Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
13060
Service:
DCA
Call Sign:
WNLO-CD
Channel:
14 (UHF)
File Number:
0000028703
FRN:
0009961889
Date Submitted:
03/10/2022

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

Nexstar Media Inc.

Elizabeth Ryder

545 E. JOHN CARPENTER FREEWAY

SUITE 700

IRVING, TX 75062

United States

+1 (972) 373-8800 eryder@nexstar.tv Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Elizabeth Ryder

General Counsel

Nexstar Media Inc.

Elizabeth Ryder

545 E. John Carpenter Freeway

Suite 700

Irving, TX 75062

United States

+1 (972) 373-8800 eryder@nexstar.tv

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan SEE ATTACHED DOCUMENT.

Question Response
Sharee Station Facility ID 65387
Call Sign WVBT
Type Commercial
Licensee Name Nexstar Media Inc.
Status LICENSED
DTS No
Community of License VIRGINIA BEACH, VA
Pre-auction RF Channel 21
Post-auction RF Channel 21
Neilsen DMA Norfolk-Portsmth-Newpt Nws
Network Affiliation
Question Response
Sharee Station Facility ID 71119
Call Sign WITD-CD
Type
Licensee Name Nexstar Media Inc.
Status LICENSED
DTS No
Community of License CHESAPEAKE, VA
Pre-auction RF Channel 23
Post-auction RF Channel 23
Neilsen DMA Norfolk-Portsmth-Newpt Nws
Network Affiliation
Question Response
Sharee Station Facility ID 71121
Call Sign WKTD-CD
Type
Licensee Name Nexstar Media Inc.
Status LICENSED
DTS No
Community of License PORTSMOUTH, VA
Pre-auction RF Channel 17
Post-auction RF Channel 17
Neilsen DMA Norfolk-Portsmth-Newpt Nws
Network Affiliation
Question Response
Sharee Station Facility ID 71127
Call Sign WAVY-TV
Type Commercial
Licensee Name Nexstar Media Inc.
Status LICENSED
DTS No
Community of License PORTSMOUTH, VA
Pre-auction RF Channel 19
Post-auction RF Channel 19
Neilsen DMA Norfolk-Portsmth-Newpt Nws
Network Affiliation

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model DTT5KSUG2
Year 2006
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 6 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model TMU9EVO-4
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 1.5 kW
Justification for New Transmitter Existing transmitter cannot be converted to repacked channel per manufacturer and is no longer in business.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) Yes
Switchgear (industrial 800 amp) Yes
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring Yes
Size 2 inches
Length 75.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Heating and Cooling
Size 5 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 100.0 square feet
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days 20

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Additional Transmitter Costs

Additional Transmitter Costs

Transmitter Installation Services

Install and commission new RePack Transmitter. Please see Land Communications Quote # 1067 Attached.

Transmitter Control System

Transmitter Control System

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Class A
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 15.0 kW
Manufacturer
Model TLP-24S190
Year 2005

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? Yes
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Broadband Panel
Number of Stations Supported 3
Number of Panels/Bays 32
Lower Limit 470.00 MHz
Upper Limit 630.00 MHz
Design power capacity in use 50.0 %
Other Antenna Type N/A
ERP: 500.0 kW
Manufacturer
Model TUA-O4-8/32H-1-R SM
Year 2019
Justification for New Antenna Existing coaxial slot antenna is not designed to operate on repacked channel. See WNLO-CD transition plan for cost and time savings justification associated with overall approach.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 4
Frequencies of channels supported RF channel
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? Yes
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Broadband
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Enter a list of RF channel numbers.

