Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
19183
Service:
DTV
Call Sign:
WZVN-TV
Channel:
28 (UHF)
File Number:
0000028624
FRN:
0001733518
Date Submitted:
02/28/2022

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

Montclair Communications, Inc.

Doing Business As: Montclair Communications, Inc.

Lara W. Kunkler

101 Devon Rd.

Charlottesville, VA 22903

United States

+1 (239) 841-1706 kunk@water.net Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Matthew Gaige

Chief Engineer

Waterman Broadcasting

3719 Central Ave

Ft Myers, FL 33901

United States

+1 (239) 292-9249 mattg@water.net

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan Replace current channel 41 TX with a new channel 28 TX. Encode ABC with WBBH and broadcast on the WBBH signal. Install temporary antenna. Remove old top mount antenna. Transition to new to new E pol to mount antenna when install completed..

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Leased
Owner Waterman Broadcasting, LLC
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model DCX-2H
Year 2002
Type Inductive Output Tube
IOT Power Type Two
Power Capacity 40 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model PRLX U24 D28
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 40 kW
Justification for New Transmitter Manufacturer will not retune current transmitter. This purchase represents "Like for Like" replacement to ensure operations maintain current flexibility. See attachment "WZVN 399 Cost Estimate Questions and Answers" for further explanation.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service Yes
Description Onsite electrical contractor estimate for all electrical work needed to install the new transmitter.
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 10 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Transmitter offloading

The estimated cost to offload and place the new transmitter in our building.

State Sales Tax

State sales tax levied on equipment at 6 percent.

Remote control rebuild

Rebuild remote control system to work with new transmitter.

Transmitter Shipping

The estimated cost of shipment for the new transmitter to our facility.

Primary Transmitter - Other Expenses

Primary Transmitter - Other Expenses

Temporary storage

Temporary storage of new transmitter, filters, combiner, heat exchangers and associated hardware.

Primary Transmitter - HVAC Concrete Pad

Primary Transmitter - HVAC Concrete Pad

Surge Suppressor

Replacement of current surge suppression with system suitable for the solid state transmitter.

Primary Transmitter Installation

Primary Transmitter Installation

Current transmitter removal

Disassemble current transmitter, filters, combiner, heat exchangers, piping, etc. Remove from site.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Add Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Leased
Owner Waterman Broadcasting, LLC
Site N/A
Is this antenna currently shared with any other stations? Yes
Is this antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Broadband Panel
Number of Stations Supported 2
Number of Panels 56
Design power capacity in use 80.0 %
Lower Limit 476.00 MHz
Upper Limit 638.00 MHz
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model ABBP14H3-HTP4-15/41
Year 2002

Facility ID's and Call Signs of all stations with whom the antenna is shared.

Facility ID Call Sign
71085 WBBH-tv

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Leased
Owner Waterman Broadcasting, LLC
Is antenna shared? Yes
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Broadband Panel
Number of Stations Supported 2
Number of Panels/Bays 42
Lower Limit 476.00 MHz
Upper Limit 560.00 MHz
Design power capacity in use 70.0 %
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model TUM30-P4-14/42H-1-R
Year 2018
Justification for New Antenna Current antenna pattern and performance questionable at channel 28. Replace to maintain current performance and upgrade to E Pol for ATSC 3.0. See attachment "WZVN 399 Cost Estimate Questions and Answers" for further explanation.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 2
Frequencies of channels supported RF channel
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? No
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Broadband
Feed Line Size 7 3/16 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Enter a list of RF channel numbers.

RF Channel Number
28
15

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Current Antenna Analysis

Parameter analysis pattern tabulation of current Alan Dick antenna.

State Sales Tax

State sales tax levied on equipment at 6 percent.

Temporary main antenna storage

Portable temporary storage for the new main antenna and associated hardware prior to installation.

New Main Antenna Shipping

Estimated cost to ship new main antenna from Europe,

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Leased
Owner Waterman Broadcasting, LLC
Is antenna shared? Yes
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Broadband Slot
Number of Stations Supported 2
Number of Panels/Bays 24
Lower Limit 470.00 MHz
Upper Limit 698.00 MHz
Design power capacity in use 50.0 %
Other Antenna Type N/A
ERP: 541.0 kW
Manufacturer
Model TFU-24WB C160 CH 14-51
Year 2018
Justification for New Antenna To be used during time the main top mount antenna and line are being changed. This is a Dielectric slotted side mounted antenna. See attachments "exhibit a" and "WZVN 399 Cost Estimate Questions and Answers" for quote and requirement explanation.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? B
Feed Line Size 6 1/8 inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Interim antenna shipment

Estimated cost to ship interim antenna.

State Sales Tax

State sales tax levied on equipment at 6 percent.

Interim Operaton plumbing

This is the cost for in building plumbing hardware and installation to the Interim antenna system.

