Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
LOTUS TV OF HOUSTON LLC Doing Business As: LOTUS TV OF HOUSTON LLC |
Jay A. Levine 3301 Barham Boulevard Suite 200 LOS ANGELES, CA 90068 United States |
+1 (323) 512-2225 | headquarters@lotuscorp.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Tony zumMallen President QCommunications, LLC |
Tony zumMallen 705B SE Melody ln #314 Lees SUmmit, MO 64063 United States |
+1 (816) 729-1177 | tony@qcomm.tv |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Repack to new CH10 on time and on budget. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | INNOVATOR | |
Year | 2009 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 15 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | VAXTE-2R37 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 2 kW | |
Justification for New Transmitter | New transmitter required per the REPACK channel reassignment, transitioning from UHF to VHF. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Heating and Cooling | |
Size | 5 tons | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Transmitter Taxes |
Transmitter sales tax |
Site Prep |
Site preparation for new transmitter installation |
HVAC Install |
HVAC installation |
Transmitter Shipping fee |
Shipping fees for transmitter |
Transmitter Decommissioning |
Harvesting and removal of old transmitter |
Transmitter Misc. Equipment |
I/O rack customer IO plate, AC distro assembly, 2.5kW, post filter coupler kit, switch controller, associated cables |
Encoder |
Encoder |
Demo HVAC |
Demo old HVAC units |
Dehydrator Rebuild |
rebuilt dehydrator and connect to transmission line |
Connectors |
Connectors and misc parts/pieces to ensure proper mating of new transmitter, line, and connected equipment |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | ALP 24L3 CSMX-43 | |
Year | 2009 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Broadband Slot | |
Number of Stations Supported | 2 | |
Number of Panels/Bays | 4 | |
Lower Limit | 174.00 MHz | |
Upper Limit | 216.00 MHz | |
Design power capacity in use | 90.0 % | |
ERP: | 3.0 kW | |
Manufacturer | ||
Model | TLS-V4/VP | |
Year | 2019 | |
Justification for New Antenna | New antenna required for new channel. Original antenna unable to be retuned. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Broadband | |
Feed Line Size | 4 1/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Custom Mounting Brackets |
Custom mounting brackets for 7.5" OD round legs |
Flexline, Adapters, connectors |
Flexline, connectors, adapters, hardware assemblies, etc. |
Antenna Sales Tax |
Sales tax for new antenna |
Antenna Shipping fee |
Shipping fees for new antenna |
Filter |
VHF high band, 6-pole filter |
Antenna Pattern Verification |
Antenna Pattern Verification |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Waveguide | |
Number of parallel runs | 1 | |
Length | 1654 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Waveguide | |
Number of parallel runs | 1 | |
Length | 1654 feet per run | |
Justification for New Transmission Line | Changing from UHF CH 43 to VHF CH 10 may require the existing line to be changed out. We await the results of sweep testing to determine if new line it required or not. | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | Candelabra | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1059622 | |
Coordinates (NAD83) | Latitude (NAD83) | 29° 33' 45.2" N- |
Longitude (NAD83) | 095° 30' 35.9" W- | |
Overall Structure Height | 1974.06 feet | |
Support Structure Height | 1844.14 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 74.15 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | American Towers LLC | |
Date Constructed | 08/30/2000 |
Facility ID | Call Sign | Service |
---|---|---|
7079 | KCVH-LD | LPD |
13200 | KUVM-CD | DTV |
167664 | KUVM-LD | LPD |
31870 | KYAZ | DTV |
51569 | KTXH | DTV |
22204 | KRIV | DTV |
28324 | KTBU | DTV |
53847 | KXLN-DT | DTV |
69531 | KZJL | DTV |
Users |
---|
Cell phone |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Tower mapping and report for structural engineer |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Candelabra |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 325 | |
Explanation | Required to assist in the turnkey management of the channel relocation project in order that the existing internal personal can maintain and operate the stations daily operational requirements and plans. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Prepare Form 601 | Yes | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 5 | |
Justification | Estimated field engineering services during transition activities. Actual costs to be determined. |
Name | Description |
---|---|
Consulting Engineering |
Repack engineering work not covered by existing 399 default fields. |
General Attorney fees for Repack |
Repack attorney work not covered by existing 399 default fields. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | Yes |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $266,398.17 | $274,898.17 | N/A | $195,766.10 | N/A |
