Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

SCRIPPS BROADCASTING HOLDINGS LLC

Doing Business As: SCRIPPS MEDIA, INC.

David Giles

312 Walnut Street

28th Floor

Cincinnati, OH 45202

United States

+1 (513) 977-3000 DAVE.GILES@SCRIPPS.COM Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Ray Thurber

SCRIPPS BROADCASTING HOLDINGS LLC

312 WALNUT STREET

28TH FLOOR

CINCINNATI, OH 45202

United States

+1 (248) 827-9202 ray.thurber@scripps.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan Current transmission system consists of a main/aux transmitter feeding a transmission line which connects to an antenna on the tower. Work includes installing new transmission line, attaching to antenna and connecting to new repack channel transmitters.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Auxiliary Transmitter

Back to Top

Add Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use Used in case of failure of main transmitter
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model CST-II
Year 2013
Type Inductive Output Tube
IOT Power Type Single
Power Capacity 20.0 kW

Auxiliary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Auxiliary (Backup)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model UAXTE-8R44
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 4.8 kW
Justification for New Transmitter Current transmitter manufacturer is no longer in business. See attached narrative and justification -- WHDT previous owner was reimbursed for a transmitter that was never installed. New GatesAir information reflects what WHDT is using.

Auxiliary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service Yes
Description Provide new sub panel and wire into transmitter. Also, wire pumps and heat exchanger to transmitter. Cost based on past experience.
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Auxiliary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model CST-II
Year 2000
Type Inductive Output Tube
IOT Power Type Two
Power Capacity 80.0 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model ULXTE-50
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 31.7 kW
Justification for New Transmitter Current transmitter manufacturer is no longer in business. See previously submitted narrative and justification. -- WHDT previous owner was reimbursed for transmitter that was not installed. New GatesAir transmitter reflects what WHDT is using.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring Yes
Size 4 inches
Length 100.0 feet
Other Electrical Service Yes
Description Labor and materials for installing and testing electrical components required for transmitter operation
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 15 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 900.0 square feet
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Primary Transmitter - Installation

Primary Transmitter - Installation

Primary Transmitter - Other Expenses

Other Expenses added by GatesAir that were not included in original quote and other expenses needed for the repack.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Retune Existing
Antenna Use Primary (Main)
Description of Use N/A
Ownership Leased
Owner Gray Media
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Other
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type Custom - Customer Assembled
ERP: 700.0 kW
Manufacturer DIE
Model TUA-SP4-12/48H-1-S-R
Year 2009

Primary Antenna

Back to Top

Adjustment to Existing Antenna

Section Question Response
Sweep Test of Existing Antenna Do you need a sweep test of existing antenna?

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna?
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Leased
Owner Gray Media
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Other
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type Custom - Customer Assembled
ERP: 700.0 kW
Manufacturer
Model TUA-SP4-12/48H-1-S-R
Year 2009

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model TFU-27JSC/VP-R P220
Year 2018
Justification for New Antenna Current antenna was assembled by licensee and actual performance on repack channel is unlikely. Upgrade for new antenna is for elliptical polarization. Upgrade cost was deducted from quote. NOTE: Bottom of quote shows both discount and upgrade deduction.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna?
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 8 3/16 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Custom Mounting Brackets

Due to WHDT being in a high-wind area (i.e. Florida), stronger mounting brackets are required. This was overlooked on the original proposal. See change order 3 Jan 2019

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Leased
Owner Gray Media
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 8 3/16 inches
Other Diameter N/A
Segment Length Other
Other Segment Length 19.33 feet
Number of parallel runs 1
Length 1700 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 8 3/16 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1700 feet per run
Justification for New Transmission Line See previously submitted narrative and justification. Also see attached quote which includes discounted price.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Minor changes

Minor changes in line cost. These were discovered after installation planning. See Invoice MAN00694 line items 4 and 22 from Dielectric.