RF Channel Number
31
14
19
21

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Additional Antenna Costs

Additional Antenna Costs

Combiner Installation Services

Combiner Installation Service Please see Land Communications Estimate # 1087 Attached

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Flexible Air
Diameter 3 inches
Other Diameter N/A
Segment Length N/A
Other Segment Length N/A
Number of parallel runs 1
Length 825 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 1
Length 825 feet per run
Justification for New Transmission Line The transmission line with higher power capability is an integral part to the tower consolidation plan (see attached WNLO-CD Transtition Plan) that reduces cost and time associated with the 3 stations being repacked on this tower.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Transmission Line 6-50

Transmission Line 6-50

Additional Transmission Line Components

Additional Transmission Line Components

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1018104
Coordinates (NAD83) Latitude (NAD83) 36° 49' 15.0" N-
Longitude (NAD83) 076° 30' 40.0" W-
Overall Structure Height 1026.89 feet
Support Structure Height 889.10 feet
Ground Elevation Above Mean Sea Level (AMSL) 22.97 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner WAVY BROADCASTING INC
Date Constructed 01/01/1957

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
71119 WITD-CD DTV
71121 WKTD-CD DTV
71127 WAVY-TV DTV
13060 WNLO-CD DTV
65387 WVBT DTV

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Serious Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Weather Delays, Additional Charges

Weather Delays, Additional Charges

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 90
Explanation The engineering, tower rigging, transmitter and combiner suppliers, must all coordinate effectively because WAVY transitions in Phase 9 and the WNLO & WVBT transition in Phase 7. Cost of this activity is shared between WAVY, WVBT, & WNLO-CD.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Minor Modification of CP Application

Minor Modification of CP Application

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning Yes
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? No
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Land Mobile Facilities Notification

Land Mobile Facilities Notification; see DTV Notification quote EST-001702

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $511,939.00 $382,319.00 N/A $141,192.34 N/A
Total for all systems $2,444,310.98 $1,362,442.28 N/A $633,024.39 N/A
Primary Transmitter TMU9EVO-4 $511,939.00 $382,319.00 $141,192.34
Transmitter Control System $2,635.00 $2,635.00 Replace transmitter control system that is no longer compatible due to change in transmitters; see Burk quote. 1/3 share of cost with WAVY and WVBT $2,633.34 N/A
Transmitter Installation Services $41,760.00 $41,760.00 Installation & Commissioning of New RePack Transmitter by Land Communications Inc. Please see quote # 1067 attached. $41,760.00 N/A
Additional Transmitter Costs $4,884.00 $4,884.00 See Rohde & Schwarz quotes 263750.0 and 267328.0 $4,884.00 N/A
Additional field engineering time, 10-30 days $63,100.00 $60,000.00 N/A N/A N/A
Channel 14 Mask Filter $189,500.00 $100,000.00 N/A N/A N/A
RF Consulting Engineer $5,260.00 $5,000.00 N/A N/A N/A
Other -- Building Addition Size: 100.0 $5,000.00 $5,000.00 Need to move walls, plumbing, electrical wiring, lighting fixtures, etc. N/A N/A
Other -- HVAC Service Type: H Size:5 (Other) $19,250.00 $19,250.00 N/A N/A N/A
2" Rigid Conduit and Wiring (Cost per foot) $1,950.00 $1,875.00 N/A N/A N/A
Switchgear - industrial 800 amp $38,200.00 $36,300.00 N/A N/A N/A
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW $126,000.00 $91,915.00 See Rohde & Schwarz quote 195743.0 $91,915.00 N/A
Service entrance 3 phase/800 amp/208 volt $14,400.00 $13,700.00 N/A N/A N/A

Components

Actual Information Description File Name
Transmitter Control System

Component Description:
Replace transmitter control system; 1/3 shared cost with WAVY and WVBT
Amount:
$2,633.34
Transmitter Installation Services

Component Description:
Transmitter electrical and installation, installment #1
Amount:
$20,880.00

Component Description:
Transmitter electrical and installation, installment #2
Amount:
$20,880.00
Additional Transmitter Costs

Component Description:
Additional transmitter components
Amount:
$3,664.00

Component Description:
Additional transmitter component
Amount:
$1,220.00
Additional field engineering time, 10-30 days Information not provided.
Channel 14 Mask Filter Information not provided.
RF Consulting Engineer Information not provided.
Other -- Building Addition Size: 100.0 Information not provided.
Other -- HVAC Service Type: H Size:5 (Other) Information not provided.
2" Rigid Conduit and Wiring (Cost per foot) Information not provided.
Switchgear - industrial 800 amp Information not provided.
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW

Component Description:
Transmitter, installment #1
Amount:
$22,978.75

Component Description:
Transmitter, installment #2
Amount:
$68,936.25
Service entrance 3 phase/800 amp/208 volt Information not provided.

