Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
144
Service:
DTV
Call Sign:
KNVA
Channel:
23 (UHF)
File Number:
0000028705
FRN:
0006564959
Date Submitted:
10/08/2021

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

54 Broadcasting, Inc.

Thomas J. Vaughan

3121 Rivershore Lane

Port Charlotte, FL 33953

United States

+1 (941) 764-6867 glenn.richards@pillsburylaw.com Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Jessica Nyman , Esq .

FCC Counsel

Pillsbury Winthrop Shaw Pittman LLP

Jessica Nyman

1200 Seventeenth Street, NW

Washington, DC 20036

United States

+1 (202) 663-8810 jessica.nyman@pillsburylaw.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan Replace transmitter, antenna, and transmission line. Acquire interim antenna system during construction and duration of the assigned phase. Map and analyze tower; design and implement modifications if required. See updated transition plan.

Question Response
Sharee Station Facility ID 35918
Call Sign KBVO-CD
Type
Licensee Name NEXSTAR INC.
Status LICENSED
DTS No
Community of License AUSTIN, TX
Pre-auction RF Channel 31
Post-auction RF Channel 31
Neilsen DMA Austin
Network Affiliation
Question Response
Sharee Station Facility ID 35920
Call Sign KXAN-TV
Type Commercial
Licensee Name Nexstar Media Inc.
Status LICENSED
DTS No
Community of License AUSTIN, TX
Pre-auction RF Channel 21
Post-auction RF Channel 21
Neilsen DMA Austin
Network Affiliation
Question Response
Sharee Station Facility ID 35882
Call Sign KTFO-CD
Type
Licensee Name KAKW LICENSE PARTNERSHIP, L.P.
Status LICENSED
DTS No
Community of License AUSTIN, TX
Pre-auction RF Channel 36
Post-auction RF Channel 36
Neilsen DMA Austin
Network Affiliation

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model CTT-U-40 DCX-2H
Year 2000
Type Inductive Output Tube
IOT Power Type Two
Power Capacity 40 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model THU9evo-36
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 25.1 kW
Justification for New Transmitter The manufacturer of the existing IOT transmitter advises that the transmitter cannot be re-tuned to the assigned channel. A new Comark Paragon MSDC IOT transmitter is the basis for the replacement cost, but the SS is less expensive. See attached quotes.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 300 kVA
Rigid Conduit and Wiring Yes
Size 3 inches
Length 100.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Transmitter Electrical and Installation

Transmitter Electrical and Installation

Transmitter Storage Costs

Storage of Transmitter by manufacturer Rhode & Schwarz

Additional Interior RF System

Interior RF System Existing Transmitter to Interim Transmission line

Additional Transmitter Costs

Additional Transmitter Costs

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Top
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 500.0 kW
Manufacturer
Model TFU-30GTH 04
Year 2000

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Top
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 500.0 kW
Manufacturer
Model TFU-22GTH/VP-R O6 TC
Year 2019
Justification for New Antenna Existing antenna is a single channel, top-of-stack, slot which can't accommodate assigned channel. Bottom stack (old analog) can't support new antenna, thus, a 57.4 ft support pole is required below new antenna to maintain radiation center and FAA height.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna?
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Broadband
Feed Line Size 8 3/16 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna?
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

ANTENNA MOUNTING WEDDING CAKE

ANTENNA MOUNTING WEDDING CAKE ADAPTER, 3 FT. ALLOWS ANTENNA TO MOUNT ON NEW SUPPORT POLE

Additional Antenna Costs

Additional Antenna Costs

ANTENNA SUPPORT POLE

ANTENNA SUPPORT POLE, 57.4 FT. MAINTAINS EXISTING OVERALL STRUCTURE HEIGHT ON TOWER.

