expenses | |
Land Survey for New Tower Construction | |
MVPD Notification of Channel Change | Information not provided. |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Storage | |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
Non-zoning permits | |
Local Zoning | Information not provided. |
DTV Medical Facility Notification |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $6,397,323.56 | $5,397,358.19 | $4,996,060.69 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Thomas J. Vaughan Manager 03/21/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Thomas J. Vaughan Manager 03/21/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Thomas J. Vaughan Manager 03/21/2022 |