Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
REGION 1 TRANSLATOR ASSOCIATION Doing Business As: REGION 1 TRANSLATOR ASSOCIATION |
Ed Lake 221 S Interocean Ave Holyoke, CO 80734 United States |
+1 (970) 854-3778 | rfsystemsllc@gmail.com | Government Entity |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | K50LP-D displaced to Ch 29. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | No | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | DTX125U-50 | |
Year | 2012 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | .1 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TAUD100/TP400D | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | .1 kW | |
Justification for New Transmitter | Pineapple transmitter cannot be retuned to Ch 29. Company out of business, no support. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | No | |
Prepare engineering section of Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
Prepare and file Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
Antenna Installation |
Installation of new Ch 29 receive antenna at Yuma (take down Ch 50) |
New Receive Antenna |
Change the Ch 50 receive antenna at Yuma to new displaced Ch 29 |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $13,750.00 | $12,398.00 | N/A | $12,398.00 | N/A |
Total for all systems | $19,989.06 | $16,987.06 | N/A | $16,987.06 | N/A |
Primary Transmitter TAUD100/TP400D | $13,750.00 | $12,398.00 | $12,398.00 | ||
UHF - Air Cooled Solid State Transmitter 50.001 - 150 Watts | $13,750.00 | $12,398.00 | N/A | $12,398.00 | N/A |
Actual Information Description | File Name |
---|---|
UHF - Air Cooled Solid State Transmitter 50.001 - 150 Watts |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $4,510.00 | $2,860.00 | N/A | $2,860.00 | N/A |
Total for all systems | $19,989.06 | $16,987.06 | N/A | $16,987.06 | N/A |
Outside Professional Services | $4,510.00 | $2,860.00 | $2,860.00 | ||
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | 399 Reimbursement Complete Project Management See Reg1 399R K50LP.pdf | $1,710.00 | N/A |
Perform engineering study for displacement application | $1,800.00 | $150.00 | N/A | $150.00 | N/A |
Form 399 assistance or other Program Management costs | $1,000.00 | $1,000.00 | 399 Eligibility Filing and 1876 Preparation & Submission See Reg1 399E K50LP.pdf | $1,000.00 | N/A |
Actual Information Description | File Name |
---|---|
Prepare/ Review 399 reimbursement form | |
Perform engineering study for displacement application | |
Form 399 assistance or other Program Management costs |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,729.06 | $1,729.06 | N/A | $1,729.06 | N/A |
Total for all systems | $19,989.06 | $16,987.06 | N/A | $16,987.06 | N/A |
Other Expenses | $1,729.06 | $1,729.06 | $1,729.06 | ||
Antenna Installation | $0.00 | $0.00 | United Tower Service Quote to hang new Ch 29 Receive antenna. See United Tower RX Yuma Anton.pdf | $0.00 | N/A |
New Receive Antenna | $1,729.06 | $1,729.06 | K50LP displaced to Ch 29, this translator feeds the system at Yuma so the receive antenna at Yuma had to be replaced to Ch 29. | $1,729.06 | N/A |
Actual Information Description | File Name |
---|---|
Antenna Installation | Information not provided. |
New Receive Antenna |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $19,989.06 | $16,987.06 | $16,987.06 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Ed Lake Manager 09/04/2022 |