Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
46728
Service:
DTV
Call Sign:
WCAX-TV
Channel:
20 (UHF)
File Number:
0000028424
FRN:
0018223693
Date Submitted:
01/31/2022

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

GRAY TELEVISION LICENSEE, LLC

Doing Business As: WCAX TV

WCAX

4370 PEACHTREE ROAD, NE

ATLANTA, GA 30319

United States

+1 (404) 504-9828 allfcclms@gray.tv Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Ellen Baier

Gray Television Licensee, LLC

WCAX

PO Box 4508

Atlanta, GA 30319

United States

+1 (404) 504-9828 allfcclms@gray.tv

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan WCAX-TV will transition from Channel 22 to the newly assigned Channel 20. This will impact WPTZ which shares the tower and antenna

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model PWR60D2
Year 2006
Type Inductive Output Tube
IOT Power Type Two
Power Capacity 60 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model ULXTED-60
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 38.4 kW
Justification for New Transmitter There is no room available to perform a retune of the existing IOT transmitter.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service Yes
Description The new transmitter will require reconfiguration of the electrical service on site. The electrical work cost has been estimated based on verbal guidance from local electrical contractors.
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

De-Install Old Equipment

De-Install Old Equipment

Primary Transmitter-Distilled Water and Antifreeze

Primary Transmitter-Distilled Water and Antifreeze

Additional Parts

Additional Parts for Transmitter

Interim Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Interim
Description of Use N/A
Change Type Purchase
Manufacturer
Model ULXTE-30
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 19.2 kW
Justification for New Transmitter Needed to broadcast during transition period because the existing IOT must be removed to allow for the installation of the interim transmitter.

Interim Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service Yes
Description The new transmitter will require reconfiguration of the electrical service on site. The electrical work cost has been estimated based on verbal guidance from local electrical contractors.
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A
Inside RF System Is an additional interior RF system required to support this interim transmitter? Yes

Interim Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

UHF Inside RF System

UHF Inside RF System including switching

New Interim Transformer

Transformer for the Interim Transmitter

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Retune Existing
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? Yes
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Bottom
Polarization Horizontal
Type Broadband Panel
Number of Stations Supported 2
Number of Panels 40
Design power capacity in use 100.0 %
Lower Limit 470.00 MHz
Upper Limit 710.00 MHz
Other Antenna Type N/A
ERP: 443.0 kW
Manufacturer Dielectric
Model TUP-04/C4SP-10/40H-2-R
Year 2006

Facility ID's and Call Signs of all stations with whom the antenna is shared.

Facility ID Call Sign
57476 WPTZ

Primary Antenna

Back to Top

Adjustment to Existing Antenna

Section Question Response
Sweep Test of Existing Antenna Do you need a sweep test of existing antenna? Yes

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 3
Frequencies of channels supported Upper and lower frequency
Frequency 470.0 MHz - 698.0 MHz

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Site Survey and Coverage Mapping

GatesAir Site Survey and Coverage Mapping

Lower Power Elbow Complex

3 1/8" line feed, broadband

Lower Power Line Antenna Sweep

Antenna sweep for low power line

Auxiliary Antenna

Back to Top

Add Antenna Information

Section Question Response
Existing Antenna Description Type of change Retune Existing
Antenna Use Auxiliary (Backup)
Description of Use Backup
Ownership Owned
Owner N/A
Site N/A
Is this antenna currently shared with any other stations? Yes
Is this antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Top
Polarization Horizontal
Type Broadband Panel
Number of Stations Supported 2
Number of Panels 8
Design power capacity in use 100.0 %
Lower Limit 470.00 MHz
Upper Limit 710.00 MHz
Other Antenna Type N/A
ERP: 76.6 kW
Manufacturer Dielectric
Model TUP-04-2/8U-1-R
Year 2006

Facility ID's and Call Signs of all stations with whom the antenna is shared.

Facility ID Call Sign
57476 WPTZ

Auxiliary Antenna

Back to Top

Adjustment to Existing Antenna

Section Question Response
Sweep Test of Existing Antenna Do you need a sweep test of existing antenna? Yes

Auxiliary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 3
Frequencies of channels supported Upper and lower frequency
Frequency 470.0 MHz - 698.0 MHz

Auxiliary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Auxiliary Transmission Line

Back to Top

Add Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use Backup
Ownership Owned
Owner N/A
Site N/A
Is this transmission currently shared with any other stations? Yes
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 4 1/16 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 1
Length 500 feet per run

Facility ID's and Call Signs of all stations with whom the transmission line is shared.