Temporary interim antenna storage

Portable storage facility for temporary storage of the interim antenna prior to installation.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? Yes
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 7 3/16 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 1
Length 1575 feet per run

Facility ID's and Call Signs of all stations with whom the transmission line is shared.

Facility ID Call Sign
71085 WBBH-TV

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 7 3/16 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 1
Length 1575 feet per run
Justification for New Transmission Line Current transmission line cut and optimized for channels 15 and 41. Will change to line optimized for new channel 28 and 15.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Temporary main TX line storage

Portable temporary storage of the main transmission line before installation.

Shipment of main TX line

Shipment of the main transmission line to our facility.

State sales tax

State sales tax levied on equipment at 6 percent.

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Rigid
Diameter 6 1/8 inches
Segment Length Broadband
Other Segment Length
Number of parallel runs 1
Length 1575 feet per run
Justification for New Transmission Line Needed to stay in operation while permanent line, antenna and ABC transmitter are installed.

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Shipment of interim TX line

Shipment of the interim transmission line to our facility.

State sales tax

State sales tax levied on equipment at 6 percent.

Temporary storage for interim TX line

Portable temporary storage for the interim transmission line prior to installation.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1231697
Coordinates (NAD83) Latitude (NAD83) 26° 49' 22.4" N-
Longitude (NAD83) 081° 45' 53.6" W-
Overall Structure Height 1516.06 feet
Support Structure Height 1457.66 feet
Ground Elevation Above Mean Sea Level (AMSL) 33.14 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner Waterman Broadcasting Corp. of Florida
Date Constructed 09/13/2002

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
71085 WBBH-TV DTV

Other Types of Users

Users
LoJack
EMS

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? Yes

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Information not provided.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 915
Explanation Manage the delivery of new transmitter and RF systems, storage, installation process and disposal of old equipment. Manage tower modifications and line and antenna installation. Processing Form 399.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application No
For Auxiliary Facility N/A
For Main Facility N/A
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review Yes
Environmental Assessment Yes
ASR Modification Yes
FAA Consultation (including preparation of FAA Form 7460) Yes
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers No
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements Yes
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Comark

Site Design Service - On site analysis, layout and drawings for new transmitter and RF system. See attachments "exhibit f" and "WZVN 399 Cost Estimate Questions and Answers" costs already incurred and for further explanation.

DTV Pros

The company will assist with quotations and add efficiency throughout project. See attachments "exhibit a" and "WZVN 399 Cost Estimate Questions and Answers" for further explanation.

Washington Engineering

Antenna pattern analysis and CP for channel 28 and repack consultation. Cohen, Dippell and Everist. P.C. See attachment "WZVN 399 Cost Estimate Questions and Answers" for further explanation.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning Yes
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Comark Training

Training for two company engineers so that transmitter may be maintained to FCC specifications. Same as with current transmitter.

WBBH Transmitter Costs

WBBH was required to change equipment due to WZVN transition

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,763,532.13 $1,448,849.13 N/A $1,428,192.84 N/A
Total for all systems $5,951,559.72 $5,751,035.11 N/A $4,032,068.29 N/A
Primary Transmitter PRLX U24 D28 $1,763,532.13 $1,448,849.13 $1,428,192.84
Surge Suppressor $8,465.99 $8,465.99 The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. $8,465.99 N/A
Current transmitter removal $20,575.00 $20,575.00 Removal of current transmitter, RF system and cooling system Includes disposal. Per Comark estimate. $20,575.00 N/A
Primary Transmitter Installation $15,090.00 $15,090.00 Please see Hitachi Kokusai Electric Comark LLC quote P#2868-PRLXU24-032217-R11 $14,746.74 N/A
Temporary storage $5,000.00 $5,000.00 N/A N/A N/A
Primary Transmitter - Other Expenses $30,153.91 $30,153.91 Please see Hitachi Kokusai Electric Comark LLC Proposal #P4204R2 $30,153.91 N/A
Transmitter Shipping $17,945.14 $17,945.14 Please see Estimated Cost Justification WZVN-110-1st Primary Transmittere - Shipping v0 $17,945.14 N/A
Remote control rebuild $8,000.00 $8,000.00 Rebuild remote control system to work with new transmitter. $5,308.82 N/A
State Sales Tax $76,065.28 $76,065.28 see Estimated Cost Justification WZVN-110-1st Primary Transmitter - State Sales Tax v1 $76,065.28 N/A
10 Ton system $38,900.00 $37,000.00 N/A $24,378.15 N/A
Other Electrical Service: Onsite electrical contractor estimate for all electrical work needed to install the new transmitter. $63,086.81 $63,086.81 Please see Estimated Cost Justification WZVN-110-1st Primary Transmitter - Other Electrical Service v2 $63,086.81 N/A
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW $1,473,000.00 $1,160,217.00 Comark quoted cost. $1,160,217.00 N/A
Primary Transmitter - HVAC Concrete Pad $1,250.00 $1,250.00 Please see TEDCO CORP Proposal dated February 4, 2021 $1,250.00 N/A
Transmitter offloading $6,000.00 $6,000.00 Comark quoted cost. $6,000.00 N/A