FEED THROUGH COMPONENTS

FEED THROUGH COMPONENTS TO CONNECT ANTENNA INPUT TO ELBOW COMPLEX INSIDE CANDELABRA ARM

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? Yes
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Broadband Slot
Number of Stations Supported 2
Number of Panels/Bays 24
Lower Limit 512.00 MHz
Upper Limit 686.00 MHz
Design power capacity in use 50.0 %
Other Antenna Type N/A
ERP: 950.0 kW
Manufacturer
Model TFU-WB-24 C160
Year 2019
Justification for New Antenna An interim antenna is necessary to keep stations on the air during primary antenna replacement and for the duration of the assigned phase.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 2
Frequencies of channels supported Upper and lower frequency
Frequency 512.0 MHz - 686.0 MHz
Do you need a combiner output splitter/switcher for dual feed lines? No
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? S
Feed Line Size 6 1/8 inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Additional Antenna Costs

Additional Antenna Costs

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 8 3/16 inches
Other Diameter N/A
Segment Length 19 3/4 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1260 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 8 3/16 inches
Other Diameter N/A
Segment Length 19 3/4 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1300 feet per run
Justification for New Transmission Line The line might be compatible with the assigned channel, but a new line is budgeted in case the performance is unacceptable on the assigned channel. The station will utilize the existing line if the sweep tests confirm acceptable performance.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Rigid
Diameter 6 1/8 inches
Segment Length 19 ¾ '
Other Segment Length
Number of parallel runs 1
Length 1075 feet per run
Justification for New Transmission Line An interim transmission line is necessary for the interim antenna to keep stations on the air during primary antenna replacement and for the duration of the assigned phase.

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Tranmission line pieces

Transmission line pieces

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? Candelabra
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? No
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1050398
Coordinates (NAD83) Latitude (NAD83) 30° 19' 34.0" N-
Longitude (NAD83) 097° 47' 59.0" W-
Overall Structure Height 1197.49 feet
Support Structure Height 1079.38 feet
Ground Elevation Above Mean Sea Level (AMSL) 849.73 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner LIN Television of Texas, L.P.
Date Constructed 09/22/1965

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
35882 KTFO-CD DTV
35918 KBVO-CD DTV
35920 KXAN-TV DTV

Other Types of Users

Users
15 mwave licens
2 RPU licenses

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for undocumented/poorly documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Serious Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Candelabra
Helicopter Services Required Are helicopter services required? Yes

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Weather Delays

Weather Delays

Land Clearing, Fence Removal and Re-installation

Land must be cleared and existing fence removed to allow for Helicopter Antenna work, then new fence installed.

Land Clearing, Fence Removal and Re-installation

Land must be cleared and existing fence removed to allow for Helicopter Antenna work, then new fence installed.

On Site Helicopter Security

Weather Delays grounded Helicopter for a week. Security required to secure aircraft

On Site Helicopter Security

Weather Delays grounded Helicopter for a week. Security required to secure aircraft

Weather Delays

Weather Delays

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 1000
Explanation It will be necessary to schedule and coordinate multiple vendors, complete progress reports, and update Schedule 399. Station does not have available personnel or personnel trained in project management for such complex projects.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 2
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 2
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification Yes
FAA Consultation (including preparation of FAA Form 7460) Yes
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service Yes
Number of Days 20
Justification It will be necessary to survey the site, plan the equipment, develop specifications for purchasing, and oversee multiple vendor RF projects. Station does not have available personnel or personnel trained in such services.

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Information not provided.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Equipment Rentals

Equipment Rentals

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,225,783.00 $1,102,183.00 N/A $1,024,183.00 N/A
Total for all systems $5,190,906.43 $4,694,859.73 N/A $2,698,869.43 N/A
Primary Transmitter THU9evo-36 $1,225,783.00 $1,102,183.00 $1,024,183.00
Additional Transmitter Costs $4,876.00 $4,876.00 See R&S Quote 206414.1 $4,876.00 N/A
Additional Interior RF System $76,110.00 $76,110.00 See Rohde & Schwarz quote 182781.1 $76,110.00 N/A
Transmitter Storage Costs $10,097.00 $10,097.00 Storage Costs by transmitter manufacturer Rohde & Schwarz. See Sales quote 246110 $10,097.00 N/A
Transmitter Electrical and Installation $107,500.00 $107,500.00 See Rohde & Schwarz quote 177533.0 $107,500.00 N/A
3" Rigid Conduit and Wiring (Cost per foot) $5,200.00 $5,000.00 N/A N/A N/A
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW $947,000.00 $825,600.00 Quoted cost is lower than the IOT equivalent. Cost revised from 788,930 to 825,600 per Rohde & Schwarz quote 132940.2 attached. $825,600.00 N/A
Transformer 3 phase/480v - 300 KVA $36,800.00 $35,850.00 N/A N/A N/A
Switchgear - industrial 800 amp $38,200.00 $37,150.00 N/A N/A N/A

