Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
59438
Service:
DTV
Call Sign:
WCPO-TV
Channel:
26 (UHF)
File Number:
0000027254
FRN:
0002710192
Date Submitted:
09/27/2021

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

SCRIPPS BROADCASTING HOLDINGS LLC

David Giles

312 WALNUT STREET

28TH FLOOR

CINCINNATI, OH 45202

United States

+1 (513) 977-3000 DAVE.GILES@SCRIPPS.COM Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Ray Thurber

Vice President Engineering

SCRIPPS BROADCASTING HOLDINGS LLC

Ray Thurber

312 Walnut St.

Cincinnati, OH 45202

United States

+1 (248) 827-9202 ray.thurber@scripps.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan WCPO must replace its main antenna and transmitter in order to move its new channel. It will need to install interim facilities in order to be able to replace the main facility. See attached narrative for a more detailed explanation.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Auxiliary Transmitter

Back to Top

Add Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Retune Existing
Use Auxiliary (Backup)
Ownership Owned
Owner N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer GatesAir
Model ULXTE-20
Year 2017
Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 12.0 kW

Auxiliary Transmitter

Back to Top

Retuning Transmitter Costs

Section Question Response
New IOT Tubes Number of Tubes (including accessories) needed N/A
New Mask Filter
Power 30 kW
Other Power N/A
New Exciter Is a new exciter needed? No

Auxiliary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service Yes
Description Auxiliary transmitter electrical service will have to be moved off current UPS to direct service to the backup generator. This is needed for the installation of the new main transmitter.
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Auxiliary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Visionary DT
Year 1999
Type Inductive Output Tube
IOT Power Type Two
Power Capacity 60 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model ULXTE100
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 63.0 kW
Justification for New Transmitter Current Axcera transmitter is orphaned and no longer supported by the manufacturer. Available parts are in very limited supply and in some cases are no longer available. It cannot be re-tuned.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) Yes
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 300 kVA
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service Yes
Description Necessary conduit, wiring and fuse disconnects as quoted by electrical contractor.
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 15 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Removal of Existing HVAC Unit

Existing TRANE HVAC unit and associated ductwork must be decommissioned/removed in order to make room for the new transmitter and heat exchangers.

Ice Bridge Extension

Ice bridge extension needed to cover new heat exchangers.

HVAC Dampers

4 Dampers over return openings in block wall.

Mask Filter

Mask Filter

Primary Transmitter - Installation

Primary Transmitter - Installation

Plenum Rework

Existing HVAC unit ductwork needs to be redirected to location of new transmitter.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 980.0 kW
Manufacturer
Model TFU-36GTH/VP-O6
Year 2010

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Top
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model TFU-36GTH/VP-R O6
Year 2017
Justification for New Antenna Existing main antenna is a coaxial slot antenna that is channel specific and cannot be reused on the new channel.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna?
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 7 3/16 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna?
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

RF Eng - Custom Antenna Design

Custom design of antenna mount required for repack.

Ohio Sales Tax

Sales Tax on Main and Interim Antenna and Main and Interim Sweep Tests for both.

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Broadband Slot
Number of Stations Supported 1
Number of Panels/Bays 24
Lower Limit 470.00 MHz
Upper Limit 698.00 MHz
Design power capacity in use 63.0 %
Other Antenna Type N/A
ERP: 950.0 kW
Manufacturer
Model TFU-24WB/VP C160
Year 2019
Justification for New Antenna Interim antenna is necessary for interim operation while the main antenna is being replaced for the new channel.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 1
Length 908 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 7 3/16 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 1
Length 910 feet per run
Justification for New Transmission Line WCPO is moving to a higher channel, which will require more power. The existing 6-1/8" line does not have enough headroom to handle the additional power.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Ohio Sales Tax

Sales Tax on Main and Interim Transmission Line

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Rigid
Diameter 6 1/8 inches
Segment Length 19 ½ '
Other Segment Length
Number of parallel runs 1
Length 600 feet per run
Justification for New Transmission Line WCPO plans to re-use existing main 6-1/8" line for its interim facility. This will require purchase of approximately 40 ft of new line and several elbows.