Components

Actual Information Description File Name
Surge Suppressor

Component Description:
Trip Charge, Material, Labor - Removed and replaced 3 units. Hot checked.
Amount:
$558.80

Component Description:
PV 200 277/480-3Y
Amount:
$7,907.19
Current transmitter removal

Component Description:
WZVN-110-1st Primary Transmitter - Removal of Existing Transmitter
Amount:
$1,028.75

Component Description:
WZVN-110-1st Primary Transmitter - Removal of Existing Transmitter
Amount:
$9,258.75

Component Description:
Removal of existing transmitters
Amount:
$10,287.50
Primary Transmitter Installation

Component Description:
On site Engineering for RF installation
Amount:
$14,746.74
Temporary storage Information not provided.
Primary Transmitter - Other Expenses

Component Description:
CDS WBBH/WZVN MAIN 2HD/3SD ENCODER MUX
Amount:
$15,076.95

Component Description:
CDS WBBH/WZVN Main 2HD/3SD Encoder Mux
Amount:
$15,076.96
Transmitter Shipping

Component Description:
WZVN-110-1st Primary Transmitter - Shipping
Amount:
$847.25

Component Description:
WZVN-110-1st Primary Transmitter - Shipping
Amount:
$7,625.25

Component Description:
Broadcast Television Transmitter Appointment Delivery
Amount:
$1,000.14

Component Description:
Transmitter Transportation
Amount:
$8,472.50
Remote control rebuild

Component Description:
BURK IU IP-BASED TRANSMITTER R/C
Amount:
$5,308.82
State Sales Tax

Component Description:
Taxes
Amount:
$36,059.36

Component Description:
WZVN-110-1st Primary Transmitter - State Sales Tax
Amount:
$35,838.69

Component Description:
WZVN-110-1st Primary Transmitter - State Sales Tax
Amount:
$4,167.23
10 Ton system

Component Description:
Universal Programmable Ethernet Thermostat
Amount:
$537.15

Component Description:
The installation of one (1) new Trane 7.5 Ton A/C system
Amount:
$23,841.00
Other Electrical Service: Onsite electrical contractor estimate for all electrical work needed to install the new transmitter.

Component Description:
Extended wires rdp1 to rdp2. Ran start up tests on transmitters with line and generator power.
Amount:
$886.68

Component Description:
Installed tower XFMR, tied in (2) 150 KVA XFMR's and repaired conductor
Amount:
$1,828.16

Component Description:
ATS and battery compartment replacement
Amount:
$19,078.27

Component Description:
Electrical costs: R FUSE REDUCER
Amount:
$14,240.36

Component Description:
Provided power for A/H and A/C. Bond to HALO
Amount:
$7,021.00

Component Description:
Trip Charge, 4SQ Box, 1/2' Mud Ring
Amount:
$248.34

Component Description:
Replaced Transmitter #2 Reworked piping
Amount:
$19,784.00
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW

Component Description:
System, WZVN PRLX U24 D28
Amount:
$522,097.65

Component Description:
SYSTEM, WZVN PRLX U24 D28; TV Transmitter Installation; Transmitter Proof of Performance; Removal of Existing DCX-2 IOT Transmitter; Transportation/Offloading
Amount:
$580,108.50

Component Description:
System, WZVN PRLX U24
Amount:
$58,010.85
Primary Transmitter - HVAC Concrete Pad

Component Description:
Form and pour 6-0 x 6-0 concrete pad.
Amount:
$1,250.00
Transmitter offloading

Component Description:
Transmitter Offloading
Amount:
$3,000.00

Component Description:
WZVN-110-1st Primary Transmitter - Transmitter Offloading
Amount:
$300.00

Component Description:
WZVN-110-1st Primary Transmitter - Transmitter Offloading
Amount:
$2,700.00

