FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
72098
Service:
DTV
Call Sign:
WGBX-TV
Channel:
43 (UHF)
File Number:
0000028580
FRN:
0003764560
Date Submitted:
10/22/2021

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

WGBH EDUCATIONAL FOUNDATION

Eric Brass

1 Guest Street

Boston, MA 02135

United States

+1 (617) 300-4405 ERIC_BRASS@WGBH.ORG Not-for-Profit

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

The Preparer is same as the reimbursement contact.

 

 

 

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan WGBX will operate on Ch. 43 from an interim site for 10-12 mos. while extensive tower work is conducted and then resume operations on Ch. 32 at its original tower. After the transition, WGBX will retune its interim transmitter to replace its existing aux.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Auxiliary Transmitter

Back to Top

Add Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Retune Existing
Use Auxiliary (Backup)
Ownership Owned
Owner N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer Harris
Model Ranger CZ1000L
Year 2011
Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 1 kW

Auxiliary Transmitter

Back to Top

Retuning Transmitter Costs

Section Question Response
New IOT Tubes Number of Tubes (including accessories) needed N/A
New Mask Filter
Power 30 kW
Other Power N/A
New Exciter Is a new exciter needed? No

Auxiliary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Auxiliary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Primary Transmitter

Back to Top

Add Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Millennium CTT-U-DCX-1H
Year 2001
Type Inductive Output Tube
IOT Power Type Single
Power Capacity 22.3 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model THU9-60 EVO 88.8kW
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 88.8 kW
Justification for New Transmitter See attachment "Transmitter Justification"

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) Yes
Power 300 kVA
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service Yes
Description Conduit and wiring material and labor costs required for new transmitter.
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

RF Monitor

RF Monitor System

Interim Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Interim
Description of Use N/A
Change Type Purchase
Manufacturer
Model THU9-EVO 73.5 kW
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 73.5 kW
Justification for New Transmitter Transitional site required to maintain full power operations during the 10-12 months while a reinforcement and new combiner system are installed on the existing tower.

Interim Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) Yes
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 300 kVA
Rigid Conduit and Wiring Yes
Size 4 inches
Length 150.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 20 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 250.0 square feet
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A
Inside RF System Is an additional interior RF system required to support this interim transmitter? Yes

Interim Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Monitoring

Monitoring

Engineering and Design

Interim and Main: Site Survey and Lidar Scanning,Outdoor Cooling Equipment Study, Design Coordination and Construction/Permit Set, Construction Phase Services-Site Inspection Visits/Punchlist

Microwave Link to Interim Site

Link from studio to interim transmitter site

Emergency Generator

Interim Tower Generator. Includes $100,000 connection fee. Paragraph 3(b).

Distribution and Encoding

Distribution and Encoding

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Add Antenna Information

Section Question Response
Existing Antenna Description Type of change Lease New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Leased
Owner American Tower
Site N/A
Is this antenna currently shared with any other stations? Yes
Is this antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Bottom
Polarization Horizontal
Type Broadband Panel
Number of Stations Supported 5
Number of Panels 24
Design power capacity in use 87.1 %
Lower Limit 500.00 MHz
Upper Limit 660.00 MHz
Other Antenna Type N/A
ERP: 625.0 kW
Manufacturer
Model TAD24UDA-5-60MR
Year 2001

Facility ID's and Call Signs of all stations with whom the antenna is shared.

Facility ID Call Sign
25456 WBZ-TV
65684 WCVB-TV
72099 WGBH-TV
73982 WSBK-TV

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Lease New
Is this a request for upgraded equipment? Yes
Ownership Leased
Owner American Tower
Is antenna shared? Yes
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Broadband Panel
Number of Stations Supported 5
Number of Panels/Bays 14
Lower Limit 500.00 MHz
Upper Limit 590.00 MHz
Design power capacity in use 83.0 %
Other Antenna Type N/A
ERP: 922.0 kW
Manufacturer
Model PEP70E
Year 2020
Justification for New Antenna Existing antenna not usable at new channel assignments.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 4
Frequencies of channels supported RF channel
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? No
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Broadband
Feed Line Size 7 3/16 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna?
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Enter a list of RF channel numbers.

RF Channel Number
20
21
32
33

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Combiner Installation

Installation and commission of combiner system. See ATC quotation.

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Leased
Owner American Tower
Is antenna shared? Yes
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Bottom
Polarization Elliptical
Type Broadband Panel
Number of Stations Supported 4
Number of Panels/Bays 14
Lower Limit 470.00 MHz
Upper Limit 608.00 MHz
Design power capacity in use 85.0 %
Other Antenna Type N/A
ERP: 200.0 kW
Manufacturer
Model TUM-AP-04-14/56-2-B
Year 2018
Justification for New Antenna Interim antenna required for transitional site during the 10-12 months while a reinforcement and new combiner system are installed on the existing tower.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 4
Frequencies of channels supported RF channel
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? No
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? B
Feed Line Size 8 3/16 inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna?
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Enter a list of RF channel numbers.

RF Channel Number
33
20
21
32

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Tower rental

One-time tower rental during market repack period.

Combiner Installation

WGBX shared expense of installation, testing and commissioning of combiner

Nitrogen Generator

Nitrogen Generator Upgrade.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Utilize Existing
Use Primary (Main)
Description of Use N/A
Ownership Leased
Owner American Tower
Site N/A
Is the existing transmission line shared with another station or stations? Yes
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer Dielectric
Type Rigid
Diameter 8 3/16 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 3
Length 1469 feet per run

Facility ID's and Call Signs of all stations with whom the transmission line is shared.

Facility ID Call Sign
72099 WGBH-TV
25456 WBZ-TV
65684 WCVB-TV
73982 WSBK-TV

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Transmission line refurbish

Refurbish existing transmission lines per ATC.

Primary Transmission Line

Back to Top

Add Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Lease New
Use Primary (Main)
Description of Use N/A
Ownership Leased
Owner American Tower LLC
Site N/A
Is this transmission currently shared with any other stations? Yes
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 8 3/16 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 2
Length 200 feet per run

Facility ID's and Call Signs of all stations with whom the transmission line is shared.

Facility ID Call Sign
65684 WCVB-TV
30577 WUTF-TV
25456 WBZ-TV
73982 WSBK-TV

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Lease New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 8 3/16 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 2
Length 20 feet per run
Justification for New Transmission Line Connection of tower to new equipment.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Lease New
Type Rigid
Diameter 8 3/16 inches
Segment Length Broadband
Other Segment Length
Number of parallel runs 2
Length 1250 feet per run
Justification for New Transmission Line Interim site requires transmission line to accommodate interim antenna.

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Auxiliary Tower

Back to Top

Add Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Auxiliary (Backup)
Description of Use Interim Tower
Ownership Leased
Is this tower consider Complex? Candelabra
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1004233
Coordinates (NAD83) Latitude (NAD83) 42° 18' 10.7" N-
Longitude (NAD83) 071° 13' 04.9" W-
Overall Structure Height 1200.77 feet
Support Structure Height 1101.04 feet
Ground Elevation Above Mean Sea Level (AMSL) 150.92 feet
Structure Type GTOWER - Guyed Structure Used for Communication Purposes
Tower Owner American Towers, LLC
Date Constructed 04/19/2005

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
49385 WXRV FM
73238 WLVI DTV
13806 WZLX FM
6463 WFXT DTV
22667 WODS AM
1901 WBZ-FM FM
72098 WGBX-TV DTV
26897 WWBX FM

Auxiliary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for tower with candelabra
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Auxiliary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Candelabra
Helicopter Services Required Are helicopter services required? No

Auxiliary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Tower Permits

Permits

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Yes
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1003433
Coordinates (NAD83) Latitude (NAD83) 42° 18' 37.0" N-
Longitude (NAD83) 071° 14' 12.0" W-
Overall Structure Height 1296.24 feet
Support Structure Height 1192.24 feet
Ground Elevation Above Mean Sea Level (AMSL) 152.89 feet
Structure Type GTOWER - Guyed Structure Used for Communication Purposes
Tower Owner American Tower, LLC
Date Constructed 01/01/1957

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
25456 WBZ-TV DTV
65684 WCVB-TV DTV
68241 WBUR-FM FM
10542 WKLB-FM FM
73982 WSBK-TV DTV
72099 WGBH-TV DTV

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for undocumented/poorly documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Tower Permit Package

Generation of a construction drawing package per ATC quote

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 95
Explanation American Tower (ATC) outside project management required to coordinate WGBX w multiple broadcasters including interim move to second tower with shared antenna and related infrastructure
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 2
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 2
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements No
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Attorney Fees - Prepare Transition Progress Report

Attorney Fees - Prepare Transition Progress Report

Attorney Fees - Draft Viewer Announcements

Attorney Fees - Draft Viewer Announcements

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning Yes
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Building Renovation

Modifications to existing buildings needed to house new transmitter.