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Elbow

Elbow need for Interim Antenna and Transmission Line

Interim Transmission Line - Internal Transmission Line

Internal Transmission Line

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Yes
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1013618
Coordinates (NAD83) Latitude (NAD83) 39° 07' 30.4" N-
Longitude (NAD83) 084° 29' 56.0" W-
Overall Structure Height 865.80 feet
Support Structure Height 791.00 feet
Ground Elevation Above Mean Sea Level (AMSL) 844.15 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner SCRIPPS MEDIA, INC.
Date Constructed 12/16/2010

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
74302 WVXU FM
6126 WGUC FM
10140 WUBE-FM FM

Other Types of Users

Users
LPTV-168414
LPTV-168413

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? Yes

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Tower Structural Analysis

Tower Structural Analysis

Rigging Plan, PE Review

Professional Engineering review of proposed rigging plan as required by ANSI/ASEE A10.48 and ANSI/TIA 322 standards.

Helicopter Lift- Site Security

Helicopter Lift- Site Security

Ohio Sales Tax

Ohio Sales Tax for Tower and Rigging Services

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 595
Explanation reimbursement filing, expense tracking, vendor coordination, progress reporting, budget creation, budget review, budget tracking, daisy-chain monitoring and all other activities necessary, WCPO cannot spare personnel to ensure these tasks are completed.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification Yes
FAA Consultation (including preparation of FAA Form 7460) Yes
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements Yes
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Site Survey

GatesAir performed a site survey to access changes to facility as necessary to transition to new channel including, power and HVAC requirements, available transmitter room space and existing antenna and transmission line RF characteristics at new channel.

Ohio Sales Tax

Ohio Sales Tax for professional services.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning Yes
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Employee Time

Time needed by Scripps corporate and WCPO employees to work on the transition to a new channel.

In-building Disassembly

Work necessary to disassemble and remove existing transmitter, beam supplies, step starts, heat exchangers and mask filter.

Ohio Sales Tax

Ohio Sales Tax for Other Expenses

Site Security

Site security required for installation of repack equipment

Sales Tax

Sales Tax

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $2,158,568.77 $2,252,768.77 N/A $2,006,809.09 N/A
Total for all systems $4,278,134.56 $4,874,663.45 N/A $4,145,668.41 N/A
Primary Transmitter ULXTE100 $2,010,768.77 $2,111,768.77 $1,987,060.91
Plenum Rework $15,000.00 $15,000.00 N/A $0.00 N/A
Primary Transmitter - Installation $750.00 $750.00 Please see WCPO-TV Primary Transmitter - Installation Budget Revision Justification Letter $750.00 N/A
Ice Bridge Extension $17,309.00 $17,309.00 Please see WCPO-TV DeBra-Kuempel QUOTE for inv 01230617 $17,309.00 N/A
15 Ton system $55,800.00 $161,200.00 Please see DeBra-Kuempel Inc. quote dated November 5, 2020 $161,200.00 N/A
Other Electrical Service: Necessary conduit, wiring and fuse disconnects as quoted by electrical contractor. $109,086.31 $109,086.31 Please see Estimated Cost Justification WCPO-TV-110-1st Primary Transmitter - Other Electrical Service v2 $109,086.31 N/A
Transformer 3 phase/480v - 300 KVA $36,800.00 $35,000.00 N/A $0.00 N/A
Switchgear - industrial 800 amp $38,200.00 $36,300.00 N/A $0.00 N/A
Service entrance 3 phase/800 amp/208 volt $14,400.00 $13,700.00 N/A $0.00 N/A
Removal of Existing HVAC Unit $12,537.39 $12,537.39 see Estimated Cost Justification WCPO-TV-110-1st Primary Transmitter - Removal of Existing HVAC Unit V0 $12,537.39 N/A
Mask Filter $92,180.75 $92,180.75 Please see GatesAir quote Q-84088 plus freight and tax on invoice US0332396 $92,180.75 N/A
HVAC Dampers $7,418.32 $7,418.32 see Estimated Cost Justification WCPO-TV-110-1st Primary Transmitter - Other Expenses HVAC Dampers V0 $7,418.32 Please see submitted invoices.
UHF - Liquid Cooled Solid State Transmitter 63.0 kW $1,611,287.00 $1,611,287.00 N/A $1,586,579.14 N/A
Auxiliary Transmitter ULXTE-20 $147,800.00 $141,000.00 $19,748.18
30 kW mask filter $32,600.00 $31,000.00 N/A $0.00 N/A
UHF and VHF - minor banding issues $105,200.00 $100,000.00 N/A $19,748.18 N/A
Other Electrical Service: Auxiliary transmitter electrical service will have to be moved off current UPS to direct service to the backup generator. This is needed for the installation of the new main transmitter. $10,000.00 $10,000.00 N/A $0.00 N/A