Components

Actual Information Description File Name
Additional Transmitter Costs

Component Description:
Additional transmitter components
Amount:
$4,876.00
Additional Interior RF System

Component Description:
See revised invoice
Amount:
($31,943.25)

Component Description:
See revised invoice
Amount:
($31,943.25)

Component Description:
Three channel combiner, installment #1
Amount:
$31,943.25

Component Description:
Additional RF Components
Amount:
$76,110.00

Component Description:
Three channel combiner, installment #2
Amount:
$31,943.25
Transmitter Storage Costs

Component Description:
Transmitter storage
Amount:
$10,097.00
Transmitter Electrical and Installation

Component Description:
Transmitter electrical and installation
Amount:
$107,500.00
3" Rigid Conduit and Wiring (Cost per foot) Information not provided.
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW

Component Description:
Transmitter, installment #1, less upgrade cost
Amount:
$206,400.00

Component Description:
Transmitter, installment #3, less upgrade cost
Amount:
$206,400.00

Component Description:
Transmitter, installment #2, less upgrade cost
Amount:
$412,800.00
Transformer 3 phase/480v - 300 KVA Information not provided.
Switchgear - industrial 800 amp Information not provided.

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $795,202.00 $689,672.00 N/A $571,305.00 N/A
Total for all systems $5,190,906.43 $4,694,859.73 N/A $2,698,869.43 N/A
Interim Antenna TFU-WB-24 C160 $297,090.00 $288,855.00 $170,719.00
Additional Antenna Costs $15,000.00 $15,000.00 See related Dielectric order confirmations $13,869.00 N/A
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $5,120.00 N/A N/A N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $22,500.00 N/A N/A N/A
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) $12,300.00 $12,000.00 N/A N/A N/A
New combiner, cost per channel (without antenna) $84,200.00 $77,385.00 See attached Dielectric quote (Quote No. 800047CMZ). NOTE: See updated repack transition plan. $0.00 N/A
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 950 kW input, directional,, horizontally polarized $150,450.00 $150,450.00 See Dielectric Quote Number DMS127-3. KNVA will share interim antenna with KXAN; however, KXAN is a "Non-Repack" station; therefore, expenses are not shared. Interim antenna is required for stations to remain on-air while main facility is built-out. $150,450.00 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 See attached Dielectric quote (Quote No. DMS127-3). $6,400.00 N/A
Primary Antenna TFU-22GTH/VP-R O6 TC $498,112.00 $400,817.00 $400,586.00
ANTENNA MOUNTING WEDDING CAKE $18,300.00 $18,300.00 See attached Dielectric Quote (Quote No. DMS095-2). NOTE: See updated repack transition plan. $18,300.00 N/A
Additional Antenna Costs $25,000.00 $25,000.00 See related Dielectric order confirmations $24,769.00 N/A
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized $289,500.00 $194,835.00 See attached Dielectric Quote (Quote No. DMS095-2). NOTE: Costs for V-pol fill have been removed. NOTE: See updated repack transition plan. $194,835.00 N/A
Elbow complex, broadband, at antenna input, per 8 3/16. feedline (if needed) $18,950.00 $16,650.00 See attached Dielectric Quote (Quote No. DMS095-2). NOTE: See updated repack transition plan. $16,650.00 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 See attached Dielectric Quote (Quote No. DMS095-2). $6,400.00 N/A
FEED THROUGH COMPONENTS $20,588.00 $20,588.00 See attached Dielectric Quote (Quote No. DMS095-2). NOTE: See updated repack transition plan. $20,588.00 N/A
ANTENNA SUPPORT POLE $119,044.00 $119,044.00 See attached Dielectric Quote (Quote No. DMS095-2). NOTE: See updated repack transition plan. $119,044.00 N/A