Engineering Construction Services

Site Survey and Lidar Scanning; Outdoor Cooling Equipment Study; Design Coordination and Construction/Permit Set; Construction Phase Services and Project Expenses

Pre planning survey and engineering

Site and transmitter building drawings.

RF System Commission

Testing of the combiner system for optimal transmission patterns per ATC documentation

Site coordination meetings

Site coordination with broadcasters, contractors and vendors involved with the site deliveries and construction. Per attached ATC documentation

Transition site encoding and transport stream conversion

Enable transition to the temporary transitional site.

Transmitter Installation and Commissioning

Transmitter Installation and Commissioning

Transmitter and RF System

Set-up, installation, commissioning and proof of performance of Interim and Main transmitter systems. Marsand, Inc. - Main $93,400, Int. $72,500

Remote Control

Burk ARC Plus Touch V5 Remote Control

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $5,574,147.76 $4,598,904.19 N/A $2,491,958.80 N/A
Total for all systems $11,134,348.27 $7,060,651.48 N/A $4,353,054.08 N/A
Interim Transmitter THU9-EVO 73.5 kW $2,620,472.76 $2,277,410.60 $1,431,978.83
Distribution and Encoding $30,000.00 $30,000.00 Ross Video Limited $0.00 N/A
Emergency Generator $100,000.00 $100,000.00 Emergency Power Generator connection fee. $100,000.00 N/A
Microwave Link to Interim Site $150,094.77 $150,094.77 Per attached quote from Vislink. $119,289.40 Evertz quote CCCQ55261-04 50% cost share. $24,370.87 Evertz quote CCCQ47196-02 50% cost share $6,434.50 $118,083.47 N/A
Engineering and Design $0.00 $0.00 Main: $112,992.35 Interim: $79,068.67 Site Survey and Lidar Scanning Outdoor Cooling Equipment Study Design Coordination and Construction/Permit Set Construction Phase Services (Site Inspection Visits/Punchlist) N/A N/A
UHF inside RF system including switching $147,500.00 $140,000.00 Dielectric $0.00 N/A
Other -- Building Addition Size: 250.0 $37,305.61 $37,305.61 Includes Ice shield and permitting per ATC quote $26,894.29. Bomara Assoc. $4,791.82. Hopewell Precision $5,619.50. $37,305.61 Scope significantly increased from original estimate, fire panels were relocated, full electrical demo, water line relocation.
Other -- HVAC Service Type: C Size:20 (Other) $42,579.00 $42,579.00 HVAC Services for 10 Ton Cooling System $4,104.00 for load room cooling. HVAC Heating and Cooling for 20 Ton System and Ice Shield for HVAC $13,910.00. $42,579.00 N/A
4" Rigid Conduit and Wiring (Cost per foot) $15,150.00 $41,146.81 2", 3" and 4" conduit. Increase in scope to complete trenching, conduit installation and transformer pads that was originally expected to be in electricity provider scope. $34540.00. Cable. $37,142.13 N/A
Transformer 3 phase/480v - 300 KVA $36,800.00 $142,091.91 ATC quote $35,617.94. C&W quote $89,451. C&W Inv. #7155 $17,022.97. The ATC Needham site did not have adequate available power to service the interim TRX. Add. utility power was required, as well as assoc. switch gear and transformers beyond initial est. $142,091.91 N/A
Switchgear - industrial 800 amp $38,200.00 $12,000.00 N/A $12,000.00 N/A
Service entrance 3 phase/800 amp/208 volt $14,400.00 $22,568.80 Increase in scope to complete trenching, conduit installation and transformer pads that was originally expected to be in electricity provider scope. $22,568.80 N/A
UHF - Liquid Cooled Solid State Transmitter 68.5 - 75 kW $1,999,000.00 $1,550,180.32 N/A $914,656.11 Like-for-Like total of $914,656.11 vs. upgraded equipment purchase total of $1,550,180.32 for WGBX CH43 (Interim) THU9-EVO 73.5kW ATSC/67kW OFDM.
Monitoring $9,443.38 $9,443.38 Dexon - Cisco Meraki Sencore Monitoring Receivers. Ramtronix Sony $5,551.80 Amount matches Estimated Cost.
Primary Transmitter THU9-60 EVO 88.8kW $2,815,875.00 $2,291,493.59 $1,059,979.97
RF Monitor $4,075.00 $4,075.00 Orolia - Epsilon Clock for monitoring. $4,075.00 N/A
Other Electrical Service: Conduit and wiring material and labor costs required for new transmitter. $145,000.00 $145,000.00 C&W 10/18/19 Proposal $115,933.00 for WGBX Main electrical installation at Cedar St. Needham. De-icer addition $10,534.41. C&W 10/22/19 Proposal $11,670.00. C&W $1,301.33 EOS - Cable $141,248.86 N/A
Transformer 3 phase/480v - 300 KVA $36,800.00 $30,000.00 N/A $0.00 N/A
UHF - Liquid Cooled Solid State Transmitter 86.8 . 106 kW $2,630,000.00 $2,112,418.59 N/A $914,656.11 Like-for-Like total of $914,656.11 vs. upgraded equipment purchase total of $2,112,418.59 for WGBX CH43 (Main) THU9-60 88.5 kW ATSC/80.5 kW OFDM.
Auxiliary Transmitter Ranger CZ1000L $137,800.00 $30,000.00 $0.00
30 kW mask filter $32,600.00 $30,000.00 Existing backup transmitter cannot be retuned. Estimate is for retuning interim transmitter for post-transition channel, which is less expensive than replacing existing backup transmitter. $0.00 N/A
UHF and VHF - minor banding issues $105,200.00 $0.00 Existing backup transmitter cannot be retuned. Estimate is for retuning interim transmitter for post-transition channel, which is less expensive than replacing existing backup transmitter. **No expense due to phase change. N/A N/A

Components

Actual Information Description File Name
Distribution and Encoding

Component Description:
OpenGear 3.0 Frame with Cooling and Adv Network; OG3-FR power supply and Nielsen Watermark encoder.
Amount:
$24,968.25

Component Description:
OpenGear 3.0 Advanced Networking Frame Controller; Utility Video D/A RML.
Amount:
$3,648.47

Component Description:
OpenGear 3.0 Frame with Cooling and Adv Network.
Amount:
$1,382.77

Component Description:
Dual HD/SD-SDI Equalizing DA; openGear OGX Frame; 600 Watt Universal Power Supply.
Amount:
$4,149.63
Emergency Generator

Component Description:
Emergency power generator connection fee.
Amount:
$100,000.00
Microwave Link to Interim Site

Component Description:
WGBX Cabot Street, Duplex NON-Standby STL/TSL STL - 7012.5 MHz and TSL 6912.5MHz. G3 - Antennas, Waveguide and accessories.
Amount:
$49,996.80

Component Description:
6' Ice Shield for parabolic antenna.
Amount:
$5,249.00

Component Description:
Deducted $1,500 travel. WGBX Cabot Street, Duplex NON-Standby STL/TSL STL - 7012.5 MHz and TSL 6912.5MHz. G3 - Antennas, Waveguide and accessories.
Amount:
$48,496.79

Component Description:
50% WGBX shared expense. Ethernet Transceiver $24,370.88 minus 50% of credit for equipment exchange $10,030.00.
Amount:
$14,340.88

Component Description:
Adjustment for Evertz Microsystems Inv. # 284746 previously approved and paid.
Amount:
($6,434.50)

Component Description:
50% Shared expense. HD 4X1 Router.
Amount:
$1,402.50

Component Description:
50% WGBX shared expense. Ethernet Transceiver.
Amount:
$24,370.87

Component Description:
50% Shared expense. 4CH HD/SD Transceiver.
Amount:
$7,710.00

Component Description:
50% Shared expense. HD/SD SDI Relocking DA7 Outpt.
Amount:
$1,925.00

Component Description:
50% WGBX shared expense. Ethernet Transceiver.
Amount:
$6,434.50

Component Description:
WGBX Cabot Street, Duplex NON-Standby STL/TSL STL - 7012.5 MHz and TSL 6912.5MHz. G3 - Antennas, Waveguide and accessories.
Amount:
$49,996.79

Component Description:
50% WGBX shared expense. Ethernet Transceiver.
Amount:
$6,434.50
Engineering and Design Information not provided.
UHF inside RF system including switching

Component Description:
50% of shared expense. Belden RSNSKITU.
Amount:
$73.15

Component Description:
50% of shared expense. Belden cable.
Amount:
$957.00

Component Description:
50% of shared expense. Belden cable & connectors.
Amount:
$2,461.25