Components

Actual Information Description File Name
Plenum Rework Information not provided.
Primary Transmitter - Installation

Component Description:
11'' diameter x 8'' depth core drill.
Amount:
$500.00

Component Description:
Installation
Amount:
$250.00
Ice Bridge Extension

Component Description:
WCPO Transmitter/ Roof Ice Guard
Amount:
$17,309.00
15 Ton system

Component Description:
WCPO / Transmitter Bldg AC Addition
Amount:
$80,500.00

Component Description:
WCPO / Transmitter Bldg AC Addition
Amount:
$80,700.00
Other Electrical Service: Necessary conduit, wiring and fuse disconnects as quoted by electrical contractor.

Component Description:
1st invoice for the original contract amount
Amount:
$49,410.50

Component Description:
WCPO Transmitter Install
Amount:
$7,372.31

Component Description:
Furnished labor and material for tower upgrade
Amount:
$52,303.50

Component Description:
WCPO Transmitter
Amount:
$1,968.80
Transformer 3 phase/480v - 300 KVA Information not provided.
Switchgear - industrial 800 amp Information not provided.
Service entrance 3 phase/800 amp/208 volt Information not provided.
Removal of Existing HVAC Unit

Component Description:
WCPO Transmitter-Remove Duct work for installation of new transmitter
Amount:
$4,782.39

Component Description:
Removal of the Trane HVAC unit
Amount:
$7,276.00

Component Description:
Removal of commercial chain link fence
Amount:
$479.00
Mask Filter

Component Description:
ULXTE-100 Replacement Filters
Amount:
$92,180.75
HVAC Dampers

Component Description:
Added Relay Module
Amount:
$1,016.51

Component Description:
Quoted Amount
Amount:
$6,401.81
UHF - Liquid Cooled Solid State Transmitter 63.0 kW

Component Description:
ULXTE-100
Amount:
$23,034.00

Component Description:
ULXTE-100
Amount:
$485,633.81

Component Description:
ULXTE-100
Amount:
$505,863.08

Component Description:
ULXTE-100
Amount:
$436,258.52

Component Description:
ULXTE-100
Amount:
$135,789.73
30 kW mask filter Information not provided.
UHF and VHF - minor banding issues

Component Description:
Field Service
Amount:
$10,053.18

Component Description:
MISC BROADCAST FIELD SERVICE
Amount:
$9,695.00

Component Description:
Invoice moved to another component.
Amount:
N/A
Other Electrical Service: Auxiliary transmitter electrical service will have to be moved off current UPS to direct service to the backup generator. This is needed for the installation of the new main transmitter. Information not provided.

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $551,079.00 $513,556.48 N/A $478,005.48 N/A
Total for all systems $4,278,134.56 $4,874,663.45 N/A $4,145,668.41 N/A
Interim Antenna TFU-24WB/VP C160 $202,898.00 $179,418.00 $179,418.00
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $0.00 N/A N/A N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $6,400.00 N/A
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 950 kW input, directional,, elliptically or circularly polarized $173,018.00 $173,018.00 Please see Dielectric quote 700148CMZ-3 $173,018.00 N/A
Primary Antenna TFU-36GTH/VP-R O6 $348,181.00 $334,138.48 $298,587.48
RF Eng - Custom Antenna Design $2,500.00 $2,500.00 Please see Elevated Structural Consultants, LLC quote dated 3-25-19 $2,500.00 N/A
Ohio Sales Tax $35,551.00 $35,551.00 N/A $0.00 N/A
Elbow complex, single channel, at antenna input, per 7 3/16. feedline (if needed) $13,900.00 $12,383.00 Please see Dielectric Quote 700149CMZ-4 $12,383.00 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $6,400.00 N/A
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized $289,500.00 $277,304.48 please see Estimated Cost Justification WCPO-TV-210-Primary Antenna - UHF High Power Top Mount, E-POL V0 $277,304.48 N/A

Components

Actual Information Description File Name
Side mount brackets for high power antennas (if not included in antenna base cost) Information not provided.
Sweep test of existing antenna

Component Description:
WCPO-TV-280-Interim Antenna - Sweep Test
Amount:
$2,880.00

Component Description:
WCPO-TV-280-Interim Antenna - Sweep Test
Amount:
$2,880.00

Component Description:
WCPO-TV-280-Interim Antenna - Sweep Test
Amount:
$640.00
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 950 kW input, directional,, elliptically or circularly polarized