Total for all systems | $712,053.66 | $801,003.16 | N/A | $508,321.69 | N/A |
Primary Transmitter VAXTE-2R37 | $266,398.17 | $274,898.17 | $195,766.10 | ||
Transmitter Misc. Equipment | $6,502.12 | $6,502.12 | Estimate based on attached GatesAir quote Q-85538 attached to Transmitter invoices. | $6,502.10 | N/A |
Transmitter Decommissioning | $8,000.00 | $8,000.00 | Per attached QCommunications quote. | $8,000.00 | N/A |
Other -- HVAC Service Type: H Size:5 (Other) | $19,700.00 | $19,700.00 | These 2-ton units replaces the 10-ton unit which was a short cycle unit which won't maintain the temperature. Space City Quote 11189 E | $19,700.00 | N/A |
Encoder | $83,931.66 | $83,931.66 | Harmonic estimate for required 8-channel encoder and installation. Actual costs to be determined. The channel change requires replacement of the existing 8-channel encoder. Estimated costs includes shipping fees not calculated on original quote. | $83,931.66 | N/A |
Transmitter Shipping fee | $4,372.39 | $4,372.39 | Actual shipping costs for transmitter | $4,372.39 | N/A |
High VHF - Air Cooled Solid State Transmitter 1.1 - 4.4 kW | $101,000.00 | $101,000.00 | N/A | $46,324.95 | N/A |
Transmitter Building Site Survey/Installation | $10,000.00 | $18,500.00 | Per attached QCommunications quote. | $18,500.00 | N/A |
HVAC Install | $3,500.00 | $3,500.00 | HVAC Install. Includes disconnecting electrical from old units; connected 2 new units; and demolition and installation of conduits, wiring, breakers, etc to accommodate new units. | $3,500.00 | N/A |
Site Prep | $5,000.00 | $5,000.00 | Per attached QCommunications quote. | $0.00 | N/A |
Transmitter Taxes | $10,000.00 | $10,000.00 | Estimated taxes for new transmitter and associated eqpt. Actual costs to be determined. | $0.00 | N/A |
Connectors | $10,000.00 | $10,000.00 | Estimated costs of connectors and associated parts/pieces in order to ensure proper mating of new transmitter to existing equipment. Actual costs to be determined. | $1,038.00 | N/A |
Dehydrator Rebuild | $495.00 | $495.00 | Rebuild dehydrator and connect it to transmission line. | $0.00 | N/A |
Demo HVAC | $3,897.00 | $3,897.00 | Demolition and recycling of old HVAC units in preparation for installation of 2 new units necessary for Repack | $3,897.00 | N/A |
Actual Information Description | File Name |
---|---|
Transmitter Misc. Equipment | |
Transmitter Decommissioning | |
Other -- HVAC Service Type: H Size:5 (Other) | |
Encoder | |
Transmitter Shipping fee | |
High VHF - Air Cooled Solid State Transmitter 1.1 - 4.4 kW | |
Transmitter Building Site Survey/Installation | |
HVAC Install | |
Site Prep | |
Transmitter Taxes | |
Connectors | |
Dehydrator Rebuild | |
Demo HVAC |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $122,450.11 | $118,495.11 | N/A | $85,720.11 | N/A |
Total for all systems | $712,053.66 | $801,003.16 | N/A | $508,321.69 | N/A |
Primary Antenna TLS-V4/VP | $122,450.11 | $118,495.11 | $85,720.11 | ||
Antenna Shipping fee | $8,965.00 | $8,965.00 | Actual shipping fees for new antenna per Dielectric INV 833015 | $8,965.00 | N/A |
Filter | $3,034.00 | $3,034.00 | Per attached Dielectric quote. | $3,034.00 | N/A |
Side Mount antenna brackets | $4,625.00 | $0.00 | 4-9-20 Costs captured under "custom mounts" component. Zeroed out. | $0.00 | N/A |
Flexline, Adapters, connectors | $2,063.11 | $2,063.11 | Per Dielectric invoice 829002 and attached quote. | $2,063.11 | N/A |
High VHF-Low Power, Side Mount, Broadband Slot, 4 bay, 3.0kW input, Elliptical | $47,509.00 | $47,509.00 | Per attached Dielectric quote 180087ESM attached to Invoice 746019 | $47,509.00 | Costs Per actual invoice #746019 and quote # 180087ESM. |
Sweep test of transmission line and antenna | $5,730.00 | $6,400.00 | Per Dielectric quote 180087ESM attached to INV MAN001546 and MAN01555 | $6,400.00 | N/A |
Elbow complex, broadband, at antenna input, per 4 1/16. feedline (if needed) | $10,950.00 | $10,950.00 | N/A | N/A | N/A |
Custom Mounting Brackets | $8,449.00 | $8,449.00 | Per Dielectric invoice 746019 and associated quote 180087ESM attached to invoice. | $8,449.00 | N/A |
Antenna Pattern Verification | $27,125.00 | $27,125.00 | Comprehensive Coverage Verification - Antenna Pattern Verification. QComm (QForce) quote 716C / 3001 | $9,300.00 | N/A |
Antenna Sales Tax | $4,000.00 | $4,000.00 | Estimated sales tax for new antenna. Actual costs to be determined. | N/A | N/A |
Actual Information Description | File Name |
---|---|
Antenna Shipping fee | |
Filter | |
Side Mount antenna brackets | Information not provided. |
Flexline, Adapters, connectors | |
High VHF-Low Power, Side Mount, Broadband Slot, 4 bay, 3.0kW input, Elliptical | |
Sweep test of transmission line and antenna | |
Elbow complex, broadband, at antenna input, per 4 1/16. feedline (if needed) | Information not provided. |
Custom Mounting Brackets | |
Antenna Pattern Verification | |
Antenna Sales Tax | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $19,000.00 | $19,000.00 | N/A | $0.00 | N/A |
Total for all systems | $712,053.66 | $801,003.16 | N/A | $508,321.69 | N/A |
Primary Transmission Line | $19,000.00 | $19,000.00 | $0.00 | ||
