Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
KJZZ Licensee, LLC Doing Business As: KJZZ Licensee, LLC |
Harvey Arnold 10706 Beaver Dam Road Cockeysville, MD 21030 United States |
+1 (410) 568-1500 | FCCContacts@sbgtv.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Paul A Cicelski Lerman Senter PLLC |
Paul Cicelski 2001 L Street, NW Suite 400 Washington, DC 20036 United States |
+1 (202) 429-8970 | pcicelski@lermansenter.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | See Exhibit A. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | DHD45P2 | |
Year | 2001 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 10.5 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | THU9evo-16 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 25.5 kW | |
Justification for New Transmitter | Per the manufacturer, the current transmitter cannot be retuned. See Exhibit B. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 300 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 2 inches | |
Length | 800.0 feet | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Heating and Cooling | |
Size | 50 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Large Parallel Remote Interface |
Large Parallel Remote Interface |
Additional parts |
Additional parts |
Band 5 Harmonic Filter |
Band 5 Harmonic Filter |
Dummy Load and Switches |
Dummy Load and Switches |
Replacement Services |
Replacement Services |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase | |
Manufacturer | ||
Model | ULXTE-20 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 12 kW | |
Justification for New Transmitter | This interim transmitter cost will be shared by the eight stations that are collocated on this tower, and will aid all of the stations in transitioning to their new channels considering the terrain and phase time constraints. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 300 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 2 inches | |
Length | 800.0 feet | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Heating and Cooling | |
Size | 50 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A | |
Inside RF System | Is an additional interior RF system required to support this interim transmitter? | Yes |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Top | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 8 | |
Number of Panels | 48 | |
Design power capacity in use | 77.0 % | |
Lower Limit | 773.00 MHz | |
Upper Limit | 928.00 MHz | |
Other Antenna Type | N/A | |
ERP: | 200.0 kW | |
Manufacturer | ||
Model | 773 928 | |
Year | 1999 |
Facility ID | Call Sign |
---|---|
69396 | KUED |
69582 | KUEN |
1136 | KUCW |
35823 | KUTV |
6359 | KSL-TV |
6823 | KBYU-TV |
68889 | KTVX |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | Yes | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Bottom | |
Polarization | Circular | |
Type | Broadband Panel | |
Number of Stations Supported | 8 | |
Number of Panels/Bays | 48 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 608.00 MHz | |
Design power capacity in use | 90.0 % | |
Other Antenna Type | N/A | |
ERP: | 114.0 kW | |
Manufacturer | ||
Model | 759 25063 | |
Year | 2017 | |
Justification for New Antenna | FROM MANUFACTURER. These panel antennas are finely tuned to a specific band, but the new repacked channels are not within the specific band, so the current antenna cannot be used for the new repack channel. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 8 | |
Frequencies of channels supported | Upper and lower frequency | |
Frequency | 470.0 MHz - 608.0 MHz | |
Do you need a combiner output splitter/switcher for dual feed lines? | Yes | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Broadband | |
Feed Line Size | 6 1/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Antenna Installation |
Antenna Installation Cost |
Other Costs |
Other Costs |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | Terrain Constrained | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1062408 | |
Coordinates (NAD83) | Latitude (NAD83) | 40° 39' 33.0" N- |
Longitude (NAD83) | 112° 12' 10.0" W- | |
Overall Structure Height | 308.40 feet | |
Support Structure Height | 308.40 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 9035.32 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | DTV UTAH, LC | |
Date Constructed | 10/28/1999 |
Facility ID | Call Sign | Service |
---|---|---|
6823 | KBYU-TV | DTV |
68889 | KTVX | DTV |
69396 | KUED | DTV |
69582 | KUEN | DTV |
35823 | KUTV | DTV |
6359 | KSL-TV | DTV |
