Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
GRAY TELEVISION LICENSEE, LLC |
4370 PEACHTREE RD NE ATLANTA, GA 30319 United States |
+1 (404) 504-9828 | Robert.Folliard@gray.tv | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Samuel Hariton WIDELITY |
Samuel Hariton 4031 University Dr Suite 100 Fairfax, VA 22030 United States |
+1 (339) 222-8107 | sam.hariton@widelity.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | K18AB-D is planning purchase of an upgraded transmitter, a like-for-like antenna and transmission line, using the same tower. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | MI501U | |
Year | 2012 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 0.25 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | UAXTE-2 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.2 kW | |
Justification for New Transmitter | The existing transmitter cannot be retuned to the new channel. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | Yes | |
Size | 2 inches | |
Length | 60.0 feet | |
Other Electrical Service | Yes | |
Description | The new main transmitter will require reconfiguration of the electrical service on site. See attached "Justification Other Electrical Service Lawrence Electric Co" | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Heating and Cooling | |
Size | Other | |
Other Size | 3 tons | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Electrical work to support transmitter and HVAC units |
Electrical work to support transmitter and HVAC units |
Mask Filter |
Standard 1250 W Mask Filter included in transmitter quote |
Primary Transmitter - Other Expenses |
Primary Transmitter - Other Expenses |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 2.54 kW | |
Manufacturer | ||
Model | DLP-8 | |
Year | 2013 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 9.2 kW | |
Manufacturer | ||
Model | DLP-8 | |
Year | 2019 | |
Justification for New Antenna | The new antenna is necessary because the existing antenna is single channel and not re-tunable. The increase in power is due to the upgraded transmitter. The new antenna is like-for-like. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 100 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 100 feet per run | |
Justification for New Transmission Line | The new line is required in order to terminate the new transmitter with different connector types. | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
Coordinates (NAD83) | Latitude (NAD83) | 33° 12' 42.0" N- |
Longitude (NAD83) | 092° 39' 50.3" W- | |
Overall Structure Height | 96.00 feet | |
Support Structure Height | 59.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 279.00 feet | |
Structure Type | BMAST - Building with Mast | |
Tower Owner | Bankcorp South | |
Date Constructed | 01/01/1969 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | No study needed |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 254 | |
Explanation | K18AB-D does not have sufficient resource capacity and expertise in house to handle all of the reimbursement filing, expense tracking, vendor coordination, progress reporting, budget creation, budget review, budget tracking, daisy-chain monitoring and all | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | Yes | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | Yes |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $107,929.56 | $49,101.72 | N/A | $43,293.77 | N/A |
Total for all systems | $217,721.14 | $138,982.98 | N/A | $100,763.38 | N/A |
Primary Transmitter UAXTE-2 | $107,929.56 | $49,101.72 | $43,293.77 | ||
Primary Transmitter - Other Expenses | $1,524.04 | $1,524.04 | Please see K20OC-D Heartland Video quote WISQ53484-01, plus actual freight on invoice 66556 | $1,524.03 | N/A |
Mask Filter | $4,074.58 | $4,074.58 | Please see K18AB-D GatesAir Quote Q-78495 | $3,646.64 | N/A |
Electrical work to support transmitter and HVAC units | $6,805.65 | $6,805.65 | Please see "BANCORP TRANSMITTER BLDG PROP" | $6,805.65 | N/A |
Other -- HVAC Service Type: H Size:3 (Other) | $9,178.00 | $9,178.00 | see Estimated Cost Justification K18AB-D-110-Primary Transmitter - HVAC Service v0 | $5,298.00 | N/A |
