Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
Telecinco, Inc. |
Andres Ramirez P.O. Box 43 Mayaguez, PR 00682 United States |
+1 (787) 721-4054 | Lrosa@telecincoinc.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Alejandro Luciano , PE . Repack Coordinator Alejandro Luciano PE |
Alejandro Luciano PE PO Box 194528 SAN JUAN, PR 00919 United States |
+1 (787) 717-6984 | aluciano@aluciano.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | File for construction permit, construction of Interim Facility, Tower Modifications, facilities maximization, Antenna, transmission line and transmitter installation, RF systems sweep and test, transition to new channel. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | AFFINITY | |
Year | 2008 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 2.0 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | Maxiva ULXTE-24 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 16.1 kW | |
Justification for New Transmitter | Existing transmitter on channel 51 is not re-tunable to channel 30. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | Yes | |
Size | 2 inches | |
Length | 40.0 feet | |
Other Electrical Service | Yes | |
Description | UPS for Above transmitter | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 200.0 square feet | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
SURGE PROTECTOR |
PARALLEL SURGE PROTECTOR FOR 3PH WYE |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase | |
Manufacturer | ||
Model | SLIM4_03_UHF_SD_PCM-4P-PPT | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 2.5 kW | |
Justification for New Transmitter | An small interim transmitter is needed to remain on the air while the existing is removed. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | Yes | |
Size | 2 inches | |
Length | 40.0 feet | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 5 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A | |
Inside RF System | Is an additional interior RF system required to support this interim transmitter? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 16.0 kW | |
Manufacturer | ||
Model | ATC-24H6C2-51 | |
Year | 2008 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | Yes | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 250.0 kW | |
Manufacturer | ||
Model | TFU-24DSBW/VP-R W (C) | |
Year | 2018 | |
Justification for New Antenna | The existing antenna on Channel 51 can't be retuned to new repack channel 30. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 2 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | No | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
RF Channel Number |
---|
29 |
30 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 40.0 kW | |
Manufacturer | ||
Model | TLP-16M/VP | |
Year | 2020 | |
Justification for New Antenna | An interim antenna is needed to remain on the air while the repack facilities are built |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Air | |
Diameter | 3 inches | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 275 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Type | Flexible Air | |
Diameter | 4 inches | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 300 feet per run | |
Justification for New Transmission Line | The existing line will be used to remain on the air while the new facilities on channel 30 are built. |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Segment Length | N/A | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 200 feet per run | |
Justification for New Transmission Line | An interim transmission line is needed for WRFB interim facilities |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Construct New |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
One or more FM, AM or TV radio broadcaster(s) | N/A | |
Others Types of Users | N/A | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1043939 | |
Coordinates (NAD83) | Latitude (NAD83) | 18° 16' 37.0" N- |
Longitude (NAD83) | 065° 51' 11.0" W- | |
Overall Structure Height | 333.99 feet | |
Support Structure Height | 300.19 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 2411.39 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | ESTRADA, JORGE L DBA = COMMUNICATIONS TOWER SERVICES | |
Date Constructed | 01/01/1987 |
Section | Question | Response |
---|---|---|
Construct New Tower | Use | Primary (Main) |
Description of Use | N/A | |
Is this a request for upgraded equipment? | No | |
Height | 250.00 feet | |
Justification for New Tower | See Attached tower construction justification document |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Tower Construction Supervision |
Structural Engineer Tower Construction Supervision |
Site Survey the Tower contractor |
Site Visit by ERI tower Contractor |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 750 | |
Explanation | Station lacks personnel to perform the project management. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | Yes | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Quarterly Progress Reports. |
Quarterly Repack Progress Report. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
State Service Tax |
State Service Tax 4 percent |
State and City Sales Tax |
State and City Sales Tax 11.5 percent |
Station Employees Time |
Station Employees Time dedicated to the repack functions. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $879,344.43 | $609,542.67 | N/A | $245,265.30 | N/A |
Total for all systems | $3,806,288.23 | $3,209,857.04 | N/A | $1,406,125.49 | N/A |
Interim Transmitter SLIM4_03_UHF_SD_PCM-4P-PPT | $147,290.00 | $120,220.40 | $99,970.40 | ||