Component Description:
50% of shared expense. Kings connectors.
Amount:
$196.00
Other -- Building Addition Size: 250.0

Component Description:
50% down payment of equipment racks.
Amount:
$2,709.75

Component Description:
Approx. 600 to 1500 square foot addition (costs vary with location, site access, and construction type) $900.00 Testing for Asbestos and Lead Paint $900.00
Amount:
$1,800.00

Component Description:
Approx. 600 to 1500 square foot addition (costs vary with location, site access, and construction type) $450.00 Testing for Asbestos and Lead Paint $450.00
Amount:
$900.00

Component Description:
Remaining balance due plus freight for equipment racks.
Amount:
$2,909.75

Component Description:
50% WGBX shared expense. UPS for transmitter electronics.
Amount:
$4,791.82

Component Description:
Approx. 600 to 1500 square foot addition. $25,544.29. Asbestos Testing ($1,350.00).
Amount:
$24,194.29

Component Description:
Approx. 600 to 1500 square foot addition (costs vary with location, site access, and construction type) $900.00 Testing for Asbestos and Lead Paint $900.00
Amount:
$1,800.00

Component Description:
50% WGBX shared expense. UPS for transmitter electronics.
Amount:
$4,791.82

Component Description:
50% WGBX shared expense. UPS for transmitter electronics.
Amount:
$4,791.82
Other -- HVAC Service Type: C Size:20 (Other)

Component Description:
20 Ton System $8,065.00; Ice Shield for HVAC equipment $10,910.00; 10 Ton System $4,104.00.
Amount:
$23,079.00

Component Description:
20 Ton System $11,000.00 Ice Shield for HVAC equipment $2,000.00.
Amount:
$13,000.00

Component Description:
20 Ton System $11,000.00 Ice Shield for HVAC equipment $2,000.00
Amount:
$13,000.00

Component Description:
20 Ton System $5,500.00 Ice Shield for HVAC equipment $1,000.00
Amount:
$6,500.00
4" Rigid Conduit and Wiring (Cost per foot)

Component Description:
2 inch/3 inch/4 inch Rigid Conduit and Wiring. $6,750.00, $7840.00, $17,759.75.
Amount:
$32,349.75

Component Description:
2inch Rigid Conduit and Wiring (Cost per foot) $500.00 4inch Rigid Conduit and Wiring (Cost per foot) $960.17
Amount:
$1,460.17

Component Description:
50% split expense of Belden 10/C 24 AWG Cable.
Amount:
$319.15

Component Description:
50% split expense of Belden RG-223/U Coax.
Amount:
$918.48

Component Description:
Partial request for (1) Switch Control Cable for the WGBX Interim facility.
Amount:
$1,225.00

Component Description:
50% split expense of Belden 1592A-4.
Amount:
$139.50

Component Description:
7/8" Jumper Cable.
Amount:
$2,450.00

Component Description:
Bittree HD Video Jackfield.
Amount:
$2,516.00

Component Description:
Video Patch Cord.
Amount:
$148.50

Component Description:
2inch Rigid Conduit and Wiring (Cost per foot) $250.00 4inch Rigid Conduit and Wiring (Cost per foot) $480.08
Amount:
$730.08

Component Description:
2inch Rigid Conduit and Wiring (Cost per foot) $500.00 4inch Rigid Conduit and Wiring (Cost per foot) $960.17
Amount:
$1,460.17
Transformer 3 phase/480v - 300 KVA

Component Description:
15% Final payment for Interim electrical.
Amount:
$13,417.65

Component Description:
Transformer 3 phase/480v-500KVA $4,600. Other Transmitter Cost Not Listed: New electrical sub-panels $5,000.
Amount:
$9,600.00

Component Description:
15% Progress payment for Interim electrical.
Amount:
$13,417.65

Component Description:
30% Deposit for Interim electrical.
Amount:
$26,835.30

Component Description:
Transformer 3 phase/480v-500KVA $4,600. Other Transmitter Cost Not Listed: New electrical sub-panels $5,000.
Amount:
$9,600.00

Component Description:
Transformer 3 phase/480v-500KVA $4,021.20. Other Transmitter Cost Not Listed: New electrical sub-panels $17,196.74.
Amount:
$21,217.94

Component Description:
Transformer 3 phase/480v-500KVA $2,300. Other Transmitter Cost Not Listed: New electrical sub-panels $2,500.
Amount:
$4,800.00

Component Description:
Partial request for highlighted items related to electrical power installation.
Amount:
$17,022.97

Component Description:
40% Progress payment for Interim electrical.
Amount:
$35,780.40

Component Description:
30% Deposit for Interim electrical.
Amount:
$26,835.30

Component Description:
40% Progress payment for Interim electrical.
Amount:
$35,780.40
Switchgear - industrial 800 amp

Component Description:
Switchgear - Industrial 800 amp.
Amount:
$6,555.00

Component Description:
Switchgear - Industrial 800 amp.
Amount:
$3,630.00

Component Description:
Switchgear - Industrial 800 amp
Amount:
$1,815.00

Component Description:
Switchgear - Industrial 800 amp
Amount:
$3,630.00
Service entrance 3 phase/800 amp/208 volt

Component Description:
Service entrance 3 phase/800 amp/208 volt.
Amount:
$20,513.80

Component Description:
Service entrance 3 phase/800 amp/208 volt.
Amount:
$1,370.00

Component Description:
Service entrance 3 phase/800 amp/208 volt
Amount:
$1,370.00

Component Description:
Service entrance 3 phase/800 amp/208 volt.
Amount:
$685.00
UHF - Liquid Cooled Solid State Transmitter 68.5 - 75 kW

Component Description:
Final 10% payment due Upon Acceptance. Like-for-Like total of $914,656.11.
Amount:
$91,465.61

Component Description:
30% Downpayment for WGBX CH43 THU9-EVO 73.5kW ATSC/67kW OFDM.
Amount:
$465,054.10

Component Description:
60% payment due Upon Delivery of Like-for-Like total of $1,202,579.92 for WGBX CH43 (Interim) THU9-EVO 73.5kW ATSC/67kW OFDM.
Amount:
$721,547.95

Component Description:
60% payment due Upon Delivery of Like-for-Like total of $1,202,579.92 for WGBX CH43 (Interim) THU9-EVO 73.5kW ATSC/67kW OFDM.
Amount:
$721,547.95

Component Description:
60% payment due Upon Delivery of Like-for-Like total of $1,202,579.92 for WGBX CH43 (Interim) THU9-EVO 73.5kW ATSC/67kW OFDM. Requesting reimbursement of 90% payment schedule balance due of Like-for-Like minus previous payment received.
Amount:
$358,136.40
Monitoring

Component Description:
Keyence AP-C30K pressure sensor and configuration.
Amount:
$137.50

Component Description:
50% share of Kings KN-59-104 Straight Plug.
Amount:
$110.17

Component Description:
50% share of Cisco Meraki Ethernet Switch.
Amount:
$685.00

Component Description:
50% share of Kings KN-59-104 Straight Plug.
Amount:
$127.13

Component Description:
Epsilon Clock for monitoring.
Amount:
$4,492.00

Component Description:
50% share Meraki subscription license.
Amount:
$503.00

Component Description:
Monitor.
Amount:
$2,152.05

Component Description:
Monitor/bracket
Amount:
$1,236.53
RF Monitor

Component Description:
Epsilon Clock for monitoring.
Amount:
$4,075.00
Other Electrical Service: Conduit and wiring material and labor costs required for new transmitter.

Component Description:
30% Deposit for electrical installation of WGBX Main transmitter at 350 Cedar St. Needham.
Amount:
$34,779.90

Component Description:
Demo power and conduits to existing transmitter.
Amount:
$11,670.00

Component Description:
Platinum EZRJ45 Boots/Connectors
Amount:
$91.97

Component Description:
Partial request for (1) Switch Control Cable for the WGBX Main facility.
Amount:
$1,225.00

Component Description:
Belden 10/C 24 AWG Cable.
Amount:
$319.15

Component Description:
8' LED Strip light and switch above new transmitter.
Amount:
$1,301.33

Component Description:
70% balance due of WGBX Main electrical installation $81,153.10. New feed for De-Icer $9,720.31 plus $814.10 for De-Icer troubleshooting.
Amount:
$91,687.51

Component Description:
Belden 7883A-4 Cable.
Amount:
$174.00
Transformer 3 phase/480v - 300 KVA Information not provided.
UHF - Liquid Cooled Solid State Transmitter 86.8 . 106 kW

Component Description:
Final 10% payment due Upon Acceptance. Like-for-Like total of $914,656.11.
Amount:
$91,465.61

Component Description:
60% payment due Upon Delivery of Like-for-Like Total of $1,202,579.92 for WGBX (Main) THU9-60 EVO 88.5 kW ATSC/80.5 kW OFDM. Requesting reimbursement of 90% payment schedule balance due of Like-for-Like minus previous payment received.
Amount:
$462,416.52

Component Description:
60% payment due Upon Delivery of Like-for-Like Total of $1,202,579.92 for WGBX (Main) THU9-60 EVO 88.5 kW ATSC/80.5 kW OFDM.
Amount:
$721,547.95

Component Description:
60% payment due Upon Delivery of Like-for-Like Total of $1,202,579.92 for WGBX (Main) THU9-60 EVO 88.5 kW ATSC/80.5 kW OFDM.
Amount:
$721,547.95

Component Description:
30% Downpayment of Like-for-Like Total of $1,202,579.92.
Amount:
$360,773.98
30 kW mask filter Information not provided.
UHF and VHF - minor banding issues Information not provided.

