Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
THE GREATER CHATTANOOGA PUBLIC TELEVISION CORP Doing Business As: Greater Chattanooga Public TV |
Bryan Fuqua PO Box 37416 Chattanooga, TN 37416 United States |
+1 (423) 702-7800 | bfuqua@wtcitv.org | Not-for-Profit |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Build new tower adjacent to the old tower. Install new transmitter / new transmission line / new antenna. Remove old antenna/line from existing tower so WUTC-FM can continue to operate without expenses on old tower. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Diamond DHD-60 P2 | |
Year | 2002 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 14 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | Maxiva ULXTE-20 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 12.9 kW | |
Justification for New Transmitter | GatesAir issued a letter to all Diamond CD (as well as other model) transmitter owners dated January 1, 2017 that they would no longer offer channel change services or support in-field channel changes. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 3 inches | |
Length | 100.0 feet | |
Other Electrical Service | Yes | |
Description | Installation/wiring of 75 KVA transformer and 200 amp switch panel/breakers for GatesAir ULXTE-20 transmitter | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 160.0 kW | |
Manufacturer | ||
Model | ATW18H6-HTO-29H | |
Year | 2014 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 181.0 kW | |
Manufacturer | ||
Model | ATW22H4-HTO10-35L | |
Year | 2019 | |
Justification for New Antenna | Main licensed antenna for WTCI. Slotted coaxial antenna can not be re-tuned to re-pack channel. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 31.9 kW | |
Manufacturer | ||
Model | ATW2G150-HSS-35 | |
Year | 2019 | |
Justification for New Antenna | WTCI will not be able to meet September 6th deadline to start operation on final Ch 35 repack facility. ERI's ATW G series emergency/standby antenna is only short lead time antenna available. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | Broadband | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 500 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | Broadband | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 500 feet per run | |
Justification for New Transmission Line | Need to install new rigid coax in a new tower in order to repack station. Current tower will not pass EIA-222-G codes and can't be modified to meet new codes. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Construct New |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | Terrain Constrained | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1042763 | |
Coordinates (NAD83) | Latitude (NAD83) | 35° 12' 26.0" N- |
Longitude (NAD83) | 085° 16' 52.0" W- | |
Overall Structure Height | 493.00 feet | |
Support Structure Height | 448.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 2012.00 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | The Greater Chattanooga Public TV Corp | |
Date Constructed | 08/15/1993 |
Facility ID | Call Sign | Service |
---|---|---|
69325 | WUTC | FM |
Section | Question | Response |
---|---|---|
Construct New Tower | Use | Primary (Main) |
Description of Use | N/A | |
Is this a request for upgraded equipment? | No | |
Height | 445.00 feet | |
Justification for New Tower | Tower will not meet current EIA-222-G standard with the repack antenna and can't be modified to meet the EIA-222-G standard. |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Terrain constrained |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Number of Hours | N/A | |
Explanation | N/A | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | No |
Prepare engineering section of Form FCC Construction Permit Application | No | |
For Auxiliary Facility | N/A | |
For Main Facility | N/A | |
Prepare engineering section of Form FCC License to Cover Application | No | |
For Auxiliary Facility | N/A | |
For Main Facility | N/A | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | Yes | |
Environmental Assessment | Yes | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | Yes | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Cultural Resources Survey |
Cultural survey to start work on Environmental Assessment triggered by new repack tower |
NEPA and EA services |
Terracon will provide services to complete an Environmental Assessment to get WTCI's new repack tower licensed. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | No | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
MVPD Notifications |