Waveguide Transmission Line - " 1 parallel runs 1654 feet | $19,000.00 | $19,000.00 | Only concerned with the horizontal 200 ft run. Existing line may need to be replaced due to going from UHF CH43 to VHF CH10. The line has not been tested yet for operations on CH10. If the lines sweeps well, then the line will not be required. | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $114,462.38 | $114,462.38 | N/A | $43,462.38 | N/A |
Total for all systems | $712,053.66 | $801,003.16 | N/A | $508,321.69 | N/A |
Primary Tower GTOWER | $114,462.38 | $114,462.38 | $43,462.38 | ||
Minor tower reinforcement/modifications | $50,000.00 | $50,000.00 | Estimated tower modification costs, depending on engineering report results. Actual costs to be determined. | N/A | N/A |
Tower mapping and report for structural engineer | $21,000.00 | $21,000.00 | N/A | N/A | N/A |
Complex Tower (includes, e.g., towers with candelabras and/or stacked antennas) | $43,462.38 | $43,462.38 | Actual rigging costs - 3 invoices from Rio Steel and Tower. | $43,462.38 | N/A |
Actual Information Description | File Name |
---|---|
Minor tower reinforcement/modifications | Information not provided. |
Tower mapping and report for structural engineer | Information not provided. |
Complex Tower (includes, e.g., towers with candelabras and/or stacked antennas) |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $175,533.00 | $259,937.50 | N/A | $183,373.10 | N/A |
Total for all systems | $712,053.66 | $801,003.16 | N/A | $508,321.69 | N/A |
Outside Professional Services | $175,533.00 | $259,937.50 | $183,373.10 | ||
Form 399 assistance or other Program Management costs | $15,000.00 | $15,000.00 | Estimated costs for form 399 assistance. Actual costs to be determined. | $14,147.60 | N/A |
Project management of the transition | $34,287.50 | $118,500.00 | Per actual time work on QCommunications invoices. | $118,500.00 | N/A |
Consulting Engineering | $12,430.00 | $12,430.00 | Consulting Engineering work not covered by existing 399 default fields. | $12,430.00 | Actual costs per consulting engineer invoices. |
Additional Field Engineering Service, 5 Days | $12,500.00 | $12,500.00 | Estimated field engineering services during transition activities. Actual costs to be determined. | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | $930.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Prepare Form 601 | $755.00 | $755.00 | N/A | N/A | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $2,650.00 | Estimated costs to prepare 399 reimbursement form. Actual costs to be determined. | $150.00 | N/A |
Perform engineering study for displacement application | $1,800.00 | $6,500.00 | Displacement studies-required to ascertain the final channel assignment | $3,100.00 | N/A |
Prepare request for Special Temporary Authorization | $1,280.00 | $2,700.00 | Actual costs per consulting engineer invoices. | $2,700.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | $1,500.00 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $3,262.50 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $2,235.00 | N/A | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $52,600.00 | $45,732.00 | Per QForce Quote 714-R | N/A | N/A |
General Attorney fees for Repack | $29,915.50 | $29,915.50 | Repack Attorney fees not covered by existing 399 default fields. | $29,915.50 | N/A |
Actual Information Description | File Name |
---|---|
Form 399 assistance or other Program Management costs | |
Project management of the transition | |
Consulting Engineering | |
Additional Field Engineering Service, 5 Days | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare Form 601 | Information not provided. |
Prepare/ Review 399 reimbursement form | |
Perform engineering study for displacement application | |
Prepare request for Special Temporary Authorization | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
General Attorney fees for Repack |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $14,210.00 | $14,210.00 | N/A | $0.00 | N/A |
Total for all systems | $712,053.66 | $801,003.16 | N/A | $508,321.69 | N/A |
Other Expenses | $14,210.00 | $14,210.00 | $0.00 | ||
Equipment Delivery and Handling Charges | $2,000.00 | $2,000.00 | Estimated transport, forklift rental and handling fees from staging area to transmitter site. Actuals to be determined. | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $305.00 | $305.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 Major change CP application | $4,960.00 | $4,960.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
Equipment Storage | $3,000.00 | $3,000.00 | N/A | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $2,500.00 | $2,500.00 | Estimated 4-6 yard disposal bin on site to capture all waste from on site system integration and tower vendors. Actual costs to be determined. | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $712,053.66 | $801,003.16 | $508,321.69 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jay Levine Senior Vice President 06/14/2021 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jay Levine Senior Vice President 06/14/2021 |