FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
68519
Service:
DTV
Call Sign:
WJKT
Channel:
21 (UHF)
File Number:
0000028516
FRN:
0009961889
Date Submitted:
06/21/2021

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

Nexstar Media Inc.

Elizabeth Ryder

545 E. John Carpenter Freeway

Suite 700

Irving, TX 75062

United States

+1 (972) 373-8800 eryder@nexstar.tv Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Elizabeth Ryder

General Counsel

Nexstar Media Inc.

Elizabeth Ryder

545 E. John Carpenter Freeway

Suite 700

Irving, TX 75062

United States

+1 (972) 373-8800 eryder@nexstar.tv

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan Replace transmitter, antenna and add new line. Acquire temporary antenna and line for continued operation during construction. Use existing line and antenna throughout phase. Map, analyze tower; design and implement modifications if required. See attached

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model IOX
Year 2000
Type Inductive Output Tube
IOT Power Type Two
Power Capacity 60 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model THU9evo-12
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 19 kW
Justification for New Transmitter The manufacturer of the existing IOT transmitter advises that the transmitter cannot be re-tuned to the assigned channel. A new Comark Paragon MSDC IOT transmitter is the basis for a replacement as suggested by the FCC. See attachment.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 300 kVA
Rigid Conduit and Wiring Yes
Size 3 inches
Length 100.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

HVAC System

HVAC System

Additional Transmitter Costs

Additional Transmitter Costs

Additional Interior RF System

Interior RF System Existing Transmitter to Interim Transmission line

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 392.0 kW
Manufacturer
Model ATL25H3-HSO-39
Year 2000

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 193.0 kW
Manufacturer
Model TFU-23ETT/VP-R 04
Year 2018
Justification for New Antenna The existing primary antenna is a single channel slotted coaxial which cannot accommodate the assigned channel.The main antenna is moving from side to top mount. The existing antenna will serve as interim throughout the phase.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna?
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna?
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Additional Antenna Costs

Additional Antenna Costs

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 392.0 kW
Manufacturer
Model TFU-8WB-R C160
Year 2018
Justification for New Antenna A temporary antenna is necessary to keep station on the air during primary antenna work. Station will attempt to rent if renting is available at time of acquisition.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? S
Feed Line Size 3 1/8 inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Additional Antenna Costs

Additional Antenna Costs

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1130 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1090 feet per run
Justification for New Transmission Line The existing primary transmission line is rigid with section lengths that cannot accommodate the assigned channel. The main antenna is moving from side to top mount so new line is needed for the new main antenna. Existing line will serve as Interim

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Additional Transmission Line Components

Additional Transmission Line Components

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Flexible Air
Diameter 3 inches
Segment Length N/A
Other Segment Length
Number of parallel runs 1
Length 1000 feet per run
Justification for New Transmission Line A temporary transmission line is necessary for the temporary antenna to keep station on the air during primary antenna work. Station will attempt to rent if renting is available at time of acquisition

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Additional Transmission Line Components

Additional Transmission Line Components

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? No
One or more FM, AM or TV radio broadcaster(s) N/A
Others Types of Users N/A
Is tower documented for structural analysis? No
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1049754
Coordinates (NAD83) Latitude (NAD83) 35° 47' 27.0" N-
Longitude (NAD83) 089° 05' 58.0" W-
Overall Structure Height 1040.01 feet
Support Structure Height 1037.06 feet
Ground Elevation Above Mean Sea Level (AMSL) 376.96 feet
Structure Type LTOWER - Lattice Tower
Tower Owner Nexstar Broadcasting, Inc.
Date Constructed 10/10/1991


Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for undocumented/poorly documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Serious Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Tower Foundation Modifications

Phase I: Tower-base foundation GPR survey to interpret the lateral dimensions of a potential, subgrade footing. Phase II: Mobilize GeoProbe rig for field testing. Phase III: Foundation reinforcement steel. Phase IV: Install Helical piers.