1136 | KUCW | DTV |
Users |
---|
KPNZ - Telev |
Go Go Air |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Major Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Terrain constrained |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 800 | |
Explanation | Outside consulting engineering, legal work, and accounting services, as well as project management for regional and comprehensive repack execution. See Exhibit K. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | Yes | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Sinclair Internal Costs |
Internal Employee Time Costs |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
DTV Utah Operating Agreement Equity Equalization |
Per Operating Agreement signed July 1998. See Exhibit M. |
Garbage Disposal |
Remove general garbage from mountaintop site (does not include equipment removal). Billed as used. |
KSTU Mask Filter |
Needed for KSTU (channel 28) to protect KUED (channel 27). See Exhibit N. |
Road Maintenance |
Snow plowing, grading, and repairs to existing road to remote mountaintop site. See Exhibit R. |
Tax |
Tax |
Temporary Sanitation |
For onsite workers. See Exhibit S. |
Temporary Storage |
For tools and equipment onsite and staging area off-site. See Exhibit P. |
Transportation Services |
Snow cat and helicopter to move equipment and personnel to remote mountaintop site during winter season. See Exhibit R. |
True-up |
True-up |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,449,046.85 | $1,442,594.76 | N/A | $425,317.57 | N/A |
Total for all systems | $4,505,788.32 | $2,782,857.46 | N/A | $1,203,584.34 | N/A |
Interim Transmitter ULXTE-20 | $1,003,800.00 | $262,847.91 | $161,538.33 | ||
Transformer 3 phase/480v - 300 KVA | $36,800.00 | $4,375.00 | This cost is shared with all DTV Utah stations and represents 1/8 of the cost of this item. | $0.00 | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $4,537.50 | This cost is shared with all DTV Utah stations and represents 1/8 of the cost of this item. | $3,645.79 | N/A |
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW | $494,500.00 | $137,542.91 | This cost is shared with all DTV Utah stations and represents 1/6 of the cost of this item. | $98,682.30 | N/A |
50 Ton system | $266,000.00 | $96,392.50 | Updated cost estimate per FCC guidelines. Check quote for CCI and Quote for WHW. 1/6 share of the entire quotes added including added scope. | $53,707.98 | N/A |
UHF inside RF system including switching | $147,500.00 | $17,500.00 | This cost is shared with all DTV Utah stations and represents 1/8 of the cost of this item. | $5,502.26 | N/A |
2" Rigid Conduit and Wiring (Cost per foot) | $20,800.00 | $2,500.00 | This cost is shared with all DTV Utah stations and represents 1/8 of the cost of this item. | $0.00 | N/A |
Primary Transmitter THU9evo-16 | $1,445,246.85 | $1,179,746.85 | $263,779.24 | ||
Dummy Load and Switches | $49,879.14 | $49,879.14 | N/A | $49,879.14 | N/A |
Band 5 Harmonic Filter | $6,230.30 | $6,230.30 | N/A | $6,230.30 | N/A |
Additional parts | $190.05 | $190.05 | N/A | $190.05 | N/A |
Large Parallel Remote Interface | $934.94 | $934.94 | N/A | $934.94 | N/A |
50 Ton system | $266,000.00 | $30,000.00 | This cost is shared with eight stations, six of which are repacked, and we estimate $180,000 total for the cost of this HVAC service. | $25,484.27 | The need more information can be removed. |
2" Rigid Conduit and Wiring (Cost per foot) | $20,800.00 | $20,000.00 | N/A | $0.00 | N/A |
Transformer 3 phase/480v - 300 KVA | $36,800.00 | $35,000.00 | N/A | $0.00 | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $36,300.00 | N/A | $0.00 | N/A |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW | $947,000.00 | $922,000.00 | N/A | $101,848.12 | N/A |
Replacement Services | $79,212.42 | $79,212.42 | N/A | $79,212.42 | The need more information can be removed. |
Actual Information Description | File Name |
---|---|
Transformer 3 phase/480v - 300 KVA | Information not provided. |
Switchgear - industrial 800 amp | |
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW | |
50 Ton system | |
UHF inside RF system including switching | |
2" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Dummy Load and Switches | |
Band 5 Harmonic Filter | |
Additional parts | |
Large Parallel Remote Interface | |
50 Ton system | |
2" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Transformer 3 phase/480v - 300 KVA | Information not provided. |
Switchgear - industrial 800 amp | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW | |
