Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
TRINITY BROADCASTING OF TEXAS, INC. Doing Business As: TRINITY BROADCASTING NETWORKs |
13600 Heritage Parkway Suite 200 Fort Worth, TX 76177 United States |
+1 (855) 826-2255 | CMMAY@MAYLAWOFFICES.COM | Not-for-Profit |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | Reduce TPO to 50% and remove 1/2 of the xmitter system. Install new SS xmitter system. Add AUX antenna & line to the tower & feed it with a reduced signal from the current xmitter. Remove & replace antenna. Test. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | DCX 2 | |
Year | 2004 | |
Type | Inductive Output Tube | |
IOT Power Type | Two | |
Power Capacity | 50 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | HPTV PRLX U24 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 40 kW | |
Justification for New Transmitter | See Atachment |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | Yes | |
Size | 2 inches | |
Length | 500.0 feet | |
Other Electrical Service | Yes | |
Description | Labor, Disconnects, breakers... | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Heating and Cooling | |
Size | 10 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 1000.0 square feet | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Owner | American Tower | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Broadband Panel | |
Number of Stations Supported | 4 | |
Number of Panels | 14 | |
Design power capacity in use | 80.0 % | |
Lower Limit | 470.00 MHz | |
Upper Limit | 800.00 MHz | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | TUD-05-14/70U-2-B | |
Year | 2000 |
Facility ID | Call Sign |
---|---|
48813 | WUVG-DT |
64033 | WPCH-TV |
72120 | WGCL-TV |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Leased | |
Owner | aMERICAN tOWER | |
Is antenna shared? | Yes | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Broadband Panel | |
Number of Stations Supported | 4 | |
Number of Panels/Bays | 12 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 800.00 MHz | |
Design power capacity in use | 80.0 % | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | PEPL48D-C170-2-6 | |
Year | 2017 | |
Justification for New Antenna | aMERICAN tOWER |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | Additional Module | |
Number of channels supported | 1 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | No | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Broadband | |
Feed Line Size | 8 3/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
RF Channel Number |
---|
22 |
Name | Description |
---|---|
Connection to Combiner |
to connect the xmitter output to the combiner input. |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Owner | American Tower | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | Yes | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 8 3/16 inches | |
Other Diameter | N/A | |
Segment Length | Broadband | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 2000 feet per run |
Facility ID | Call Sign |
---|---|
64033 | WPCH-TV |
48813 | WUVG-DT |
6900 | WUPA |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 8 3/16 inches | |
Other Diameter | N/A | |
Segment Length | Broadband | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 2000 feet per run | |
Justification for New Transmission Line | American tower |
Name | Description |
---|---|
combiner install |
installation |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | Candelabra | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1223132 | |
Coordinates (NAD83) | Latitude (NAD83) | 33° 48' 26.4" N- |
Longitude (NAD83) | 084° 20' 21.5" W- | |
Overall Structure Height | 1182.07 feet | |
Support Structure Height | 1056.09 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 867.12 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | American Tower, LLC | |
Date Constructed | 03/27/2002 |
Facility ID | Call Sign | Service |
---|---|---|
64033 | WPCH-TV | DTV |
6900 | WUPA | DTV |
72120 | WGCL-TV | DTV |
22819 | WATL | DTV |
48813 | WUVG-DT | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Candelabra |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
drawing |
permit |
structural |
load study |
ground |
package |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 95 | |
Explanation | American Tower | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | Yes | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
site |
meeting |
RF System |
testing |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | No | |
Does this relocation require MVPD Notification of a Channel Change? | No |
Name | Description |
---|---|
ATC Tower rental |
One time tower rental during repack |
Compound fencing |
fence |
Nitrogen gen |
Nitrogen generator |
FM moving |
FM move / rigging |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,686,500.00 | $1,633,250.00 | N/A | $1,158,676.85 | N/A |
Total for all systems | $4,637,350.00 | $2,739,034.00 | N/A | $2,067,113.15 | N/A |
Primary Transmitter HPTV PRLX U24 | $1,686,500.00 | $1,633,250.00 | $1,158,676.85 | ||
install | $35,000.00 | $35,000.00 | installation quote | $35,000.00 | N/A |
Other -- Building Addition Size: 1000.0 | $36,000.00 | $36,000.00 | American Tower | $22,500.00 | N/A |
10 Ton system | $60,500.00 | $87,000.00 | ATC | $43,125.00 | N/A |
Other Electrical Service: Labor, Disconnects, breakers... | $69,000.00 | $69,000.00 | updated quote | $65,925.08 | N/A |
2" Rigid Conduit and Wiring (Cost per foot) | $13,000.00 | $6,250.00 | N/A | $4,687.50 | N/A |
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW | $1,473,000.00 | $1,400,000.00 | N/A | $987,439.27 | N/A |
Actual Information Description | File Name |
---|---|
install | |
Other -- Building Addition Size: 1000.0 | |
10 Ton system | |
Other Electrical Service: Labor, Disconnects, breakers... | |
2" Rigid Conduit and Wiring (Cost per foot) | |
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,279,880.00 | $356,693.00 | N/A | $269,083.12 | N/A |