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $2,598,423.38 $615,542.36 N/A $486,160.85 N/A
Total for all systems $11,134,348.27 $7,060,651.48 N/A $4,353,054.08 N/A
Interim Antenna TUM-AP-04-14/56-2-B $1,275,067.40 $271,571.60 $261,257.40
Nitrogen Generator $3,057.40 $3,057.40 Nitrogen Generator Upgrade. $3,057.40 N/A
Combiner Installation $14,530.00 $14,530.00 N/A $14,530.00 N/A
Tower rental $57,600.00 $57,600.00 One-time tower rental during market repack period. $57,600.00 N/A
Elbow complex, broadband, at antenna input, per 8 3/16. feedline (if needed) $18,950.00 $7,076.25 N/A $7,076.25 N/A
New combiner, cost per channel (without antenna) $84,200.00 $107,129.17 Actual cost from American Tower based on design and fabrication of the four station combining system. $107,129.17 N/A
Sweep test of existing antenna $6,730.00 $3,000.00 N/A $3,000.00 N/A
UHF - High Power Top Mount (200-1000 kW), Four Station broadband panel antenna, elliptically or circularly polarized $1,090,000.00 $79,178.78 N/A $68,864.58 N/A
Primary Antenna PEP70E $1,323,355.98 $343,970.76 $224,903.45
Combiner Installation $15,199.58 $15,199.58 N/A $7,012.80 N/A
Elbow complex, broadband, at antenna input, per 7 3/16. feedline (if needed) $16,850.00 $10,000.00 N/A $5,990.40 N/A
New combiner, cost per channel (without antenna) $84,200.00 $97,357.18 Actual cost inclusive of $8750 installation charge. Final cost including freight and tax. $97,357.18 Final cost covering freight and tax.
UHF - High Power Top Mount Five Station broadband panel antenna elliptically or circularly polarized $110,376.40 $110,376.40 ***New line updating antenna make/model***$126,250 plus side mount bracket expense of $3,750. $4,338.80 N/A
Sweep test of existing antenna $6,730.00 $5,000.00 N/A $4,166.67 N/A
UHF - High Power Top Mount (200-1000 kW), Four Station broadband panel antenna, elliptically or circularly polarized $1,090,000.00 $106,037.60 ***System Notice: Estimate adjusted and locked because line has been superseded.***$126,250 plus side mount bracket expense of $3,750. $106,037.60 N/A

Components

Actual Information Description File Name
Nitrogen Generator

Component Description:
Nitrogen Generator Upgrade.
Amount:
$750.00

Component Description:
Nitrogen Generator Upgrade.
Amount:
$2,307.40
Combiner Installation

Component Description:
Combiner installation.
Amount:
$9,280.00

Component Description:
Combiner installation.
Amount:
$3,500.00

Component Description:
Combiner installation
Amount:
$1,750.00

Component Description:
Combiner installation
Amount:
$3,500.00
Tower rental

Component Description:
ATC one-time tower rental during market repack period.
Amount:
$28,800.00

Component Description:
ATC one-time tower rental during market repack period.
Amount:
$28,800.00

Component Description:
ATC one-time tower rental during market repack period.
Amount:
$14,400.00

Component Description:
ATC one-time tower rental during market repack period.
Amount:
$14,400.00
Elbow complex, broadband, at antenna input, per 8 3/16. feedline (if needed)

Component Description:
Elbow complex, single channel, at antenna input, per 8-3/16" feedline (if needed).
Amount:
$3,330.00

Component Description:
Elbow complex, single channel, at antenna input, per 8-3/16" feedline.
Amount:
$2,081.25

Component Description:
Elbow complex, single channel, at antenna input, per 8-3/16" feedline (if needed).
Amount:
$3,330.00

Component Description:
Elbow complex, single channel, at antenna input, per 8 3/16" feedline (if needed).
Amount:
$1,665.00
New combiner, cost per channel (without antenna)

Component Description:
New combiner, cost per channel (without antenna).
Amount:
$67,700.00

Component Description:
New combiner, cost per channel (without antenna)
Amount:
$67,700.00

Component Description:
New combiner, cost per channel (without antenna)
Amount:
$5,579.17

Component Description:
New combiner, cost per channel (without antenna)
Amount:
$33,850.00
Sweep test of existing antenna

Component Description:
Sweep test of transmission line and antenna.
Amount:
$1,500.00

Component Description:
Sweep test of transmission line and antenna.
Amount:
$1,500.00

Component Description:
Sweep test of transmission line and antenna.
Amount:
$750.00

Component Description:
Sweep test of transmission line and antenna.
Amount:
$750.00
UHF - High Power Top Mount (200-1000 kW), Four Station broadband panel antenna, elliptically or circularly polarized

Component Description:
Four station broadband panel antenna, elliptically or circularly polarized.$25,701.98-$10,314.20 for upgrade.
Amount:
$15,387.78

Component Description:
Four station broadband panel antenna, elliptically or circularly polarized.
Amount:
$35,651.20

Component Description:
Four station broadband panel antenna, elliptically or circularly polarized
Amount:
$17,825.60

Component Description:
Four station broadband panel antenna, elliptically or circularly polarized.
Amount:
$35,651.20
Combiner Installation

Component Description:
Combiner installation. Final actual cost came in lower then estimated.
Amount:
($8,186.78)

Component Description:
Combiner installation.
Amount:
$2,812.50

Component Description:
Combiner installation.
Amount:
$2,812.50

Component Description:
Combiner installation.
Amount:
$12,387.08
Elbow complex, broadband, at antenna input, per 7 3/16. feedline (if needed)

Component Description:
Elbow complex, broadband, at antenna input, per 8 3/16 feedline. Actual cost came in lower then estimated.
Amount:
($2,009.60)

Component Description:
Elbow complex, broadband, at antenna input, per 8 3/16 feedline (if needed).
Amount:
$2,500.00

Component Description:
Elbow complex, broadband, at antenna input, per 8 3/16 feedline (if needed).
Amount:
$2,500.00

Component Description:
Elbow complex, broadband, at antenna input, per 8 3/16 feedline (if needed).
Amount:
$5,500.00
New combiner, cost per channel (without antenna)

Component Description:
New combiner, cost per channel (without antenna).
Amount:
$70,230.41

Component Description:
New combiner, cost per channel (without antenna). Final cost covering freight and tax.
Amount:
$4,251.77

Component Description:
New combiner, cost per channel (without antenna).
Amount:
$22,875.00

Component Description:
New combiner, cost per channel (without antenna).
Amount:
$22,875.00
UHF - High Power Top Mount Five Station broadband panel antenna elliptically or circularly polarized

Component Description:
RFS PEP70E UHF Antenna. Final cost covering freight and tax.
Amount:
$4,338.80

Component Description:
$74,475.10 UHF - High Power Top Mount (200-1000 kW) Four station broadband panel antenna, elliptically or circularly polarized. $937.50 Side mount brackets for high power antennas.
Amount:
$73,537.60

Component Description:
$31,562.50 UHF - High Power Top Mount (200-1000 kW) Four station broadband panel antenna, elliptically or circularly polarized. $937.50 Side mount brackets for high power antennas.
Amount:
$32,500.00
Sweep test of existing antenna

Component Description:
Sweep test of transmission line and antenna.
Amount:
$1,250.00

Component Description:
Sweep test of transmission line and antenna.
Amount:
$2,916.67

Component Description:
Sweep test of transmission line and antenna.
Amount:
$1,250.00
UHF - High Power Top Mount (200-1000 kW), Four Station broadband panel antenna, elliptically or circularly polarized

Component Description:
$74,475.10 UHF - High Power Top Mount (200-1000 kW) Four station broadband panel antenna, elliptically or circularly polarized. ($937.50) Side mount brackets for high power antennas.
Amount:
$73,537.60