Primary Transmission Line - Existing Line Inspection

Inspection to assess pre-transition transmission line's ability to handle power and frequency of assigned channel

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Move Equipment
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? Unknown
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1028084
Coordinates (NAD83) Latitude (NAD83) 26° 34' 30.7" N-
Longitude (NAD83) 080° 14' 31.1" W-
Overall Structure Height 1532.13 feet
Support Structure Height 1528.85 feet
Ground Elevation Above Mean Sea Level (AMSL) 17.06 feet
Structure Type GTOWER - Guyed Structure Used for Communication Purposes
Tower Owner WFLX, LLC
Date Constructed 10/06/2015

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
39736 WFLX DTV
20436 WRMF FM

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Information not provided.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 595
Explanation reimbursement filing, expense tracking, vendor coordination, progress reporting, budget creation, budget review, budget tracking, daisy-chain monitoring and all other activities necessary
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority No
Quantity N/A
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements Yes
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Reviewing and Preparing Form 399

Legal work to prosecute Form 399 filings

Engineering Support for CP Extension

Engineering - CP Extension Request

Legal for CP Extension

Legal work relating to request for extension of CP

Power Engineering

Engineering plan to change generator and transfer switch for 380 vac service. Preparation of electrical plan for transmitter room.

Progress Reporting

Prepare and file 6 required progress reports on FCC Form 2100, Schedule 387 on a quarterly basis with the FCC.

Progress Reporting - Legal

Review and/or file FCC Form 2100, Schedule 387

RF Consulting Services

Coverage and population counts for alternate site locations

Site Candidate Identification Selection Negotiation

Site Identification Selection and Initial Negotiation Services for potential alternate sites

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $3,687,607.53 $3,537,623.84 N/A $689,962.80 N/A
Total for all systems $5,066,940.08 $4,605,361.89 N/A $885,955.44 N/A
Primary Transmitter ULXTE-50 $2,752,107.53 $2,769,064.86 $526,403.82
Primary Transmitter - Installation $5,378.90 $5,378.90 Please see WHDT Primary Transmitter-Installation Budget Revision Justification Letter $5,378.90 N/A
Primary Transmitter - Other Expenses $5,949.00 $5,949.00 Please see attached GatesAir Quote Q-83454 N/A N/A
Other -- Building Addition Size: 900.0 $100,459.52 $100,459.52 See previously submitted narrative and justification. Also, see attached estimate for construction in the West Palm Beach, FL area. Use of small factory was used based on a commercial structure that will need to meet commercial code requirements. $2,480.00 N/A
15 Ton system $55,800.00 $40,000.00 N/A $0.00 N/A
4" Rigid Conduit and Wiring (Cost per foot) $10,100.00 $9,600.00 N/A $0.00 N/A
UHF - Liquid Cooled Solid State Transmitter 52 - 61 kW $1,788,000.00 $1,795,233.40 ***System Notice: Estimate adjusted and locked because line has been superseded.***see Estimated Cost Justification WHDT-110-1st Primary Transmitter - UHF Liquid Cooled Solid State, 52-61 kW v1 $1,795,233.40 invoices
Other Electrical Service: Labor and materials for installing and testing electrical components required for transmitter operation $20,388.57 $20,388.57 Please see WHDT Primary Transmitter - Other Electrical Service Budget Revision Justification Letter $20,388.57 N/A
UHF - Liquid Cooled Solid State Transmitter 31.7 kW $727,831.54 $727,831.54 Please see attached GatesAir Quote Q-80899 items A, B, D, and E. WHDT's previous owner was reimbursed for a transmitter that was not installed. The like-for-like reimbursable amount for this equipment is quoted on GatesAir Q-83454: $469,623.89. ($1,361,300.98) N/A
Switchgear - industrial 800 amp $38,200.00 $64,223.93 Please see Estimated Cost Justification WHDT-110-1st Primary Transmitter - Industrial Switchgear v0 (like for like cost) $64,223.93 N/A
Auxiliary Transmitter UAXTE-8R44 $935,500.00 $768,558.98 $163,558.98
UHF - Air Cooled Solid State Transmitter 4 - 6 kW $236,500.00 $163,558.98 Please see Estimated Cost Justification WHDT-150-1st Auxiliary Transmitter - UHF - Air Cooled Solid State Transmitter 4-6 kW v0 ($426,441.02) N/A
Other Electrical Service: Provide new sub panel and wire into transmitter. Also, wire pumps and heat exchanger to transmitter. Cost based on past experience. $15,000.00 $15,000.00 See attached narrative and justification $0.00 N/A
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW $684,000.00 $590,000.00 ***System Notice: Estimate adjusted and locked because line has been superseded.*** $590,000.00 N/A