Facility ID Call Sign
57476 WPTZ

Auxiliary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Auxiliary (Backup)
Description of Use Backup
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 4 1/16 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 1
Length 500 feet per run
Justification for New Transmission Line Line sweep determined that flange summing occurs in band for repacked channel 20 eliminating chances to reuse any of the existing lines

Auxiliary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Primary Transmission Line

Back to Top

Add Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmission currently shared with any other stations? Yes
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 3 1/8 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 1
Length 450 feet per run

Facility ID's and Call Signs of all stations with whom the transmission line is shared.

Facility ID Call Sign
57476 WPTZ

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 3 1/8 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 1
Length 450 feet per run
Justification for New Transmission Line Line sweep determined that flange summing occurs in band for repacked channel 20 eliminating chances to reuse any of the existing lines

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Sweep Existing Transmission Line

Sweep test of existing transmission line

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? Yes
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 1
Length 450 feet per run

Facility ID's and Call Signs of all stations with whom the transmission line is shared.

Facility ID Call Sign
57476 WPTZ

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 1
Length 450 feet per run
Justification for New Transmission Line Line sweep determined that flange summing occurs in band for repacked channel 20 eliminating chances to reuse any of the existing lines

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? Terrain Constrained
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? No
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? No
ASR Number
Coordinates (NAD83) Latitude (NAD83) 44° 31' 32.19" N-
Longitude (NAD83) 072° 48' 56.4" W-
Overall Structure Height 185.00 feet
Support Structure Height 130.00 feet
Ground Elevation Above Mean Sea Level (AMSL) 4166.67 feet
Structure Type MTOWER - Monopole
Tower Owner WCAX-TV
Date Constructed 01/01/2005

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
57476 WPTZ DTV

Other Types of Users

Users
WEZF FM
WVPS FM

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for undocumented/poorly documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Terrain constrained
Helicopter Services Required Are helicopter services required? Yes

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Corrosion analysis

Corrosion analysis

Tower structural analysis

Structural analysis of existing tower

Move Equipment

Replace transmission lines

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 900
Explanation Strategic Support
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority No
Quantity N/A
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment Yes
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements Yes
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Additional Repack Legal Services Not Otherwise Specified in Form 399

Other Attorney services

Outside Professional Services - Engineering Consulting Services

Outside Professional Services-Engineering Consulting Services

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits Yes
BLM or NFS Coordination Yes
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Contractor Meals

Food for crew at mountain transmitter site

Taxes

State and Local Taxes

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $2,499,425.22 $2,336,111.80 N/A $2,240,327.95 N/A
Total for all systems $4,139,135.47 $4,283,113.88 N/A $3,378,482.09 N/A
Interim Transmitter ULXTE-30 $907,526.21 $680,587.95 $665,916.58
New Interim Transformer $2,798.21 $2,798.21 Please see the attached GatesAir quote Q-77168 and change order Q-77494. $2,798.21 N/A
UHF Inside RF System $0.00 $0.00 Consolidated with UHF Inside RF System including switch category. $0.00 N/A
UHF inside RF system including switching $147,500.00 $11,518.75 N/A $11,518.75 N/A
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW $684,000.00 $593,042.99 see Estimated Cost Justification WCAX-180-New Interim Transmitter v0 $579,307.62 N/A
Other Electrical Service: The new transmitter will require reconfiguration of the electrical service on site. The electrical work cost has been estimated based on verbal guidance from local electrical contractors. $73,228.00 $73,228.00 See quote, amended to be added to this document per FCC request dated 8/14/17 (complete response narrative attached as well). The physical build for the interim/permanent transmitter solution drove the cost of quote. $72,292.00 N/A
Primary Transmitter ULXTED-60 $1,591,899.01 $1,655,523.85 $1,574,411.37
Primary Transmitter-Distilled Water and Antifreeze $197.80 $197.80 Please see WCAX-TV Primary Transmitter-Distilled Water and Antifreeze Budget Revision Justification Letter $197.80 N/A
De-Install Old Equipment $38,413.53 $38,413.53 Please see GatesAir quote Q-79921 $38,413.53 N/A
Other Electrical Service: The new transmitter will require reconfiguration of the electrical service on site. The electrical work cost has been estimated based on verbal guidance from local electrical contractors. $80,073.00 $80,073.00 Justifying Quote - WCAX Delta Main Transmitter - Electrical $70,757.75 N/A
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW $1,473,000.00 $1,536,624.84 see Estimated Cost Justification WCAX-110-New 1st Primary Transmitter v1 $1,464,827.61 N/A
Additional Parts $214.68 $214.68 Please see WCAX-TV Primary Transmitter - Additional Parts Revision Justification Cover Letter $214.68 N/A