Component Description:
UHF Broadband side mount
Amount:
$17,301.80

Component Description:
UHF -BROADBAND SIDE MOUNT
Amount:
$77,858.10

Component Description:
UHF Broadband Side Mount
Amount:
$77,858.10
RF Eng - Custom Antenna Design

Component Description:
Provide drawings for custom antenna mount.
Amount:
$2,500.00
Ohio Sales Tax

Component Description:
KY Sales Tax- Invoice 521004
Amount:
$742.98

Component Description:
invoice moved to correct category
Amount:
N/A
Elbow complex, single channel, at antenna input, per 7 3/16. feedline (if needed)

Component Description:
OTHER ELBOW COMPLEX
Amount:
$1,238.30

Component Description:
WCPO-TV-210-Primary Antenna - Elbow Complex
Amount:
$5,572.35

Component Description:
WCPO-TV-210-Primary Antenna - Elbow Complex
Amount:
$5,572.35
Sweep test of existing antenna

Component Description:
Sweep Test
Amount:
$640.00

Component Description:
WCPO-TV-210-Primary Antenna - Sweep Test
Amount:
$2,880.00

Component Description:
WCPO-TV-210-Primary Antenna - Sweep Test
Amount:
$2,880.00
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized

Component Description:
Rigid Transmission Line
Amount:
$3,844.50

Component Description:
Antenna
Amount:
$4,786.30

Component Description:
Other
Amount:
$6,400.00

Component Description:
ANTENNA - UHF HIGH
Amount:
$117,723.60

Component Description:
Rigid Transmission Line
Amount:
$2,040.00

Component Description:
RIGID TRANSMISSION LINE- COPPER
Amount:
$6,705.00

Component Description:
TRANSMISSION LINE RIGID-COPPER
Amount:
$2,385.00

Component Description:
ANTENNA - UHF HIGH
Amount:
$117,723.60

Component Description:
Sales Tax
Amount:
$15,696.48

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $481,231.09 $483,849.56 N/A $415,026.15 N/A
Total for all systems $4,278,134.56 $4,874,663.45 N/A $4,145,668.41 N/A
Interim Transmission Line $198,934.09 $214,292.56 $202,592.53
Elbow $11,700.00 $11,700.00 N/A $0.00 N/A
Rigid Transmission Line - copper, 6 1/8" $121,200.00 $136,558.47 see Estimated Cost Justification WCPO-TV-380-Interim Transmission Line - 6 1_8in Rigid Copper v1 $136,558.45 N/A
Interim Transmission Line - Internal Transmission Line $66,034.09 $66,034.09 Please see Estimated Cost Justification WCPO-TV-380-Interim Transmission Line - Internal Transmission Line v0 $66,034.08 N/A
Primary Transmission Line $282,297.00 $269,557.00 $212,433.62
Rigid Transmission Line - copper, 7 3/16" $263,900.00 $251,160.00 N/A $212,433.62 N/A
Ohio Sales Tax $18,397.00 $18,397.00 N/A $0.00 N/A

Components

Actual Information Description File Name
Elbow Information not provided.
Rigid Transmission Line - copper, 6 1/8"

Component Description:
WCPO-TV-380-Interim Transmission Line - 6 1/8" Rigid Copper
Amount:
$27,326.60

Component Description:
KY Sales Tax -Invoice 562043
Amount:
$311.16

Component Description:
WCPO-TV-380-Interim Transmission Line - 6 1/8" Rigid Copper
Amount:
$54,004.54

Component Description:
KY Sales Tax- Invoice 560008
Amount:
$648.12

Component Description:
KY Sales Tax- Invoice 558011
Amount:
$95.55

Component Description:
WCPO-TV-380-Interim Transmission Line - 6 1/8" Rigid Copper
Amount:
$54,004.54

Component Description:
KY Sales Tax -Invoice 567012
Amount:
$167.94
Interim Transmission Line - Internal Transmission Line

Component Description:
Materials for Transmitter Room
Amount:
$571.20

Component Description:
Transmission Line
Amount:
$31,032.00

Component Description:
Materials for Transmitter Room
Amount:
$1,849.60

Component Description:
Materials for Transmitter Room
Amount:
$3,289.28

Component Description:
Materials for Transmitter Room
Amount:
$29,292.00
Rigid Transmission Line - copper, 7 3/16"

Component Description:
WCPO-TV-310-Primary Transmission Line - 7 3/16" Rigid Copper
Amount:
$3,167.50

