Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
SCRIPPS BROADCASTING HOLDINGS LLC Doing Business As: SCRIPPS BROADCASTING HOLDINGS LLC |
C/O SCRIPPS MEDIA, INC. 312 WALNUT ST., 28TH FLOOR CINCINNATI, OH 45202 United States |
+1 (513) 977-3000 | DAVE.GILES@SCRIPPS.COM | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Sam Hariton Widelity |
4031 University Dr Suite 100 Fairfax, VA 22030 United States |
+1 (339) 222-8107 | sam.hariton@widelity.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | KZCS-LP is moving to a different, existing tower in the same location, which it will share with KOAA (FacID 59014). The station is purchasing a new like-for-like transmitter, like-for-like antenna, and like-for-like transmission line. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | SCA 132UB | |
Year | 2004 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 2 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | UAXTE-2R23 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.2 kW | |
Justification for New Transmitter | Re-tuning the existing main transmitter is not an option because the manufacturer is no longer in business in the United States |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | Yes | |
Size | 1 inches | |
Length | 75.0 feet | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 50.0 kW | |
Manufacturer | ||
Model | B16UA | |
Year | 2004 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | ALP8L1-HSER-18 | |
Year | 2019 | |
Justification for New Antenna | The pre-displacement antenna cannot be retuned to the new channel and the original manufacturer is out of business. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 200 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Air | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 250 feet per run | |
Justification for New Transmission Line | With the change of towers and the difference in the distance to the antenna, a new transmission line is needed. | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | No |
Name | Description |
---|---|
Primary Transmission Line-Other Parts |
Primary Transmission Line-Other Parts |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
Coordinates (NAD83) | Latitude (NAD83) | 38° 44' 38.9" N- |
Longitude (NAD83) | 104° 51' 47.7" W- | |
Overall Structure Height | 198.82 feet | |
Support Structure Height | 198.82 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 9425.74 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | Scripps Broadcasting Holdings LLC | |
Date Constructed | 04/02/2019 |
Facility ID | Call Sign | Service |
---|---|---|
59014 | KOAA-TV | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Tower mapping and report for structural engineer |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 254 | |
Explanation | KZCS-LP requires the aid of outside project management services. KZCS-LP does not have sufficient resource capacity and expertise in house to handle all of the activities necessary to facility on-time completion of the station's build. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Prepare Form 601 | Yes | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | Yes |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
Site Survey |
Site Survey |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $93,953.00 | $70,520.64 | N/A | $47,939.25 | N/A |
Total for all systems | $276,885.91 | $271,903.42 | N/A | $127,176.87 | N/A |
Primary Transmitter UAXTE-2R23 | $93,953.00 | $70,520.64 | $47,939.25 | ||
1" Rigid Conduit and Wiring | $9,953.00 | $9,953.00 | Please see Main Electric Quote 6236 | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $60,567.64 | Please see GatesAir quote Q-82462, plus actual taxes on invoice US0334642 | $47,939.25 | N/A |
Actual Information Description | File Name |
---|---|
1" Rigid Conduit and Wiring | Information not provided. |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $25,941.00 | $25,941.00 | N/A | $21,231.00 | N/A |
Total for all systems | $276,885.91 | $271,903.42 | N/A | $127,176.87 | N/A |
Primary Antenna ALP8L1-HSER-18 | $25,941.00 | $25,941.00 | $21,231.00 | ||
Sweep test of transmission line and antenna | $5,730.00 | $5,730.00 | Based on FCC's catalog of costs while waiting for official quote | $1,020.00 | N/A |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Horizontal | $20,211.00 | $20,211.00 | Please see ERI Proposal 20190617-860 | $20,211.00 | N/A |
Actual Information Description | File Name |
---|---|
Sweep test of transmission line and antenna | |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Horizontal |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $9,727.75 | $9,594.48 | N/A | $9,537.67 | N/A |
Total for all systems | $276,885.91 | $271,903.42 | N/A | $127,176.87 | N/A |
Primary Transmission Line | $9,727.75 | $9,594.48 | $9,537.67 | ||
Primary Transmission Line-Other Parts | $1,477.75 | $1,477.75 | Please see Estimated Cost Justification KZCS-LP-310-Primary Transmission Line-Other Parts v0 | $1,477.75 | N/A |