Component Description:
$31,562.50 UHF - High Power Top Mount (200-1000 kW) Four station broadband panel antenna, elliptically or circularly polarized. $937.50 Side mount brackets for high power antennas.
Amount:
$32,500.00

Component Description:
$31,562.50 UHF - High Power Top Mount (200-1000 kW) Four station broadband panel antenna, elliptically or circularly polarized. $937.50 Side mount brackets for high power antennas.
Amount:
$32,500.00

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,011,380.00 $200,853.92 N/A $200,853.91 N/A
Total for all systems $11,134,348.27 $7,060,651.48 N/A $4,353,054.08 N/A
Interim Transmission Line $997,500.00 $168,962.57 $168,962.56
Rigid Transmission Line - copper, 8 3/16" broadband $997,500.00 $168,962.57 Rigid Transmission Line - copper 7 3/16" $24,354; copper 8 3/16" $113,496 and Nitrogen Generator Upgrade $3,000. Dielectric $27,283.59 $168,962.56 N/A
Primary Transmission Line $0.00 $0.00 $0.00
Transmission line refurbish $0.00 $0.00 Cost to refurbish two (2) existing 8-3/16" transmission lines per ATC quote. IT HAS BEEN DETERMINED THAT THE EXPENSE IS NOT REIMBURSABLE UNDER THE FCC GUIDELINES. $0.00 N/A
Primary Transmission Line $13,880.00 $31,891.35 $31,891.35
Rigid Transmission Line - copper, 8 3/16" $13,880.00 $31,891.35 Cost for elbows, connectors cut pieces, 80' of transmission line, freight and tax. $31,891.35 N/A

Components

Actual Information Description File Name
Rigid Transmission Line - copper, 8 3/16" broadband

Component Description:
Rigid Transmission Line - copper 8 3/16" $42,450.00 and Nitrogen Generator Upgrade $1,500.00.
Amount:
$43,950.00

Component Description:
Freight charges.
Amount:
$1,530.90

Component Description:
Rigid Transmission Line - copper 8 3/16" $21,225.00 and Nitrogen Generator Upgrade $750.00.
Amount:
$21,975.00

Component Description:
Rigid Transmission Line - copper 8 3/16" $49,821.47; 7 3/16" $24,354.00 and Nitrogen Generator Upgrade $1,578.50.
Amount:
$75,753.97

Component Description:
Rigid transmission line, flange assy, conn anchor, kit assy, hanger kit.
Amount:
$22,511.40

Component Description:
Rigid Transmission Line - copper 8 3/16" $42,450.00 and Nitrogen Generator Upgrade $1,500.00.
Amount:
$43,950.00

Component Description:
T/L Tuner w/freight charges.
Amount:
$3,241.29
Transmission line refurbish

Component Description:
$12,187.50 8 3/16" broadband $750.00 Nitrogen Generator Upgrade.
Amount:
$12,937.50
Rigid Transmission Line - copper, 8 3/16"

Component Description:
Conn 7-75 Anch Adptr Die/Myat.
Amount:
$793.64

Component Description:
T/L Tuner Section.
Amount:
$1,808.00

Component Description:
Expedited freight charges - due to an installation drawing measurement change expedited shipping of parts was necessary for the installation crew to stay on schedule.
Amount:
$60.52

Component Description:
Expedited freight charges - due to an installation drawing measurement change expedited shipping of parts was necessary for the installation crew to stay on schedule.
Amount:
$500.75

Component Description:
Expedited freight charges - due to an installation drawing measurement change expedited shipping of parts was necessary for the installation crew to stay on schedule.
Amount:
$238.28

Component Description:
Flange Assembly, Hardware, Hanger, Coax.
Amount:
$9,009.36

Component Description:
Cost for elbows, connectors, cut pieces. 80' of transmission line. freight and tax.
Amount:
$19,480.80

Component Description:
Freight charges.
Amount:
$60.52

Component Description:
Freight charges.
Amount:
$500.75

Component Description:
Freight charges.
Amount:
$238.28

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,012,600.00 $637,213.38 N/A $533,949.22 N/A
Total for all systems $11,134,348.27 $7,060,651.48 N/A $4,353,054.08 N/A
Primary Tower GTOWER $404,200.00 $171,957.25 $87,630.59
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study $26,300.00 $25,000.00 N/A $7,440.00 N/A
Minor tower reinforcement/modifications $158,000.00 $77,057.25 Actual American Tower costs. $77,057.25 Sub-total matches the Estimated Cost.
Tall Tower (greater than 500') $210,500.00 $60,500.00 N/A $0.00 N/A
Tower Permit Package $9,400.00 $9,400.00 Tower permit drawing plus ground & building A&E permit drawing per attached ATC quote $4,700 + $4,700. $3,133.34 N/A
Auxiliary Tower GTOWER $608,400.00 $465,256.13 $446,318.63
Structural engineering tower load study for a documented tower with candelabra $20,000.00 $19,000.00 N/A $5,700.00 N/A
Minor tower reinforcement/modifications $158,000.00 $43,010.70 Major tower reinforcement/modification $31,682.25 Construction project management (Tower modifications reinforcements and facilities) $11,328.45 $43,010.70 N/A
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $393,845.43 Rigging, testing for asbestos and lead paint, site security, public hearing, and tower rental per attached ATC quote. Helicopter Lift $42,508.00. $393,845.43 N/A
Tower Permits $9,400.00 $9,400.00 Tower permit drawing plus ground & building A&E permit drawing per attached ATC quote $3,762.50 N/A

Components

Actual Information Description File Name
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study

Component Description:
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study.
Amount:
$2,893.33

Component Description:
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study.
Amount:
$1,240.00

Component Description:
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study.
Amount:
$1,240.00

Component Description:
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study.
Amount:
$826.67

Component Description:
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study
Amount:
$1,240.00

Component Description:
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study.
Amount:
$620.00

Component Description:
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study.
Amount:
$1,240.00

Component Description:
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study
Amount:
$620.00
Minor tower reinforcement/modifications

Component Description:
$58,616.54 Minor tower reinforcement/modifications (Labor and materials) $5,687.50 Construction project management (Tower Modification reinforcements and facilities)
Amount:
$64,304.04

Component Description:
Final costs: $64,866.54 Minor tower reinforcement/modifications (Labor and materials) $12,190.71 Construction project management (Tower Modification reinforcements and facilities)
Amount:
$5,190.71

Component Description:
$6,250.00 Minor tower reinforcement/modifications (Labor and materials) $1,312.50 Construction project management (Tower Modification reinforcements and facilities).
Amount:
$7,562.50

Component Description:
$6,250.00 Minor tower reinforcement/modifications (Labor and materials) $1,312.50 Construction project management (Tower Modification reinforcements and facilities)
Amount:
$7,562.50
Tall Tower (greater than 500') Information not provided.
Tower Permit Package

Component Description:
$1,175 Tower Permit Drawing Package. $1,175 Ground & Building A&E Permit Drawing Package.
Amount:
$2,350.00

Component Description:
$391.67 Tower Permit Drawing Package. $391.67 Ground & Building A&E Permit Drawing Package.
Amount:
$783.34

Component Description:
$1,175 Tower Permit Drawing Package. $1,175 Ground & Building A&E Permit Drawing Package.
Amount:
$2,350.00
Structural engineering tower load study for a documented tower with candelabra

Component Description:
Structural engineering tower load study for a documented tower with candelabra.
Amount:
$2,216.67

Component Description:
Structural engineering tower load study for a documented tower with candelabra.
Amount:
$633.33

Component Description:
Structural engineering tower load study for a documented tower with candelabra.
Amount:
$950.00

Component Description:
Structural engineering tower load study for a documented tower with candelabra.
Amount:
$950.00

Component Description:
Structural engineering tower load study for a documented tower with candelabra.
Amount:
$950.00

Component Description:
Structural engineering tower load study for a documented tower with candelabra
Amount:
$475.00

Component Description:
Structural engineering tower load study for a documented tower with candelabra.
Amount:
$475.00

Component Description:
Structural engineering tower load study for a documented tower with candelabra
Amount:
$950.00
Minor tower reinforcement/modifications

Component Description:
Major tower reinforcement/modification $8,750.00 Construction project management (Tower modification reinforcements and facilities) $1,500.00.
Amount:
$10,250.00

Component Description:
Major tower reinforcement/modification $18,557.25 Construction project management (Tower modification reinforcements and facilities) $9,078.45.
Amount:
$27,635.70

Component Description:
Major tower reinforcement/modification $4,375.00 Construction project management (Tower modification reinforcements and facilities) $750.00
Amount:
$5,125.00