Components

Actual Information Description File Name
Additional Antenna Costs

Component Description:
Additional antenna component
Amount:
$2,418.00

Component Description:
Additional antenna component
Amount:
$9,960.00

Component Description:
Additional antenna component
Amount:
$1,491.00
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) Information not provided.
Side mount brackets for high power antennas (if not included in antenna base cost) Information not provided.
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) Information not provided.
New combiner, cost per channel (without antenna)

Component Description:
Combiner, installment #2, 50% of cost shared with non repack station
Amount:
$15,971.62

Component Description:
Combiner, installment #1, 50% of cost shared with non repack station
Amount:
$15,971.62
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 950 kW input, directional,, horizontally polarized

Component Description:
Aux antenna, balance due
Amount:
$15,045.00

Component Description:
Antenna component, line 1 of invoice, installment #2
Amount:
$67,702.50

Component Description:
Antenna component, line 1 of invoice, installment #1
Amount:
$67,702.50
Sweep test of existing antenna

Component Description:
Interim antenna sweep test
Amount:
$6,400.00
ANTENNA MOUNTING WEDDING CAKE

Component Description:
Antenna mounting component, balance due
Amount:
$1,830.00

Component Description:
Antenna mounting component, line 3 of invoice, installment #1
Amount:
$8,235.00

Component Description:
Antenna Mounting component, line 3 of invoice, installment #2
Amount:
$8,235.00
Additional Antenna Costs

Component Description:
Additional antenna components
Amount:
$4,495.00

Component Description:
Additional antenna components
Amount:
$14,400.00

Component Description:
Additional antenna components
Amount:
$2,054.00

Component Description:
Additional antenna component
Amount:
$764.00

Component Description:
Additional antenna components
Amount:
$3,056.00
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized

Component Description:
Antenna, balance due
Amount:
$19,483.50

Component Description:
UHF High Power Top Mount, line 1 of invoice, installment #1
Amount:
$87,675.75

Component Description:
UHF High Power Top Mount, line 1 of invoice, installment #2
Amount:
$87,675.75
Elbow complex, broadband, at antenna input, per 8 3/16. feedline (if needed)

Component Description:
Elbow complex, balance due
Amount:
$1,665.00

Component Description:
Digitline elbow complex, line 6 of invoice, installment #2
Amount:
$7,492.50

Component Description:
Digitline elbow complex, line 6 of invoice, installment #1
Amount:
$7,492.50
Sweep test of existing antenna

Component Description:
Main antenna sweep test
Amount:
$6,400.00
FEED THROUGH COMPONENTS

Component Description:
Feed through component, balance due
Amount:
$2,058.80

Component Description:
Feed through component, line 5 of invoice, installment #2
Amount:
$9,264.60

Component Description:
Feed through components, line 5 of invoice, installment #1
Amount:
$9,264.60
ANTENNA SUPPORT POLE

Component Description:
Antenna support pole, balance due
Amount:
$11,904.40

Component Description:
Antenna support pole component, line 4 of invoice, installment #1
Amount:
$53,569.80

Component Description:
Antenna support pole, line 4 of invoice, installment #2
Amount:
$53,569.80

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $670,980.00 $450,710.30 N/A $174,941.30 N/A
Total for all systems $5,190,906.43 $4,694,859.73 N/A $2,698,869.43 N/A
Interim Transmission Line $219,880.00 $149,981.30 $149,981.30
Tranmission line pieces $2,730.00 $2,730.00 See Dielectric change orders $2,730.00 N/A
Rigid Transmission Line - copper, 6 1/8" $217,150.00 $147,251.30 See Dielectric Quote Number DMS127-3. KNVA will share Interim transmission line with KXAN; however, KXAN is a "Non-Repack" station; therefore, expenses are not shared. Interim line is required for stations to remain on-air while main facility is built-out $147,251.30 N/A
Primary Transmission Line $451,100.00 $300,729.00 $24,960.00
Rigid Transmission Line - copper, 8 3/16" $451,100.00 $300,729.00 See attached Dielectric Quote (Quote No. DMS095-2). NOTE: See updated repack transition plan. $24,960.00 N/A