Components

Actual Information Description File Name
New Interim Transformer

Component Description:
WCAX-180-New Interim Transformer
Amount:
$2,798.21
UHF Inside RF System Information not provided.
UHF inside RF system including switching

Component Description:
Field service, Tv ULXTE-30 Channel Change
Amount:
$11,518.75
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW

Component Description:
A. Transmitter
Amount:
$52,409.08

Component Description:
ULXTE-30 Transmitter
Amount:
$344,497.67

Component Description:
ULXTE-30 Transmitter
Amount:
$182,400.87
Other Electrical Service: The new transmitter will require reconfiguration of the electrical service on site. The electrical work cost has been estimated based on verbal guidance from local electrical contractors.

Component Description:
Labor and Material
Amount:
$7,237.00

Component Description:
Labor and Material
Amount:
$7,500.00

Component Description:
Labor and material
Amount:
$16,055.00

Component Description:
materials & installation of the electrical service to the interim UHF transmitter
Amount:
$14,500.00

Component Description:
Labor and Material
Amount:
$17,000.00

Component Description:
Labor and Material
Amount:
$10,000.00
Primary Transmitter-Distilled Water and Antifreeze

Component Description:
Distilled water for new transmitter
Amount:
$197.80
De-Install Old Equipment

Component Description:
Field Service, TV
Amount:
$38,413.53
Other Electrical Service: The new transmitter will require reconfiguration of the electrical service on site. The electrical work cost has been estimated based on verbal guidance from local electrical contractors.

Component Description:
Tube M Cop
Amount:
$312.01

Component Description:
Tube M COP HRD 1-1/2x10'
Amount:
$109.14

Component Description:
S/S RPHMS 10/24X1.25
Amount:
$205.37

Component Description:
Labor and Material
Amount:
$30,000.00

Component Description:
Hole Splice
Amount:
$58.23

Component Description:
Final Billing #4
Amount:
$23,920.00

Component Description:
Materials & Labor - Electrical Gear Package
Amount:
$16,153.00
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW

Component Description:
ULXTED-60 Transmitter
Amount:
$139,112.59

Component Description:
Transmitter
Amount:
$338,745.36

Component Description:
Distilled water for new transmitter
Amount:
$57.80

Component Description:
This is distilled water used for the new transmitter.
Amount:
$96.36

Component Description:
Two drums of anti-freeze for new transmitter
Amount:
$140.00

Component Description:
PTFE Tape 1/2-IN X 43 FT
Amount:
$9.53

Component Description:
Invoice moved to correct budget category.
Amount:
N/A

Component Description:
Invoice moved to correct budget category per NMI message.
Amount:
N/A

Component Description:
Invoice moved to correct budget category.
Amount:
N/A

Component Description:
Invoice moved to correct budget category per NMI message.
Amount:
N/A

Component Description:
Invoice moved to correct budget category.
Amount:
N/A

Component Description:
Invoice moved to correct budget category.
Amount:
N/A

Component Description:
Absorbent
Amount:
$20.31

Component Description:
Invoice moved to correct budget category.
Amount:
N/A

Component Description:
Invoice moved to correct budget category.
Amount:
N/A

Component Description:
BrightEye 42 HD/SD/ASI Distribution Amplifier
Amount:
$1,701.47

Component Description:
Invoice moved to correct budget category.
Amount:
N/A

Component Description:
Invoice moved to correct budget category per NMI message
Amount:
N/A

Component Description:
ULXTED-60 Transmitter
Amount:
$984,944.19
Additional Parts