Other Electrical Service: The new main transmitter will require reconfiguration of the electrical service on site. See attached "Justification Other Electrical Service Lawrence Electric Co" | $787.29 | $787.29 | Please see "Justification Other Electrical Services Lawrence Electric Co" | $787.29 | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $25,232.16 | Please see Estimated Cost Justification K20OC-D-110-Primary Transmitter - UHF Air Cooled Solid State, 1 - 2.5kW v0 | $25,232.16 | N/A |
2" Rigid Conduit and Wiring (Cost per foot) | $1,560.00 | $1,500.00 | Estimate based on catalog pricing. | N/A | N/A |
Actual Information Description | File Name |
---|---|
Primary Transmitter - Other Expenses | |
Mask Filter | |
Electrical work to support transmitter and HVAC units | |
Other -- HVAC Service Type: H Size:3 (Other) | |
Other Electrical Service: The new main transmitter will require reconfiguration of the electrical service on site. See attached "Justification Other Electrical Service Lawrence Electric Co" | |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | |
2" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $5,977.08 | $5,977.08 | N/A | $5,977.08 | N/A |
Total for all systems | $217,721.14 | $138,982.98 | N/A | $100,763.38 | N/A |
Primary Antenna DLP-8 | $5,977.08 | $5,977.08 | $5,977.08 | ||
UHF-Low Power, Side Mount, Slotted Coaxial, 9.2kW input, Horizontal | $5,977.08 | $5,977.08 | see Estimated Cost Justification K18AB-D-210-Primary Antenna - UHF Low Power Side Mount, H-POL v0 | $5,977.08 | N/A |
Actual Information Description | File Name |
---|---|
UHF-Low Power, Side Mount, Slotted Coaxial, 9.2kW input, Horizontal |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,400.00 | $2,061.43 | N/A | $2,061.43 | N/A |
Total for all systems | $217,721.14 | $138,982.98 | N/A | $100,763.38 | N/A |
Primary Transmission Line | $2,400.00 | $2,061.43 | $2,061.43 | ||
Flexible Foam Transmission Line - dielectric, 1 5/8" | $2,400.00 | $2,061.43 | Estimated Cost Justification K18AB-D-310-Primary Transmission Line - 1 5_8_ Flexible Foam Dielectric v1 | $2,061.43 | a |
Actual Information Description | File Name |
---|---|
Flexible Foam Transmission Line - dielectric, 1 5/8" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $56,190.00 | $20,742.75 | N/A | $20,742.75 | N/A |
Total for all systems | $217,721.14 | $138,982.98 | N/A | $100,763.38 | N/A |
Primary Tower BMAST | $56,190.00 | $20,742.75 | $20,742.75 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $20,742.75 | see Estimated Cost Justification K18AB-D-410-Primary Tower - Tower Rigging v0 | $20,742.75 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Short Tower (less than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $38,819.50 | $54,695.00 | N/A | $28,688.35 | N/A |
Total for all systems | $217,721.14 | $138,982.98 | N/A | $100,763.38 | N/A |
Outside Professional Services | $38,819.50 | $54,695.00 | $28,688.35 | ||
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | N/A | N/A |
Perform engineering study for displacement application | $1,800.00 | $2,562.50 | Please see Estimated Cost Justification K18AB-D-530-RF Eng - Engineering Study for Displacement Application v0 | $2,562.50 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | N/A | N/A |
Prepare Form 601 | $755.00 | $755.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | N/A | N/A |
Project management of the transition | $26,797.00 | $41,910.00 | Please see K18AB-D LPTV Strategic Support Quote | $26,125.85 | N/A |
Actual Information Description | File Name |
---|---|
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for displacement application | |
Prepare/ Review 399 reimbursement form | Information not provided. |
Prepare Form 601 | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $6,405.00 | $6,405.00 | N/A | $0.00 | N/A |
Total for all systems | $217,721.14 | $138,982.98 | N/A | $100,763.38 | N/A |
Other Expenses | $6,405.00 | $6,405.00 | $0.00 | ||
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 Major change CP application | $4,960.00 | $4,960.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $217,721.14 | $138,982.98 | $100,763.38 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Robert Folliard , III . Assistant Secretary 12/20/2021 |