Component Description:
Major tower reinforcement/modification $8,750.00 Construction project management (Tower modification reinforcements and facilities) $1,500.00
Amount:
$10,250.00
Complex Tower (includes, for example, those with candelabras and/or stacked antennas)

Component Description:
Complex Tower $49,566.51 and Helicopter Lift 42,508.00.
Amount:
$92,074.51

Component Description:
Complex Tower.
Amount:
$27,950.13

Component Description:
Complex Tower.
Amount:
$18,562.50

Component Description:
Complex Tower.
Amount:
$143,551.50

Component Description:
Complex Tower
Amount:
$13,975.07

Component Description:
Complex Tower
Amount:
$27,950.13

Component Description:
Complex tower.
Amount:
$97,731.72

Component Description:
Complex Tower.
Amount:
$18,562.50
Tower Permits

Component Description:
Tower Permit Drawing Package ($3,525.00) Ground & Building A&E Permit Drawing Package $237.50
Amount:
($3,287.50)

Component Description:
Tower Permit Drawing Package $2,350.00 Ground & Building A&E Permit Drawing Package $2,350.00.
Amount:
$4,700.00

Component Description:
Tower Permit Drawing Package $2,350.00 Ground & Building A&E Permit Drawing Package $2,350.00
Amount:
$4,700.00

Component Description:
Tower Permit Drawing Package $1,175.00 Ground & Building A&E Permit Drawing Package $1,175.00
Amount:
$2,350.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $146,860.00 $211,633.50 N/A $98,557.65 N/A
Total for all systems $11,134,348.27 $7,060,651.48 N/A $4,353,054.08 N/A
Outside Professional Services $146,860.00 $211,633.50 $98,557.65
Attorney Fees - Draft Viewer Announcements $2,000.00 $2,000.00 N/A $335.00 N/A
Attorney Fees - Prepare Transition Progress Report $5,000.00 $5,000.00 N/A $368.50 N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $80,000.00 Field study $80,000 - vendor unknown $0.00 N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $7,360.00 $7,000.00 N/A $0.00 N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $27,000.00 Complex request with shared tower and need for interim facilities, also to be shared with multiple broadcasters; responding to FCC inquiries. $26,336.00 N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A $848.75 N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $6,459.00 Complex request with shared tower and need for interim facilities, also to be shared with multiple broadcasters; responding to FCC inquiries. $5,789.00 N/A
Prepare request for Special Temporary Authorization $4,100.00 $4,345.75 Complex request with shared tower and need for interim facilities, also to be shared with multiple broadcasters; responding to FCC inquiries. $4,345.75 revise.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A $0.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A N/A N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $13,525.00 $5,000 ATC Aux $5,000 ATC Main $1,075.00 Orion Broadcast Solutions. $375.00 Chesapeake #4090 $550.00 Chesapeake #4205 $13,525.00 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $9,093.75 Address transition timing and site coordination meeting for primary and interim sites per attached ATC quotes. Wiley Rein legal fees. $9,093.73 N/A
Prepare and or review reimbursement form $2,630.00 $15,000.00 Complex request with shared tower and need for interim facilities, also to be shared with multiple broadcasters; responding to FCC inquiries. $14,061.50 N/A
Project management of the transition $15,010.00 $35,460.00 Primary: 44 hrs constr. proj. mgt + 94.8 hrs of proj. mgt for transition + RF sys test Interim: 24 hrs constr. proj. mgt + 94.8 hrs proj. mgt for transition + RF sys test Per ATC quotes $35,460.00 $23,854.42 N/A

Components

Actual Information Description File Name
Attorney Fees - Draft Viewer Announcements

Component Description:
Draft instructions for WGBX-TV repack announcements on 5/9/19.
Amount:
$335.00
Attorney Fees - Prepare Transition Progress Report

Component Description:
Draft transition progress reports 8/2/19.
Amount:
$201.00

Component Description:
Professional services on 1/7/19.
Amount:
$167.50

Component Description:
Professional services on 8/2-5/19.
Amount:
$502.50
Comprehensive coverage verification via field study, if needed

Component Description:
Moved to Perform Engineering study as instructed by FCC. Analysis of power levels, interference analysis and studies related to FCC applications and filings.
Amount:
N/A

Component Description:
Analysis of power levels, interference analysis and studies related to FCC applications and filings.
Amount:
$187.50

Component Description:
Moved to Perform Engineering study as instructed by FCC. Analysis of power levels, interference analysis and studies related to FCC applications and filings.
Amount:
N/A

Component Description:
Analysis of power levels, interference analysis and studies related to FCC applications and filings.
Amount:
$1,075.00
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees - Negotiation of lease and other matters for shared locations

Component Description:
Partial reimbursement for services on 10/31/17, 11/9/17, 11/13/17 and 11/20/17.
Amount:
$4,210.50

Component Description:
Partial reimbursement for professional services from 2/13-15/18.
Amount:
$1,156.00

Component Description:
Partial reimbursement for services on 10/5/17.
Amount:
$847.50

Component Description:
For professional services from 1/2-19/18.
Amount:
$4,414.00

Component Description:
Partial reimbursement for professional services from 4/19-27/18.
Amount:
$8,092.00

Component Description:
Partial reimbursement for professional services from3/6-19/18.
Amount:
$7,616.00
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application

Component Description:
6/19/20 Review repack status.
Amount:
$186.25

Component Description:
Professional services on 2/5/20.
Amount:
$103.75

Component Description:
Professional services on 8/15/19.
Amount:
$167.50

Component Description:
Professional services on 7/15-16/20.
Amount:
$558.75
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
Partial reimbursement for professional services on 6/20/17.
Amount:
$113.00

Component Description:
Professional services on 7/22/19.
Amount:
$1,172.50

Component Description:
Partial reimbursement for professional services on 6/6-30/17.
Amount:
$1,742.50

Component Description:
Partial reimbursement for .30 hrs. on 12/18/17.
Amount:
$270.00

Component Description:
Professional services on 8/2-7/19.
Amount:
$670.00

Component Description:
Professional services on 2/12-25/20.
Amount:
$372.50

Component Description:
Professional services on 1/15-16/20.
Amount:
$931.25

Component Description:
Professional service on 10/19/17 & 10/30/17.
Amount:
$459.00

Component Description:
Professional services on 5/30/17.
Amount:
$423.75

Component Description:
Professional services on 1/9/18.
Amount:
$304.50
Prepare request for Special Temporary Authorization

Component Description:
Professional services on 4/20/20.
Amount:
$186.25

Component Description:
Professional services on 7/11-31/19.
Amount:
$2,345.00

Component Description:
Professional services on 3/18/20.
Amount:
$186.25

Component Description:
Professional services on 2/26/20.
Amount:
$186.25

Component Description:
Professional services on 1/2-3/18.
Amount:
$617.00

Component Description:
Professional services on 9/28-29/17.
Amount:
$825.00
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application Information not provided.
Perform engineering study for new channel assignment and antenna development

Component Description:
Perform engineering study for new channel assignment and antenna development (Cost per customer).
Amount:
$2,500.00

Component Description:
Develop technical parameters for interim antenna on repack CH. 32 for use during transition. Prep, upload exhibits for FCC application.
Amount:
$600.00

Component Description:
Perform engineering study for new channel assignment and antenna development.
Amount:
$1,250.00

Component Description:
Preparation of engineering portions of FCC application.
Amount:
$350.00

Component Description:
Analysis of power levels, interference analysis and studies related to FCC applications and filings.
Amount:
$375.00

Component Description:
Perform engineering study for new channel assignment and antenna development (Cost per customer)
Amount:
$1,250.00

Component Description:
Perform engineering study for new channel assignment and antenna development.
Amount:
$3,750.00

Component Description:
Develop final operating constants, FCC application prep. Provide exhibits.
Amount:
$575.00

Component Description:
Perform engineering study for new channel assignment and antenna development.
Amount:
$1,250.00

Component Description:
Analysis of power levels, interference analysis and studies related to FCC applications and filings.
Amount:
$550.00

Component Description:
Perform engineering study for new channel assignment and antenna development.
Amount:
$1,250.00

Component Description:
Frequency Search - 7 GHz Duplex path.
Amount:
$1,075.00

Component Description:
Perform engineering study for new channel assignment and antenna development (Cost per customer)
Amount:
$2,500.00
Address transition timing and coordination issues w/ other stations and wireless

Component Description:
Address transition timing and coordination issues with other stations and wireless.
Amount:
$1,500.00

Component Description:
Address transition timing and coordination issues with other stations and wireless (Cost per customer).
Amount:
$1,250.00

Component Description:
Address transition timing and coordination issues with other stations and wireless.
Amount:
$500.00

Component Description:
Analysis of power levels, interference analysis and studies related to FCC applications and filings.
Amount:
$1,075.00