Component Description:
Mini Circuits - 20.5 dB
Amount:
$107.34

Component Description:
Mini Circuits - 20.5 dB
Amount:
$107.34

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $245,991.75 $676,299.00 N/A $359,910.47 N/A
Total for all systems $4,139,135.47 $4,283,113.88 N/A $3,378,482.09 N/A
Primary Antenna TUP-04/C4SP-10/40H-2-R $144,111.75 $415,949.00 $343,630.47
Lower Power Line Antenna Sweep $6,400.00 $6,400.00 N/A $5,120.00 N/A
Lower Power Elbow Complex $18,506.25 $18,506.25 DTV Pros Quote JEHQ1327-03 $14,804.99 N/A
Site Survey and Coverage Mapping $14,575.50 $14,575.50 Please see the attached invoice from GatesAir #US0324201 $14,575.50 N/A
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) $13,700.00 $20,634.00 DTV Pros Quote JEHQ1327-03 $16,507.20 N/A
New combiner, cost per channel (without antenna) $84,200.00 $349,433.25 Catalog cost listed as 80k per channel; GatesAir Quote Q-70240 $287,502.78 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $5,120.00 N/A
Auxiliary Antenna TUP-04-2/8U-1-R $101,880.00 $260,350.00 $16,280.00
New combiner, cost per channel (without antenna) $84,200.00 $240,000.00 Catalog cost listed as 80k per channel $0.00 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $5,120.00 N/A
Elbow complex, broadband, at antenna input, per 4 1/16. feedline (if needed) $10,950.00 $13,950.00 DTV Pros Quote JEHQ1327-03 $11,160.00 N/A

Components

Actual Information Description File Name
Lower Power Line Antenna Sweep

Component Description:
WCAX-210-Sweep test New Low Power Primary Antenna System
Amount:
$1,600.00

Component Description:
WCAX Sweep Test Lower Power New Primary Antenna
Amount:
$1,600.00

Component Description:
WCAX Sweep Test Lower Power New Primary Antenna
Amount:
$1,920.00
Lower Power Elbow Complex

Component Description:
3" 50 Ohm Transmission Line System
Amount:
$4,626.56

Component Description:
Rigid Transmission Line - Copper T/L 3-50 234.00 MF EX CONN
Amount:
$4,626.56

Component Description:
Rigid Transmission Line Copper
Amount:
$5,551.87
Site Survey and Coverage Mapping

Component Description:
Field Service, TV
Amount:
$14,575.50
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed)

Component Description:
WCAX-210-Elbow complex New Primary Antenna
Amount:
$5,158.50

Component Description:
WCAX Elbow Complex New Primary Antenna
Amount:
$5,158.50

Component Description:
WCAX Elbow Complex New Primary Antenna
Amount:
$6,190.20
New combiner, cost per channel (without antenna)

Component Description:
WCAX-290-New Combiner New Primary Antenna System
Amount:
$42,899.51

Component Description:
Combiner
Amount:
$244,603.27
Sweep test of existing antenna

Component Description:
WCAX-210-Sweep test New Primary Antenna System
Amount:
$1,600.00

Component Description:
WCAX Sweep Test New Primary Antenna System
Amount:
$1,600.00

Component Description:
WCAX Sweep Test New Primary Antenna System
Amount:
$1,920.00
New combiner, cost per channel (without antenna) Information not provided.
Sweep test of existing antenna

Component Description:
WCAX-250-Sweep test New Auxiliary Antenna
Amount:
$1,600.00

Component Description:
WCAX Sweep Test New Auxiliary Antenna
Amount:
$1,600.00

Component Description:
WCAX Sweep Test New Auxiliary Antenna
Amount:
$1,920.00
Elbow complex, broadband, at antenna input, per 4 1/16. feedline (if needed)

Component Description:
WCAX-250-Elbow complex New Auxiliary Antenna
Amount:
$3,487.50

Component Description:
WCAX Elbow Complex New Auxiliary Antenna
Amount:
$4,185.00

Component Description:
WCAX Elbow Complex New Auxiliary Antenna
Amount:
$3,487.50

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $243,400.00 $318,050.65 N/A $255,824.25 N/A
Total for all systems $4,139,135.47 $4,283,113.88 N/A $3,378,482.09 N/A
Primary Transmission Line $57,500.00 $75,480.30 $61,768.01
Sweep Existing Transmission Line $3,500.00 $3,500.00 See invoice $3,298.69 N/A
Rigid Transmission Line - copper, 3 1/8" broadband $54,000.00 $71,980.30 DTV Pros Quote JEHQ1327-03 $58,469.32 N/A
Primary Transmission Line $104,400.00 $148,315.20 $118,652.14
Rigid Transmission Line - copper, 6 1/8" broadband $104,400.00 $148,315.20 DTV Pros Quote JEHQ1327-03 $118,652.14 N/A
Auxiliary Transmission Line $81,500.00 $94,255.15 $75,404.10
Rigid Transmission Line - copper, 4 1/16" broadband $81,500.00 $94,255.15 DTV Pros Quote JEHQ1327-03 $75,404.10 N/A