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,396,979.65 $1,287,769.65 N/A $578,048.43 N/A
Total for all systems $5,951,559.72 $5,751,035.11 N/A $4,032,068.29 N/A
Interim Antenna TFU-24WB C160 CH 14-51 $456,300.00 $454,120.00 $158,612.20
Temporary interim antenna storage $5,000.00 $5,000.00 N/A N/A N/A
Interim Operaton plumbing $20,000.00 $20,000.00 Additional transmission line plumbing and labor for temporary operation. N/A N/A
State Sales Tax $12,720.00 $12,720.00 State sales tax on interim antenna related equipment. $7,780.20 N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $22,000.00 N/A N/A N/A
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) $13,700.00 $13,000.00 Interim antenna elbow complex. $8,937.60 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 Sweep testing of interim antenna. $6,400.00 N/A
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 541 kW input, directional,, horizontally polarized $357,000.00 $357,000.00 Dielectric side mount 24 bay antenna including installation. $135,494.40 N/A
Interim antenna shipment $18,000.00 $18,000.00 N/A N/A N/A
Primary Antenna TUM30-P4-14/42H-1-R $940,679.65 $833,649.65 $419,436.23
New Main Antenna Shipping $25,000.00 $25,000.00 Estimated cost for shipment of Alan Dick antenna from the UK. N/A N/A
Temporary main antenna storage $5,000.00 $5,000.00 N/A N/A N/A
State Sales Tax $30,165.00 $30,165.00 Estimated state sales tax for primary antenna related equipment. $18,785.48 N/A
Current Antenna Analysis $4,734.65 $4,734.65 see Estimated Cost Justification WZVN-210-Primary Antenna - Existing Antenna Analysis v0 $4,734.65 N/A
Elbow complex, broadband, at antenna input, per 7 3/16. feedline (if needed) $16,850.00 $16,000.00 New main antenna elbow complex. $13,356.00 N/A
New combiner, cost per channel (without antenna) $84,200.00 $48,750.00 Comark quoted combiner cost for channel 15 and channel 28. N/A N/A
Sweep test of existing antenna $6,730.00 $6,400.00 Sweep testing of new antenna. $6,400.00 N/A
UHF - High Power Top Mount (200-1000 kW), Two Station broadband panel antenna, elliptically or circularly polarized $768,000.00 $697,600.00 Alan Dick quoted E Pol panel antenna replacement including installation. $376,160.10 N/A

Components

Actual Information Description File Name
Temporary interim antenna storage Information not provided.
Interim Operaton plumbing Information not provided.
State Sales Tax

Component Description:
WZVN-210-Primary Antenna - State Sales Tax
Amount:
$3,734.50

Component Description:
WZVN-280-Interim Antenna - State Sales Tax
Amount:
$4,045.70
Side mount brackets for high power antennas (if not included in antenna base cost) Information not provided.
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed)

Component Description:
WZVN-280-Interim Antenna - Elbow Complex, Broadband, 6 1/8"
Amount:
$4,468.80

Component Description:
Interim Antenna, Elbow Complex
Amount:
$4,468.80
Sweep test of existing antenna

Component Description:
WZVN-280-Interim Antenna - Sweep Test
Amount:
$6,400.00
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 541 kW input, directional,, horizontally polarized

Component Description:
WZVN-280-Interim Antenna - UHF High Power Side Mount Antenna, H-POL
Amount:
$57,772.80

Component Description:
WZVN-280-Interim Antenna - UHF High Power Side Mount Antenna, H-POL
Amount:
$19,948.80

Component Description:
Interim Antenna
Amount:
$57,772.80
Interim antenna shipment Information not provided.
New Main Antenna Shipping Information not provided.
Temporary main antenna storage Information not provided.
State Sales Tax

Component Description:
Florida Sales Tax
Amount:
$9,688.58

Component Description:
sales tax to the State of Florida
Amount:
$9,096.90
Current Antenna Analysis

Component Description:
Antenna System checkout - 1 Work Day
Amount:
$4,734.65
Elbow complex, broadband, at antenna input, per 7 3/16. feedline (if needed)

Component Description:
WZVN-210-Primary Antenna - Elbow Complex, Broadband, 7 3/16"
Amount:
$2,671.20

Component Description:
WZVN-210-Primary Antenna - Elbow Complex, Broadband, 7 3/16"
Amount:
$5,342.40

Component Description:
Primary Antenna, Elbow Complex
Amount:
$5,342.40
New combiner, cost per channel (without antenna) Information not provided.
Sweep test of existing antenna

Component Description:
WZVN-210-Primary Antenna - Sweep Test
Amount:
$1,280.00

Component Description:
Primary Antenna - Sweep Test
Amount:
$2,560.00

Component Description:
WZVN-210-Primary Antenna - Sweep Test
Amount:
$2,560.00
UHF - High Power Top Mount (200-1000 kW), Two Station broadband panel antenna, elliptically or circularly polarized

Component Description:
UHF - HIGH POWER TOP MOUNT (200-1000 KW)
Amount:
$88,734.90

Component Description:
UHF high power top mount
Amount:
$143,712.60

Component Description:
UHF - HIGH POWER TOP MOUNT (200-1000KW)
Amount:
$143,712.60

