Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
ION TELEVISION LICENSE, LLC Doing Business As: ION TELEVISION LICENSE, LLC |
601 CLEARWATER PARK ROAD WEST PALM BEACH, FL 33401 United States |
+1 (561) 682-4110 | BIANCAFRYE@IONMEDIA.COM | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | Relocate current operations to new tower on a shared broadband Aux antenna and new transmitter until repack phase concludes. Remove and install a shared broadband main antenna and transmission line. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Millennium | |
Year | 2004 | |
Type | Inductive Output Tube | |
IOT Power Type | Three | |
Power Capacity | 60 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | THU9-36 EVO | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 55 kW | |
Justification for New Transmitter | See attached Transmitter Exhibits. See attached Transmitter Upgrade Disclaimer. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Electrical Installation for replacement transmitter | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Heating and Cooling | |
Size | 20 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 1078.0 square feet | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Removal of Existing Equipment |
Removal of existing transmitters and equipment / Site Prep |
RF Interconnect |
Interconnect between the RF system and transmission line |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Top | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 830.0 kW | |
Manufacturer | ||
Model | TFU-18DSC-R C170 | |
Year | 2004 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | Yes | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Broadband Slot | |
Number of Stations Supported | 2 | |
Number of Panels/Bays | 22 | |
Lower Limit | 566.00 MHz | |
Upper Limit | 578.00 MHz | |
Design power capacity in use | 79.9 % | |
Other Antenna Type | N/A | |
ERP: | 750.0 kW | |
Manufacturer | ||
Model | TFU-22ETT/VP-R4 C160 | |
Year | 2017 | |
Justification for New Antenna | Current slot antenna can not be re-channeled and relocating to a shared operation. ION assumed the full amount of the antenna cost at this time. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 2 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | No | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Broadband | |
Feed Line Size | 8 3/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
RF Channel Number |
---|
30 |
31 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | Yes | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Slot | |
Number of Stations Supported | 2 | |
Number of Panels/Bays | 16 | |
Lower Limit | 566.00 MHz | |
Upper Limit | 632.00 MHz | |
Design power capacity in use | 100.0 % | |
Other Antenna Type | N/A | |
ERP: | 350.1 kW | |
Manufacturer | ||
Model | TFU-16WB C160 | |
Year | 2017 | |
Justification for New Antenna | Interim antenna needed to support channel sharing and repack operation between WPXE/WITI. ION has purchased the antenna and is submitting the full amount. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 4 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | No | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | B | |
Feed Line Size | 6 1/8 inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
RF Channel Number |
---|
40 |
31 |
30 |
33 |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1320 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 8 3/16 inches | |
Other Diameter | N/A | |
Segment Length | Broadband | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1300 feet per run | |
Justification for New Transmission Line | See attached Transmission Line Exhibit |
Name | Description |
---|---|
Sweep existing transmission line |
Sweep existing transmission line |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Segment Length | Broadband | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 1169 feet per run | |
Justification for New Transmission Line | Support 2 station operation combined into single shared antenna See attached Transmission Line Exhibit |
Name | Description |
---|---|
Sweep existing aux transmission line |
Sweep existing aux transmission line |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1056835 | |
Coordinates (NAD83) | Latitude (NAD83) | 43° 05' 26.0" N- |
Longitude (NAD83) | 087° 53' 50.0" W- | |
Overall Structure Height | 1080.70 feet | |
Support Structure Height | 993.43 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 630.57 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | WITI License, LLC | |
Date Constructed | 03/29/1974 |
Facility ID | Call Sign | Service |
---|---|---|
4285 | WUWM | FM |
21010 | WMWK | FM |
42669 | WYMS | FM |
73107 | WITI | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Major Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | Yes |
Name | Description |
---|---|
Interim antenna installation |
Replacement of current auxiliary and installation of interim antenna |
Structural Study |
Structural analysis required after tower mapping completed |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | Candelabra | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1057482 | |
Coordinates (NAD83) | Latitude (NAD83) | 43° 05' 46.2" N- |
Longitude (NAD83) | 087° 54' 15.0" W- | |
Overall Structure Height | 1212.91 feet | |
Support Structure Height | 1098.74 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 627.95 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | Milwaukee Area Technical College District Board | |
Date Constructed | 05/27/2015 |
Facility ID | Call Sign | Service |
---|---|---|
35091 | WMKE-CD | DTV |
42665 | WMVT | DTV |
72342 | WVCY-TV | DTV |
71278 | WCGV-TV | DTV |
60571 | WIWN | DTV |