Components

Actual Information Description File Name
Sweep Existing Transmission Line

Component Description:
Sweep Test
Amount:
$3,298.69

Component Description:
Sweep test of all transmission lines
Amount:
$3,490.25
Rigid Transmission Line - copper, 3 1/8" broadband

Component Description:
1. WCAX-310-Lower power New Primary Transmission Line
Amount:
$17,995.07

Component Description:
RIGID TRANSMISSION LINE - COPPER
Amount:
$885.09

Component Description:
WCAX Lower Power New Primary Transmission Line
Amount:
$17,995.07

Component Description:
WCAX Lower Power New Primary Transmission Line
Amount:
$21,594.09
Rigid Transmission Line - copper, 6 1/8" broadband

Component Description:
WCAX New Primary Transmission Line
Amount:
$44,494.56

Component Description:
WCAX-310-New Primary Transmission Line
Amount:
$37,078.79

Component Description:
WCAX New Primary Transmission Line
Amount:
$37,078.79
Rigid Transmission Line - copper, 4 1/16" broadband

Component Description:
WCAX-350-New Auxiliary Transmission Line
Amount:
$23,563.78

Component Description:
WCAX New Auxiliary Transmission Line
Amount:
$28,276.54

Component Description:
WCAX New Auxiliary Transmission Line
Amount:
$23,563.78

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $655,940.00 $432,235.00 N/A $229,345.00 N/A
Total for all systems $4,139,135.47 $4,283,113.88 N/A $3,378,482.09 N/A
Primary Tower MTOWER $655,940.00 $432,235.00 $229,345.00
Move Equipment $0.00 $0.00 N/A $0.00 N/A
Tower Helicopter Lift $46,640.00 $46,640.00 May require helicopter to delivery equipment and transmission line to transmitter site. $0.00 N/A
Corrosion analysis $1,500.00 $1,500.00 See invoice $1,500.00 N/A
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $219,595.00 see Estimated Cost Justification WCAX-410-Install antennas and lines existing tower V1 $219,595.00 N/A
Tower structural analysis $2,500.00 $2,500.00 See invoice $2,500.00 N/A
Minor tower reinforcement/modifications $158,000.00 $150,000.00 N/A $0.00 N/A
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study $26,300.00 $12,000.00 N/A $5,750.00 N/A

Components

Actual Information Description File Name
Move Equipment Information not provided.
Tower Helicopter Lift Information not provided.
Corrosion analysis

Component Description:
Level 1 Corrosion Risk Analysis
Amount:
$750.00

Component Description:
Level 1 Corrosion Risk Analysis
Amount:
$750.00
Complex Tower (includes, for example, those with candelabras and/or stacked antennas)

Component Description:
While crew is on site
Amount:
$25,180.00

Component Description:
Tower Equipment and Rigging
Amount:
$135,311.25

Component Description:
Field: 4 Weather Days at rate of $500/man per day for 7 man crew on site
Amount:
$14,000.00

Component Description:
Tower Equipment and Rigging
Amount:
$45,103.75
Tower structural analysis

Component Description:
Engineering Evaluation
Amount:
$1,250.00

Component Description:
Engineering Evaluation
Amount:
$1,250.00
Minor tower reinforcement/modifications Information not provided.
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study