Notification of cable and Satellite MVPD providers of new RF channel and TS stream parameters. |
Mask Filter |
New Dielectric mask filter on CH 35 to replace CH 29 filter. |
Tower foundation and anchors |
Tower foundations and installation. Drilled pier design in rock. |
Bird Diverters |
Bird Diverters required by FCC as condition for Antenna Structure Registration. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $534,480.00 | $479,289.03 | N/A | $476,573.48 | N/A |
Total for all systems | $1,806,882.10 | $1,608,442.47 | N/A | $1,484,767.29 | N/A |
Primary Transmitter Maxiva ULXTE-20 | $534,480.00 | $479,289.03 | $476,573.48 | ||
Other Electrical Service: Installation/wiring of 75 KVA transformer and 200 amp switch panel/breakers for GatesAir ULXTE-20 transmitter | $9,230.00 | $9,230.00 | Electrical installation costs for transformer, panels and breakers power GatesAir ULXTE-20 transmitter | $9,230.00 | N/A |
3" Rigid Conduit and Wiring (Cost per foot) | $5,200.00 | $0.00 | Removing this item - can't figure out how to delete from Form 399 | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW | $494,500.00 | $467,343.48 | Updated quote estimate with change orders and actual shipping costs raised total cost from $456,290.47 to $467,343.48. | $467,343.48 | Change order Q-77238 and Q-78300 added $5,140.15. Also freight was estimated at $5,400 and was finally billed at $8,597.32. |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $2,715.55 | Only need 75 KVA transformer. Priced from GatesAir transmitter quote. | N/A | N/A |
Actual Information Description | File Name |
---|---|
Other Electrical Service: Installation/wiring of 75 KVA transformer and 200 amp switch panel/breakers for GatesAir ULXTE-20 transmitter | |
3" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW | |
Transformer 3 phase/480v - 150 KVA | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $298,780.00 | $237,225.00 | N/A | $145,629.48 | N/A |
Total for all systems | $1,806,882.10 | $1,608,442.47 | N/A | $1,484,767.29 | N/A |
Interim Antenna ATW2G150-HSS-35 | $45,050.00 | $27,850.00 | $27,850.00 | ||
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $5,950.00 | N/A | $5,950.00 | N/A |
UHF - High Power, Side Mount, basic slot antenna, 32 kW input, directional,, horizontally polarized | $21,900.00 | $21,900.00 | N/A | $21,900.00 | N/A |
Primary Antenna ATW22H4-HTO10-35L | $253,730.00 | $209,375.00 | $117,779.48 | ||
Sweep test of existing antenna | $6,730.00 | $6,250.00 | Should be labeled 'System Sweep' for new antenna and line but I can't figure out how to change description. | $6,250.00 | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized | $247,000.00 | $203,125.00 | N/A | $111,529.48 | N/A |
Actual Information Description | File Name |
---|---|
Side mount brackets for high power antennas (if not included in antenna base cost) | |
UHF - High Power, Side Mount, basic slot antenna, 32 kW input, directional,, horizontally polarized | |
Sweep test of existing antenna | |
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $116,000.00 | $105,595.70 | N/A | $105,595.70 | N/A |
Total for all systems | $1,806,882.10 | $1,608,442.47 | N/A | $1,484,767.29 | N/A |
Primary Transmission Line | $116,000.00 | $105,595.70 | $105,595.70 | ||
Rigid Transmission Line - copper, 6 1/8" broadband | $116,000.00 | $105,595.70 | Additional adapters needed to interface to mask filter and existing dummy load raised the initial estimate of $95,000 to the quoted $105,595.70 | $105,595.70 | N/A |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 6 1/8" broadband |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $628,770.00 | $571,520.00 | N/A | $571,520.00 | N/A |
Total for all systems | $1,806,882.10 | $1,608,442.47 | N/A | $1,484,767.29 | N/A |
Primary Tower TOWER | $0.00 | $0.00 | $0.00 | ||
Primary Tower | $628,770.00 | $571,520.00 | $571,520.00 | ||
Structural engineering tower load study for well documented tower | $12,600.00 | $2,500.00 | ***System Notice: Estimate adjusted and locked because line has been superseded.*** | $2,500.00 | N/A |
New tower | $195,170.00 | $195,170.00 | Tower sections, waveguide bridge, guy wire hardware, and red obstruction lighting combined. Updated price after site visit by Quality Tower Services/Rohn. | $195,170.00 | N/A |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $373,850.00 | Increased cost from $363,650 was to install ERI ATW2G175 antenna as an interim antenna operated under an STA to meet deadline for ceasing operation on Channel 29 before September 6, 2019 deadline while tower installation continued. | $373,850.00 | Extra $10,200 over estimated cost is amount to mount a standby/emergency ERI ATW2 antenna for use on new repack channel on old tower while new tower work was completed to meet Phase 5 deadline to get off old channel. |