Flexible Air Transmission Line - dielectric, 1 5/8" | $8,250.00 | $8,116.73 | Please see Electronics Research, Inc. 20200409-418, plus freight and taxes on invoice 55772 | $8,059.92 | N/A |
Actual Information Description | File Name |
---|---|
Primary Transmission Line-Other Parts | |
Flexible Air Transmission Line - dielectric, 1 5/8" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $77,190.00 | $78,627.64 | N/A | $15,650.00 | N/A |
Total for all systems | $276,885.91 | $271,903.42 | N/A | $127,176.87 | N/A |
Primary Tower GTOWER | $77,190.00 | $78,627.64 | $15,650.00 | ||
Tower mapping and report for structural engineer | $21,000.00 | $2,750.00 | Please see ERI proposal 20190815-450. The tower mapping is necessary because the tower is very close to being at maximum load. Any new or additional load requires a tower study to make sure that the additional weight will not damage the new tower. | $2,750.00 | N/A |
Tower Rigging Short Tower (less than 500') | $56,190.00 | $75,877.64 | Please see ThinAir KZCS Antenna Install/Rigging quote | $12,900.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower mapping and report for structural engineer | |
Tower Rigging Short Tower (less than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $45,597.00 | $62,742.50 | N/A | $32,138.95 | N/A |
Total for all systems | $276,885.91 | $271,903.42 | N/A | $127,176.87 | N/A |
Outside Professional Services | $45,597.00 | $62,742.50 | $32,138.95 | ||
Project management of the transition | $26,797.00 | $41,910.00 | Please see Widelity KZCS Strategic Support Quote | $28,006.45 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $2,235.00 | Based on FCC's catalog of costs while waiting for official quote | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $3,262.50 | Based on FCC's catalog of costs while waiting for official quote | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | Based on FCC's catalog of costs while waiting for official quote | N/A | N/A |
Prepare Form 601 | $755.00 | $755.00 | Based on FCC's catalog of costs while waiting for official quote | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | Based on FCC's catalog of costs while waiting for official quote | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | Based on FCC's catalog of costs while waiting for official quote | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | Based on FCC's catalog of costs while waiting for official quote | N/A | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | Based on FCC's catalog of costs while waiting for official quote | N/A | N/A |
Perform engineering study for displacement application | $1,800.00 | $3,832.50 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $3,832.50 | N/A |
Prepare request for Special Temporary Authorization | $1,280.00 | $1,280.00 | Based on FCC's catalog of costs while waiting for official quote | $300.00 | N/A |
Actual Information Description | File Name |
---|---|
Project management of the transition | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare Form 601 | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare/ Review 399 reimbursement form | Information not provided. |
Perform engineering study for displacement application | |
Prepare request for Special Temporary Authorization |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $24,477.16 | $24,477.16 | N/A | $680.00 | N/A |
Total for all systems | $276,885.91 | $271,903.42 | N/A | $127,176.87 | N/A |
Other Expenses | $24,477.16 | $24,477.16 | $680.00 | ||
Equipment Delivery and Handling Charges | $2,547.16 | $2,547.16 | Please see GatesAir, Inc. Quote #Q-82462 & Invoice #US0335240.pdf | N/A | N/A |
Site Survey | $680.00 | $680.00 | Please see KZCS-LP Site Survey Budget Revision Justification Letter | $680.00 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | Based on FCC's catalog of costs while waiting for official quote. | N/A | N/A |
FCC Filing Fees - Form 2100 Major change CP application | $4,960.00 | $4,960.00 | Based on FCC's catalog of costs while waiting for official quote. | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | Based on FCC's catalogue of costs while waiting for official quote | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $305.00 | $305.00 | Based on FCC's catalog of costs while waiting for official quote. | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $14,540.00 | $14,540.00 | Please see Thin Air Proposal 3268_001_KMGH and Thin Air Proposal 3260_001_KMGH | N/A | N/A |
Actual Information Description | File Name |
---|---|
Equipment Delivery and Handling Charges | Information not provided. |
Site Survey | |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
FCC Filing Fees - Form 2100 Major change CP application | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $276,885.91 | $271,903.42 | $127,176.87 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Sravan V Reddy , Reddy . Senior Director, General Accounting 09/27/2021 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Sravan V Reddy , Reddy . Senior Director, General Accounting 09/27/2021 |