Component Description:
Tower Mapping
Amount:
$2,875.00

Component Description:
Tower Mapping
Amount:
$2,875.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $216,813.44 $251,827.37 N/A $222,855.31 N/A
Total for all systems $4,139,135.47 $4,283,113.88 N/A $3,378,482.09 N/A
Outside Professional Services $216,813.44 $251,827.37 $222,855.31
Project management of the transition $142,200.00 $181,479.70 The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. $181,479.70 N/A
Outside Professional Services - Engineering Consulting Services $850.00 $850.00 Please see the invoice from Chesapeake RF Consultants, LLC. Invoice #5084, $850.00 N/A
Additional Repack Legal Services Not Otherwise Specified in Form 399 $5,638.44 $5,638.44 See Estimated Cost Justification WCAX-550-Attorney fees - Other attorney services V1 $5,484.43 N/A
RF Exposure Measurements $21,050.00 $25,628.83 see Estimated Cost Justification WCAX-580-Field Eng RF measurements v0 The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. $25,628.83 N/A
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet $10,520.00 $3,480.40 see Estimated Cost Justification WCAX-590-Environmental expert fees v1 $3,480.40 N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A $622.50 N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A $222.00 N/A
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application $4,210.00 $4,000.00 N/A $0.00 N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A $1,250.00 N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application $1,580.00 $1,500.00 N/A $0.00 N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A $0.00 N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application $2,105.00 $2,000.00 N/A $0.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $187.50 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $3,131.95 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A $518.00 N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A $0.00 N/A

Components

Actual Information Description File Name
Project management of the transition

Component Description:
Project management
Amount:
$2,904.20

Component Description:
Project management
Amount:
$1,328.55

Component Description:
Project Management
Amount:
$2,158.05

Component Description:
Project Management
Amount:
$2,624.35

Component Description:
Project Management
Amount:
$2,406.90

Component Description:
Project Management
Amount:
$3,747.85

Component Description:
Project Management
Amount:
$3,328.50

Component Description:
Project Management
Amount:
$2,777.40

Component Description:
Project Management
Amount:
$3,943.05

Component Description:
Project Management
Amount:
$3,554.95

Component Description:
Project Management
Amount:
$2,734.95

Component Description:
Project Management
Amount:
$4,325.05

Component Description:
Project Management
Amount:
$8,130.65

Component Description:
Project Management
Amount:
$8,708.70

Component Description:
Project Management
Amount:
$5,543.55

Component Description:
Project Management
Amount:
$3,376.95

Component Description:
Project Management
Amount:
$5,927.15

Component Description:
Project Management
Amount:
$660.00

Component Description:
Project Management
Amount:
$1,375.05

Component Description:
Project management
Amount:
$1,582.60

Component Description:
Project Management
Amount:
$7,808.35

Component Description:
Transition Related Project Management Costs
Amount:
$3,300.00

Component Description:
Project Mgt
Amount:
$2,381.30

Component Description:
Project Management
Amount:
$2,128.55

Component Description:
Project management
Amount:
$2,330.15

Component Description:
Project Management
Amount:
$4,229.65

Component Description:
Project Management
Amount:
$4,870.80

Component Description:
Project Mgt
Amount:
$28.20

Component Description:
Project Management
Amount:
$2,111.25

Component Description:
Project Mgt
Amount:
$802.25

Component Description:
Project management
Amount:
$700.05

Component Description:
Project Management
Amount:
$8,348.25

Component Description:
Project Management
Amount:
$1,319.55

Component Description:
Project Management
Amount:
$10,885.75

Component Description:
Project Management
Amount:
$5,618.75

Component Description:
Project Management
Amount:
$1,912.75

Component Description:
Project Management
Amount:
$2,574.45

Component Description:
Project Management
Amount:
$2,515.60

Component Description:
Project Management
Amount:
$4,135.15

Component Description:
Project Management
Amount:
$1,891.25

Component Description:
Project Management
Amount:
$2,442.90

Component Description:
Project Mgt
Amount:
$718.30

Component Description:
Project Management
Amount:
$3,913.15

Component Description:
Project Mgt
Amount:
$3,763.95

Component Description:
Project Management
Amount:
$1,994.40

Component Description:
Project Management
Amount:
$697.50

Component Description:
Project Management
Amount:
$1,869.35

Component Description:
Project Management
Amount:
$116.25

Component Description:
Project Management
Amount:
$1,857.60

Component Description:
Project Management
Amount:
$2,633.45

Component Description:
Project Management
Amount:
$2,498.65

Component Description:
Project Management
Amount:
$704.10

Component Description:
Project Management
Amount:
$465.00

Component Description:
Project Management
Amount:
$5,251.90

Component Description:
Project Management
Amount:
$4,051.70

Component Description:
Project Mgt
Amount:
$2,507.30

Component Description:
Project Management
Amount:
$2,011.80

Component Description:
Project management
Amount:
$2,951.90
Outside Professional Services - Engineering Consulting Services

