Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
MULTIMEDIA NETWORK OF NC, INC Doing Business As: MULTIMEDIA NETWORK OF NC, INC |
Dr.Mark Evans 110 TORREY PINES LANE PINEHURST, NC 28374 United States |
+1 (910) 215-5686 | markmywords@embarqmail.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Station will submit application for construction permit (Schedule E) and estimates of equipment costs for which station is eligible for reimbursement. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | ITS-220A | |
Year | 1996 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 0.03 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | UAXTE-50 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 0.11 kW | |
Justification for New Transmitter | Transmitter no longer manufactured. Parts not available to retune. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Installation |
Separately billed installation cost |
Transmitter Rack |
From Gates Air |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Retune Existing |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Class A |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Other | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | UHF Dipole with grid reflectors | |
ERP: | 0.11 kW | |
Manufacturer | Scala | |
Model | WYBE-SCACUSTOM | |
Year | 1996 |
Section | Question | Response |
---|---|---|
Sweep Test of Existing Antenna | Do you need a sweep test of existing antenna? | No |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency |
Name | Description |
---|---|
Feedhorns and power divider |
PDL2-55-50 two-way, equal split ratio power divider, broadband 470-614 MHz, max input 100-watts with 50 ohm type.PRFTV-34-50 Paraflector feed assembly, Channel 34 (590-596 MHz) |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1006461 | |
Coordinates (NAD83) | Latitude (NAD83) | 35° 09' 58.0" N- |
Longitude (NAD83) | 079° 25' 11.0" W- | |
Overall Structure Height | 250.00 feet | |
Support Structure Height | 246.39 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 479.65 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | MUIRFIELD BROADCASTING INC | |
Date Constructed | 10/01/1990 |
Facility ID | Call Sign | Service |
---|---|---|
46949 | WIOZ | AM |
25204 | WIOZ-FM | FM |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 16 | |
Explanation | We need technical assistance from a consulting engineer regarding configuration. This requires on-site presence of the engineer for an estimated 16 hours. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | No |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
For Auxiliary Facility | N/A | |
For Main Facility | N/A | |
Prepare and file Form FCC License to Cover Application | No | |
For Auxiliary Facility | N/A | |
For Main Facility | N/A | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | No | |
Address transition timing and coordination issues w/ other stations and wireless providers | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Consulting and Onsite Engineering Services |
Engineering Consulting and On-Site Coordination of Equipment Required for Repacking with New Transmitter and Antenna equipment |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Cable Carrier 2 Notification |
Notification of Cable Carrier 2 as required |
Cable Notification |
Notification of Cable Carrier as required |
Freight |
Shipping charges for transmitter and other listed equipment |
License to Cover Fee Paid to the F.C.C. |
License to Cover Fee paid to the F.C.C. Advised that this is reimbursable. |
Mask Filter System |
Required for transmitter to broadcast FCC approved signal and channel |
Medical-Cable Notification Postal |
Postal receipts for notification of medical and cable facilities |
Rack Screws |
Required to secure transmitter to rack |
Tower Crew |
Necessary to climb the tower and modify antenna and install equipment. |
Ethernet Switch |
Device necessary to enable monitoring of transmitter as required by FCC. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $21,456.50 | $21,456.50 | N/A | $21,456.50 | N/A |
Total for all systems | $151,884.04 | $65,441.04 | N/A | $38,388.09 | N/A |
Primary Transmitter UAXTE-50 | $21,456.50 | $21,456.50 | $21,456.50 | ||
UHF - Air Cooled Solid State Transmitter 0.11 kW | $9,520.00 | $9,520.00 | N/A | $9,520.00 | N/A |
Installation | $7,985.00 | $7,985.00 | N/A | $7,985.00 | N/A |