2" Rigid Conduit and Wiring (Cost per foot) | $1,040.00 | $1,000.00 | N/A | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $126,000.00 | $99,970.40 | See attached Broadcast Depot Sales Quote 206231 | $99,970.40 | N/A |
5 Ton system | $20,250.00 | $19,250.00 | N/A | N/A | N/A |
Primary Transmitter Maxiva ULXTE-24 | $732,054.43 | $489,322.27 | $145,294.90 | ||
2" Rigid Conduit and Wiring (Cost per foot) | $1,040.00 | $1,000.00 | N/A | N/A | N/A |
SURGE PROTECTOR | $2,014.43 | $2,014.43 | ***System Notice: Estimate adjusted and locked because line has been superseded.***SEE ATTACHED GATES AIR PROPOSAL ELECTRICAL SECTION. | $2,014.43 | N/A |
Other Electrical Service: UPS for Above transmitter | $25,000.00 | $25,000.00 | Based on consultations with manufacturer local sales office. | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | $684,000.00 | $441,307.84 | See Attached RGB Broadcast Services Main Transmitter Proposal HMDRQ3064 Excluding Section 22 Item 23 Parallel surge Protector and RGB HMDRQ3081 2.4KW Baseline Transmitter proposal. | $143,280.47 | N/A |
Other -- Building Addition Size: 200.0 | $20,000.00 | $20,000.00 | Based on local construction cost of $100.00 per square ft. The addition is necessary to house the new full power transmitter, combining system, aux transmitter and existing transmitters at the site. A quote will be provided as soon as received. | N/A | N/A |
Actual Information Description | File Name |
---|---|
2" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | |
5 Ton system | Information not provided. |
2" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
SURGE PROTECTOR | |
Other Electrical Service: UPS for Above transmitter | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | |
Other -- Building Addition Size: 200.0 | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $401,326.00 | $201,573.00 | N/A | $167,323.00 | N/A |
Total for all systems | $3,806,288.23 | $3,209,857.04 | N/A | $1,406,125.49 | N/A |
Interim Antenna TLP-16M/VP | $54,986.00 | $40,686.00 | $40,686.00 | ||
UHF - High Power, Side Mount, basic slot antenna, 40 kW input, directional,, elliptically or circularly polarized | $25,106.00 | $25,106.00 | ***System Notice: Estimate adjusted and locked because line has been superseded.***See uploaded Dielectric Proposal 200173CMZ-1 less line 2, ADD FOR DUAL CHANNEL 30/29 and line 3, REPACK V POL. | $25,106.00 | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $9,180.00 | See Attached Dielectric Proposal 200173CMZ-1 | $9,180.00 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | See Attached Dielectric Proposal 200173CMZ-1 | $6,400.00 | N/A |
Primary Antenna TFU-24DSBW/VP-R W (C) | $346,340.00 | $160,887.00 | $126,637.00 | ||
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $13,320.00 | SEE ATTACHED DIELECTRIC PROPOSAL NUMBER 800111CMZ-1 LINE 2 | $6,660.00 | N/A |
New combiner, cost per channel (without antenna) | $84,200.00 | $39,823.00 | SEE ATTACHED DIELECTRIC ANTENNA PROPOSAL 800111CMZ-1 LINE 21 | $38,496.50 | N/A |
UHF - Lower Power Side Mount, One station antenna -- 200-500 kW, elliptically or circularly polarized | $227,000.00 | $96,344.00 | SEE ATTACHED DIELECTRIC PROPOSAL NUMBER 8000111CMZ-1 LINE 1 | $78,280.50 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | SEE ATTACHED DIELECTRIC PROPOSAL NUMBER 800111CMZ-1 LINE 22 | $3,200.00 | N/A |
Actual Information Description | File Name |
---|---|
UHF - High Power, Side Mount, basic slot antenna, 40 kW input, directional,, elliptically or circularly polarized | |
Side mount brackets for high power antennas (if not included in antenna base cost) | |
Sweep test of existing antenna | |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | Information not provided. |
Side mount brackets for high power antennas (if not included in antenna base cost) | |
New combiner, cost per channel (without antenna) | |
UHF - Lower Power Side Mount, One station antenna -- 200-500 kW, elliptically or circularly polarized | |
Sweep test of existing antenna |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $27,000.00 | $23,147.29 | N/A | $20,909.91 | N/A |
Total for all systems | $3,806,288.23 | $3,209,857.04 | N/A | $1,406,125.49 | N/A |
Interim Transmission Line | $4,800.00 | $3,860.00 | $3,860.00 | ||
Flexible Foam Transmission Line - dielectric, 1 5/8" | $4,800.00 | $3,860.00 | See uploaded Broadcast Depot sales quote 214688. Items 1,10 and 11 are the components of the transmission line. Those three components totalize $3,860.00 | $3,860.00 | N/A |
Primary Transmission Line | $22,200.00 | $19,287.29 | $17,049.91 | ||
Flexible Air Transmission Line - dielectric, 4" | $22,200.00 | $19,287.29 | SEE ATTACHED DIELECTRIC PROPOSAL NUMBER 800111CMZ-1 LINE 3 | $17,049.91 | N/A |
Actual Information Description | File Name |
---|---|
Flexible Foam Transmission Line - dielectric, 1 5/8" | |
Flexible Air Transmission Line - dielectric, 4" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,817,208.18 | $1,733,008.18 | N/A | $835,779.50 | N/A |
Total for all systems | $3,806,288.23 | $3,209,857.04 | N/A | $1,406,125.49 | N/A |
Primary Tower TOWER | $0.00 | $0.00 | $0.00 | ||
Primary Tower | $1,817,208.18 | $1,733,008.18 | $835,779.50 | ||
Site Survey the Tower contractor | $30,000.00 | $30,000.00 | See uploaded ERI proposal for site survey. Proposal Number: 20210524-911 | $15,000.00 | N/A |
Tower Construction Supervision | $28,500.00 | $28,500.00 | Estimated cost of the Tower construction supervision. | N/A | N/A |
Short Tower (less than 500') | $84,200.00 | $0.00 | Tower Rigging cost is included in the tower installation updated cost. ERI Proposal Number: 20210819-545 Item 002 Structural Installation. | $0.00 | N/A |
