Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
UNIVISION ATLANTA LLC Doing Business As: UNIVISION ATLANTA LLC |
CHRISTOPHER G. WOOD 5999 CENTER DRIVE LOS ANGELES, CA 90045 United States |
+1 (310) 348-3600 | CWOOD@UNIVISION.NET | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Gregory Scott Coburn Director Next Gen TV Univision Communications Inc |
5999 Center Drive Los Angeles, CA 90045 United States |
+1 (304) 952-8816 | gcoburn@univision.net |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Move from Channel 17 to post repack channel 35. Move the transmission site because there was no frequency available to achieve coverage of the markett post repack |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | CU100B | |
Year | 2010 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TMU9-2 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.2 kW | |
Justification for New Transmitter | New transmitter required as the old transmitter does not have enough power to achieve the desired contour. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | Yes | |
Description | Install electrical service at new transmitter site. Test, Comission and place generator in service | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | Other | |
Other Size | 3 tons | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Maskfilter |
New mask filter required |
RF Interconect |
Rigid line, clamps, and tunable elbow |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | ALP12M-17-PL | |
Year | 2009 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
ERP: | 13.5 kW | |
Manufacturer | ||
Model | ALP12-35-PLE | |
Year | 2019 | |
Justification for New Antenna | new antenna need at new site to achieve required contours. An elliptically polarized antenna was purchased, however only the expense for a horizontally polarized antenna is sought for reimbursement. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
OTA reciever |
Katherine Antenna 1469B WUVG-DT receives its signal from the FP station OTA. |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | unknown |
Type | Rigid | |
Diameter | 4 1/16 inches | |
Segment Length | Broadband | |
Number of parallel runs | 1 | |
Length | 650 feet per run |
Name | Description |
---|---|
Dehydrator and TX line |
Dehydrator and 90 degree elbow |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1019528 | |
Coordinates (NAD83) | Latitude (NAD83) | 34° 07' 32.0" N- |
Longitude (NAD83) | 083° 51' 32.0" W- | |
Overall Structure Height | 1764.74 feet | |
Support Structure Height | 1689.94 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 889.75 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | IWG Towers Assets II, LLC | |
Date Constructed | 08/17/1984 |
Facility ID | Call Sign | Service |
---|---|---|
23960 | WSB-TV | DTV |
59970 | WSRV | FM |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Mount new antennas |
Mounting of the Channel 35 antenna, OTA receive antenna at Athens Country Club Location |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 120 | |
Explanation | Station is not staffed to perform project management | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
FCC Filing Fee - construction permit - aux |
FCC Filing Fee - construction permit (aux) |
Flowery Branch Generator Removal |
Cost associated with removal of Generator from Flowery Branch location |
Flowery Branch Site Demolition |
Costs associated with the removal of old transmission, antenna and generator from Flowery Branch site |
Internal Labor |
Internal Univision Labor directly associated with Repack |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $129,731.32 | $103,142.87 | N/A | $103,142.87 | N/A |
Total for all systems | $433,784.94 | $446,324.96 | N/A | $446,324.96 | N/A |
Primary Transmitter TMU9-2 | $129,731.32 | $103,142.87 | $103,142.87 | ||
RF Interconect | $5,359.32 | $5,359.32 | N/A | $5,359.32 | Cover letter added to explain multiple Station ID on invoices |
Maskfilter | $7,032.00 | $7,032.00 | N/A | $7,032.00 | N/A |
Transmitter Building Site Survey/Installation | $10,000.00 | $14,145.00 | includes rtax | $14,145.00 | N/A |
Other Electrical Service: Install electrical service at new transmitter site. Test, Comission and place generator in service | $23,340.00 | $23,340.00 | PO64091. Electrical Work for new transmitter installation | $23,340.00 | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $53,266.55 | N/A | $53,266.55 | N/A |
Other -- HVAC Service Type: C Size:3 (Other) | $0.00 | $0.00 | HVAC in transmitter site | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
RF Interconect | |
Maskfilter | |
Transmitter Building Site Survey/Installation | |
Other Electrical Service: Install electrical service at new transmitter site. Test, Comission and place generator in service | |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | |
Other -- HVAC Service Type: C Size:3 (Other) |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $16,663.82 | $15,532.55 | N/A | $15,532.55 | N/A |
Total for all systems | $433,784.94 | $446,324.96 | N/A | $446,324.96 | N/A |
Primary Antenna ALP12-35-PLE | $16,663.82 | $15,532.55 | $15,532.55 | ||