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $994,144.90 $951,619.90 N/A $406,697.28 N/A
Total for all systems $5,951,559.72 $5,751,035.11 N/A $4,032,068.29 N/A
Interim Transmission Line $399,397.70 $382,072.70 $17,378.70
State sales tax $20,880.00 $20,880.00 State sales tax for interim line related equipment. N/A N/A
Shipment of interim TX line $8,117.70 $8,117.70 see Estimated Cost Justification WZVN-380-Interim Transmission Line - Shipping v0 $8,117.70 N/A
Rigid Transmission Line - copper, 6 1/8" broadband $365,400.00 $348,075.00 N/A $9,261.00 N/A
Temporary storage for interim TX line $5,000.00 $5,000.00 N/A N/A N/A
Primary Transmission Line $594,747.20 $569,547.20 $389,318.58
Rigid Transmission Line - copper, 7 3/16" broadband $524,475.00 $499,275.00 N/A $335,388.07 N/A
State sales tax $30,000.00 $30,000.00 State sales tax on new main line related equipment. $14,618.31 N/A
Shipment of main TX line $35,272.20 $35,272.20 see Estimated Cost Justification WZVN-310-Primary Transmission Line - Shipping v0 $35,272.20 N/A
Temporary main TX line storage $5,000.00 $5,000.00 N/A $4,040.00 N/A

Components

Actual Information Description File Name
State sales tax Information not provided.
Shipment of interim TX line

Component Description:
WZVN-380-Interim Transmission Line - Shipping
Amount:
$8,117.70
Rigid Transmission Line - copper, 6 1/8" broadband

Component Description:
WZVN-380-Interim Transmission Line - Rigid Transmission Line Copper, 6 1/8"", Broadband
Amount:
$9,261.00
Temporary storage for interim TX line Information not provided.
Rigid Transmission Line - copper, 7 3/16" broadband

Component Description:
RIGID TRANSMISSION LINE - COPPER
Amount:
$95,859.16

Component Description:
Rigid transmission line - copper
Amount:
$119,764.44

Component Description:
Rigid transmission line - copper
Amount:
$119,764.47
State sales tax

Component Description:
WZVN-280-Interim Antenna - State Sales Tax
Amount:
$7,185.87

Component Description:
WZVN-310-Primary Transmission Line - State Sales Tax
Amount:
$7,432.44
Shipment of main TX line

Component Description:
WZVN-310-Primary Transmission Line - Shipping
Amount:
$35,272.20
Temporary main TX line storage

Component Description:
WZVN-310-Primary Transmission Line - Temporary Storage for Main Transmission Line
Amount:
$4,040.00

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $511,080.00 $868,432.52 N/A $544,404.52 N/A
Total for all systems $5,951,559.72 $5,751,035.11 N/A $4,032,068.29 N/A
Primary Tower TOWER $511,080.00 $868,432.52 $544,404.52
Minor tower reinforcement/modifications $158,000.00 $479,940.00 Please see Estimated Cost Justification WZVN-410-Existing Primary Tower - Minor Tower Reinforcements_Modifications v0 $159,792.00 N/A
Tall Tower (greater than 500') $210,500.00 $246,512.52 see Estimated Cost Justification WZVN-410-Existing Primary Tower - Tower Equipment and Rigging Costs, Tall Tower v0 $246,512.52 N/A
Tower Helicopter Lift $129,980.00 $129,980.00 Please see Tower Consultants Inc. Change Order Request One $129,980.00 N/A
Structural engineering tower load study for well documented tower $12,600.00 $12,000.00 N/A $8,120.00 N/A

Components

Actual Information Description File Name
Minor tower reinforcement/modifications

Component Description:
Mobilization Invoice
Amount:
$59,922.00

Component Description:
Tower reinforcements/modifications; 1516 ft guyed tower
Amount:
$99,870.00
Tall Tower (greater than 500')

Component Description:
Change Order #2 - Additional Material to support input complex
Amount:
$1,650.00

Component Description:
2 men to help with the tuning of top antenna, troubleshoot the light
Amount:
$2,400.00

Component Description:
WZVN-410-Existing Primary Tower - Tower Equipment and Rigging Costs, Tall Tower
Amount:
$56,040.00

Component Description:
Tower Equipment and Rigging Costs, Tall Tower
Amount:
$93,400.00

Component Description:
Reported Weather Days
Amount:
$28,600.00

Component Description:
Completion Invoice
Amount:
$52,768.00

Component Description:
Conduit
Amount:
$11,654.52
Tower Helicopter Lift

Component Description:
Change Order #1 - Helicopter Pick
Amount:
$64,990.00

Component Description:
Change Order #1 - Helicopter Pick
Amount:
$64,990.00
Structural engineering tower load study for well documented tower