Components

Actual Information Description File Name
Primary Transmitter - Installation

Component Description:
CAD Drawings
Amount:
$5,378.90
Primary Transmitter - Other Expenses Information not provided.
Other -- Building Addition Size: 900.0

Component Description:
WHDT-110-1st Primary Transmitter - Building Addition, 900 Sq. Ft. -$8,235.00
Amount:
($8,235.00)

Component Description:
Remove one interior wall, screen porch and 18" wall and float corner wall
Amount:
$2,480.00

Component Description:
Line item 5 -Space planning and building layout drawings for cooling system, transmission line, etc. See invoice detail. Final payment.
Amount:
$8,235.00

Component Description:
WHDT-110-1st Primary Transmitter - Building Addition, 900 Sq. Ft. -$8,235.00
Amount:
($8,235.00)

Component Description:
line item 5 - space planning and transmitter room engineering total cost: $16,470.00 50 percent of total cost: $8,235.00
Amount:
$8,235.00
15 Ton system

Component Description:
Credit Memo - Over-reimbursement to WHDT for the Blumark Laboratories
Amount:
($7,560.00)

Component Description:
line item 3 - 12 ton HVAC total cost: $11,700.00 50 percent of total cost: $5,850.00
Amount:
$5,850.00

Component Description:
Line Item 4 - Air Filtration unit final payment
Amount:
$1,710.00

Component Description:
Line item 3 - AC Compressor final payment
Amount:
$5,850.00

Component Description:
Credit Memo
Amount:
($7,560.00)

Component Description:
Invoice item 4 - Air Filtration part of the HVAC expense item. Amount requested reflects 50% down payment.
Amount:
$1,710.00
4" Rigid Conduit and Wiring (Cost per foot) Information not provided.
UHF - Liquid Cooled Solid State Transmitter 52 - 61 kW

Component Description:
WHDT-110-1st Primary Transmitter - UHF Liquid Cooled Solid State, 52-61 kW
Amount:
$10,173.40

Component Description:
line item 1 - 60kW main transmitter total cost: $1,785,060.00 50 percent of total cost: $892,530.00
Amount:
$892,530.00

Component Description:
Line Item 1 - Final Payment for main transmitter.
Amount:
$892,530.00
Other Electrical Service: Labor and materials for installing and testing electrical components required for transmitter operation

Component Description:
Overtime Labor
Amount:
$20,388.57

Component Description:
WHDT-110-1st Primary Transmitter - Other Electrical Service -$3,950.00
Amount:
($3,950.00)

Component Description:
WHDT-110-1st Primary Transmitter - Other Electrical Service -$3,950.00
Amount:
($3,950.00)
UHF - Liquid Cooled Solid State Transmitter 31.7 kW

Component Description:
Transmitter
Amount:
$135,455.06

Component Description:
Transmitter
Amount:
$110,407.97

Component Description:
credit memo for payment of Blumark Laboratories Invoice #17.1015.0012
Amount:
($892,530.00)

Component Description:
Transmitter
Amount:
$135,455.06

Component Description:
Transmitter
Amount:
$42,440.93

Component Description:
credit memo for payment of Blumark Laboratories Invoice #17.1015.0012
Amount:
($892,530.00)
Switchgear - industrial 800 amp

Component Description:
WHDT-110-1st Primary Transmitter - Industrial Switchgear
Amount:
$21,086.23

Component Description:
WHDT-110-1st Primary Transmitter - Industrial Switchgear
Amount:
$965.24

Component Description:
WHDT-110-1st Primary Transmitter - Industrial Switchgear
Amount:
$21,086.23

Component Description:
WHDT-110-1st Primary Transmitter - Industrial Switchgear
Amount:
$21,086.23
UHF - Air Cooled Solid State Transmitter 4 - 6 kW

Component Description:
Transmitter
Amount:
$163,558.98

Component Description:
credit memo for payment of Blumark Laboratories Invoice #17.1015.0012
Amount:
($295,000.00)

Component Description:
credit memo for payment of Blumark Laboratories Invoice #17.1015.0012
Amount:
($295,000.00)
Other Electrical Service: Provide new sub panel and wire into transmitter. Also, wire pumps and heat exchanger to transmitter. Cost based on past experience.