Total for all systems | $4,637,350.00 | $2,739,034.00 | N/A | $2,067,113.15 | N/A |
Primary Antenna PEPL48D-C170-2-6 | $1,279,880.00 | $356,693.00 | $269,083.12 | ||
Connection to Combiner | $80,000.00 | $80,000.00 | materials to connect the transmitter to the combiner. | $65,071.02 | N/A |
Elbow complex, broadband, at antenna input, per 8 3/16. feedline (if needed) | $18,950.00 | $11,100.00 | N/A | $10,895.60 | N/A |
Adding a module to existing combiner (without antenna) | $84,200.00 | $66,500.00 | N/A | $45,967.90 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $3,000.00 | N/A |
UHF - High Power Top Mount (200-1000 kW), Four Station broadband panel antenna, elliptically or circularly polarized | $1,090,000.00 | $192,693.00 | N/A | $144,148.60 | N/A |
Actual Information Description | File Name |
---|---|
Connection to Combiner | |
Elbow complex, broadband, at antenna input, per 8 3/16. feedline (if needed) | |
Adding a module to existing combiner (without antenna) | |
Sweep test of existing antenna | |
UHF - High Power Top Mount (200-1000 kW), Four Station broadband panel antenna, elliptically or circularly polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $811,500.00 | $211,116.00 | N/A | $187,227.18 | N/A |
Total for all systems | $4,637,350.00 | $2,739,034.00 | N/A | $2,067,113.15 | N/A |
Primary Transmission Line | $811,500.00 | $211,116.00 | $187,227.18 | ||
combiner install | $13,500.00 | $13,500.00 | ATC quote | $11,600.00 | N/A |
Rigid Transmission Line - copper, 8 3/16" broadband | $798,000.00 | $197,616.00 | N/A | $175,627.18 | N/A |
Actual Information Description | File Name |
---|---|
combiner install | |
Rigid Transmission Line - copper, 8 3/16" broadband |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $620,700.00 | $314,360.00 | N/A | $275,610.50 | N/A |
Total for all systems | $4,637,350.00 | $2,739,034.00 | N/A | $2,067,113.15 | N/A |
Primary Tower GTOWER | $620,700.00 | $314,360.00 | $275,610.50 | ||
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $165,000.00 | N/A | $146,374.00 | N/A |
Minor tower reinforcement/modifications | $158,000.00 | $125,000.00 | N/A | $109,046.50 | N/A |
drawing | $4,700.00 | $4,700.00 | Tower permit drawing package, American Tower | $3,525.00 | N/A |
ground | $4,700.00 | $4,700.00 | American Tower | $3,525.00 | N/A |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $8,960.00 | N/A | $7,440.00 | N/A |
structural | $6,000.00 | $6,000.00 | American Tower | $5,700.00 | q |
Actual Information Description | File Name |
---|---|
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | |
Minor tower reinforcement/modifications | |
drawing | |
ground | |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | |
structural |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $78,865.00 | $69,180.00 | N/A | $27,105.00 | N/A |
Total for all systems | $4,637,350.00 | $2,739,034.00 | N/A | $2,067,113.15 | N/A |
Outside Professional Services | $78,865.00 | $69,180.00 | $27,105.00 | ||
RF System | $6,000.00 | $6,000.00 | Quoted by ATC | $5,000.00 | N/A |
site | $3,000.00 | $3,000.00 | American Tower | $3,000.00 | N/A |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | $10,520.00 | $10,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $7,360.00 | $7,000.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,200.00 | N/A | N/A | N/A |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | $4,210.00 | $4,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $4,100.00 | $3,000.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,000.00 | N/A | $750.00 | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | $2,105.00 | $2,000.00 | N/A | N/A | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | $2,500.00 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Project management of the transition | $15,010.00 | $9,480.00 | N/A | $7,805.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $1,750.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $6,300.00 | N/A |
Actual Information Description | File Name |
---|---|
RF System | |
site | |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | Information not provided. |
Address transition timing and coordination issues w/ other stations and wireless | |
Prepare and or review reimbursement form | Information not provided. |
Project management of the transition | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $159,905.00 | $154,435.00 | N/A | $149,410.50 | N/A |
Total for all systems | $4,637,350.00 | $2,739,034.00 | N/A | $2,067,113.15 | N/A |
Other Expenses | $159,905.00 | $154,435.00 | $149,410.50 | ||
FM moving | $43,000.00 | $43,000.00 | ATC Quote | $42,004.00 | N/A |
Nitrogen gen | $7,000.00 | $7,000.00 | ATC Quote | $6,693.50 | N/A |
Compound fencing | $500.00 | $500.00 | ATC Quote | $495.75 | N/A |
ATC Tower rental | $57,600.00 | $57,600.00 | American Tower rental | $57,600.00 | N/A |
Equipment Delivery and Handling Charges | $12,500.00 | $12,500.00 | American Tower | $9,375.00 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $26,670.00 | $26,670.00 | It is required by ATC that the old suite be empty of all transmitter equipment. | $26,670.00 | N/A |
Non-zoning permits | $750.00 | $750.00 | American Tower | $666.65 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $222.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $6,193.00 | N/A | $5,905.60 | N/A |
Actual Information Description | File Name |
---|---|
FM moving | |
Nitrogen gen | |
Compound fencing | |
ATC Tower rental | |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
Non-zoning permits | |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
DTV Medical Facility Notification |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $4,637,350.00 | $2,739,034.00 | $2,067,113.15 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Steve Hastings Network RF Manager 07/09/2021 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Steve Hastings Network RF Manager 07/09/2021 |