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $356,080.32 $315,398.99 N/A $186,130.64 N/A
Total for all systems $2,444,310.98 $1,362,442.28 N/A $633,024.39 N/A
Primary Antenna TUA-O4-8/32H-1-R SM $356,080.32 $315,398.99 $186,130.64
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $2,133.33 N/A
Additional Antenna Costs $4,675.00 $4,675.00 See Dielectric order confirmation 1698051 $4,673.33 N/A
Combiner Installation Services $13,666.66 $13,666.66 Combiner Installation Service Please see Land Communications Estimate # 1087 Attached $13,666.66 N/A
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $5,000.00 N/A N/A N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $7,250.00 See Dielectric quote 700323CMZ-5. Cost to be shared with WAVY FAC ID 71127 and WVBT FAC ID 65387, split 3 ways; this is WNLO-CD share of cost $7,250.00 N/A
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) $13,700.00 $3,570.00 See Dielectric quote 700323CMZ-5. Cost to be shared with WAVY FAC ID 71127 and WVBT FAC ID 65387, split 3 ways; this is WNLO-CD share of cost $3,570.00 N/A
Combiner output splitting/switching for dual feed lines, if applicable $126,000.00 $120,000.00 N/A N/A N/A
New combiner, cost per channel (without antenna) $84,200.00 $76,138.67 See Dielectric quote 900049CMZ, cost shared with WAVY FAC ID 71127 and WVBT FAC ID 65387. $76,138.66 N/A
UHF - High Power, Side Mount, broadband panel, 32 bay,, 500 kW input, horizontally polarized $78,698.66 $78,698.66 The antenna selection is part of an overall cost reduction and time/complexity for all three stations on the tower: WAVY, WVBT and WNLO-CD. See Dielectric quote 700323CMZ-5. Cost to be shared with WAVY and WVBT, split 3 ways; this is WNLO share of cost $78,698.66 N/A

Components

Actual Information Description File Name
Sweep test of existing antenna

Component Description:
Antenna sweep test, 1/3 share of cost
Amount:
$2,133.33
Additional Antenna Costs

Component Description:
Additional elbow, 1/3 share of cost
Amount:
$1,146.33

Component Description:
Additional elbow, 1/3 share of cost
Amount:
$3,439.00

Component Description:
Antenna flange, 1/3 share of cost
Amount:
$88.00
Combiner Installation Services

Component Description:
Combiner installation, installment #2, shared cost with WAVY and WVBT
Amount:
$6,833.33

Component Description:
Combiner installation, installment #1, shared cost with WAVY and WVBT
Amount:
$6,833.33
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) Information not provided.
Side mount brackets for high power antennas (if not included in antenna base cost)

Component Description:
Side mount brackets, installment #2, line 2 of invoice. WNLO-CD 1/3 share of cost
Amount:
$3,262.50

Component Description:
Side mount brackets, installment #1, line 2 of invoice; WNLO-CD 1/3 share of cost
Amount:
$3,262.50

Component Description:
Side mount brackets, installment #3, 1/3 share of cost
Amount:
$440.34

Component Description:
Side mount brackets, balance due, 1/3 share of cost
Amount:
$284.66
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed)

Component Description:
Elbow complex, installment #1, line 3 of invoice; WNLO-CD 1/3 share of cost
Amount:
$1,606.50

Component Description:
Elbow complex, balance due, 1/3 share of cost
Amount:
$357.00

Component Description:
Elbow complex, installment #2, line 3 of invoice. WNLO-CD 1/3 share of cost
Amount:
$1,606.50
Combiner output splitting/switching for dual feed lines, if applicable Information not provided.
New combiner, cost per channel (without antenna)

