Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
GRAY TELEVISION LICENSEE, LLC |
Robert Folliard PO Box 30319 Atlanta, GA 30319 United States |
+1 (701) 237-5211 | robert.folliard@gray.tv | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Sam Hariton Widelity |
Sam Hariton 4031 University Dr Suite 100 Fairfax, VA 22030 United States |
+1 (339) 222-8107 | sam.hariton@widelity.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | K23NW-D is planning to purchase an upgraded antenna and transmitter, to re-use its transmission line, and to install the equipment at a new transmitter location shared with a sister station K21JK-D (168357, low power). |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Ranger CZ250 | |
Year | 2008 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 0.25 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | UAXTE-2R37 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.2 kW | |
Justification for New Transmitter | K23NW-D cannot retune the transmitter. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | Yes | |
Description | Modification of existing electrical service for installation of surge protector and flex conduit to transmitter | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 5 tons | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Mask Filter |
Mask Filter |
Primary Transmitter - Other Additional Parts |
Primary Transmitter - Other Additional Parts |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 1.0 kW | |
Manufacturer | ||
Model | SL-8 | |
Year | 2007 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | Yes | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 600.0 W | |
Manufacturer | ||
Model | TBD | |
Year | 2019 | |
Justification for New Antenna | Sharing the antenna with sister station K21JK will cut costs in supporting two sites at same location. Also Better signal coverage, Directional Covering Front and Back Side to serve more population. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 2 | |
Frequencies of channels supported | Upper and lower frequency | |
Frequency | 512.0 MHz - 530.0 MHz | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
Coordinates (NAD83) | Latitude (NAD83) | 38° 18' 55.0" N- |
Longitude (NAD83) | 108° 12' 17.4" W- | |
Overall Structure Height | 184.00 feet | |
Support Structure Height | 184.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 10174.00 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Southwest Colorado Television Translator Association | |
Date Constructed | 01/01/1999 |
Facility ID | Call Sign | Service |
---|---|---|
168357 | K21JK-D | LPD |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Tower mapping and report for structural engineer |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Major Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Removal of Equipment |
Removal of Equipment |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 254 | |
Explanation | K23NW-D does not have sufficient capacity and expertise in house to handle all reimbursement activities necessary to facilitate on-time completion of the station's build. As such, K23NW-D will hire an outside firm to support K23NW-D in these tasks. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Prepare Form 601 | Yes | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | Yes |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | Yes | |
New Point to Point Microwave System | Yes | |
Type | Unlicensed |
Name | Description |
---|---|
Use Tax |
Use Tax |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $112,595.66 | $55,816.11 | N/A | $43,186.58 | N/A |
Total for all systems | $354,471.68 | $310,034.73 | N/A | $191,711.24 | N/A |
Primary Transmitter UAXTE-2R37 | $112,595.66 | $55,816.11 | $43,186.58 | ||
Primary Transmitter - Other Additional Parts | $164.13 | $164.13 | Please see K23NW-D Primary Transmitter - Other Additional Parts Budget Revision Justification Letter | $164.13 | N/A |
Mask Filter | $5,681.53 | $5,681.53 | Please see mask filter from Quote Q-766864 plus additional services on Quote Q-76684 | N/A | N/A |
5 Ton system | $20,250.00 | $4,448.00 | Please see Fortney Refrigeration Proposal Mini Split Rasberry mtn. Note that 5 Tons is the smallest size LMS allows to be entered. | N/A | N/A |
Other Electrical Service: Modification of existing electrical service for installation of surge protector and flex conduit to transmitter | $2,500.00 | $2,500.00 | Please see Est_812_from_A__J_Electric_Inc._1272 | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $43,022.45 | Estimated Cost Justification K23NW-D-110-Primary Transmitter - UHF - Air Cooled Solid State Transmitter 1 - 2.5kw v0 | $43,022.45 | N/A |
Actual Information Description | File Name |
---|---|
Primary Transmitter - Other Additional Parts | |
Mask Filter | Information not provided. |
