Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
WYFF Hearst Television Inc. Doing Business As: WYFF Hearst Television Inc. |
PO Box 1800 Raleigh, NC 27602 United States |
+1 (919) 839-0300 | shartzell@brookspierce.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | We will replace the translator, filter, power divider and antennas due to the translator being displaced. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | MXD3V | |
Year | 2010 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 3 W |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | VAXTE-10 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 10 W | |
Justification for New Transmitter | The current translator manufacturer is out of business so a new translator is needed. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Shipping |
Transmitter shipping |
Electrical Accessories |
surge suppressor |
RF Accessories |
other RF components and accessories needed for installation |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Yagi | |
ERP: | 0.026 kW | |
Manufacturer | ||
Model | TAC Y-103-10 | |
Year | 2010 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Log Periodic | |
ERP: | 0.061 kW | |
Manufacturer | ||
Model | CL-713HRM50N | |
Year | 2020 | |
Justification for New Antenna | current antenna channel specific and will not work on new channel. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
Coordinates (NAD83) | Latitude (NAD83) | 35° 15' 58.6" N- |
Longitude (NAD83) | 082° 14' 38.8" W- | |
Overall Structure Height | 45.00 feet | |
Support Structure Height | 45.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 3240.16 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Hearst Television | |
Date Constructed | 09/23/1979 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | No study needed |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | No | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
Channel Study |
RF consulting to determine displaced translator and alternative channel |
Non-Catalog legal expenses |
Non-Catalog expenses for legal advice and services, including financial/reimbursement review, transition reporting, transition procedures, and other transition-related issues |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
in-house labor |
in-house labor directly related to station's repack |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $13,589.47 | $12,161.82 | N/A | $12,161.82 | N/A |
Total for all systems | $85,859.18 | $22,594.85 | N/A | $22,594.85 | N/A |
Primary Transmitter VAXTE-10 | $13,589.47 | $12,161.82 | $12,161.82 | ||
Electrical Accessories | $1,624.01 | $1,624.01 | per GatesAir documentation | $1,624.01 | N/A |
Shipping | $198.22 | $198.22 | shipping per GatesAir invoices | $198.22 | N/A |
High VHF - Air Cooled Solid State Transmitter 10 - 100 Watts | $11,300.00 | $9,872.35 | per quote | $9,872.35 | N/A |
RF Accessories | $467.24 | $467.24 | additional components needed for installation | $467.24 | N/A |
Actual Information Description | File Name |
---|---|
Electrical Accessories | |
Shipping | |
High VHF - Air Cooled Solid State Transmitter 10 - 100 Watts | |
RF Accessories |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,353.40 | $3,589.40 | N/A | $3,589.40 | N/A |
Total for all systems | $85,859.18 | $22,594.85 | N/A | $22,594.85 | N/A |
Primary Antenna CL-713HRM50N | $1,353.40 | $3,589.40 | $3,589.40 | ||
Shipping | $233.40 | $233.40 | per invoice | $233.40 | N/A |
High-VHF, Low Power, Yagi/Cross-Dipole/Log Periodic Transmit Antenna | $1,120.00 | $3,356.00 | per invoice | $3,356.00 | N/A |
Actual Information Description | File Name |
---|---|
Shipping | |
High-VHF, Low Power, Yagi/Cross-Dipole/Log Periodic Transmit Antenna |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $56,190.00 | $1,000.00 | N/A | $1,000.00 | N/A |
Total for all systems | $85,859.18 | $22,594.85 | N/A | $22,594.85 | N/A |
Primary Tower TOWER | $56,190.00 | $1,000.00 | $1,000.00 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $1,000.00 | per invoice | $1,000.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Short Tower (less than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $12,079.60 | $4,471.92 | N/A | $4,471.92 | N/A |
Total for all systems | $85,859.18 | $22,594.85 | N/A | $22,594.85 | N/A |
Outside Professional Services | $12,079.60 | $4,471.92 | $4,471.92 | ||
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $628.20 | N/A | $628.20 | N/A |
Non-Catalog legal expenses | $1,616.60 | $1,616.60 | per invoice | $1,616.60 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $0.00 | N/A | N/A | N/A |
Form 399 assistance or other Program Management costs | $423.00 | $423.00 | per invoice | $423.00 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $681.00 | N/A | $681.00 | N/A |
Channel Study | $482.50 | $482.50 | per invoice | $482.50 | N/A |
Perform engineering study for displacement application | $1,800.00 | $640.62 | N/A | $640.62 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $0.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Non-Catalog legal expenses | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Form 399 assistance or other Program Management costs | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Channel Study | |
Perform engineering study for displacement application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,646.71 | $1,371.71 | N/A | $1,371.71 | N/A |
Total for all systems | $85,859.18 | $22,594.85 | N/A | $22,594.85 | N/A |
Other Expenses | $2,646.71 | $1,371.71 | $1,371.71 | ||
in-house labor | $1,201.71 | $1,201.71 | in-house labor directly related to station's repack | $1,201.71 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $0.00 | $0.00 | estimate | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $0.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $170.00 | N/A | $170.00 | N/A |
Actual Information Description | File Name |
---|---|
in-house labor | |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $85,859.18 | $22,594.85 | $22,594.85 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | John Drain Hearst Television SVP Chief Financial Officer 07/02/2021 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Douglas Durkee Hearst Television Manager of Spectrum Repack 07/02/2021 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Douglas Durkee Hearst Television Manager of Spectrum Repack 07/02/2021 |