Components

Actual Information Description File Name
Tranmission line pieces

Component Description:
Transmission line pieces
Amount:
$2,730.00
Rigid Transmission Line - copper, 6 1/8"

Component Description:
Rigid transmission line, line 2 of invoice, installment #1
Amount:
$66,263.09

Component Description:
Rigid transmission line, line 2 of invoice, installment #2
Amount:
$66,263.09

Component Description:
Transmission line, balance due
Amount:
$14,725.12
Rigid Transmission Line - copper, 8 3/16"

Component Description:
Transmission line components
Amount:
$7,800.00

Component Description:
Transmission line, balance due
Amount:
$30,072.90

Component Description:
Credit for returned transmission line
Amount:
($283,569.00)

Component Description:
Rigid transmission line, line 7 of invoice, installment #2
Amount:
$135,328.05

Component Description:
Rigid transmission line component, line 7 of invoice, installment #1
Amount:
$135,328.05

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $2,021,191.43 $1,980,991.43 N/A $785,600.62 N/A
Total for all systems $5,190,906.43 $4,694,859.73 N/A $2,698,869.43 N/A
Primary Tower TOWER $2,021,191.43 $1,980,991.43 $785,600.62
On Site Helicopter Security $7,891.43 $7,891.43 Weather Delays grounded helicopter for a week, and security for the aircraft was required $7,891.43 N/A
Land Clearing, Fence Removal and Re-installation $23,000.00 $23,000.00 N/A $22,129.05 N/A
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $409,500.00 NOTE: See updated repack transition plan. $286,342.00 N/A
Tower Helicopter Lift $325,000.00 $325,000.00 N/A N/A N/A
Weather Delays $166,000.00 $166,000.00 Weather delays and additional work costs per Coast to Coast quote at $600 per man per day; see related invoices $165,621.14 N/A
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study $26,300.00 $25,600.00 N/A $24,500.00 N/A
Serious tower reinforcement/modifications $1,052,000.00 $1,024,000.00 NOTE: See updated repack transition plan. $279,117.00 N/A

Components

Actual Information Description File Name
On Site Helicopter Security

Component Description:
Security required for helicopter
Amount:
$7,891.43
Land Clearing, Fence Removal and Re-installation

Component Description:
Tower site fence removal and replacement
Amount:
$14,551.55

Component Description:
Clear land for helicopter pick
Amount:
$7,577.50
Complex Tower (includes, for example, those with candelabras and/or stacked antennas)

Component Description:
Interim antenna installation
Amount:
$68,233.00

Component Description:
Antenna installation services
Amount:
$100,000.00

Component Description:
Antenna installation services
Amount:
$118,109.00
Tower Helicopter Lift Information not provided.
Weather Delays

Component Description:
Weather delays and additional work
Amount:
$98,862.33

Component Description:
May weather delays
Amount:
$16,800.00

Component Description:
Weather delays and additional work
Amount:
$17,135.43

Component Description:
Weather delays and additional work
Amount:
$32,823.38
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study

Component Description:
Structural report
Amount:
$6,000.00

Component Description:
Design structural modifications
Amount:
$5,000.00

Component Description:
Structural analysis
Amount:
$3,000.00

Component Description:
Structural mapping
Amount:
$6,500.00

Component Description:
Structural analysis
Amount:
$2,000.00

Component Description:
Structural analysis
Amount:
$2,000.00
Serious tower reinforcement/modifications

Component Description:
Deposit for Tower Modification Services
Amount:
$82,127.00

Component Description:
Deposit for Tower services
Amount:
$10,000.00

Component Description:
Tower modification services, installment #2
Amount:
$155,250.00