UHF-Low Power, Side Mount, Slotted Coaxial, 13.5kW input, Elliptical | $9,983.91 | $9,983.91 | ***System Notice: Estimate adjusted and locked because line has been superseded.***New antenna required to meet new frequency and contours. Transmitter and antenna location had to be moved because no clear channel was available in the original location. Price estimate includes H Pol only, Inv 53415, 37281 & quotes | $9,983.91 | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $4,598.73 | N/A | $4,598.73 | See PO54308 uploaded in attachments line 61 and 63 |
OTA reciever | $949.91 | $949.91 | N/A | $949.91 | mounting kit |
Actual Information Description | File Name |
---|---|
UHF-Low Power, Side Mount, Slotted Coaxial, 13.5kW input, Elliptical | |
Sweep test of transmission line and antenna | |
OTA reciever |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $5,894.07 | $5,894.07 | N/A | $5,894.07 | N/A |
Total for all systems | $433,784.94 | $446,324.96 | N/A | $446,324.96 | N/A |
Primary Transmission Line | $5,894.07 | $5,894.07 | $5,894.07 | ||
Dehydrator and TX line | $5,894.07 | $5,894.07 | N/A | $5,894.07 | N/A |
Actual Information Description | File Name |
---|---|
Dehydrator and TX line |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $180,340.00 | $184,990.00 | N/A | $184,990.00 | N/A |
Total for all systems | $433,784.94 | $446,324.96 | N/A | $446,324.96 | N/A |
Primary Tower TOWER | $180,340.00 | $184,990.00 | $184,990.00 | ||
Tower Rigging Tall Tower (greater than 500') | $157,750.00 | $162,400.00 | Decommission antenna and line at Flowery Branch site | $162,400.00 | N/A |
Mount new antennas | $22,590.00 | $22,590.00 | Mount Chan 35 antenna and OTA receiver at Athens Country Club site | $22,590.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Tall Tower (greater than 500') | |
Mount new antennas |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $30,705.00 | $66,619.74 | N/A | $66,619.74 | N/A |
Total for all systems | $433,784.94 | $446,324.96 | N/A | $446,324.96 | N/A |
Outside Professional Services | $30,705.00 | $66,619.74 | $66,619.74 | ||
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $0.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $0.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $0.00 | based on fees charged for similar re-pack stations | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $250.00 | based on fees for similar repack station | $250.00 | N/A |
Prepare request for Special Temporary Authorization | $1,280.00 | $0.00 | N/A | N/A | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,000.00 | N/A | $1,000.00 | N/A |
Form 399 assistance or other Program Management costs | $0.00 | $0.00 | based on fees for similar repack stations | $0.00 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $0.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $3,000.00 | N/A | $3,000.00 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $0.00 | based on fees charged for work on similar re-pack stations | N/A | N/A |
Project management of the transition | $12,660.00 | $62,369.74 | The project was complicated because the transmitter site had to move to avoid interference with a protected signal. Project managers have submitted PO's that provide a better estimate. see PO 50959, 57894, 51546, 64207 | $62,369.74 | N/A |
Actual Information Description | File Name |
---|---|
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | Information not provided. |
Perform engineering study for displacement application | |
Form 399 assistance or other Program Management costs | Information not provided. |
Prepare/ Review 399 reimbursement form | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $70,450.73 | $70,145.73 | N/A | $70,145.73 | N/A |
Total for all systems | $433,784.94 | $446,324.96 | N/A | $446,324.96 | N/A |
Other Expenses | $70,450.73 | $70,145.73 | $70,145.73 | ||
Internal Labor | $22,015.73 | $22,015.73 | Internal Univision Labor directly associated with Repack | $22,015.73 | N/A |
Flowery Branch Site Demolition | $29,915.00 | $29,915.00 | Demolition, removal and clean up of WVUG0DRT transmission, electrical and generator from the Flowery Branch Site. | $29,915.00 | N/A |
FCC Filing Fee - construction permit - aux | $0.00 | $0.00 | Category not required | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $805.00 | Displacement Application Fee. | $805.00 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $10,790.00 | $10,790.00 | Demo and Disposal of FLO TV equipment at Athens Country Club to make room for WUVG-DRT equipment | $10,790.00 | N/A |
Flowery Branch Generator Removal | $6,620.00 | $6,620.00 | N/A | $6,620.00 | N/A |
Actual Information Description | File Name |
---|---|
Internal Labor | |
Flowery Branch Site Demolition | |
FCC Filing Fee - construction permit - aux | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
Flowery Branch Generator Removal |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $433,784.94 | $446,324.96 | $446,324.96 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jose Franchi VP Finance 03/01/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jose Franchi VP Finance 03/01/2022 |