Transmitter Rack | $3,951.50 | $3,951.50 | Engineer has recommended a rack incorporating an electrical power strip. Rack must have casters to be able to move to service equipment being added as a result of the repack requirements. | $3,951.50 | N/A |
Actual Information Description | File Name |
---|---|
UHF - Air Cooled Solid State Transmitter 0.11 kW | |
Installation | |
Transmitter Rack |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $7,789.00 | $7,459.00 | N/A | $1,006.05 | N/A |
Total for all systems | $151,884.04 | $65,441.04 | N/A | $38,388.09 | N/A |
Primary Antenna WYBE-SCACUSTOM | $7,789.00 | $7,459.00 | $1,006.05 | ||
Feedhorns and power divider | $1,059.00 | $1,059.00 | N/A | $1,006.05 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Feedhorns and power divider | |
Sweep test of existing antenna | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $84,200.00 | $5,000.00 | N/A | $0.00 | N/A |
Total for all systems | $151,884.04 | $65,441.04 | N/A | $38,388.09 | N/A |
Primary Tower TOWER | $84,200.00 | $5,000.00 | $0.00 | ||
Short Tower (less than 500') | $84,200.00 | $5,000.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $15,363.00 | $15,000.00 | N/A | $8,100.00 | N/A |
Total for all systems | $151,884.04 | $65,441.04 | N/A | $38,388.09 | N/A |
Outside Professional Services | $15,363.00 | $15,000.00 | $8,100.00 | ||
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | N/A | N/A |
Project management of the transition | $2,528.00 | $2,400.00 | N/A | N/A | N/A |
Consulting and Onsite Engineering Services | $8,100.00 | $8,100.00 | N/A | $8,100.00 | N/A |
Actual Information Description | File Name |
---|---|
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Project management of the transition | Information not provided. |
Consulting and Onsite Engineering Services |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $23,075.54 | $16,525.54 | N/A | $7,825.54 | N/A |
Total for all systems | $151,884.04 | $65,441.04 | N/A | $38,388.09 | N/A |
Other Expenses | $23,075.54 | $16,525.54 | $7,825.54 | ||
Ethernet Switch | $20.99 | $20.99 | This is the actual cost and proved necessary for monitoring the new transmitter as required by the FCC. | $20.99 | N/A |
Mask Filter System | $1,566.00 | $1,566.00 | N/A | $1,566.00 | N/A |
License to Cover Fee Paid to the F.C.C. | $335.00 | $335.00 | N/A | $335.00 | N/A |
Freight | $3,500.00 | $3,500.00 | N/A | $3,500.00 | N/A |
Cable Notification | $6.85 | $6.85 | N/A | $6.85 | N/A |
Cable Carrier 2 Notification | $6.85 | $6.85 | N/A | $6.85 | N/A |
Rack Screws | $33.00 | $33.00 | N/A | $33.00 | N/A |
DTV Medical Facility Notification | $11,550.00 | $5,000.00 | N/A | N/A | N/A |
MVPD Notification of Channel Change | $0.00 | $0.00 | We were able to accomplish this ourselves without an outside consulting firm. | N/A | N/A |
Develop and air announcement of upcoming channel change | $3,200.00 | $3,200.00 | Estimate for production costs to develop ad, replacement of broadcast spots on the air. | N/A | N/A |
Equipment Delivery and Handling Charges | $500.00 | $500.00 | Quotes for transmitter and antenna specify freight to be billed at time of invoice.Estimated cost is for $500.00 | N/A | N/A |
Tower Crew | $2,350.00 | $2,350.00 | Upon examination of the time and crew requirements, the tower company has supplied a slightly increased estimate from the original expectation of $2000.00 for labor and hours.. | $2,350.00 | N/A |
Medical-Cable Notification Postal | $6.85 | $6.85 | Please note. U.S. Postal Service does not provide written estimates, only actual costs. | $6.85 | N/A |
Actual Information Description | File Name |
---|---|
Ethernet Switch | |
Mask Filter System | |
License to Cover Fee Paid to the F.C.C. | |
Freight | |
Cable Notification | |
Cable Carrier 2 Notification | |
Rack Screws | |
DTV Medical Facility Notification | Information not provided. |
MVPD Notification of Channel Change | Information not provided. |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Delivery and Handling Charges | Information not provided. |
Tower Crew | |
Medical-Cable Notification Postal |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $151,884.04 | $65,441.04 | $38,388.09 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Mark Evans , PhD . President 10/04/2021 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Mark Evans , PhD . President 10/04/2021 |