5 Ton system | Information not provided. |
Other Electrical Service: Modification of existing electrical service for installation of surge protector and flex conduit to transmitter | Information not provided. |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $16,348.79 | $16,348.79 | N/A | $1,218.79 | N/A |
Total for all systems | $354,471.68 | $310,034.73 | N/A | $191,711.24 | N/A |
Primary Antenna TBD | $16,348.79 | $16,348.79 | $1,218.79 | ||
Sweep test of transmission line and antenna | $5,730.00 | $5,730.00 | N/A | N/A | N/A |
UHF-Low Power, Side Mount, Slotted Coaxial, 600.0watt input, Horizontal | $1,218.79 | $1,218.79 | ***System Notice: Estimate adjusted and locked because line has been superseded.***The Est Cost has been established by like-for-like antenna information. See the station narrative and Justification K23NW-D Antenna Cost Like-For-Like for details. | $1,218.79 | N/A |
1 kW UHF Combiner (per channel) | $9,400.00 | $9,400.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Sweep test of transmission line and antenna | Information not provided. |
UHF-Low Power, Side Mount, Slotted Coaxial, 600.0watt input, Horizontal | |
1 kW UHF Combiner (per channel) | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $168,709.15 | $168,709.15 | N/A | $109,494.15 | N/A |
Total for all systems | $354,471.68 | $310,034.73 | N/A | $191,711.24 | N/A |
Primary Tower TOWER | $168,709.15 | $168,709.15 | $109,494.15 | ||
Major tower reinforcement/modifications | $87,869.15 | $87,869.15 | Please see Estimated Cost Justification K23NW-D-410-Existing Primary Tower - Major Tower Reinforcement Modifications v2 | $87,869.15 | N/A |
Removal of Equipment | $3,650.00 | $3,650.00 | Per Thin Air Estimate 3064_002_KKCO | $3,650.00 | N/A |
Tower Rigging Short Tower (less than 500') | $56,190.00 | $56,190.00 | N/A | $17,975.00 | N/A |
Tower mapping and report for structural engineer | $21,000.00 | $21,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Major tower reinforcement/modifications | |
Removal of Equipment | |
Tower Rigging Short Tower (less than 500') | |
Tower mapping and report for structural engineer | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $45,597.00 | $57,939.60 | N/A | $36,650.65 | N/A |
Total for all systems | $354,471.68 | $310,034.73 | N/A | $191,711.24 | N/A |
Outside Professional Services | $45,597.00 | $57,939.60 | $36,650.65 | ||
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $2,235.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $492.10 | Please see K23NW Attorney - Negotiation of Lease and Other Matters Budget Revision Justification Letter | $492.10 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | N/A | N/A |
Prepare Form 601 | $755.00 | $755.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $1,280.00 | $1,280.00 | N/A | N/A | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | N/A | $250.00 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | N/A | N/A |
Project management of the transition | $26,797.00 | $41,910.00 | Please see K23NW-D-LPTV strategic support quote | $35,908.55 | N/A |
Actual Information Description | File Name |
---|---|
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare Form 601 | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
Perform engineering study for displacement application | |
Prepare/ Review 399 reimbursement form | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $11,221.08 | $11,221.08 | N/A | $1,161.07 | N/A |
Total for all systems | $354,471.68 | $310,034.73 | N/A | $191,711.24 | N/A |
Other Expenses | $11,221.08 | $11,221.08 | $1,161.07 | ||
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 Major change CP application | $4,960.00 | $4,960.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $305.00 | $305.00 | N/A | N/A | N/A |
Point to Point Microwave (STL/ICR): Frequency Coordination for Bi-Direction System | $1,100.00 | $1,100.00 | N/A | N/A | N/A |
New Point to Point Microwave System: Unlicensed | $2,250.00 | $2,250.00 | N/A | N/A | N/A |
Use Tax | $1,161.08 | $1,161.08 | Please see K23NW-D Use Tax Budget Revision Justification Letter | $1,161.07 | N/A |
Actual Information Description | File Name |
---|---|
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
FCC Filing Fees - Form 2100 Major change CP application | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
Point to Point Microwave (STL/ICR): Frequency Coordination for Bi-Direction System | Information not provided. |
New Point to Point Microwave System: Unlicensed | Information not provided. |
Use Tax |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $354,471.68 | $310,034.73 | $191,711.24 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Robert Folliard , III . Assistant Secretary 01/12/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Robert Folliard , III . Assistant Secretary 01/12/2022 |