Component Description:
Consulting Engineer- J. Davis - Hourly ( @ $250/hr)
Amount:
$850.00
Additional Repack Legal Services Not Otherwise Specified in Form 399

Component Description:
Gravel & Shea PC invoices
Amount:
$3,660.89

Component Description:
WCAX-550-Attorney fees - Other attorney services
Amount:
$295.55

Component Description:
Gravel & Shea PC
Amount:
$1,527.99
RF Exposure Measurements

Component Description:
Provide 2 RF Specialists from GTI to attend the 1 WCAX Mt. Mansfield tower site
Amount:
$5,355.00

Component Description:
WCAX-580-Field Eng RF measurements
Amount:
$9,712.50

Component Description:
WCAX-580-Field Eng RF measurements
Amount:
$3,237.50

Component Description:
Provide 2 RF Specialists from GTI to attend the WCAX Mt. Mansfield tower site & Perform RF measurements to identify OET 65 issues.
Amount:
$5,223.83

Component Description:
Consultation on regulatory compliance at base station.
Amount:
$2,100.00
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet

Component Description:
Site Monitoring
Amount:
$688.74

Component Description:
Crew walk-through
Amount:
$2,791.66
Attorney Fees - Prepare and File request for Special Temporary Authorization

Component Description:
Prepare and file WCAX-TV engineering STA extension request.
Amount:
$415.00

Component Description:
Total Professional Services
Amount:
$207.50
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application

Component Description:
Professional Services
Amount:
$222.00
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
Emails, review draft 2100, send draft to Gray. File 2100.
Amount:
$650.00

Component Description:
Email re: lifting of anti-collusion rule, time of FCC letter; emails re: FCC letter, next steps; Email re: WPTZ
Amount:
$600.00
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
review engineering portions and related exhibits of "90 day" FCC CP application
Amount:
$187.50
Perform engineering study for new channel assignment and antenna development

Component Description:
Email duTreil re issues in repacking application
Amount:
$200.00

Component Description:
Engineering Study for New Channel Assignment
Amount:
$1,283.33

Component Description:
Supplies
Amount:
$148.62

Component Description:
Perform engineering study for new channel assignment
Amount:
$1,500.00
Address transition timing and coordination issues w/ other stations and wireless

Component Description:
Total Professional Services
Amount:
$518.00
Prepare and or review reimbursement form Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $277,565.06 $268,590.06 N/A $70,219.11 N/A
Total for all systems $4,139,135.47 $4,283,113.88 N/A $3,378,482.09 N/A
Other Expenses $277,565.06 $268,590.06 $70,219.11
Taxes $171,482.00 $171,482.00 N/A $21,277.01 N/A
Contractor Meals $386.75 $386.75 See expense reports ER006BW-WCAX, ER007BW-WCAX, ER008BW-WCAX, ER009BW-WCAX, ER004BW-WCAX, ER005BW-WCAX $386.75 N/A
MVPD Notification of Channel Change $2,000.00 $2,000.00 see Estimated Cost Justification WCAX-610-MVPD Notifications v0 $2,000.00 N/A
Develop and air announcement of upcoming channel change $10,000.00 $10,000.00 N/A $0.00 N/A
Equipment Storage $12,000.00 $12,000.00 N/A $11,659.05 N/A
Equipment Delivery and Handling Charges $31,006.31 $31,006.31 see Estimated Cost Justification WCAX-610-Equipment Delivery v6 $31,006.30 .
Disposal Costs (for equipment and other waste, net of any salvage value) $25,000.00 $25,000.00 N/A $0.00 N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $0.00 4/22/20 Category Deemed non-reimbursable $0.00 N/A
DTV Medical Facility Notification $11,550.00 $3,490.00 N/A $3,490.00 N/A
BLM or NFS Coordination $10,000.00 $10,000.00 N/A $0.00 N/A
Non-zoning permits $2,500.00 $2,500.00 N/A $0.00 N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $400.00 see Estimated Cost Justification WCAX-610-STA FCC Filing Fees v1 $400.00 N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 N/A $0.00 N/A

Components

Actual Information Description File Name
Taxes

Component Description:
VERMONT DEPARTMENT OF TAXES DTVPROS, LLC
Amount:
$21,277.01
Contractor Meals