Replacement Services |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $554,566.67 | $681,600.19 | N/A | $568,946.72 | N/A |
Total for all systems | $4,505,788.32 | $2,782,857.46 | N/A | $1,203,584.34 | N/A |
Primary Antenna 759 25063 | $554,566.67 | $681,600.19 | $568,946.72 | ||
Other Costs | $50,873.70 | $50,873.70 | ***System Notice: Estimate adjusted and locked because line has been superseded.***Updated estimated amount per FCC's requirement. | $36,765.06 | N/A |
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | $13,700.00 | $8,014.01 | N/A | $8,014.01 | N/A |
Antenna Installation | $23,062.97 | $23,062.97 | N/A | $23,062.97 | N/A |
New combiner, cost per channel (without antenna) | $84,200.00 | $223,649.51 | As per the request of the FCC | $223,649.51 | The share of the cost is greater than expected because the FCC requested to use 1/6 share as opposed to 1/8 share of the cost. Please delete the old entries as the new ones are updated. |
Sweep test of existing antenna | $6,730.00 | $6,000.00 | N/A | $3,157.24 | N/A |
UHF - High Power Top Mount Eight Station broadband panel antenna elliptically or circularly polarized | $250,000.00 | $250,000.00 | This cost is shared with all DTV Utah stations and represents 1/8 of the cost of this item. See Exhibit D. | $238,471.92 | N/A |
Combiner output splitting/switching for dual feed lines, if applicable | $126,000.00 | $120,000.00 | The station now has an invoice with this cost separated as a line item, and is entering it in the 399 as such. | $35,826.01 | The need more information for KSL and Burk can be removed. |
Actual Information Description | File Name |
---|---|
Other Costs | |
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | |
Antenna Installation | |
New combiner, cost per channel (without antenna) | |
Sweep test of existing antenna | |
UHF - High Power Top Mount Eight Station broadband panel antenna elliptically or circularly polarized | |
Combiner output splitting/switching for dual feed lines, if applicable |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $854,600.00 | $101,500.00 | N/A | $2,413.47 | N/A |
Total for all systems | $4,505,788.32 | $2,782,857.46 | N/A | $1,203,584.34 | N/A |
Primary Tower TOWER | $854,600.00 | $101,500.00 | $2,413.47 | ||
Structural engineering tower load study for well documented tower | $12,600.00 | $1,500.00 | This cost is shared with all DTV Utah stations and represents 1/8 of the cost of this item. | $898.32 | N/A |
Major tower reinforcement/modifications | $421,000.00 | $50,000.00 | This cost is shared with all DTV Utah stations and represents 1/8 of the cost of this item. | $1,515.15 | N/A |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $50,000.00 | This cost is shared with all DTV Utah stations and represents 1/8 of the cost of this item. See Exhibit L for partial cost. | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Structural engineering tower load study for well documented tower | |
Major tower reinforcement/modifications | |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $276,919.10 | $187,586.81 | N/A | $163,028.38 | N/A |
Total for all systems | $4,505,788.32 | $2,782,857.46 | N/A | $1,203,584.34 | N/A |
Outside Professional Services | $276,919.10 | $187,586.81 | $163,028.38 | ||
Project management of the transition | $126,400.00 | $120,000.00 | N/A | $109,254.97 | N/A |
RF Exposure Measurements | $21,050.00 | $18,296.87 | This cost is shared with all DTV Utah stations and represents 1/6 of the cost of this item. | $18,296.87 | . |
Sinclair Internal Costs | $409.10 | $409.10 | N/A | $409.10 | . |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $10,000.00 | This cost is shared with all DTV Utah stations and represents 1/8 of the cost of this item. | $3,468.50 | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $2,000.00 | N/A | $0.00 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $7,360.00 | $659.45 | N/A | $659.45 | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $3,043.64 | N/A | $3,043.64 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $0.00 | N/A | $0.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $221.92 | N/A | $221.92 | . |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | $2,105.00 | $2,000.00 | N/A | $0.00 | N/A |
Prepare request for Special Temporary Authorization | $4,100.00 | $3,000.00 | N/A | $2,565.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $5,785.83 | See Carl T. Jones invoices | $5,785.83 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $10,170.00 | See Carl T. Jones invoices | $10,170.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $6,360.00 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $2,418.10 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | $375.00 | N/A |