Component Description:
credit memo for payment of Blumark Laboratories Invoice 17.1015.0012
Amount:
($3,950.00)

Component Description:
line item 7 - step-down power transformer total cost: $7.900.00 50 percent of total cost: $3,950.00
Amount:
$3,950.00

Component Description:
Line item 7 - Step down transformer. Final payment.
Amount:
$3,950.00

Component Description:
credit memo for payment of Blumark Laboratories invoice #17.1015.0012
Amount:
($3,950.00)
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW

Component Description:
Line Item 2 - Final payment for Aux transmitter
Amount:
$295,000.00

Component Description:
line item 2 - 20kW backup transmitter total cost: $590,000.00 50 percent of total cost: $295,000.00
Amount:
$295,000.00

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $182,412.00 $177,098.00 N/A $8,600.00 N/A
Total for all systems $5,066,940.08 $4,605,361.89 N/A $885,955.44 N/A
Primary Antenna TFU-27JSC/VP-R P220 $175,682.00 $168,498.00 $168,498.00
Elbow complex, single channel, at antenna input, per 8 3/16. feedline (if needed) $15,250.00 $9,036.00 ***System Notice: Estimate adjusted and locked because line has been superseded.***See attached quote with discount included. $9,036.00 N/A
Sweep test of existing antenna $6,730.00 $5,760.00 ***System Notice: Estimate adjusted and locked because line has been superseded.***Please see Estimated Cost Justification WHDT-210-Primary Antenna - Sweep Test V0. $5,760.00 N/A
UHF - High Power, Side Mount, basic slot antenna, 1000 kW input, directional,, elliptically or circularly polarized $153,702.00 $153,702.00 ***System Notice: Estimate adjusted and locked because line has been superseded.***Current antenna was assembled by licensee and actual performance on repack channel is unlikely. Upgrade for new antenna is for elliptical polarization. Upgrade cost was deducted from quote. NOTE: Bottom of quote shows both discount and upgrade deduction. $153,702.00 line item 1 - main antenna total cost: $170,780.00 45 percent of total cost: $76,851.00.
Primary Antenna TUA-SP4-12/48H-1-S-R $6,730.00 $8,600.00 ($159,898.00)
Sweep test of existing antenna $6,730.00 $8,600.00 Please see WHDT RF Analytical invoice 1496. WHDT's previous owner was reimbursed for an antenna that was never used. WHDT utilized its pre-transition antenna ($159,898.00) N/A

Components

Actual Information Description File Name
Elbow complex, single channel, at antenna input, per 8 3/16. feedline (if needed)

Component Description:
Line item 3, 45% due prior to shipment. NOTE: See explanation of cost variance shown after invoice for non-reimbursable item. We will not resubmit this same invoice in the future in order to claim the unreimbursed balance.
Amount:
$4,518.00

Component Description:
item 3 - elbow complex total cost: $10,040.00 45 percent of total cost: $4,518.00
Amount:
$4,518.00
Sweep test of existing antenna

Component Description:
line item 22 - sweep total cost of item 22: $6,400.00 45 percent of total cost: $2,880.00
Amount:
$2,880.00

Component Description:
Line item 23, 45% due prior to shipment. NOTE: See explanation of cost variance shown after invoice for non-reimbursable item. We will not resubmit this same invoice in the future in order to claim the unreimbursed balance.
Amount:
$2,880.00
UHF - High Power, Side Mount, basic slot antenna, 1000 kW input, directional,, elliptically or circularly polarized

Component Description:
line item 1 - main antenna total cost: $170,780.00 45 percent of total cost: $76,851.00
Amount:
$76,851.00

Component Description:
Line item 1, 45% due prior to shipment. NOTE: See explanation of cost variance shown after invoice for non-reimbursable item. We will not resubmit this same invoice in the future in order to claim the unreimbursed balance.
Amount:
$76,851.00
Sweep test of existing antenna

Component Description:
Sweep test line and antenna - 1 day
Amount:
$8,600.00

Component Description:
Credit Memo
Amount:
($84,249.00)

Component Description:
Credit Memo -
Amount:
($84,249.00)

