Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
Hearst Properties Inc. Doing Business As: Hearst Properties Inc. |
PO Box 1800 Raleigh, NC 27602 United States |
+1 (919) 839-0300 | shartzell@brookspierce.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | WPXT will build its post-repack facility at the WMTW transmitter site in Baldwin, Maine. It will share WMTW's transmitter room and tower. A new antenna will be installed for WPXT utilizing an existing transmission line. See attached WPXT Transition Plan. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Diamond | |
Year | 2006 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 7.25 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | ULXTE-12 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 8.5 kW | |
Justification for New Transmitter | Existing Transmitter cannot be retuned. Selected model closest to power needs. Post-repack facility will be built at another site. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | transmitter electrical design and installation | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Remote Control |
items needed to integrate transmitter into existing remote control system |
RF Accessories |
miscellaneous required RF components |
Transmitter de-install |
removal of old transmitter |
Sales Tax |
transmitter sales tax - Maine |
Transmitter shipping |
transmitter shipping to site |
Electrical Accessories |
Manufacturer required surge protection device |
Change Orders |
changes to original transmitter ordered needed for installation |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 137.4 kW | |
Manufacturer | ||
Model | TLP-16B-R | |
Year | 2006 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 500.0 kW | |
Manufacturer | ||
Model | TFU-16DSB/VP-F OS | |
Year | 2019 | |
Justification for New Antenna | current antenna channel specific and cannot be retuned or otherwise used on post-repack channel |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 4 1/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
RF adapters |
additional required antenna components |
Sales Tax |
antenna sales tax |
Shipping |
antenna shipping |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | Dielectric |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | Broadband | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1500 feet per run |
Name | Description |
---|---|
Line sweep |
sweep existing unused line at new location to be utilized for post-repack channel |
Adapters for line sweep |
adapters needed to sweep existing transmission line |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1045602 | |
Coordinates (NAD83) | Latitude (NAD83) | 43° 50' 44.0" N- |
Longitude (NAD83) | 070° 45' 41.0" W- | |
Overall Structure Height | 1666.65 feet | |
Support Structure Height | 1555.10 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 882.54 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Hearst Properties Inc. | |
Date Constructed | 02/01/2003 |
Facility ID | Call Sign | Service |
---|---|---|
73288 | WMTW | DTV |
48408 | WIPL | DTV |
65675 | WFNK | FM |
Users |
---|
Land-Mobile |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Major Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Old antenna removal |
remove old antenna and transmission line |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 100 | |
Explanation | supervise and manage project | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Non-Catalog legal expenses |
Non-Catalog expenses for legal advice and services, including financial/reimbursement review, transition reporting, transition procedures, and other transition-related issues |
Tower Consulting |
Consulting for tower analysis, modifications and permits. |
Transmitter Site Survey |
Transmitter planning survey and transmitter building drawings |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
in-house labor |
in-house labor directly related to station's repack |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $627,758.85 | $411,947.84 | N/A | $411,947.84 | N/A |
Total for all systems | $1,502,913.48 | $925,761.27 | N/A | $925,761.27 | N/A |
Primary Transmitter ULXTE-12 | $627,758.85 | $411,947.84 | $411,947.84 | ||
Other Electrical Service: transmitter electrical design and installation | $25,150.00 | $25,150.00 | per BH Milliken invoices and quote | $25,150.00 | N/A |
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW | $494,500.00 | $299,668.93 | Transmitter cost based on FCC transmitter definition, transmitter, mask filter, installation and proof. | $299,668.93 | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $4,570.06 | cost per GatesAir quote | $4,570.06 | N/A |
Change Orders | $24,129.54 | $24,129.54 | changes needed for transmitter installation | $24,129.54 | N/A |
Electrical Accessories | $1,618.74 | $1,618.74 | transmitter manufacturer required surge protection per quote | $1,618.74 | N/A |
Transmitter shipping | $7,992.45 | $7,992.45 | per GatesAir invoice | $7,992.45 | N/A |
Sales Tax | $17,780.93 | $17,780.93 | sales tax per GatesAir invoice | $17,780.93 | N/A |
Transmitter de-install | $150.00 | $150.00 | per invoice | $150.00 | N/A |
RF Accessories | $28,102.19 | $28,102.19 | additional RF components required for transmitter installation | $28,102.19 | N/A |
Remote Control | $2,785.00 | $2,785.00 | per Burk invoice | $2,785.00 | N/A |
Actual Information Description | File Name |
---|---|
Other Electrical Service: transmitter electrical design and installation | |
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW | |
Transformer 3 phase/480v - 150 KVA | |
Change Orders | |
Electrical Accessories | |
Transmitter shipping | |
Sales Tax | |
Transmitter de-install | |
RF Accessories | |
Remote Control |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $73,722.22 | $55,278.22 | N/A | $55,278.22 | N/A |
Total for all systems | $1,502,913.48 | $925,761.27 | N/A | $925,761.27 | N/A |
Primary Antenna TFU-16DSB/VP-F OS | $73,722.22 | $55,278.22 | $55,278.22 | ||
UHF - High Power, Side Mount, basic slot antenna, 500 kW input, directional,, elliptically or circularly polarized | $31,176.22 | $31,176.22 | N/A | $31,176.22 | N/A |
Sweep test of existing antenna | $6,730.00 | $5,700.00 | N/A | $5,700.00 | N/A |
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) | $9,570.00 | $6,700.00 | Flex line used in place of elbow complex for faster and easier installation | $6,700.00 | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $8,606.00 | N/A | $8,606.00 | N/A |