Component Description:
Combiner, installment #1, shared cost with WAVY and WVBT
Amount:
$34,262.40

Component Description:
Combiner, balance due, 1/3 share of cost
Amount:
$7,613.86

Component Description:
Combiner, installment #2, shared cost with WAVY and WVBT
Amount:
$34,262.40
UHF - High Power, Side Mount, broadband panel, 32 bay,, 500 kW input, horizontally polarized

Component Description:
Antenna, balance due, 1/3 share of cost
Amount:
$7,869.86

Component Description:
Antenna, installment #1, line 1 of invoice, WNLO-CD 1/3 share of cost
Amount:
$35,414.40

Component Description:
Antenna, installment #2, line 1 of invoice; WNLO-CD 1/3 share of cost
Amount:
$35,414.40

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $193,586.66 $53,820.29 N/A $53,817.61 N/A
Total for all systems $2,444,310.98 $1,362,442.28 N/A $633,024.39 N/A
Primary Transmission Line $193,586.66 $53,820.29 $53,817.61
Additional Transmission Line Components $1,545.00 $1,545.00 See Dielectric order confirmation 1698051 $1,542.33 N/A
Transmission Line 6-50 $641.66 $641.66 See Dielectric quote 700323CMZ-5;Cost to be shared with WAVY FAC ID 71127 and WVBT FAC ID 65387, split 3 ways; this is WNLO-CD share of cost $641.66 N/A
Rigid Transmission Line - copper, 6 1/8" broadband $191,400.00 $51,633.63 See Dielectric quote 800089CMZ. Cost to be shared with WAVY FAC ID 71127 and WVBT FAC ID 65387, split 3 ways; this is WNLO-CD share of cost $51,633.62 N/A

Components

Actual Information Description File Name
Additional Transmission Line Components

Component Description:
Additional transmission line, 1/3 share of cost
Amount:
$641.66

Component Description:
Additional transmission line, 1/3 share of cost
Amount:
$900.67
Transmission Line 6-50

Component Description:
Transmission line, installment #2, line 4 of invoice; WNLO-CD 1/3 share of cost
Amount:
$288.75

Component Description:
Transmission line, balance due, 1/3 share of cost
Amount:
$64.16

Component Description:
Transmission line, installment #1, line 4 of invoice; WNLO-CD 1/3 share of cost
Amount:
$288.75
Rigid Transmission Line - copper, 6 1/8" broadband

Component Description:
Transmission line, balance due, 1/3 share of cost
Amount:
$5,163.36

Component Description:
Transmission line, installment #1; WNLO-CD 1/3 share of cost
Amount:
$23,235.13

Component Description:
Transmission line, installment #2; WNLO-CD 1/3 share of cost
Amount:
$23,235.13

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,283,100.00 $499,334.00 N/A $175,000.98 N/A
Total for all systems $2,444,310.98 $1,362,442.28 N/A $633,024.39 N/A
Primary Tower TOWER $1,283,100.00 $499,334.00 $175,000.98
Weather Delays, Additional Charges $8,000.00 $8,000.00 See related invoices and daily worksheets from Coast to Coast; 1/3 share of cost $7,066.66 N/A
Tall Tower (greater than 500') $210,500.00 $153,601.00 Costs of this activity is shared between WAVY, WVBT, & WNLO-CD. One third is allocated to WNLO-CD. See Coast to Coast proposal #05211901T. $153,601.00 N/A
Serious tower reinforcement/modifications $1,052,000.00 $333,333.00 The tower modification costs allowed for serious modifications are shared among 3 stations WAVY, WVBT, & WNLO-CD. $10,000.00 N/A
Structural engineering tower load study for well documented tower $12,600.00 $4,400.00 Cost of this activity is shared between WAVY, WVBT, & WNLO-CD. This is WNLO-CD share only. $4,333.32 N/A

Components

Actual Information Description File Name
Weather Delays, Additional Charges

Component Description:
Weather delays and additional work, 1/3 share of cost
Amount:
$3,156.66

Component Description:
Weather delays, 1/3 share of cost
Amount:
$3,910.00
Tall Tower (greater than 500')