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $618,381.50 $404,796.70 N/A $26,796.98 N/A
Total for all systems $5,066,940.08 $4,605,361.89 N/A $885,955.44 N/A
Primary Transmission Line $618,381.50 $404,796.70 $26,796.98
Minor changes $5,312.00 $5,312.00 Minor changes in line cost. These were discovered after installation planning. See Invoice MAN00694 line items 4 and 22 from Dielectric. $0.00 N/A
Primary Transmission Line - Existing Line Inspection $23,169.50 $23,169.50 Please see WHDT Primary Transmission Line - Existing Line Inspection Budget Revision Justification Letter $23,169.50 N/A
Rigid Transmission Line - copper, 8 3/16" $589,900.00 $376,315.20 See attached quote that includes discount. $3,627.48 N/A

Components

Actual Information Description File Name
Minor changes

Component Description:
Line item 22, 45% due prior to shipment. NOTE: See explanation of cost variance shown after invoice for non-reimbursable item. We will not resubmit this same invoice in the future in order to claim the unreimbursed balance.
Amount:
$2,390.40

Component Description:
WHDT-310-Primary Transmission Line - Minor Changes -$2,390.40
Amount:
($2,390.40)
Primary Transmission Line - Existing Line Inspection

Component Description:
Transmission Line Inspection
Amount:
$8,740.00

Component Description:
Transmission Line Inspection
Amount:
$10,925.00

Component Description:
Transmission Line Inspection
Amount:
$3,504.50
Rigid Transmission Line - copper, 8 3/16"

Component Description:
Other
Amount:
$508.28

Component Description:
Other
Amount:
$684.60

Component Description:
Other
Amount:
$2,434.60

Component Description:
WHDT-310-Primary Transmission Line - 8 3/16"" Rigid Copper -$167,577.48
Amount:
($167,577.48)

Component Description:
4. WHDT-310-Primary Transmission Line - 8 3/16"" Rigid Copper -$169,341.84
Amount:
($169,341.84)

Component Description:
Line item 4, 45% due prior to shipment. NOTE: See explanation of cost variance shown after invoice for non-reimbursable item. We will not resubmit this same invoice in the future in order to claim the unreimbursed balance.
Amount:
$167,577.48

Component Description:
line item 4 - transmission line total cost: $376,315.20 45 percent of total cost: $169,341.84
Amount:
$169,341.84

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $210,500.00 $200,000.00 N/A $6,500.00 N/A
Total for all systems $5,066,940.08 $4,605,361.89 N/A $885,955.44 N/A
Primary Tower GTOWER $210,500.00 $200,000.00 $6,500.00
Tall Tower (greater than 500') $210,500.00 $200,000.00 N/A $6,500.00 N/A

Components

Actual Information Description File Name
Tall Tower (greater than 500')

Component Description:
Tower Analysis 1235' Guyed Structure
Amount:
$6,500.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $296,866.75 $219,422.25 N/A $140,708.70 N/A
Total for all systems $5,066,940.08 $4,605,361.89 N/A $885,955.44 N/A
Outside Professional Services $296,866.75 $219,422.25 $140,708.70
Site Candidate Identification Selection Negotiation $4,100.00 $4,100.00 See attached April 2019 Narrative and Tower Engineering Professionals Invoices. $4,099.82 See April 2019 Narrative and Tower Engineering Professional Invoices.
RF Consulting Services $4,856.25 $4,856.25 See Narrative April 2019 and MSW Invoice $4,856.25 See attached Narrative April 2019 and MSW Invoice 7009.
Progress Reporting - Legal $467.00 $467.00 See Narrative April 2019 and PWSP Invoice entries. $467.00 See Narrative April 2019 and PWSP Invoice entries
Progress Reporting $21,000.00 $21,000.00 Prepare and file 6 required progress reports on FCC Form 2100, Schedule 387 on a quarterly basis with the FCC. $132.50 N/A
Power Engineering $10,500.00 $10,500.00 Design of replacement electrical mains for new transmitters. $0.00 N/A
Legal for CP Extension $5,274.75 $5,274.75 See Narrative April 2019 and PWSP Invoice entries $5,274.75 See attached Narrative April 2019 and PWSP invoice.
Engineering Support for CP Extension $397.50 $397.50 See Narrative April 2019 and MSW Invoice $397.50 See Narrative and MSW Invoice 7047.
Reviewing and Preparing Form 399 $19,771.25 $19,771.25 See Narrative April 2019 $19,771.25 See April 2019 Narrative and PWSP Invoice entries.
RF Exposure Measurements $21,050.00 $5,000.00 N/A $0.00 N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $20,000.00 N/A $2,650.00 N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $3,150.00 N/A $3,150.00 N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A $0.00 N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $2,973.00 N/A $2,973.50 Please see detailed entries in attached invoiced identified with Preparing and Filing FCC CP application
Prepare request for Special Temporary Authorization $2,050.00 $975.00 Please see WHDT Engineering STA Budget Justification Letter $975.00 N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A $225.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,545.00 per Estimated Cost Justification WHDT-530-RF Eng - Construction Permit Application (Main) v0 $3,545.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $4,730.00 N/A $2,925.00 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A $0.00 N/A
Prepare and or review reimbursement form $2,630.00 $6,757.50 Actual cost of budget preparation and entering into 399 form. $6,757.50 see itemized invoice 6876. See also invoice 7047
Project management of the transition $94,010.00 $99,675.00 Widelity Strategic Support $82,508.63 N/A