Component Description:
Partial reimbursement for profession services on 11/1-26/18.
Amount:
$2,343.75

Component Description:
Address transition timing and coordination issues with other stations and wireless $625.00. Site coordination $1,250.00.
Amount:
$1,875.00

Component Description:
Analysis of power levels, interference analysis and studies related to FCC applications and filings.
Amount:
$187.50

Component Description:
$1,000 Address transition timing and coordination issues with other stations and wireless. ($.02) Project management of transition.
Amount:
$999.98

Component Description:
Analysis of power levels, interference analysis and studies related to FCC applications and filings.
Amount:
$550.00

Component Description:
Address transition timing and coordination issues with other stations and wireless.
Amount:
$500.00

Component Description:
Address transition timing and coordination issues with other stations and wireless (Cost per customer)
Amount:
$625.00

Component Description:
Analysis of power levels, interference analysis and studies related to FCC applications and filings.
Amount:
$375.00

Component Description:
Address transition timing and coordination issues with other stations and wireless (Cost per customer)
Amount:
$1,250.00
Prepare and or review reimbursement form

Component Description:
12/10-17/19 Review reimbursement form.
Amount:
$837.50

Component Description:
Professional services on 6/10/21.
Amount:
$195.00

Component Description:
Partial reimbursement for professional services on 5/9-18/17.
Amount:
$226.00

Component Description:
Partial reimbursement. Professional services from 8/23-31/17.
Amount:
$2,260.00

Component Description:
11/13-21/19 Review reimbursement form.
Amount:
$502.50

Component Description:
Professional services on 4/26/18.
Amount:
$156.25

Component Description:
Professional services 1/12/18.
Amount:
$500.00

Component Description:
Professional services on 1/6/19 & 1/31/19.
Amount:
$335.00

Component Description:
9/9-17/19 Review reimbursement form.
Amount:
$1,340.00

Component Description:
Partial reimbursement for 5/23-26/21 Review reimbursement form.
Amount:
$468.00

Component Description:
Professional services on 9/9-29/21.
Amount:
$1,365.00

Component Description:
Professional services from 10/9-18/17.
Amount:
$565.00

Component Description:
Professional services from 9/1-14/17.
Amount:
$1,130.00

Component Description:
Professional services 7/7-12/17.
Amount:
$3,473.75

Component Description:
Professional services on 7/9/20.
Amount:
$372.50

Component Description:
10/2-31/19 Review reimbursement form.
Amount:
$335.00
Project management of the transition

Component Description:
Project management of the transition, if needed (Cost per hour per customer).
Amount:
$4,740.00

Component Description:
Project management of the transition, if needed.
Amount:
$2,370.00

Component Description:
Project management of the transition, if needed.
Amount:
$7,110.02

Component Description:
This has been resubmitted under Other Expenses: Engineering Construction Services as requested by FCC.
Amount:
N/A

Component Description:
This has been resubmitted under Other Expenses: Engineering Construction Services as requested by FCC.
Amount:
N/A

Component Description:
WGBX TRX Interim: Design Coordination and Construction
Amount:
$51,537.31

Component Description:
Project management of the transition, if needed (Cost per hour per customer)
Amount:
$2,370.00

Component Description:
WGBX TRX Interim: Construction Phase Services.
Amount:
$4,894.40

Component Description:
Project management of the transition.
Amount:
$2,370.00

Component Description:
WGBX TRX Interim: Site Survey, Outdoor Cooling Equipment.
Amount:
$7,127.52

Component Description:
This has been resubmitted under Other Expenses: Engineering Construction Services as requested by FCC.
Amount:
N/A

Component Description:
This has been resubmitted under Other Expenses: Engineering Construction Services as requested by FCC.
Amount:
N/A

Component Description:
This has been resubmitted under Other Expenses: Engineering Construction Services as requested by FCC.
Amount:
N/A

Component Description:
This has been resubmitted under Other Expenses: Engineering Construction Services as requested by FCC.
Amount:
N/A

Component Description:
Project management of the transition, if needed (Cost per hour per customer)
Amount:
$4,740.00

Component Description:
WGBX UHF Main: Design Coordination and Construction.
Amount:
$34,237.45

Component Description:
WGBX UHF Main: Site Survey, Outdoor Cooling Equip. Study, Demo Plan.
Amount:
$21,312.32

Component Description:
Project management of the transition, if needed.
Amount:
$2,370.00

Component Description:
This has been resubmitted under Other Expenses: Engineering Construction Services as requested by FCC.
Amount:
N/A

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $790,937.13 $796,504.13 N/A $541,573.65 N/A
Total for all systems $11,134,348.27 $7,060,651.48 N/A $4,353,054.08 N/A
Other Expenses $790,937.13 $796,504.13 $541,573.65
Remote Control $15,118.73 $15,118.73 NFB Consulting - Statmon Recon SCMS - WGBX Aux - Burk ARC Remote Control $6,036.67 N/A
Transmitter and RF System $13,748.00 $13,748.00 American Tower: RF Field Engineering Services. $13,748.00 N/A
Transmitter Installation and Commissioning $184,257.67 $184,257.67 Marsand, Inc. - Installation of WGBX Main and WGBX Interim transmitters; additional mobilization and proof-of-performance. $184,257.67 N/A
Transition site encoding and transport stream conversion $134,226.18 $134,226.18 Heartland Video Systems ELC-X2S; transport stream converter. $2,791.28 N/A
RF System Commission $10,000.00 $10,000.00 Includes primary and interim sites per ATC quotes. $10,000.00 N/A
Pre planning survey and engineering $5,000.00 $5,000.00 N/A $0.00 N/A
Engineering Construction Services $268,000.00 $268,000.00 EJC International Services - professional engineering services to replace existing main transmitter at 350 Cedar Street and provide a new aux transmitter at 140 Cabot Street. Wireless Construction $75,000. $192,061.02 N/A
Building Renovation $75,467.50 $75,467.50 Wireless Construction: Heat Exchanger pads, CMU wall demo, custom hatch plates, ladder brackets, installation of access ladder, filter plinth, decom of existing combiner equipment. $75,467.50 N/A
MVPD Notification of Channel Change $8,430.00 $8,430.00 DTV Notification - MVPD Notification Services: Notification of Cable and Satellite MVPD Providers of new RF Channel and Transport Stream Parameters on Repack Channel. x 2 due to Phase Change. $8,430.00 N/A
Develop and air announcement of upcoming channel change $30,000.00 $30,000.00 N/A $0.00 N/A
Equipment Storage $5,000.00 $5,000.00 N/A $4,509.35 N/A
Equipment Delivery and Handling Charges $12,000.00 $12,000.00 Includes primary and interim sites per ATC quotes. $11,006.11 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $11,146.81 $11,146.81 N.E. Disposal, American Tower. $11,146.81 Actual costs have been submitted. These match the Estimated cost.
Non-zoning permits $1,500.00 $1,500.00 Includes primary and interim sites per ATC quotes. $0.00 N/A
Local Zoning $1,240.00 $1,240.00 Public hearing for primary and interim sites per ATC quotes. ATC Public Hearing $400 $750.00 N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $0.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $99.00 Wiley Rein Inv. # 1433074. $99.00 N/A
DTV Medical Facility Notification $11,550.00 $18,658.00 DTV Notification Service: Notification of Medical Facilities - Transmitter Medical Facility Notification. x 2 due to Phase Change $18,658.00 N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $0.00 N/A $0.00 N/A
Site coordination meetings $2,612.24 $2,612.24 N/A $2,612.24 N/A

Components

Actual Information Description File Name
Remote Control

Component Description:
WGBX share of Statmon STC-RSCON. Quote did not include shipping.
Amount:
$6,036.67

Component Description:
WGBX Aux - Burk ARC Remote Control.
Amount:
$9,082.06
Transmitter and RF System

Component Description:
Comprehensive coverage verification via field study.
Amount:
$13,748.00
Transmitter Installation and Commissioning

Component Description:
Final installation and initialization of the WGBX Main transmitter. Completion of technical proof of performance.
Amount:
$6,234.04

Component Description:
50% Deposit for installation of the WGBX Interim transmitter.
Amount:
$36,250.00

Component Description:
50% Balance due for installation of the WGBX Interim transmitter.
Amount:
$36,250.00

Component Description:
Final installation and initialization of the WGBX Interim transmitter. Completion of technical proof of performance.
Amount:
$12,123.63

Component Description:
50% Balance due for installation of the WGBX Main transmitter.
Amount:
$46,700.00

Component Description:
50% Deposit for installation of the WGBX Main transmitter.
Amount:
$46,700.00
Transition site encoding and transport stream conversion

Component Description:
Single interface unidirectional transport stream converter.
Amount:
$2,791.28