Actual Information Description | File Name |
---|---|
Project management of the transition | |
RF Exposure Measurements | |
Sinclair Internal Costs | |
Comprehensive coverage verification via field study, if needed | |
ASR modification (prepare FCC Form 854) | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | Information not provided. |
Prepare request for Special Temporary Authorization | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Prepare and or review reimbursement form | |
Address transition timing and coordination issues w/ other stations and wireless |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $370,655.70 | $369,575.70 | N/A | $43,878.20 | N/A |
Total for all systems | $4,505,788.32 | $2,782,857.46 | N/A | $1,203,584.34 | N/A |
Other Expenses | $370,655.70 | $369,575.70 | $43,878.20 | ||
True-up | $0.00 | $0.00 | N/A | ($7,199.22) | N/A |
Transportation Services | $5,000.00 | $5,000.00 | This cost is shared with all DTV Utah stations and represents 1/8 of the cost of this item. To be used during inclement weather. | $1,871.65 | N/A |
Temporary Storage | $4,000.00 | $4,000.00 | This cost is shared with all DTV Utah stations and represents 1/8 of the cost of this item. See Exhibit P. | $1,927.50 | N/A |
Temporary Sanitation | $3,000.00 | $3,000.00 | This cost is shared with all DTV Utah stations and represents 1/8 of the cost of this item. See Exhibit S. Estimate is based on past experience at this site. | $0.00 | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $0.00 | N/A | $0.00 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $0.00 | N/A | $0.00 | N/A |
DTV Medical Facility Notification | $11,550.00 | $11,000.00 | N/A | $4,549.00 | N/A |
Non-zoning permits | $1,875.00 | $1,875.00 | This cost is shared with all DTV Utah stations and represents 1/8 of the cost of this item. | $0.00 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $28,566.00 | $28,566.00 | See Exhibit U. | $248.33 | N/A |
Equipment Delivery and Handling Charges | $11,440.22 | $11,440.22 | This cost is shared with all DTV Utah stations and represents 1/8 of the cost of this item. See Exhibit P. | $11,440.22 | N/A |
Develop and air announcement of upcoming channel change | $28,050.00 | $28,050.00 | See Exhibit T. | $0.00 | N/A |
MVPD Notification of Channel Change | $5,000.00 | $5,000.00 | N/A | $0.00 | N/A |
DTV Utah Operating Agreement Equity Equalization | $223,083.00 | $223,083.00 | See Exhibit M. | $0.00 | N/A |
Garbage Disposal | $1,500.00 | $1,500.00 | This cost is shared with all DTV Utah stations and represents 1/8 of the cost of this item. Billed as used, but the estimate is based on past experience at this site. | $1,212.50 | N/A |
KSTU Mask Filter | $6,756.25 | $6,756.25 | Mask filter to remedy adjacent channel problem with KSTU. This cost is shared with all DTV Utah stations and represents 1/8 of the cost of this item. See Exhibit N. | $0.00 | N/A |
Road Maintenance | $10,000.00 | $10,000.00 | This cost is shared with all DTV Utah stations and represents 1/8 of the cost of this item. See Exhibit R. | $0.00 | N/A |
Tax | $26,305.23 | $26,305.23 | N/A | $26,305.23 | x |
Equipment Storage | $4,000.00 | $4,000.00 | This cost is shared with all DTV Utah stations and represents 1/8 of the cost of this item. See Exhibit Q. | $3,522.99 | N/A |
Actual Information Description | File Name |
---|---|
True-up | |
Transportation Services | |
Temporary Storage | |
Temporary Sanitation | Information not provided. |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
DTV Medical Facility Notification | |
Non-zoning permits | Information not provided. |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
Equipment Delivery and Handling Charges | |
Develop and air announcement of upcoming channel change | Information not provided. |
MVPD Notification of Channel Change | Information not provided. |
DTV Utah Operating Agreement Equity Equalization | Information not provided. |
Garbage Disposal | |
KSTU Mask Filter | Information not provided. |
Road Maintenance | Information not provided. |
Tax | |
Equipment Storage |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $4,505,788.32 | $2,782,857.46 | $1,203,584.34 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Lucy Rutishauser CFO 10/01/2021 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Lucy Rutishauser CFO 10/01/2021 |