Component Description:
Deposit for Antenna replacement services
Amount:
$31,740.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $310,860.00 $304,755.00 N/A $43,491.62 N/A
Total for all systems $5,190,906.43 $4,694,859.73 N/A $2,698,869.43 N/A
Outside Professional Services $310,860.00 $304,755.00 $43,491.62
Additional Field Engineering Service, 20 Days $108,000.00 $108,000.00 N/A N/A N/A
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase $2,105.00 $2,050.00 N/A N/A N/A
ASR modification (prepare FCC Form 854) $2,105.00 $2,050.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $7,360.00 $7,170.00 N/A N/A N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $4,095.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,305.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,120.00 N/A N/A N/A
Prepare request for Special Temporary Authorization $4,100.00 $3,070.00 N/A $1,500.00 N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,535.00 N/A $625.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,070.00 N/A $3,000.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,170.00 N/A $7,000.00 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,560.00 N/A N/A N/A
Project management of the transition $158,000.00 $154,000.00 N/A $28,866.62 N/A
Prepare and or review reimbursement form $2,630.00 $2,560.00 N/A $2,500.00 N/A

Components

Actual Information Description File Name
Additional Field Engineering Service, 20 Days Information not provided.
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase Information not provided.
ASR modification (prepare FCC Form 854) Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees - Negotiation of lease and other matters for shared locations Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare request for Special Temporary Authorization

Component Description:
Prepare STA
Amount:
$1,500.00
Prepare engineering section of FCC Form 2100 (main), License to Cover Application

Component Description:
Prepare License to Cover Application
Amount:
$625.00
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Prepare engineering section of Form 2100, item 4 from invoice summary
Amount:
$3,000.00
Perform engineering study for new channel assignment and antenna development

Component Description:
Perform engineering study for new channel assignment, item 3 from invoice summary
Amount:
$7,000.00
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Project management of the transition

Component Description:
Project management services 9.29.18 through 10.26.18
Amount:
$150.00

Component Description:
Project management services Nov 2019
Amount:
$185.00

Component Description:
Project management services
Amount:
$750.00

Component Description:
Project management services May 2019
Amount:
$285.00

Component Description:
Project management services September 2018
Amount:
$100.00

Component Description:
Project management services June 2019
Amount:
$357.50

Component Description:
Project management services November 2018
Amount:
$150.00

Component Description:
Project management services 3.30.19 through 4.26.19
Amount:
$225.00

Component Description:
Project management services January 2019
Amount:
$65.00

Component Description:
Project management services Aug 2019
Amount:
$130.00

Component Description:
Project management services July 2018
Amount:
$500.00

Component Description:
Project management services various, item 1 from invoice summary
Amount:
$9,245.00

Component Description:
Project management services 10.27.18 through 11.30.18
Amount:
$3,700.00

Component Description:
Project management services
Amount:
$1,324.00

Component Description:
Project management services
Amount:
$5,038.00

Component Description:
Reimbursable expense meals
Amount:
$120.12

Component Description:
Project management services February 2019
Amount:
$84.50

Component Description:
Prepare FCC Schedule 387, item 5 from invoice summary
Amount:
$300.00

Component Description:
Project management services 3.2.19 through 3.29.19
Amount:
$225.00

Component Description:
Project management services April 2019
Amount:
$123.50

Component Description:
Project management services Aug 2019
Amount:
$70.00

Component Description:
Project management services August 2018
Amount:
$450.00

Component Description:
Project management services 4.27.19 through 5.31.19
Amount:
$750.00

Component Description:
Project management services April 2019
Amount:
$100.00

Component Description:
Project management services Sep 2019
Amount:
$115.00

Component Description:
Project management services
Amount:
$50.00

Component Description:
Prepare FCC Schedule 387, item 8 from invoice summary
Amount:
$150.00

Component Description:
Project management services March 2019
Amount:
$104.00

Component Description:
Project management services June 2019
Amount:
$100.00

Component Description:
Project management services 12.1.18 through 12.31.18
Amount:
$300.00

Component Description:
Project management services 5.26.18 through 6.29.18
Amount:
$375.00

Component Description:
Project management services 7.28.18 through 9.28.18
Amount:
$1,500.00