Components

Actual Information Description File Name
Site Candidate Identification Selection Negotiation

Component Description:
Site Selection and Initial Negotiations. See April 2019 Narrative
Amount:
$1,599.84

Component Description:
Site Candidate Identification. See April 2019 Narrative
Amount:
$2,499.98
RF Consulting Services

Component Description:
Repack Engineering
Amount:
$750.00

Component Description:
Coverage and population counts in connection with potential alternate tower sites.
Amount:
$4,106.25
Progress Reporting - Legal

Component Description:
Legal fees for review and submission of required FCC progress reporting.
Amount:
$467.00
Progress Reporting

Component Description:
Actual cost of preparing and filing required FCC Progress Report
Amount:
$132.50
Power Engineering

Component Description:
Line item 6 - Eng 2
Amount:
$5,250.00

Component Description:
credit memo for payment of Blumark Laboratories Invoice #17.1015.0012
Amount:
($5,250.00)

Component Description:
credit memo for payment of Blumark Laboratories Invoice #17.1015.0012
Amount:
($5,250.00)

Component Description:
line item 6 - ENG-2 total cost: $10,500.00 50 percent of total cost: $5,250.00
Amount:
$5,250.00
Legal for CP Extension

Component Description:
Legal fees for submitting required CP extension request.
Amount:
$5,274.75
Engineering Support for CP Extension

Component Description:
Actual cost of engineering support of CP extension filing.
Amount:
$397.50
Reviewing and Preparing Form 399

Component Description:
Legal work necessary to prosecute Form 399 to payment
Amount:
$19,771.25
RF Exposure Measurements Information not provided.
Comprehensive coverage verification via field study, if needed

Component Description:
Interference Study
Amount:
$2,650.00
Attorney Fees - Negotiation of lease and other matters for shared locations

Component Description:
Legal fees for addressing shared location matters
Amount:
$3,150.00
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
Legal Fees for Preparing and Filing FCC CP Application
Amount:
$2,973.50
Prepare request for Special Temporary Authorization

Component Description:
FCC Repack
Amount:
$975.00
Prepare engineering section of FCC Form 2100 (main), License to Cover Application

Component Description:
FCC Repack
Amount:
$225.00
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
WHDT-530-RF Eng - Construction Permit Application (Main)
Amount:
$1,425.00

Component Description:
Prepare Form 2100 & Exhibits for filing CP application with FCC
Amount:
$2,120.00
Perform engineering study for new channel assignment and antenna development

Component Description:
Mid-State Principal Engineer
Amount:
$525.00

Component Description:
WHDT - Preparation of STA and ERP/tpo Calculations
Amount:
$2,400.00

Component Description:
Previously paid. Ignore or delete this entry
Amount:
N/A
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Prepare and or review reimbursement form

Component Description:
Form 399 budget preparation
Amount:
$4,770.00

Component Description:
Actual cost of 399 budget preparation and filing.
Amount:
$1,987.50
Project management of the transition