Component Description:
Services rendered by Tower Consultants, Inc. in connection with the initial Analysis Run
Amount:
$8,120.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $429,690.96 $455,816.83 N/A $383,316.83 N/A
Total for all systems $5,951,559.72 $5,751,035.11 N/A $4,032,068.29 N/A
Outside Professional Services $429,690.96 $455,816.83 $383,316.83
Washington Engineering $109,320.96 $109,320.96 The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. $106,670.96 Please see submitted invoices.
DTV Pros $3,500.00 $3,500.00 N/A N/A N/A
Comark $15,300.00 $15,300.00 N/A $15,300.00 N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $80,000.00 N/A $64,200.00 N/A
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase $2,105.00 $2,000.00 N/A N/A N/A
ASR modification (prepare FCC Form 854) $2,105.00 $2,000.00 N/A N/A N/A
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet $10,520.00 $10,000.00 N/A N/A N/A
NEPA Section 106 environmental review, if needed $6,310.00 $6,000.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A N/A N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $2,455.00 The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. $2,440.00 N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $770.00 The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. $470.00 Please see submitted invoices.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $19,367.82 The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. $19,367.82 Invoices
Project management of the transition $144,570.00 $147,802.60 The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. $147,802.60 N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A $765.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $22,576.05 The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. $22,576.05 N/A
Prepare request for Special Temporary Authorization $2,050.00 $3,724.40 The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. $3,724.40 N/A
RF Exposure Measurements $21,050.00 $20,000.00 N/A N/A N/A

Components

Actual Information Description File Name
Washington Engineering

Component Description:
Consulting Engineering Services
Amount:
$1,255.74

Component Description:
Consulting Engineering Services
Amount:
$1,638.82

Component Description:
Consulting Engineering Services
Amount:
$3,609.20

Component Description:
Consulting Engineering Services
Amount:
$6,622.40

Component Description:
Consulting Engineering Services
Amount:
$2,623.20

Component Description:
Consulting Engineering Services
Amount:
$4,627.60

Component Description:
Consulting Engineering Services
Amount:
$1,541.70

Component Description:
Consulting Engineering Services
Amount:
$4,622.70

Component Description:
Consulting engineering services
Amount:
$9,778.20

Component Description:
CAROLYN LYONS
Amount:
$7,638.50

Component Description:
Consulting Engineering Services
Amount:
$4,887.02

Component Description:
WZVN-530-RF Eng - Washington Engineering
Amount:
$4,183.64

Component Description:
N/A
Amount:
N/A

Component Description:
Consulting Engineering Services
Amount:
$987.40

Component Description:
Mailing: Print and Mail a two page, black and white genetically addressed letter with a specifically addressed USPS barcoded route sorted envelope
Amount:
$2,650.00

Component Description:
Professional Services
Amount:
$3,572.50

Component Description:
WZVN-530-RF Eng - Washington Engineering: $2499.20
Amount:
$2,499.20

Component Description:
Professional Services
Amount:
$2,566.08

Component Description:
Consulting Engineering Services
Amount:
$2,305.70

Component Description:
Consulting Engineering Services
Amount:
$3,922.60

Component Description:
Professional Services
Amount:
$3,170.00

Component Description:
Consulting engineering services through April 2019 concerning preliminary study of possible coverage for temporary broadband antenna
Amount:
$1,404.10

Component Description:
Consulting engineering services
Amount:
$1,384.70

Component Description:
Consulting and Engineering Services through October 2019
Amount:
$562.50

Component Description:
Consulting engineering services through July 2019
Amount:
$2,641.80

Component Description:
April 2018
Amount:
$1,384.70

Component Description:
Consulting engineering services
Amount:
$6,169.90

Component Description:
Professional Services
Amount:
$2,510.00

Component Description:
Consulting Engineering Services
Amount:
$516.40

Component Description:
Consulting Engineering Services
Amount:
$3,370.55

Component Description:
Consulting Engineering Services
Amount:
$5,721.21

Component Description:
Consulting Engineering Services
Amount:
$1,619.60

Component Description:
Consulting engineering services
Amount:
$5,768.20

Component Description:
Consulting engineering services through October 2019
Amount:
$1,526.60

Component Description:
Consulting engineering services through June 28, 2018 concerning potential change of antenna manufacturer from Jampro to Dielectric and notification to FCC
Amount:
$5,768.20

Component Description:
Consulting Engineering Services
Amount:
$1,423.20
DTV Pros Information not provided.
Comark

Component Description:
DEPOSIT
Amount:
$3,000.00

Component Description:
System design services/site survey
Amount:
$12,300.00
Comprehensive coverage verification via field study, if needed

Component Description:
Consultation on coverage field strength measurements for WZVN-TV
Amount:
$64,200.00
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase Information not provided.
ASR modification (prepare FCC Form 854) Information not provided.
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet Information not provided.
NEPA Section 106 environmental review, if needed Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees - Negotiation of lease and other matters for shared locations

Component Description:
Professional Services Rendered
Amount:
$600.00

Component Description:
For Professional Services Rendered
Amount:
$135.00

Component Description:
Professional Services Rendered
Amount:
$850.00

Component Description:
WZVN-550-Attorney - Negotiation of Lease and Other Matters: $855.00
Amount:
$855.00
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application