Component Description:
Prepare FCC Schedule 387, item 7 from invoice summary
Amount:
$150.00

Component Description:
Project management and progress report preparation services.
Amount:
$300.00

Component Description:
Project management services July 2019
Amount:
$845.00

Component Description:
Project management services
Amount:
$1,200.00
Prepare and or review reimbursement form

Component Description:
Prepare reimbursement form, item 2 from invoice summary
Amount:
$2,500.00

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $166,890.00 $166,548.00 N/A $99,347.89 N/A
Total for all systems $5,190,906.43 $4,694,859.73 N/A $2,698,869.43 N/A
Other Expenses $166,890.00 $166,548.00 $99,347.89
Equipment Rentals $16,000.00 $16,000.00 See related invoices $15,219.05 N/A
MVPD Notification of Channel Change $2,000.00 $2,000.00 N/A N/A N/A
Develop and air announcement of upcoming channel change $6,500.00 $6,500.00 Production time to produce spots and crawls for viewer notification. $0.00 N/A
Equipment Storage $7,200.00 $7,200.00 See related invoices $7,125.00 N/A
Equipment Delivery and Handling Charges $72,000.00 $72,000.00 See related invoices $71,813.44 N/A
Non-zoning permits $25,000.00 $25,000.00 N/A N/A N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,070.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $11,250.00 N/A $5,190.40 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $25,000.00 $25,000.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $333.00 N/A N/A N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $195.00 N/A N/A N/A

Components

Actual Information Description File Name
Equipment Rentals

Component Description:
Equipment rental
Amount:
$77.72

Component Description:
Equipment rental
Amount:
$1,775.00

Component Description:
Equipment rental
Amount:
$4,491.33

Component Description:
Equipment rentals
Amount:
$8,875.00
MVPD Notification of Channel Change Information not provided.
Develop and air announcement of upcoming channel change Information not provided.
Equipment Storage

Component Description:
Main antenna storage cost
Amount:
$4,680.00

Component Description:
Aux antenna storage cost
Amount:
$2,445.00
Equipment Delivery and Handling Charges

Component Description:
Antenna shipping cost
Amount:
$3,220.29

Component Description:
Transmission line shipping cost
Amount:
$592.38

Component Description:
Freight costs
Amount:
$390.15

Component Description:
Transmission line shipping cost
Amount:
$2,684.77

Component Description:
Transmission line freight cost
Amount:
$10,425.00

Component Description:
Aux antenna freight cost
Amount:
$6,710.00

Component Description:
Freight related to aux antenna
Amount:
$2,114.52

Component Description:
Antenna shipping costs
Amount:
$2,120.43

Component Description:
Antenna shipping cost
Amount:
$6,259.55

Component Description:
Transmitter consolidation services
Amount:
$12,952.00

Component Description:
Antenna shipping costs
Amount:
$1,036.31

Component Description:
Main antenna freight cost
Amount:
$6,710.00

Component Description:
Transmission line shipping cost
Amount:
$2,069.71

Component Description:
Aux antenna shipping cost
Amount:
$1,423.83

Component Description:
Main antenna freight cost
Amount:
$13,104.50
Non-zoning permits Information not provided.
FCC Filing Fees - Form 2100 minor change CP application Information not provided.
DTV Medical Facility Notification

Component Description:
Notification of medical facilities
Amount:
$5,190.40
Disposal Costs (for equipment and other waste, net of any salvage value) Information not provided.
FCC Filing Fees - Form 2100 license to cover application Information not provided.
FCC Filing Fees - Special Temporary Authorization request Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $5,190,906.43 $4,694,859.73 $2,698,869.43

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. Yes
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. Yes

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Thomas J Vaughan

President


10/08/2021

Certification

Back to Top
Section Question Response
Submission of Final Allocation or Accounting Information Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  2. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  3. The above-named entity certifies that all costs identified as "actual costs" herein accurately represent the costs actually paid by the above-named entity, including any discounts, refunds, or rebates.

  4. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  5. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  6. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Thomas J Vaughan

President


10/08/2021

Attachments

Back to Top