Component Description:
Contractor Meals
Amount:
$83.01

Component Description:
Contractor Meals
Amount:
$65.61

Component Description:
Contractor Meals
Amount:
$82.15

Component Description:
Contractor Meals
Amount:
$46.15

Component Description:
Contractor Meals
Amount:
$48.05

Component Description:
Contractor Meals
Amount:
$61.78
MVPD Notification of Channel Change

Component Description:
Total Professional Services
Amount:
$2,000.00
Develop and air announcement of upcoming channel change

Component Description:
Please deny this component
Amount:
N/A
Equipment Storage

Component Description:
Equipment in warehouse, storage
Amount:
$400.00

Component Description:
Load 12 pallets out of storage for delivery
Amount:
$559.05

Component Description:
Provide unload and dry storage
Amount:
$3,000.00

Component Description:
"Receive and External Inspection of Electrical Instruments from Gates Air, Inc. 1/14/19"
Amount:
$2,500.00

Component Description:
Equipment in warehouse
Amount:
$400.00

Component Description:
Equipment in warehouse
Amount:
$400.00

Component Description:
Equipment in warehouse, storage from 4/12/19-5/9/19 4 weeks
Amount:
$400.00

Component Description:
Equipment in warehouse
Amount:
$800.00

Component Description:
Tools
Amount:
$464.58

Component Description:
Equipment in warehouse
Amount:
$800.00

Component Description:
Equipment in warehouse, storage
Amount:
$400.00

Component Description:
WCAX-610-Equipment Storage
Amount:
$400.00

Component Description:
Equipment in warehouse, storage from 1/19/19-2/15/19 4 weeks
Amount:
$400.00

Component Description:
Equipment in warehouse, Storage from 5/10/19-6/7/19 4 weeks
Amount:
$400.00

Component Description:
Equipment in warehouse, storage
Amount:
$400.00

Component Description:
Equipment in warehouse, storage
Amount:
$400.00
Equipment Delivery and Handling Charges

Component Description:
Warehouse Receiving, 7/29/19, Shipment from Dielectric LLC-PO H1000267628 and External inspection, KR
Amount:
$3,411.50

Component Description:
Forklift WHSE 5000# Gas/LP
Amount:
$286.23

Component Description:
Forklift WHSE 5000# GAS/LP
Amount:
$1,664.39

Component Description:
FORKLIFT WHSE 5000 GAS LP
Amount:
$1,664.39

Component Description:
Forklift Variable Reach 8000# 40-49'
Amount:
$2,985.38

Component Description:
Receive and external inspection, pallets
Amount:
$1,907.13

Component Description:
Equipment Delivery
Amount:
$1,375.00

Component Description:
Please deny this invoice.
Amount:
N/A

Component Description:
Forklift WHSE 5000#
Amount:
$1,664.38

Component Description:
Forklift Variable Reach
Amount:
$2,651.10

Component Description:
Forklift WHSE 5000# GAS/LP
Amount:
$1,910.49

Component Description:
Forklift Variable Reach
Amount:
$1,220.29

Component Description:
Delivery to Top of Mt. Mansfield, 6/3/19
Amount:
$776.99

Component Description:
WCAX-610-Equipment Delivery
Amount:
$4,800.00

Component Description:
Forklift WHSE 5000# GAS/LP
Amount:
$1,664.39

Component Description:
Moving Services, Delivery
Amount:
$844.56

Component Description:
Please deny this invoice
Amount:
N/A

Component Description:
FORKLIFT VARIABLE REACH
Amount:
$2,180.08
Disposal Costs (for equipment and other waste, net of any salvage value) Information not provided.
FCC Filing Fees - Form 2100 minor change CP application Information not provided.
DTV Medical Facility Notification

Component Description:
WCAX-TV Medical Notification
Amount:
$3,490.00
BLM or NFS Coordination Information not provided.
Non-zoning permits Information not provided.
FCC Filing Fees - Special Temporary Authorization request

Component Description:
WCAX-610-STA FCC Filing Fees
Amount:
$200.00

Component Description:
WCAX-610-STA FCC Filing Fees
Amount:
$200.00
FCC Filing Fees - Form 2100 license to cover application Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $4,139,135.47 $4,283,113.88 $3,378,482.09

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Robert Folliard , III .

Assistant Secretary


01/31/2022

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Robert Folliard , III .

Assistant Secretary


01/31/2022

Attachments

Back to Top