Component Description:
WZVN-550-Attorney- License to Cover: $200.00
Amount:
$200.00

Component Description:
Professional Services Rendered
Amount:
$270.00
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Legal services
Amount:
$4,068.55

Component Description:
Professional Services
Amount:
$866.90

Component Description:
Consulting Engineering Services
Amount:
$6,220.42

Component Description:
Consulting engineering services
Amount:
$3,801.20

Component Description:
Consulting engineering services
Amount:
$4,410.75
Project management of the transition

Component Description:
Project Management
Amount:
$9,050.40

Component Description:
Project Management
Amount:
$5,059.20

Component Description:
Project Management
Amount:
$2,455.20

Component Description:
Project Management
Amount:
$6,057.50

Component Description:
Project Management
Amount:
$2,708.25

Component Description:
Project Management
Amount:
$4,024.85

Component Description:
Project Management
Amount:
$2,820.50

Component Description:
Project Management
Amount:
$3,912.30

Component Description:
Project Management
Amount:
$3,526.85

Component Description:
Project management
Amount:
$1,779.20

Component Description:
Project Management
Amount:
$5,786.65

Component Description:
Project Management
Amount:
$116.25

Component Description:
Project Management
Amount:
$2,244.85

Component Description:
Project Management
Amount:
$4,531.55

Component Description:
Project Management
Amount:
$3,880.40

Component Description:
Project Management
Amount:
$2,132.60

Component Description:
Project Management
Amount:
$6,836.20

Component Description:
Project Management
Amount:
$313.75

Component Description:
Professional services
Amount:
$100.00

Component Description:
Project Management
Amount:
$5,561.40

Component Description:
Project Management
Amount:
$852.50

Component Description:
Project Management
Amount:
$581.25

Component Description:
Project Management
Amount:
$450.00

Component Description:
Project Management
Amount:
$1,630.00

Component Description:
Project Management
Amount:
$3,410.00

Component Description:
Project Management
Amount:
$2,908.75

Component Description:
Project Management
Amount:
$5,037.50

Component Description:
Project Management
Amount:
$688.75

Component Description:
Project Management
Amount:
$863.35

Component Description:
Project Management
Amount:
$658.75

Component Description:
Project Management
Amount:
$1,714.85

Component Description:
Professional services
Amount:
$280.00

Component Description:
Project Management
Amount:
$2,129.15

Component Description:
Project Management
Amount:
$677.50

Component Description:
Project Management
Amount:
$6,323.35

Component Description:
Professional services
Amount:
$200.00

Component Description:
Project Management
Amount:
$3,049.75

Component Description:
Project Management
Amount:
$3,168.20

Component Description:
Project Management
Amount:
$1,602.90

Component Description:
Cost Reconciliation
Amount:
$2,833.10

Component Description:
Project Management
Amount:
$1,201.25

Component Description:
Project Management
Amount:
$4,470.40

Component Description:
Project Management
Amount:
$3,399.80

Component Description:
Project Management
Amount:
$9,058.05

Component Description:
Project Management
Amount:
$378.75

Component Description:
Project management
Amount:
$2,362.50

Component Description:
Professional services
Amount:
$725.00

Component Description:
Project Management
Amount:
$6,119.10

Component Description:
Project Management
Amount:
$1,821.25

Component Description:
Project Management
Amount:
$2,665.15

Component Description:
Project Management
Amount:
$3,043.80

Component Description:
Professional services
Amount:
$600.00
Prepare and or review reimbursement form

Component Description:
Professional services
Amount:
$495.00

Component Description:
Prepare and/or Review Reimbursement Form
Amount:
$270.00

Component Description:
Professional Services Rendered
Amount:
$495.00
Perform engineering study for new channel assignment and antenna development

Component Description:
Professional Services
Amount:
$125.00

Component Description:
Professional Services
Amount:
$1,834.50

Component Description:
Consulting engineering services through July 2018 concerning potential change of antenna manufacturer from Jampro to Dielectric
Amount:
$1,725.00

Component Description:
Consulting Engineering Services through May 2019 concerning Preliminary Allocation study
Amount:
$6,594.40

Component Description:
Professional Services
Amount:
$274.80

Component Description:
Professional Services
Amount:
$657.00

Component Description:
Consulting engineering services through July 2018 concerning potential change of antenna manufacturer from Jampro to Dielectric
Amount:
$1,725.00

Component Description:
Consulting engineering services
Amount:
$6,443.80

Component Description:
Professional Services
Amount:
$1,615.75

Component Description:
Consulting engineering services, others expenses
Amount:
$1,716.85

Component Description:
Professional Services
Amount:
$1,588.95
Prepare request for Special Temporary Authorization