Component Description:
Antenna installation services, balance due
Amount:
$6,649.00

Component Description:
Antenna installation services, installment #5, shared cost with WAVY and WVBT
Amount:
$25,000.00

Component Description:
Antenna installation services, installment #4, shared cost with WAVY and WVBT
Amount:
$15,000.00

Component Description:
Antenna installation services, installment #1, shared cost with WAVY and WVBT
Amount:
$53,760.34

Component Description:
Antenna installation services, installment #3, shared cost with WAVY and WVBT
Amount:
$15,000.00

Component Description:
Antenna installation services, installment #2, shared cost with WAVY and WVBT
Amount:
$38,191.66
Serious tower reinforcement/modifications

Component Description:
Deposit as agreed per Nexstar Commitment Letter and Coast to Coast Tower Service
Amount:
$10,000.00
Structural engineering tower load study for well documented tower

Component Description:
Tower top plate analysis, 1/3 share of cost
Amount:
$666.66

Component Description:
Structural analysis, 1/3 share of cost
Amount:
$833.34

Component Description:
Structural analysis, 1/3 share of cost
Amount:
$1,166.66

Component Description:
Structural analysis, 1/3 share of cost
Amount:
$1,666.66

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $47,430.00 $65,000.00 N/A $39,014.25 N/A
Total for all systems $2,444,310.98 $1,362,442.28 N/A $633,024.39 N/A
Outside Professional Services $47,430.00 $65,000.00 $39,014.25
Minor Modification of CP Application $2,500.00 $2,500.00 Modification required; see Osborn invoice 34182 $2,500.00 N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A N/A N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,500.00 N/A $775.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A N/A N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $2,800.00 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A N/A N/A
Project management of the transition $14,220.00 $33,750.00 This is a complex project with three stations on a single tower with multiple phase assignments. We have estimated WNLO-CD's portion of the total project management cost to be 225 hours each at a rate of $150/hr. $32,314.25 N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A $625.00 N/A

Components

Actual Information Description File Name
Minor Modification of CP Application

Component Description:
Project management services 4.27.19 through 5.31.19
Amount:
$2,500.00
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare request for Special Temporary Authorization

Component Description:
Prepare STA
Amount:
$775.00
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application Information not provided.
Perform engineering study for new channel assignment and antenna development

Component Description:
Information gathering, creation of transition plan with definition of initial equipment and service needs.
Amount:
$350.00

Component Description:
Repack plan and revision, 399 form info
Amount:
$700.00

Component Description:
Revise and update 399 form
Amount:
$525.00

Component Description:
Revise storyboard, interference study, create CP and recalculate ERP if COR changed, transition plan document, create 399, coverage maps, & upload draft documents to ASANA.
Amount:
$1,225.00
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Prepare and or review reimbursement form Information not provided.
Project management of the transition

Component Description:
Project management services
Amount:
$316.00

Component Description:
Project management services May 2020
Amount:
$55.00

Component Description:
Project management services Dec 2019
Amount:
$70.00

Component Description:
Project management of the transition professional services from October 4, 2017 through April 27, 2018 including services provided by consultants Kessler and Gehman Associates, Inc.
Amount:
$1,695.00

Component Description:
Project management services Feb 2020
Amount:
$170.00

Component Description:
Project management services
Amount:
$619.00

Component Description:
Project management services Jun 2019
Amount:
$130.00

Component Description:
Project management services 10.27.18 through 12.31.18
Amount:
$275.00

Component Description:
Project management of the transition professional services from May 26, 2018 through June 29, 2018 including services provided by consultants Kessler and Gehman Associates, Inc.
Amount:
$150.00

Component Description:
Project management services
Amount:
$4,278.50

Component Description:
Project management services
Amount:
$158.00

Component Description:
Project management services
Amount:
$474.00

Component Description:
Project management services 9.29.18 through 10.26.18
Amount:
$225.00