Actual Information Description | File Name |
---|---|
Structural engineering tower load study for well documented tower | |
New tower | |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $45,596.00 | $39,982.04 | N/A | $23,161.46 | N/A |
Total for all systems | $1,806,882.10 | $1,608,442.47 | N/A | $1,484,767.29 | N/A |
Outside Professional Services | $45,596.00 | $39,982.04 | $23,161.46 | ||
NEPA and EA services | $6,000.00 | $6,000.00 | N/A | $6,000.00 | N/A |
Cultural Resources Survey | $1,991.00 | $1,991.00 | N/A | $1,991.00 | N/A |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | $2,105.00 | $1,000.00 | N/A | N/A | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $1,000.00 | N/A | N/A | N/A |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | $10,520.00 | $6,000.00 | N/A | N/A | N/A |
NEPA Section 106 environmental review, if needed | $6,310.00 | $1,991.04 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $2,000.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,000.00 | WTCI expects the work to prepare and file License to cover may be impacted by current work to meet National Historic Preservation Act requirements | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $16,000.00 | Additional attorney fees required by ongoing government mandated environmental review. National Historic Preservation Act study has been done and awaiting final report. | $15,170.46 | Cost overages are due to continuing issues with CP and getting new tower registered. Now being required to do an Environmental Assessment. |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $1,000.00 | N/A | N/A | N/A |
Prepare and or review reimbursement form | $2,630.00 | $1,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
NEPA and EA services | |
Cultural Resources Survey | |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | Information not provided. |
ASR modification (prepare FCC Form 854) | Information not provided. |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | Information not provided. |
NEPA Section 106 environmental review, if needed | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Prepare and or review reimbursement form | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $183,256.10 | $174,830.70 | N/A | $162,287.17 | N/A |
Total for all systems | $1,806,882.10 | $1,608,442.47 | N/A | $1,484,767.29 | N/A |
Other Expenses | $183,256.10 | $174,830.70 | $162,287.17 | ||
Bird Diverters | $5,640.60 | $5,640.60 | Bird Diverter installation is a condition of FCC to approve Antenna Structure Registration for replacement tower. | N/A | N/A |
Tower foundation and anchors | $127,800.00 | $127,800.00 | I-beam anchors, pier pin, freight, and installation of of drilled pier foundations. Updated price after site visit by Quality Tower Services/Rohn. | $127,800.00 | N/A |
Mask Filter | $24,830.25 | $24,830.25 | Dielectric UT6E-16W-30K mask filter and couplers | $26,050.09 | Freight costs were not included in original quote. Additional cost is due to freight charges, |
MVPD Notifications | $2,435.25 | $2,435.25 | N/A | $2,435.25 | Quote has not changed - dated April 19, 2018. Don't know why the amount on Form 399 request was lower. |
MVPD Notification of Channel Change | $1,000.00 | $1,000.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $6,000.00 | $6,000.00 | Delivery charges for antenna and transmission line are unknown at this time. | $1,057.23 | N/A |
Non-zoning permits | $2,000.00 | $2,000.00 | Building permits are based on actual construction costs which are unknown at this time. | $1,820.00 | Charges of $1,820.00 for actual permit fees |
Local Zoning | $2,000.00 | $2,000.00 | Zoning fees are unknown at this time. | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $3,124.60 | N/A | $3,124.60 | N/A |
Actual Information Description | File Name |
---|---|
Bird Diverters | Information not provided. |
Tower foundation and anchors | |
Mask Filter | |
MVPD Notifications | |
MVPD Notification of Channel Change | Information not provided. |
Equipment Delivery and Handling Charges | |
Non-zoning permits | |
Local Zoning | Information not provided. |
DTV Medical Facility Notification |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $1,806,882.10 | $1,608,442.47 | $1,484,767.29 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Bryan D Fuqua , Fuqua . SVP Technical Services 09/03/2021 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Bryan D Fuqua , Fuqua . SVP Technical Services 09/03/2021 |