74174 | WVTV | DTV |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Candelabra |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 180 | |
Explanation | Required by tower landlord | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
NEPA Section 106 environmental review | Yes | |
Environmental Assessment | Yes | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | Yes | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | Yes | |
BLM or NFS Coordination | Yes | |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,064,947.65 | $1,129,650.65 | N/A | $1,084,066.40 | N/A |
Total for all systems | $5,301,839.26 | $3,741,076.25 | N/A | $3,230,241.15 | N/A |
Primary Transmitter THU9-36 EVO | $2,064,947.65 | $1,129,650.65 | $1,084,066.40 | ||
Removal of Existing Equipment | $30,000.00 | $30,000.00 | N/A | $25,602.50 | N/A |
RF Interconnect | $40,000.00 | $40,000.00 | N/A | $35,739.75 | N/A |
Other -- Building Addition Size: 1078.0 | $10,000.00 | $10,000.00 | N/A | $8,243.50 | N/A |
20 Ton system | $115,500.00 | $110,000.00 | N/A | $74,830.00 | N/A |
Other Electrical Service: Electrical Installation for replacement transmitter | $81,447.65 | $81,447.65 | Please see attached. Broadcasters General quote #509467. Staff Electric quotes #19-101-WPXE, #WITI-2017-100R1, and #01. | $81,447.65 | N/A |
UHF - Liquid Cooled Solid State Transmitter 52 - 61 kW | $1,788,000.00 | $858,203.00 | N/A | $858,203.00 | N/A |
Actual Information Description | File Name |
---|---|
Removal of Existing Equipment | |
RF Interconnect | |
Other -- Building Addition Size: 1078.0 | |
20 Ton system | |
Other Electrical Service: Electrical Installation for replacement transmitter | |
UHF - Liquid Cooled Solid State Transmitter 52 - 61 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $606,560.00 | $662,015.01 | N/A | $600,485.15 | N/A |
Total for all systems | $5,301,839.26 | $3,741,076.25 | N/A | $3,230,241.15 | N/A |
Interim Antenna TFU-16WB C160 | $236,680.00 | $182,979.11 | $175,836.25 | ||
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | $13,700.00 | $1,637.63 | N/A | $1,637.63 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $6,400.00 | N/A |
New combiner, cost per channel (without antenna) | $84,200.00 | $43,620.00 | Please see attached Dielectric Quote #45122 and Rhode & Shwarz Quote #802-037753.0 | $43,620.00 | Actual cost of interim combiner installation greater than estimated cost. Supporting documentation attached. |
UHF - High Power, Side Mount, basic slot antenna, 16 bay,, 350 kW input, directional,, horizontally polarized | $115,200.00 | $115,200.00 | N/A | $108,057.14 | N/A |
Elbow complex, broadband, at antenna input, per 7 3/16. feedline (if needed) | $16,850.00 | $16,121.48 | ***System Notice: Estimate adjusted and locked because line has been superseded.*** | $16,121.48 | In filing the Form 399, ION assumed that the cost of interim elbow complex, interim reducer, and interim flange would be included in this category. Supporting documentation attached. Actual costs are greater than pre-determined estimate. |
Primary Antenna TFU-22ETT/VP-R4 C160 | $369,880.00 | $479,035.90 | $424,648.90 | ||
Elbow complex, broadband, at antenna input, per 8 3/16. feedline (if needed) | $18,950.00 | $83,020.90 | Please see attached Dielectric Quote #1929710, #1929514, #700518CMZ-1, and #1929832 WPXE-WITI - Signed Quote | $83,020.90 | N/A |
New combiner, cost per channel (without antenna) | $84,200.00 | $123,215.00 | Please see attached Dielectric Quote #1248002 | $123,215.00 | N/A |
Sweep test of existing antenna | $6,730.00 | $12,800.00 | Additional sweep needed for RF combiner after install. | $12,800.00 | N/A |
UHF - High Power Top Mount Two Station antenna elliptically or circularly polarized | $260,000.00 | $260,000.00 | V-Pol cost not included in reimbursement request | $205,613.00 | N/A |
Actual Information Description | File Name |
---|---|
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | |
Sweep test of existing antenna | |
New combiner, cost per channel (without antenna) | |
UHF - High Power, Side Mount, basic slot antenna, 16 bay,, 350 kW input, directional,, horizontally polarized | |
Elbow complex, broadband, at antenna input, per 7 3/16. feedline (if needed) | |
Elbow complex, broadband, at antenna input, per 8 3/16. feedline (if needed) | |
New combiner, cost per channel (without antenna) | |
Sweep test of existing antenna | |
UHF - High Power Top Mount Two Station antenna elliptically or circularly polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $920,777.00 | $712,921.58 | N/A | $700,121.58 | N/A |
Total for all systems | $5,301,839.26 | $3,741,076.25 | N/A | $3,230,241.15 | N/A |
Interim Transmission Line | $395,677.00 | $270,747.12 | $264,347.12 | ||
Rigid Transmission Line - copper, 7 3/16" broadband | $389,277.00 | $264,347.12 | Shipping charges on Dielectric invoice #24936 for shipping equipment was incorrectly submitted and approved in this section | $264,347.12 | N/A |
Sweep existing aux transmission line | $6,400.00 | $6,400.00 | N/A | N/A | N/A |
Primary Transmission Line | $525,100.00 | $442,174.46 | $435,774.46 | ||
Rigid Transmission Line - copper, 8 3/16" broadband | $518,700.00 | $435,774.46 | Please see Dielectric quotes #700518CMZ-1, #1929514, #1929832, #1929848, and #1930145. And "WPXE Dielectric Reconciliation - Revised" spreadsheet | $435,774.46 | Estimated cost and sub-total are equal |
Sweep existing transmission line | $6,400.00 | $6,400.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 7 3/16" broadband | |
Sweep existing aux transmission line | Information not provided. |
Rigid Transmission Line - copper, 8 3/16" broadband | |
Sweep existing transmission line | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,354,300.00 | $908,834.40 | N/A | $776,434.40 | N/A |
