Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
UNIMAS FRESNO LLC Doing Business As: UNIMAS FRESNO LLC |
Christopher G. Wood 5999 CENTER DRIVE LOS ANGELES, CA 90045 United States |
+1 (310) 348-3600 | CWOOD@UNIVISION.NET | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Gregory Scott Coburn Director Next Gen TV Univision Communications Inc |
5999 Center Drive Los Angeles, CA 90045 United States |
+1 (304) 952-8816 | gcoburn@univision.net |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Transition from Chan 41 to Chan 31. Replace Transmitter, Mask Filter and Antenna. Utilize same tower site. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | DT835A | |
Year | 2002 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TMU9-3 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.8 kW | |
Justification for New Transmitter | Existing transmitter is not capable of operating at the necessary power level for the assigned post auction channel |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Primary Transmitter Installation |
Primary Transmitter Installation |
Channel 31 Mask Filter |
Existing mask filter cannot operate on post auction channel |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | AL16M6HSER-41 | |
Year | 2002 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 1 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 862.00 MHz | |
Design power capacity in use | 58.0 % | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | 75010211 | |
Year | 2019 | |
Justification for New Antenna | Required to meet new contour and frequency |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Power Dividers | Does the panel antenna require power dividers? | No |
Cable Harness | Does the panel antenna require cable harness? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | ERI / Andrew |
Type | Rigid | |
Diameter | 3 1/8 inches | |
Segment Length | 19 1/2 inches | |
Number of parallel runs | 1 | |
Length | 190 feet per run |
Name | Description |
---|---|
Retune Existing Line |
Retune existing 3 1/8 line channel |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | No | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
Coordinates (NAD83) | Latitude (NAD83) | 37° 04' 28.8" N- |
Longitude (NAD83) | 119° 25' 54.4" W- | |
Overall Structure Height | 175.00 feet | |
Support Structure Height | 160.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 4632.00 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | Univision | |
Date Constructed | 03/19/1970 |
Users |
---|
LMR |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study need for guyed or free-standing tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 120 | |
Explanation | Local Station is not staffed tp perform Antenna, Transmitter replacement or tower work | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
Transition timing and coordination |
Transition timing and coordination |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
601 Internal Labor |
Work hours applied by Univision employees for Repack |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $107,091.92 | $92,862.16 | N/A | $92,862.16 | N/A |
Total for all systems | $224,266.68 | $163,022.14 | N/A | $163,022.14 | N/A |
Primary Transmitter TMU9-3 | $107,091.92 | $92,862.16 | $92,862.16 | ||
Channel 31 Mask Filter | $7,177.00 | $7,177.00 | N/A | $7,177.00 | N/A |
Primary Transmitter Installation | $5,914.92 | $5,914.92 | Please see KTFF-LD Primary Transmitter - Installation Budget Revision Justification Letter | $5,914.92 | N/A |
Transmitter Building Site Survey/Installation | $10,000.00 | $14,532.50 | Quotes from Vendors | $14,532.50 | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $65,237.74 | Initial estimate was made from quote191593.1 dated 28 Sep 2019 and PO 65063. taxes $5237.74 were not known until the invoices were received. | $65,237.74 | Sub total includes $1500.00 in freight and $5237.74 in taxes as shown on Invoice 9500114071. these amounts were not included in the original quote. This amount is reflected in PO 65063. |
Actual Information Description | File Name |
---|---|
Channel 31 Mask Filter | |
Primary Transmitter Installation | |
Transmitter Building Site Survey/Installation | |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $7,480.00 | $1,613.05 | N/A | $1,613.05 | N/A |
Total for all systems | $224,266.68 | $163,022.14 | N/A | $163,022.14 | N/A |
Primary Antenna 75010211 | $7,480.00 | $1,613.05 | $1,613.05 | ||
Sweep test of transmission line and antenna | $5,730.00 | $62.50 | N/A | $62.50 | N/A |