Component Description:
Harmonic HD/SD Encoder Bundle for transitional site.
Amount:
$131,434.90
RF System Commission

Component Description:
RF System Test.
Amount:
$1,250.00

Component Description:
RF System Test.
Amount:
$1,375.00

Component Description:
RF System Test
Amount:
$3,125.00

Component Description:
RF System Test.
Amount:
$3,625.00

Component Description:
RF System Test
Amount:
$1,250.00

Component Description:
RF System Test
Amount:
$625.00

Component Description:
RF System Test.
Amount:
$1,375.00
Pre planning survey and engineering Information not provided.
Engineering Construction Services

Component Description:
WGBX UHF Interim: Site Survey and Lidar Scanning, Outdoor Cooling Equipment Study, Design Coordination and Construction, Construction Phase Services, Project Expenses.
Amount:
$5,115.04

Component Description:
WGBX UHF Interim: Site Survey and Lidar Scanning, Outdoor Cooling Equipment Study, Design Coordination and Construction, Construction Phase Services, Project Expenses.
Amount:
$5,500.00

Component Description:
WGBX UHF Main: Site Survey and Lidar Scanning, Outdoor Cooling Equipment Study, Demo Plan, Design Coordination and Construction, Project Expenses.
Amount:
$5,307.52

Component Description:
WGBX UHF Main: Site Survey and Lidar Scanning, Outdoor Cooling Equipment Study, Demo Plan, Project Expenses.
Amount:
$21,312.32

Component Description:
WGBX UHF Main: Site Survey and Lidar Scanning, Outdoor Cooling Equipment Study, Demo Plan, Design Coordination and Construction, Project Expenses.
Amount:
$18,897.60

Component Description:
WGBX UHF Interim: Site Survey and Lidar Scanning, Outdoor Cooling Equipment Study, Project Expenses.
Amount:
$7,127.52

Component Description:
WGBX UHF Interim: Site Survey and Lidar Scanning, Outdoor Cooling Equipment Study, Design Coordination and Construction, Construction Phase Services, Project Expenses.
Amount:
$4,894.40

Component Description:
WGBX UHF Interim: Site Survey and Lidar Scanning, Outdoor Cooling Equipment Study, Design Coordination and Construction, Construction Phase Services, Project Expenses.
Amount:
$4,894.40

Component Description:
WGBX UHF Interim: Site Survey and Lidar Scanning, Outdoor Cooling Equipment Study, Design Coordination and Construction, Project Expenses.
Amount:
$51,537.31

Component Description:
WGBX UHF Main: Site Survey and Lidar Scanning, Outdoor Cooling Equipment Study, Demo Plan, Design Coordination and Construction, Project Expenses.
Amount:
$34,237.45

Component Description:
WGBX UHF Main: Site Survey and Lidar Scanning, Outdoor Cooling Equipment Study, Demo Plan, Design Coordination and Construction, Project Expenses.
Amount:
$33,237.46
Building Renovation

Component Description:
Decom of existing combiner equipment, including cabinet removals, heat exchangers and associated coolant lines.
Amount:
$8,500.00

Component Description:
Requesting 50% of total. Monitor installation. Hatch plate for heat exchanger; ladder brackets; access ladder; microflex window.
Amount:
$3,352.50

Component Description:
Filter plinth labor and materials.
Amount:
$8,500.00

Component Description:
Room referb, HVAC labor and materials.
Amount:
$26,997.50

Component Description:
Completion of room refurb, HVAC labor and materials.
Amount:
$17,457.50

Component Description:
On-site labor to cut back a smoke detector tube in order to install a new cable tray.
Amount:
$860.00

Component Description:
Heat Exchanger Pads; CMU Wall Demo.
Amount:
$9,800.00
MVPD Notification of Channel Change

Component Description:
MVPD Notification Services: Notification of Cable and Satellite MVPD Providers of new RF Channel and Transport Stream Parameters on Repack Channel.
Amount:
$4,215.00

Component Description:
2nd Notification due to phase change. MVPD Notification Services: Notification of Cable and Satellite MVPD Providers.
Amount:
$4,215.00

Component Description:
Notification of Cable and Satellite MVPD Providers of new RF Channel and Transport Stream Parameters on Repack Channel.
Amount:
$4,215.00
Develop and air announcement of upcoming channel change Information not provided.
Equipment Storage

Component Description:
Site Security Company during construction for theft prevention and vandalism.
Amount:
$1,800.00

Component Description:
Site Security Company during construction for theft prevention and vandalism.
Amount:
$900.00

Component Description:
Equipment storage.
Amount:
$1,456.20

Component Description:
Equipment Storage $1,000. Site Security ($2,700.00). Security System - Bldg. 140 $2,053.15.
Amount:
$353.15

Component Description:
Site Security Company during construction for theft prevention and vandalism.
Amount:
$1,800.00
Equipment Delivery and Handling Charges

Component Description:
Local transportation.
Amount:
$165.00

Component Description:
50% shared moving expense.
Amount:
$355.00

Component Description:
Equipment Delivery and Handling Charges (Cost per customer).
Amount:
$1,500.00

Component Description:
Local transportation.
Amount:
$1,175.00

Component Description:
50% shared moving expense.
Amount:
$4,210.75

Component Description:
Equipment Delivery and Handling Charges.
Amount:
$1,375.00

Component Description:
Equipment Delivery and Handling Charges (Cost per customer)
Amount:
$750.00

Component Description:
Equipment Delivery and Handling Charges.
Amount:
($2,250.00)

Component Description:
Equipment Delivery and Handling Charges.
Amount:
$1,375.00

Component Description:
Equipment Delivery and Handling Charges.
Amount:
$3,125.00

Component Description:
Equipment Delivery and Handling Charges.
Amount:
($1,979.64)

Component Description:
Local transportation.
Amount:
$1,010.00

Component Description:
Local transportation.
Amount:
$800.00

Component Description:
50% shared moving expense.
Amount:
$770.00

Component Description:
Equipment Delivery and Handling Charges (Cost per customer)
Amount:
$1,500.00
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
Disposal cost.
Amount:
$4,646.06

Component Description:
Transformer oil disposal.
Amount:
$3,452.75

Component Description:
Disposal cost.
Amount:
$3,048.00
Non-zoning permits Information not provided.
Local Zoning

Component Description:
Obtain building permits from local zoning authorities. $375.00 Public Hearing. $200.00.
Amount:
$575.00

Component Description:
$187.50 Obtain building permits from local zoning authorities. $110.00 Public Hearing.
Amount:
$297.50

Component Description:
$562.50 Obtain building permits from local zoning authorities. ($110.00) Public Hearing.
Amount:
$452.50

Component Description:
Obtain building permits from local zoning authorities. $375.00 Public Hearing. $200.00
Amount:
$575.00

Component Description:
Obtain building permits from local zoning authorities ($562.50) Public Hearing ($300.00).
Amount:
($862.50)

Component Description:
$187.50 Obtain building permits from local zoning authorities. $110.00 Public Hearing.
Amount:
$297.50

Component Description:
Obtain building permits from local zoning authorities. $187.50 Public Hearing. $100
Amount:
$287.50
FCC Filing Fees - Special Temporary Authorization request Information not provided.
FCC Filing Fees - Form 2100 license to cover application

Component Description:
Filing Fee.
Amount:
$99.00
DTV Medical Facility Notification

Component Description:
DTV Notification Service: Notification of Medical Facilities - Transmitter Medical Facility Notification.
Amount:
$9,329.00

Component Description:
2nd Notification due to phase change. DTV Notification Services: Notification of Medical Facilities.
Amount:
$9,329.00

Component Description:
Transmitter Medical Facility Notification.
Amount:
$9,329.00
FCC Filing Fees - Form 2100 minor change CP application Information not provided.
Site coordination meetings

Component Description:
Site Coordination Meeting.
Amount:
$1,500.00

Component Description:
Site Coordination Meeting.
Amount:
$612.24

Component Description:
Site Coordination Meeting.
Amount:
$500.00

Component Description:
Site Coordination Meeting.
Amount:
$500.00

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $11,134,348.27 $7,060,651.48 $4,353,054.08

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. Yes
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. Yes

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Tracy Deschenes

Business Manager Broadcast Technology


10/22/2021

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Tracy Deschenes

Business Manager Broadcast Technology


10/22/2021

Certification

Back to Top
Section Question Response
Submission of Final Allocation or Accounting Information Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  2. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  3. The above-named entity certifies that all costs identified as "actual costs" herein accurately represent the costs actually paid by the above-named entity, including any discounts, refunds, or rebates.

  4. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  5. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  6. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Tracy Deschenes

Business Manager Broadcast Technology


10/22/2021

Attachments