Component Description:
WCPO-TV-310-Primary Transmission Line - 7 3/16" Rigid Copper
Amount:
$19,029.53

Component Description:
Other
Amount:
$2,485.50

Component Description:
KIT UNIVERSAL CLIP ANGLE
Amount:
$3,827.19

Component Description:
Invoice moved to correct budget category.
Amount:
N/A

Component Description:
WCPO-TV-310-Primary Transmission Line - 7 3/16" Rigid Copper
Amount:
$1,725.07

Component Description:
Sales Tax
Amount:
$6,592.52

Component Description:
Other
Amount:
$782.00

Component Description:
WCPO-TV-310-Primary Transmission Line - 7 3/16" Rigid Copper
Amount:
$2,736.55

Component Description:
Invoice moved to correct budget category.
Amount:
N/A

Component Description:
WCPO-TV-310-Primary Transmission Line - 7 3/16" Rigid Copper
Amount:
$88,650.11

Component Description:
WCPO-TV-310-Primary Transmission Line - 7 3/16" Rigid Copper
Amount:
$1,380.06

Component Description:
WCPO-TV-310-Primary Transmission Line - 7 3/16" Rigid Copper
Amount:
$88,650.11
Ohio Sales Tax

Component Description:
invoice moved to correct category
Amount:
N/A

Component Description:
WCPO-TV-310-Primary Transmission Line - Ohio Sales Tax
Amount:
$10,881.31

Component Description:
KY Sales Tax- Invoice 676008
Amount:
$626.51

Component Description:
KY Sales Tax -Invoice 606004
Amount:
$200.51

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $565,576.29 $1,029,165.48 N/A $915,169.56 N/A
Total for all systems $4,278,134.56 $4,874,663.45 N/A $4,145,668.41 N/A
Primary Tower TOWER $565,576.29 $1,029,165.48 $915,169.56
Helicopter Lift- Site Security $854.29 $854.29 Please see WCPO Helicopter Lift Site Safety revision justification cover letter $854.29 N/A
Ohio Sales Tax $27,572.00 $27,572.00 N/A $119.00 N/A
Rigging Plan, PE Review $7,500.00 $7,500.00 N/A $3,500.00 N/A
Tall Tower (greater than 500') $210,500.00 $682,689.19 see Estimated Cost Justification WCPO-TV-410-Existing Primary Tower - Tower Rigging, Tall Tower v1 $677,795.27 N/A
Minor tower reinforcement/modifications $158,000.00 $150,000.00 N/A $84,351.00 N/A
Tower Helicopter Lift $146,750.00 $146,750.00 see Estimated Cost Justification WCPO-TV-410-Existing Primary Tower - Helicopter Lift v0 $146,750.00 N/A
Tower Structural Analysis $1,800.00 $1,800.00 Please see Elevated Structural Consultants proposal dated 4-10-18 $1,800.00 N/A
Structural engineering tower load study for well documented tower $12,600.00 $12,000.00 N/A $0.00 N/A

Components

Actual Information Description File Name
Helicopter Lift- Site Security

Component Description:
Police OT Salaries - September 2019
Amount:
$854.29
Ohio Sales Tax

Component Description:
WCPO-TV-410-Existing Primary Tower - Ohio Sales Tax
Amount:
$119.00
Rigging Plan, PE Review

Component Description:
Rigging Review for Side Mount Antenna Installation
Amount:
$3,500.00
Tall Tower (greater than 500')

Component Description:
Materials and Equipment Rental
Amount:
$70,523.00

Component Description:
ANTENNA INSTALLATION
Amount:
$105,102.00

Component Description:
Installation Charges
Amount:
$152,681.60

Component Description:
Antenna Installation
Amount:
$21,020.40

Component Description:
Antenna Installation
Amount:
$97,745.87

Component Description:
Mobilize (2) climbers to the WCPO tower
Amount:
$1,700.00

Component Description:
INSTALLATION CHARGES
Amount:
$190,852.00

Component Description:
Installation Charges
Amount:
$38,170.40
Minor tower reinforcement/modifications

Component Description:
Per Precision Communication, Inc. Proposal 18373-6; Tower Modifications and Interim Installation WCPO, Cincinnati OH
Amount:
$17,466.00

Component Description:
Amount due on proposal acceptance
Amount:
$66,885.00
Tower Helicopter Lift

Component Description:
WCPO-TV-410-Existing Primary Tower - Helicopter Lift
Amount:
$58,700.00

Component Description:
WCPO-TV-410-Existing Primary Tower - Helicopter Lift
Amount:
$73,375.00

Component Description:
WCPO-TV-410-Existing Primary Tower - Helicopter Lift
Amount:
$14,675.00
Tower Structural Analysis

Component Description:
Re-Run analysis of 783' Self Support Tower
Amount:
$1,800.00
Structural engineering tower load study for well documented tower Information not provided.