Component Description:
RF Consulting Services
Amount:
$19,278.75

Component Description:
Project management services
Amount:
$316.00

Component Description:
Project management services
Amount:
$316.00

Component Description:
Project management services March 2019
Amount:
$32.50

Component Description:
Project management services 6.1.19 through 6.28.19
Amount:
$150.00

Component Description:
Project management services February 2019
Amount:
$123.50

Component Description:
Project management services
Amount:
$466.00

Component Description:
Project management services
Amount:
$782.00

Component Description:
Project management services
Amount:
$150.00

Component Description:
Project management services
Amount:
$250.00

Component Description:
Project management services
Amount:
$1,350.00

Component Description:
Project management services 3.30.19 through 4.26.19
Amount:
$150.00

Component Description:
Project management services Apr 2020
Amount:
$50.00

Component Description:
Project management services 1.1.19 through 1.31.19
Amount:
$600.00
Prepare engineering section of FCC Form 2100 (main), License to Cover Application

Component Description:
Prepare License to Cover application
Amount:
$625.00

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $52,175.00 $46,570.00 N/A $37,868.57 N/A
Total for all systems $2,444,310.98 $1,362,442.28 N/A $633,024.39 N/A
Other Expenses $52,175.00 $46,570.00 $37,868.57
DTV Medical Facility Notification $11,550.00 $6,000.00 N/A $4,851.20 N/A
Equipment Delivery and Handling Charges $21,500.00 $21,500.00 See related invoices. $21,217.12 N/A
Land Mobile Facilities Notification $9,985.00 $9,985.00 See DTV Notification EST-001702 $9,985.00 N/A
MVPD Notification of Channel Change $3,000.00 $3,000.00 See Attached MVPD Notification Quote. N/A N/A
Equipment Storage $1,000.00 $1,000.00 N/A $531.66 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $2,500.00 $2,500.00 N/A $1,283.59 N/A
Local Zoning $1,000.00 $1,000.00 N/A N/A N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $190.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 N/A N/A N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,070.00 N/A N/A N/A

Components

Actual Information Description File Name
DTV Medical Facility Notification

Component Description:
Second notification of medical facilities
Amount:
$2,425.60

Component Description:
Notification of medical facilities
Amount:
$2,425.60
Equipment Delivery and Handling Charges

Component Description:
Antenna shipping cost, 1/3 share of cost
Amount:
$3,187.12

Component Description:
Transmission line freight, 1/3 share of cost
Amount:
$1,259.16

Component Description:
Transmitter consolidation services
Amount:
$12,676.62

Component Description:
Antenna freight cost, 1/3 share of cost
Amount:
$1,439.16

Component Description:
Combiner freight, 1/3 share of cost
Amount:
$1,214.16

Component Description:
Transmitter control system shipping; 1/3 shared cost with WAVY and WVBT
Amount:
$40.11

Component Description:
Antenna shipping cost, 1/3 share of cost
Amount:
$1,400.79
Land Mobile Facilities Notification

Component Description:
Land Mobile Facilities Notification pursuant to FCC Construction Permit requirement
Amount:
$9,985.00
MVPD Notification of Channel Change Information not provided.
Equipment Storage

Component Description:
Transmission line storage, 1/3 share of cost
Amount:
$531.66
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
Dumpster, 1/3 share of cost
Amount:
$156.49

Component Description:
Dumpster, 1/3 share of cost
Amount:
$1,127.10
Local Zoning Information not provided.
FCC Filing Fees - Special Temporary Authorization request Information not provided.
FCC Filing Fees - Form 2100 license to cover application Information not provided.
FCC Filing Fees - Form 2100 minor change CP application Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $2,444,310.98 $1,362,442.28 $633,024.39

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. Yes
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. Yes

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Elizabeth Ryder

General Counsel


03/10/2022

Certification

Back to Top
Section Question Response
Submission of Final Allocation or Accounting Information Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  2. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  3. The above-named entity certifies that all costs identified as "actual costs" herein accurately represent the costs actually paid by the above-named entity, including any discounts, refunds, or rebates.

  4. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  5. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  6. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Elizabeth Ryder

General Counsel


03/10/2022

Attachments

Back to Top