New tower | $1,674,508.18 | $1,674,508.18 | See updated ERI proposal for WRFB Tower Installation including the estimated freight charges. ERI Proposal Number: 20210819-545 Rev. A. Price revision due to steel cost increase as per manufacuturer notification. | $820,779.50 | wwwww |
Actual Information Description | File Name |
---|---|
Site Survey the Tower contractor | |
Tower Construction Supervision | Information not provided. |
Short Tower (less than 500') | Information not provided. |
New tower |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $280,705.00 | $250,424.28 | N/A | $70,081.28 | N/A |
Total for all systems | $3,806,288.23 | $3,209,857.04 | N/A | $1,406,125.49 | N/A |
Outside Professional Services | $280,705.00 | $250,424.28 | $70,081.28 | ||
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $2,500.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $5,900.00 | See Alejandro Luciano PE Invoice 1253-A lines 2 and 3. WRFB Initial Baseline application and WRFB expanded facilities application totaling $5900.00. | $5,900.00 | N/A |
Prepare request for Special Temporary Authorization | $4,100.00 | $3,000.00 | N/A | $2,500.00 | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $61,574.28 | Please see uploaded Comprehensive Coverage Verification quote from QCommunications, LLC. Quote # 865C | $45,481.28 | N/A |
RF Exposure Measurements | $21,050.00 | $20,000.00 | N/A | N/A | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $2,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $7,360.00 | $7,000.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $4,000.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | N/A | N/A |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | $4,210.00 | $4,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | $2,105.00 | $2,000.00 | N/A | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $3,200.00 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Project management of the transition | $118,500.00 | $112,500.00 | N/A | $6,900.00 | N/A |
Quarterly Progress Reports. | $4,200.00 | $4,200.00 | Quarterly Repack progress Report Documents preparation and filling. | $3,600.00 | N/A |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | $2,105.00 | $2,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Prepare and or review reimbursement form | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | |
Comprehensive coverage verification via field study, if needed | |
RF Exposure Measurements | Information not provided. |
ASR modification (prepare FCC Form 854) | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | Information not provided. |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Project management of the transition | |
Quarterly Progress Reports. | |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $400,704.62 | $392,161.62 | N/A | $66,766.50 | N/A |
Total for all systems | $3,806,288.23 | $3,209,857.04 | N/A | $1,406,125.49 | N/A |
Other Expenses | $400,704.62 | $392,161.62 | $66,766.50 | ||
State Service Tax | $25,592.00 | $25,592.00 | State Service Tax 4% | $984.00 | N/A |
Equipment Delivery and Handling Charges | $175,000.00 | $175,000.00 | See uploaded tower installation additional shipping charges and equipment rental change order fro ERI, plus the previous shipping charges from Dielectric and RGB. | $45,131.89 | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | N/A | N/A | N/A |
Station Employees Time | $49,986.42 | $49,986.42 | Estimated amount for Stations Employees time exclusively dedicated to the repack functions. See attached WRFB Station personnel expenses document. | N/A | N/A |
State and City Sales Tax | $99,120.00 | $99,120.00 | State and City Sales Tax 11.5% | $17,272.41 | N/A |
MVPD Notification of Channel Change | $316.20 | $316.20 | See Attached WRFB MVPD DTVNotification EST-001228 estimate document. | $316.20 | N/A |
Develop and air announcement of upcoming channel change | $20,000.00 | $20,000.00 | Based on previous experience during the analog to digital transition | N/A | N/A |
Equipment Storage | $5,000.00 | $5,000.00 | Based on previous experience during the analog to digital transition | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $4,500.00 | $4,500.00 | Based on previous experience during the analog to digital transition. | N/A | N/A |
Local Zoning | $8,000.00 | $8,000.00 | Based on previous experience. Estimated fees of the local authority for obtaining permits for the tower work needed. | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,070.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $3,062.00 | See Attached WRFB Medical DTVNotification Estimate EST-001215. | $3,062.00 | N/A |
Actual Information Description | File Name |
---|---|
State Service Tax | |
Equipment Delivery and Handling Charges | |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
Station Employees Time | Information not provided. |
State and City Sales Tax | |
MVPD Notification of Channel Change | |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Storage | Information not provided. |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Local Zoning | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
DTV Medical Facility Notification |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $3,806,288.23 | $3,209,857.04 | $1,406,125.49 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Alejandro Luciano , PE . Repack Project Manager 11/21/2021 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Alejandro Luciano , PE . Repack Project Manager 11/21/2021 |