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $178,918.88 $253,107.63 N/A $205,329.73 N/A
Total for all systems $4,278,134.56 $4,874,663.45 N/A $4,145,668.41 N/A
Outside Professional Services $178,918.88 $253,107.63 $205,329.73
Ohio Sales Tax $5,807.00 $5,807.00 N/A $0.00 N/A
Site Survey $18,921.88 $18,921.88 The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. $18,921.88 N/A
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase $2,105.00 $2,000.00 N/A $0.00 N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A $247.80 N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A $0.00 N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,687.50 The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. $1,687.50 N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A $150.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $3,000.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $4,070.00 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A $0.00 N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A $1,050.00 N/A
Project management of the transition $94,010.00 $175,356.95 The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. $175,356.95 N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $84.30 Please see WCPO-TV Attorney - Other Matters Budget Revision Justification Letter.pdf $84.30 N/A
ASR modification (prepare FCC Form 854) $2,105.00 $2,000.00 N/A $0.00 N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A $761.30 N/A
RF Exposure Measurements $21,050.00 $20,000.00 N/A $0.00 N/A

Components

Actual Information Description File Name
Ohio Sales Tax Information not provided.
Site Survey

Component Description:
FIELD SERVICE, TV
Amount:
$18,921.88
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application

Component Description:
WCPO-TV-550-Attorney - License to Cover Application (Main)
Amount:
$247.80
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare request for Special Temporary Authorization

Component Description:
WCPO-TV-530-RF Eng - Special Temporary Authorization
Amount:
$225.00

Component Description:
FOR SERVICES RENDERED
Amount:
$1,462.50
Prepare engineering section of FCC Form 2100 (main), License to Cover Application

Component Description:
WCPO-TV-530-RF Eng - License to Cover Application (Main)
Amount:
$150.00
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Provide modification drawings for building permit application
Amount:
$3,000.00
Perform engineering study for new channel assignment and antenna development

Component Description:
WCPO-TV-530-RF Eng - Engineering Study for New Channel Assignment
Amount:
$15.00

Component Description:
WMAR Repack Conference Call/Status Discussion
Amount:
$45.00

Component Description:
WCPO Review of Interim/Auxiliary Facility
Amount:
$1,595.00

Component Description:
Repack Conference Calls/Status Discussions
Amount:
$210.00

Component Description:
Repack Status Calls & Dielectric Call
Amount:
$1,860.00

Component Description:
Calls w/ Repack Team, Info Gathering on Station, Coverage Maps
Amount:
$345.00
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Prepare and or review reimbursement form

Component Description:
WCPO-TV-590-Prepare and/or Review Reimbursement Form
Amount:
$600.00

Component Description:
Required Revisions
Amount:
$450.00
Project management of the transition

Component Description:
Project Management
Amount:
$5,298.70

Component Description:
Project Management
Amount:
$3,812.35

Component Description:
7-30 Site Time
Amount:
$3,398.65

Component Description:
Project Management
Amount:
$4,301.25

Component Description:
Project Management
Amount:
$2,364.50

Component Description:
Project Management
Amount:
$7,452.20

Component Description:
Project Management
Amount:
$10,226.20

Component Description:
7-15 Office
Amount:
$15,424.64

Component Description:
Project Management
Amount:
$8,062.20

Component Description:
Project Management
Amount:
$7,904.30

Component Description:
FOR SERVICES RENDERED
Amount:
$225.00

Component Description:
FOR SERVICES RENDERED THROUGH: 10/1/18-10/31/18
Amount:
$75.00