Component Description:
WZVN-530-RF Eng - Special Temporary Authorization
Amount:
$3,724.40
RF Exposure Measurements Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $736,952.08 $738,547.08 N/A $691,408.39 N/A
Total for all systems $5,951,559.72 $5,751,035.11 N/A $4,032,068.29 N/A
Other Expenses $736,952.08 $738,547.08 $691,408.39
Develop and air announcement of upcoming channel change $5,000.00 $5,000.00 N/A N/A N/A
Equipment Delivery and Handling Charges $25,000.00 $25,000.00 N/A $1,427.26 N/A
Local Zoning $6,262.50 $6,262.50 See Estimated Cost Justification WZVN-610-Local Zoning v0 $6,262.50 N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $335.00 N/A $335.00 N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,070.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A $3,400.00 N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $2,380.00 Please see Estimated Cost Justification WZVN-610-FCC Filing Fee - Special Temporary Authorization v0 $2,380.00 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $4,201.62 $4,201.62 see Estimated Cost Justification WZVN-610 Disposal Costs v0 $4,201.62 N/A
WBBH Transmitter Costs $672,297.96 $672,297.96 Please see Estimated Cost Justification WZVN-610-WBBH Transmitter Costs v0 $672,297.96 N/A
Comark Training $4,800.00 $4,800.00 N/A N/A N/A
MVPD Notification of Channel Change $5,000.00 $5,000.00 N/A N/A N/A
Equipment Storage $1,200.00 $1,200.00 N/A $1,104.05 N/A

Components

Actual Information Description File Name
Develop and air announcement of upcoming channel change Information not provided.
Equipment Delivery and Handling Charges

Component Description:
Scissor Lift 19' Electric
Amount:
$668.63

Component Description:
SCISSOR LIFT
Amount:
$758.63
Local Zoning

Component Description:
ZONING - COMMERCIAL MISC
Amount:
$6,262.50
FCC Filing Fees - Form 2100 license to cover application

Component Description:
WZVN-610-FCC Filing Fees - Form 2100 license to cover application
Amount:
$335.00

Component Description:
New invoice with unique number to be uploaded
Amount:
N/A
FCC Filing Fees - Form 2100 minor change CP application Information not provided.
DTV Medical Facility Notification

Component Description:
WZVN-610-Medical Facility Notification: $550.00
Amount:
$550.00

Component Description:
WZVN-610-Medical Facility Notification - $200.00
Amount:
$200.00

Component Description:
Medical Notification
Amount:
$2,650.00
FCC Filing Fees - Special Temporary Authorization request

Component Description:
Filing Fees to the FCC
Amount:
$2,380.00

Component Description:
New invoice with unique number to be uploaded
Amount:
N/A
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
4 Yard dumpster
Amount:
$331.64

Component Description:
6 yard dumpster service
Amount:
$238.04

Component Description:
30 Yd rolloff
Amount:
$586.87

Component Description:
30 Yd rolloff
Amount:
$575.40

Component Description:
4 Yard dumpster
Amount:
$329.48

Component Description:
4 Yard dumpster service
Amount:
$331.58

Component Description:
6 Yard dumpster service
Amount:
$328.20

Component Description:
Delivery 20 yd open top
Amount:
$494.46

Component Description:
4 Yard dumpster
Amount:
$331.27

Component Description:
Ticketed 4 yd fel tuesdays only
Amount:
$333.99

Component Description:
6 Yard dumpster
Amount:
$320.69
WBBH Transmitter Costs

Component Description:
WZVN-610-WBBH Transmitter Costs
Amount:
$15,076.95

Component Description:
SYSTEM, WBBH PRLX U24 D15
Amount:
$385,256.44

Component Description:
System, WBBH PRLX U24 D15
Amount:
$32,102.20

Component Description:
SYSTEM, WBBH PRLX U24 D15
Amount:
$224,785.42

Component Description:
WZVN-610-WBBH Transmitter Costs
Amount:
$15,076.95
Comark Training Information not provided.
MVPD Notification of Channel Change Information not provided.
Equipment Storage

Component Description:
Deliver Empty Container to Location and Monthly Rental of Container
Amount:
$378.06

Component Description:
Monthly Rental of Container at Your Location
Amount:
$175.84

Component Description:
Pickup Empty Container from Your Location
Amount:
$198.47

Component Description:
Monthly Rental of Container at Your Location
Amount:
$175.84

Component Description:
Monthly Rental of Container at Your Location
Amount:
$175.84

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $5,951,559.72 $5,751,035.11 $4,032,068.29

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. Yes
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Matthew Gaige

Chief Engineer


02/28/2022

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Matthew Gaige

Chief Engineer


02/28/2022

Certification

Back to Top
Section Question Response
Submission of Final Allocation or Accounting Information Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  2. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  3. The above-named entity certifies that all costs identified as "actual costs" herein accurately represent the costs actually paid by the above-named entity, including any discounts, refunds, or rebates.

  4. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  5. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  6. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Matthew Gaige

Chief Engineer


02/28/2022

Attachments

Back to Top