Total for all systems | $5,301,839.26 | $3,741,076.25 | N/A | $3,230,241.15 | N/A |
Primary Tower GTOWER | $421,000.00 | $352,704.00 | $352,704.00 | ||
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $352,704.00 | Please see Worldwide Communications #S-18-867 plus applicable tax | $352,704.00 | N/A |
Primary Tower TOWER | $933,300.00 | $556,130.40 | $423,730.40 | ||
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $25,000.00 | See Shared Equipment Exhibit for more information. | $2,600.00 | N/A |
Interim antenna installation | $110,000.00 | $110,000.00 | N/A | N/A | N/A |
Structural Study | $15,500.00 | $15,500.00 | Please see Hodge Design Structural Study Agreement | $15,500.00 | Cost of Tower Structural Study greater than pre-determined and estimated costs. |
Tower Helicopter Lift | $150,000.00 | $150,000.00 | Please see Worldwide Communications Quote #S-19-959. | $150,000.00 | N/A |
Major tower reinforcement/modifications | $421,000.00 | $22,500.00 | See Shared Equipment Exhibit for more information. | $22,500.00 | N/A |
Tall Tower (greater than 500') | $210,500.00 | $233,130.40 | Please see attached Worldwide Quote #S-17-852 and Worldwide Communications Quote #S-19-960 for additional cost to tower services. | $233,130.40 | Sub-total appears to be the same. |
Actual Information Description | File Name |
---|---|
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | |
Interim antenna installation | Information not provided. |
Structural Study | |
Tower Helicopter Lift | |
Major tower reinforcement/modifications | |
Tall Tower (greater than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $203,275.00 | $183,780.00 | N/A | $10,055.49 | N/A |
Total for all systems | $5,301,839.26 | $3,741,076.25 | N/A | $3,230,241.15 | N/A |
Outside Professional Services | $203,275.00 | $183,780.00 | $10,055.49 | ||
RF Exposure Measurements | $21,050.00 | $20,000.00 | N/A | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $80,000.00 | N/A | N/A | N/A |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | $2,105.00 | $2,000.00 | N/A | N/A | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $2,000.00 | N/A | N/A | N/A |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | $10,520.00 | $10,000.00 | N/A | N/A | N/A |
NEPA Section 106 environmental review, if needed | $6,310.00 | $6,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $7,360.00 | $7,000.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $4,000.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | N/A | N/A |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | $4,210.00 | $4,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $4,742.99 | Duplicate line item. ION is only requesting reimbursement for Invoice Dated 5/1/2018. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $4,100.00 | $3,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | $2,105.00 | $2,000.00 | N/A | $1,000.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $2,250.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $2,062.50 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Project management of the transition | $28,440.00 | $18,530.00 | Required by tower landlord | N/A | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
RF Exposure Measurements | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | Information not provided. |
ASR modification (prepare FCC Form 854) | Information not provided. |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | Information not provided. |
NEPA Section 106 environmental review, if needed | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Project management of the transition | Information not provided. |
Prepare and or review reimbursement form | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $151,979.61 | $143,874.61 | N/A | $59,078.13 | N/A |
Total for all systems | $5,301,839.26 | $3,741,076.25 | N/A | $3,230,241.15 | N/A |
Other Expenses | $151,979.61 | $143,874.61 | $59,078.13 | ||
MVPD Notification of Channel Change | $1,400.00 | $1,400.00 | N/A | $1,400.00 | N/A |
Develop and air announcement of upcoming channel change | $0.00 | $0.00 | The amount is yet to be determined (TBD) and ION will submit on-air announcement costs when finalized. | N/A | N/A |
Equipment Storage | $10,000.00 | $10,000.00 | N/A | $2,288.52 | N/A |
Equipment Delivery and Handling Charges | $47,389.61 | $47,389.61 | This is the actual amount ION has been charged by vendors for repack equipment. | $47,389.61 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $15,000.00 | $15,000.00 | N/A | N/A | N/A |
BLM or NFS Coordination | $25,000.00 | $25,000.00 | N/A | N/A | N/A |
Non-zoning permits | $15,000.00 | $15,000.00 | N/A | $4,500.00 | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,070.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $3,500.00 | N/A | $3,500.00 | N/A |
Local Zoning | $25,000.00 | $25,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
MVPD Notification of Channel Change | |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Storage | |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
BLM or NFS Coordination | Information not provided. |
Non-zoning permits | |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
DTV Medical Facility Notification | |
Local Zoning | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $5,301,839.26 | $3,741,076.25 | $3,230,241.15 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Mario Vasquez Vice President - Finance, Operations 12/15/2021 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Mario Vasquez Vice President - Finance, Operations 12/15/2021 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Mario Vasquez Vice President - Finance, Operations 12/15/2021 |