Component Description:
Project Management
Amount:
$3,953.55

Component Description:
387
Amount:
$75.00

Component Description:
Work for Scripps Media-Broadcast TV
Amount:
$2,522.80

Component Description:
Project Management
Amount:
$3,806.45

Component Description:
FOR SERVICES RENDERED
Amount:
$225.00

Component Description:
Project Management
Amount:
$3,402.05

Component Description:
FOR SERVICES RENDERED
Amount:
$75.00

Component Description:
FOR SERVICES RENDERED
Amount:
$75.00

Component Description:
Project Management
Amount:
$11,328.90

Component Description:
Project Management
Amount:
$2,551.45

Component Description:
Project Management
Amount:
$5,971.70

Component Description:
Project Management
Amount:
$3,497.20

Component Description:
Project management
Amount:
$7,468.05

Component Description:
Structural Tower modification drawings for building permit application
Amount:
$3,300.00

Component Description:
9/4/19 Travel
Amount:
$15,337.51

Component Description:
Project Management
Amount:
$2,209.55

Component Description:
Project Management
Amount:
$4,972.90

Component Description:
FOR SERVICES RENDERED
Amount:
$75.00

Component Description:
FOR SERVICES RENDERED
Amount:
$150.00

Component Description:
Project management
Amount:
$5,820.60

Component Description:
WCPO-TV-510-Project Management
Amount:
$300.00

Component Description:
FOR SERVICES RENDERED
Amount:
$75.00

Component Description:
Project management
Amount:
$2,575.25

Component Description:
Project Management
Amount:
$2,636.55

Component Description:
FCC Repack
Amount:
$150.00

Component Description:
Project Management
Amount:
$7,360.30

Component Description:
Project Management
Amount:
$405.80

Component Description:
Updated Interim Facility Analysis for Lower Power
Amount:
$375.00

Component Description:
Project management
Amount:
$3,087.85

Component Description:
Project Management
Amount:
$7,232.05

Component Description:
Project Management
Amount:
$1,186.05

Component Description:
Project Management
Amount:
$64.95

Component Description:
Project Management
Amount:
$4,015.15

Component Description:
Project Management
Amount:
$530.30
Attorney Fees - Negotiation of lease and other matters for shared locations

Component Description:
WCPO-TV-550-Attorney - Other Matters
Amount:
$84.30
ASR modification (prepare FCC Form 854) Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization

Component Description:
Professional Services
Amount:
$378.10

Component Description:
Professional Services
Amount:
$383.20
RF Exposure Measurements Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $342,760.53 $342,215.53 N/A $125,328.40 N/A
Total for all systems $4,278,134.56 $4,874,663.45 N/A $4,145,668.41 N/A
Other Expenses $342,760.53 $342,215.53 $125,328.40
Sales Tax $14,102.88 $14,102.88 Please see Estimated Cost Justification WCPO-TV-610-Sales Tax v1 $14,102.88 N/A
Site Security $17,537.30 $17,537.30 Please see Estimated Cost Justification WCPO-TV-610-Site Security v0 $17,537.30 N/A
In-building Disassembly $25,000.00 $25,000.00 N/A $9,272.00 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $25,000.00 $25,000.00 N/A $299.60 N/A
Non-zoning permits $15,000.00 $15,000.00 N/A $0.00 N/A
Local Zoning $15,000.00 $15,000.00 N/A $500.00 N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $200.00 Please see Estimated Cost Justification WCPO-TV-610-FCC Filing Fee - Special Temporary Authorization v0 $200.00 N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $335.00 Please see Estimated Cost Justification WCPO-TV-610-FCC Filing Fee - License to Cover Application v0 .pdf $335.00 N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A $3,522.40 N/A
Employee Time $124,922.00 $124,922.00 N/A $0.00 N/A
MVPD Notification of Channel Change $2,991.30 $2,991.30 see Estimated Cost Justification WCPO-TV-610-MVPD Notifications v0 $2,991.30 N/A
Develop and air announcement of upcoming channel change $5,000.00 $5,000.00 N/A $4,185.00 N/A
Equipment Storage $20,000.00 $20,000.00 N/A $11,161.87 N/A
Equipment Delivery and Handling Charges $61,221.05 $61,221.05 see Estimated Cost Justification WCPO-TV-610-Equipment Delivery and Handling v3 $61,221.05 N/A
Ohio Sales Tax $4,906.00 $4,906.00 N/A $0.00 N/A