Shipping | $891.00 | $891.00 | antenna shipping | $891.00 | N/A |
RF adapters | $2,205.00 | $2,205.00 | reducer and transformer per Dielectric quote | $2,205.00 | N/A |
Sales Tax | $0.00 | $0.00 | estimated antenna sales tax based on Maine general sales tax rate of 5.5% | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
UHF - High Power, Side Mount, basic slot antenna, 500 kW input, directional,, elliptically or circularly polarized | |
Sweep test of existing antenna | |
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) | |
Side mount brackets for high power antennas (if not included in antenna base cost) | |
Shipping | |
RF adapters | |
Sales Tax | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $10,743.22 | $10,743.22 | N/A | $10,743.22 | N/A |
Total for all systems | $1,502,913.48 | $925,761.27 | N/A | $925,761.27 | N/A |
Primary Transmission Line | $10,743.22 | $10,743.22 | $10,743.22 | ||
Adapters for line sweep | $4,343.22 | $4,343.22 | see invoices | $4,343.22 | N/A |
Line sweep | $6,400.00 | $6,400.00 | standard Dielectric line sweep charge. Sweep to confirm unused T/L is in good working condition for repack use. | $6,400.00 | N/A |
Actual Information Description | File Name |
---|---|
Adapters for line sweep | |
Line sweep |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $674,200.00 | $374,229.10 | N/A | $374,229.10 | N/A |
Total for all systems | $1,502,913.48 | $925,761.27 | N/A | $925,761.27 | N/A |
Primary Tower TOWER | $674,200.00 | $374,229.10 | $374,229.10 | ||
Old antenna removal | $16,400.00 | $16,400.00 | old antenna and transmission line removal | $16,400.00 | N/A |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $11,550.00 | N/A | $11,550.00 | N/A |
Major tower reinforcement/modifications | $421,000.00 | $121,231.60 | tower modifications | $121,231.60 | N/A |
Tall Tower (greater than 500') | $210,500.00 | $225,047.50 | total of current tower services invoices | $225,047.50 | N/A |
Actual Information Description | File Name |
---|---|
Old antenna removal | |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | |
Major tower reinforcement/modifications | |
Tall Tower (greater than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $78,542.52 | $44,096.22 | N/A | $44,096.22 | N/A |
Total for all systems | $1,502,913.48 | $925,761.27 | N/A | $925,761.27 | N/A |
Outside Professional Services | $78,542.52 | $44,096.22 | $44,096.22 | ||
Non-Catalog legal expenses | $8,772.52 | $8,772.52 | Non-Catalog expenses for legal advice and services, including financial/reimbursement review, transition reporting, transition procedures, and other transition-related issues | $8,772.52 | N/A |
Project management of the transition | $15,800.00 | $0.00 | N/A | $0.00 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $926.00 | N/A | $926.00 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $0.00 | N/A | $0.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $11,217.20 | First two reimbursements were for former station owner. Subsequent reimbursement requests are from current owner. Ownership change resulted in totally revised repack plan. | $11,217.20 | Attached invoice includes multiple categories. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $0.00 | N/A | $0.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $800.00 | N/A | $800.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $470.00 | N/A | $470.00 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $810.50 | N/A | $810.50 | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $0.00 | N/A | $0.00 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $0.00 | N/A | N/A | N/A |
Tower Consulting | $500.00 | $500.00 | estimated tower consulting needs | $500.00 | N/A |
Transmitter Site Survey | $20,600.00 | $20,600.00 | GatesAir standard charge for site survey | $20,600.00 | N/A |
Actual Information Description | File Name |
---|---|
Non-Catalog legal expenses | |
Project management of the transition | |
Prepare and or review reimbursement form | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Perform engineering study for new channel assignment and antenna development | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Tower Consulting | |
Transmitter Site Survey |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $37,946.67 | $29,466.67 | N/A | $29,466.67 | N/A |
Total for all systems | $1,502,913.48 | $925,761.27 | N/A | $925,761.27 | N/A |
Other Expenses | $37,946.67 | $29,466.67 | $29,466.67 | ||
in-house labor | $11,986.67 | $11,986.67 | in-house labor directly related to station's repack | $11,986.67 | N/A |
Non-zoning permits | $10,225.00 | $10,225.00 | Tower construction drawings, building permit and associated services | $10,225.00 | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $0.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $3,265.00 | N/A | $3,265.00 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | $335.00 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $0.00 | $0.00 | To dispose of electronic waste (old xmtr's) and associated gear, plus old line, antenna, etc. | $0.00 | N/A |
Equipment Storage | $1,170.00 | $1,170.00 | antenna storage | $1,170.00 | N/A |
Develop and air announcement of upcoming channel change | $0.00 | $0.00 | production and air time | $0.00 | N/A |
MVPD Notification of Channel Change | $2,485.00 | $2,485.00 | N/A | $2,485.00 | N/A |
Actual Information Description | File Name |
---|---|
in-house labor | |
Non-zoning permits | |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
DTV Medical Facility Notification | |
FCC Filing Fees - Form 2100 license to cover application | |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Equipment Storage | |
Develop and air announcement of upcoming channel change | Information not provided. |
MVPD Notification of Channel Change |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $1,502,913.48 | $925,761.27 | $925,761.27 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | John Drain Hearst Television SVP Chief Financial Officer 07/02/2021 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Douglas Durkee Hearst Television Manager of Spectrum Repack 07/02/2021 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Douglas Durkee Hearst Television Manager of Spectrum Repack 07/02/2021 |