Component Description:
Project Management
Amount:
$1,909.05

Component Description:
Project Management
Amount:
$1,510.80

Component Description:
Project Management
Amount:
$3,164.55

Component Description:
Project Management
Amount:
$3,386.20

Component Description:
Project management
Amount:
$7,624.05

Component Description:
Project Management
Amount:
$789.85

Component Description:
Project Management
Amount:
$2,287.00

Component Description:
WHDT-510-Project Management
Amount:
$75.00

Component Description:
Project Management
Amount:
$3,472.45

Component Description:
Project management
Amount:
$77.50

Component Description:
Project Management
Amount:
$2,478.90

Component Description:
Project Management
Amount:
$2,257.70

Component Description:
Project Management
Amount:
$93.55

Component Description:
Project Management
Amount:
$1,600.20

Component Description:
Project Management
Amount:
$64.95

Component Description:
Project Management
Amount:
$4,701.60

Component Description:
Project management
Amount:
$3,945.55

Component Description:
Project Management
Amount:
$2,212.05

Component Description:
Project Management
Amount:
$1,768.55

Component Description:
Project Management
Amount:
$3,207.60

Component Description:
Project Management
Amount:
$2,617.20

Component Description:
Project Management
Amount:
$15,976.25

Component Description:
Project Management
Amount:
$3,512.20

Component Description:
Project Management
Amount:
$276.55

Component Description:
Project Management
Amount:
$2,490.95

Component Description:
WHDT-510-Project Management
Amount:
$150.00

Component Description:
Repack Engineering
Amount:
$458.33

Component Description:
FCC Repack
Amount:
$75.00

Component Description:
WHDT Status Call
Amount:
$150.00

Component Description:
Project Management
Amount:
$1,969.20

Component Description:
Project management
Amount:
$1,166.85

Component Description:
FCC Repack
Amount:
$375.00

Component Description:
Project Management
Amount:
$789.55

Component Description:
Project Management
Amount:
$3,016.40

Component Description:
Project management
Amount:
$2,858.05

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $71,172.30 $66,421.10 N/A $13,386.96 N/A
Total for all systems $5,066,940.08 $4,605,361.89 N/A $885,955.44 N/A
Other Expenses $71,172.30 $66,421.10 $13,386.96
MVPD Notification of Channel Change $2,395.20 $2,395.20 see Estimated Cost Justification WHDT-610-MVPD Notifications v0 $2,395.20 N/A
Develop and air announcement of upcoming channel change $500.00 $500.00 N/A $0.00 N/A
Equipment Storage $8,000.00 $8,000.00 leased storage space estimate $0.00 N/A
Equipment Delivery and Handling Charges $40,282.10 $40,282.10 See attached quote for delivery of 2 transmitters and estimating $10,000 for 1,700 ft. of 8" transmission line and antenna. $4,142.96 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $5,000.00 $5,000.00 Applicant will be required to dispose of the current transmission line and transmitters. The exact costs are not known at this time. $0.00 N/A
Non-zoning permits $2,000.00 $2,000.00 Estimated permit cost to modify unused portion of building to accommodate new transmitters . $0.00 N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 N/A $0.00 N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,070.00 N/A $0.00 N/A
DTV Medical Facility Notification $11,550.00 $6,848.80 see Estimated Cost Justification WHDT-610-Medical Facility Notifications v0 $6,848.80 N/A

Components

Actual Information Description File Name
MVPD Notification of Channel Change

Component Description:
MVPD Notification Services
Amount:
$2,395.20
Develop and air announcement of upcoming channel change Information not provided.
Equipment Storage Information not provided.
Equipment Delivery and Handling Charges

Component Description:
Other Freight and Shipping
Amount:
$642.96

Component Description:
Offload equipment & place
Amount:
$3,500.00
Disposal Costs (for equipment and other waste, net of any salvage value) Information not provided.
Non-zoning permits Information not provided.
FCC Filing Fees - Form 2100 license to cover application Information not provided.
FCC Filing Fees - Form 2100 minor change CP application Information not provided.
DTV Medical Facility Notification

Component Description:
DTV Notification Service
Amount:
$6,848.80

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $5,066,940.08 $4,605,361.89 $885,955.44

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. Yes
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. Yes

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Sravan V Reddy

Senior Director, General Accounting


10/07/2021

Certification

Back to Top
Section Question Response
Submission of Final Allocation or Accounting Information Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  2. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  3. The above-named entity certifies that all costs identified as "actual costs" herein accurately represent the costs actually paid by the above-named entity, including any discounts, refunds, or rebates.

  4. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  5. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  6. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Sravan V Reddy

Senior Director, General Accounting


10/07/2021