Components

Actual Information Description File Name
Sales Tax

Component Description:
KY Sales Tax
Amount:
$626.51

Component Description:
KY Sales Tax
Amount:
$200.51

Component Description:
KY Sales Tax - Invoice 602017
Amount:
$143.10

Component Description:
KY Sales Tax -Invoice 597003
Amount:
$402.30

Component Description:
KY Sales Tax - Invoice 600043
Amount:
$420.72

Component Description:
KY Sales Tax - Invoice 601002
Amount:
$563.05

Component Description:
KY Sales Tax -Invoice 605007
Amount:
$122.40

Component Description:
KY Sales Tax
Amount:
$11,624.29
Site Security

Component Description:
Guard hours
Amount:
$2,621.50

Component Description:
Guard hours
Amount:
$802.50

Component Description:
Guard hours
Amount:
$2,434.25

Component Description:
Standard Single
Amount:
$96.30

Component Description:
Guard hours
Amount:
$2,541.25

Component Description:
Guard hours
Amount:
$2,247.00

Component Description:
Guard hours
Amount:
$2,621.50

Component Description:
Guard hours
Amount:
$2,407.50

Component Description:
Guard hours
Amount:
$1,765.50
In-building Disassembly

Component Description:
Contract amount due
Amount:
$9,272.00
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
Standard Single
Amount:
$96.30

Component Description:
Labor
Amount:
$203.30
Non-zoning permits

Component Description:
Invoice submitted on wrong station please deny.
Amount:
N/A
Local Zoning

Component Description:
Scope of Services: June 1-30 2018
Amount:
$500.00
FCC Filing Fees - Special Temporary Authorization request

Component Description:
WCPO-TV-610-FCC Filing Fee - Special Temporary Authorization
Amount:
$200.00
FCC Filing Fees - Form 2100 license to cover application

Component Description:
WCPO-TV-610-FCC Filing Fee - License to Cover Application
Amount:
$335.00
DTV Medical Facility Notification

Component Description:
Notification of Medical Facilities
Amount:
$3,522.40
Employee Time Information not provided.
MVPD Notification of Channel Change

Component Description:
Notification of Cable and Satellite MVPD
Amount:
$2,991.30
Develop and air announcement of upcoming channel change

Component Description:
M-SU Broad Rotator
Amount:
$1,080.00

Component Description:
ISCI/SPOT TITLE
Amount:
$3,105.00
Equipment Storage

Component Description:
current rental period
Amount:
$160.50

Component Description:
09/19/19 - 10/18/19
Amount:
$80.25

Component Description:
WCPO-TV-610-Equipment Storage
Amount:
$1,595.00

Component Description:
September 2019 Storage for Antenna
Amount:
$995.00

Component Description:
WCPO-TV-610-Equipment Storage
Amount:
$1,560.00

Component Description:
08/19/19 - 09/18/19
Amount:
$80.25

Component Description:
April 2019 Storage for Antenna
Amount:
$995.00

Component Description:
Storage for January 2019
Amount:
$995.00

Component Description:
WCPO-TV-610-Equipment Storage
Amount:
$119.62

Component Description:
Unload Antenna
Amount:
$995.00

Component Description:
08/19/19 - 09/18/19
Amount:
$80.25

Component Description:
August 2019 Storage for Antenna
Amount:
$995.00

Component Description:
July 2019 Storage for Antenna
Amount:
$995.00

Component Description:
09/19/19 - 10/18/19
Amount:
$80.25

Component Description:
current rental period
Amount:
$160.50

Component Description:
Extra charges to deliver antenna
Amount:
$995.00

Component Description:
10/19/19 - 11/18/19
Amount:
$80.25

Component Description:
WCPO-TV-610-Equipment Storage
Amount:
$200.00
Equipment Delivery and Handling Charges

Component Description:
Other
Amount:
$3,780.00

Component Description:
Freight and Shipping
Amount:
$3,780.00

Component Description:
WCPO-TV-610-Equipment Delivery and Handling
Amount:
$3,200.00

Component Description:
KY Sales Tax - 625013
Amount:
$283.50

Component Description:
Other
Amount:
$251.96

Component Description:
Deliver Antenna
Amount:
$16,688.00

Component Description:
WCPO-TV-610-Equipment Delivery and Handling
Amount:
$6,095.00

Component Description:
Other
Amount:
$9,384.17

Component Description:
Other
Amount:
$229.69

Component Description:
delivery of equipment and supplies/boxes to Tower
Amount:
$3,745.00

Component Description:
Freight and Shipping
Amount:
$10,441.79

Component Description:
Other
Amount:
$3,341.94
Ohio Sales Tax Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $4,278,134.56 $4,874,663.45 $4,145,668.41

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Sravan V Reddy , Reddy .

Senior Director, General Accounting


09/27/2021

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Sravan V Reddy , Reddy .

Senior Director, General Accounting


09/27/2021

Attachments