UHF Broadband panel antenna (per panel), horizontally-polarized | $1,750.00 | $1,550.55 | now includes $1495.00 for the antenna and $55.55 of shipping charges | $1,550.55 | Sub total includes $55.55 in shipping charges that were not known at the time of the quote. |
Actual Information Description | File Name |
---|---|
Sweep test of transmission line and antenna | |
UHF Broadband panel antenna (per panel), horizontally-polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $0.00 | $0.00 | N/A | $0.00 | N/A |
Total for all systems | $224,266.68 | $163,022.14 | N/A | $163,022.14 | N/A |
Primary Transmission Line | $0.00 | $0.00 | $0.00 | ||
Retune Existing Line | $0.00 | $0.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $64,890.00 | $26,159.50 | N/A | $26,159.50 | N/A |
Total for all systems | $224,266.68 | $163,022.14 | N/A | $163,022.14 | N/A |
Primary Tower GTOWER | $64,890.00 | $26,159.50 | $26,159.50 | ||
Study needed for guyed or free-standing tower | $8,700.00 | $6,500.00 | N/A | $6,500.00 | N/A |
Tower Rigging Short Tower (less than 500') | $56,190.00 | $19,659.50 | N/A | $19,659.50 | N/A |
Actual Information Description | File Name |
---|---|
Study needed for guyed or free-standing tower | |
Tower Rigging Short Tower (less than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $33,205.00 | $30,657.67 | N/A | $30,657.67 | N/A |
Total for all systems | $224,266.68 | $163,022.14 | N/A | $163,022.14 | N/A |
Outside Professional Services | $33,205.00 | $30,657.67 | $30,657.67 | ||
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $0.00 | Estimate based on fees for similar repacked stations | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $0.00 | Estimate based on fees charged for similar repacked stations | N/A | N/A |
Form 399 assistance or other Program Management costs | $0.00 | $0.00 | based on fees for similar repacked stations | N/A | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $0.00 | Estimate based on fees charged for similar repacked stations | N/A | N/A |
Prepare request for Special Temporary Authorization | $1,280.00 | $0.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $0.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $0.00 | Based on billed amounts for similar work on other repack stations | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $0.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $0.00 | N/A | N/A | N/A |
Project management of the transition | $12,660.00 | $25,730.58 | Received Purchase Orders from the Project Managers involved in the repack that provide an accurate estimate. The location of the tower offered additional complexity to the project and PM services. See PO 557894, 64207, 59980, 50959, 511546, 54308 | $25,730.58 | N/A |
Transition timing and coordination | $2,500.00 | $2,500.00 | Coordination between Co-located broadcasters to resolve mutual exclusive channel displacement application. See Agreement and PO58748 | $2,500.00 | N/A |
Perform engineering study for displacement application | $1,800.00 | $2,427.09 | LMR band search and Channel 14 displacement | $2,427.09 | N/A |
Actual Information Description | File Name |
---|---|
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Form 399 assistance or other Program Management costs | Information not provided. |
Prepare/ Review 399 reimbursement form | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Project management of the transition | |
Transition timing and coordination | |
Perform engineering study for displacement application |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $11,599.76 | $11,729.76 | N/A | $11,729.76 | N/A |
Total for all systems | $224,266.68 | $163,022.14 | N/A | $163,022.14 | N/A |
Other Expenses | $11,599.76 | $11,729.76 | $11,729.76 | ||
FCC Filing Fees - Special Temporary Authorization request | $305.00 | $400.00 | Had to file and STA and and STA extension | $400.00 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $370.00 | Based on actual receipts | $370.00 | N/A |
601 Internal Labor | $10,959.76 | $10,959.76 | N/A | $10,959.76 | N/A |
Actual Information Description | File Name |
---|---|
FCC Filing Fees - Special Temporary Authorization request | |
FCC Filing Fees - Form 2100 license to cover application | |
601 Internal Labor |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $224,266.68 | $163,022.14 | $163,022.14 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jose Franchi VP Finance 02/24/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jose Franchi VP Finance 02/24/2022 |