Weather Delays, Additional Charges

Weather Delays, Additional Charges

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 500
Explanation Schedule and coordinate multiple vendors, complete progress reports, and update Schedule 399. Station does not have available personnel or personnel trained in project management for such complex projects. Internal accounting and Project management.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification Yes
FAA Consultation (including preparation of FAA Form 7460) Yes
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service Yes
Number of Days 20
Justification It will be necessary to survey the site, plan the equipment, develop specifications for purchasing, and oversee multiple vendor RF projects. Station does not have available personnel or personnel trained in such services.

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Information not provided.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? Yes
Is Remediation needed? Yes
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application No
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Sales Tax

Sales and use tax on goods and services

Equipment Rentals

Equipment Rentals

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,889,368.00 $697,673.00 N/A $526,173.00 N/A
Total for all systems $5,195,959.50 $3,874,782.90 N/A $3,046,254.02 N/A
Primary Transmitter THU9evo-12 $1,889,368.00 $697,673.00 $526,173.00
Additional Interior RF System $140,000.00 $140,000.00 N/A N/A N/A
Additional Transmitter Costs $10,700.00 $10,700.00 See Rohde & Schwarz quote 802-053004.0 $10,700.00 N/A
HVAC System $20,468.00 $20,468.00 See temperature, inc Proposal 1/26/18 $20,468.00 N/A
3" Rigid Conduit and Wiring (Cost per foot) $5,200.00 $5,000.00 N/A $2,990.16 N/A
Transformer 3 phase/480v - 300 KVA $36,800.00 $35,850.00 N/A $21,358.27 N/A
Switchgear - industrial 800 amp $38,200.00 $37,150.00 N/A $22,151.57 N/A
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW $684,000.00 $0.00 Costs were submitted under IOT Transmitter N/A N/A
Two IOT system (50 kW) $954,000.00 $448,505.00 ***System Notice: Estimate adjusted and locked because line has been superseded.***The purchase price of the new transmitter is based on a Proposal from Comark for a 50 kW MSDC IOT as suggested by the FCC. See attachment. Cost reduced to from $1388470 to $448,505. See R&S quote 802-050325.1 $448,505.00 N/A

Components

Actual Information Description File Name
Additional Interior RF System Information not provided.
Additional Transmitter Costs

Component Description:
Additional transmitter costs
Amount:
$10,700.00
HVAC System

Component Description:
HVAC system
Amount:
$16,700.00

Component Description:
HVAC Installation
Amount:
$3,768.00
3" Rigid Conduit and Wiring (Cost per foot)

Component Description:
Electrical Services - prorated to 3" Rigid Conduit
Amount:
$2,990.16
Transformer 3 phase/480v - 300 KVA

Component Description:
Electrical services - prorated to Transformer
Amount:
$21,358.27
Switchgear - industrial 800 amp

Component Description:
Electrical services - prorated to Switchgear
Amount:
$22,151.57
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW Information not provided.
Two IOT system (50 kW)

Component Description:
50% milestone payment due at delivery 4.17.18
Amount:
$224,252.50

Component Description:
final 25% milestone due at commissioning 5.29.18; remaining invoice amount $43,729.24 to sales tax
Amount:
$112,126.25

Component Description:
25% milestone billing Transmitter system
Amount:
$112,126.25

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $795,122.50 $426,908.00 N/A $256,285.84 N/A
Total for all systems $5,195,959.50 $3,874,782.90 N/A $3,046,254.02 N/A
Interim Antenna TFU-8WB-R C160 $236,540.00 $230,600.00 $59,977.84
Additional Antenna Costs $4,300.00 $4,300.00 See Dielectric order confirmation 948002 $4,150.30 N/A
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $5,120.00 N/A N/A N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $22,550.00 N/A N/A N/A
Elbow complex, single channel, at antenna input, per 3 1/8. feedline (if needed) $7,600.00 $7,580.00 N/A N/A N/A
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized $189,500.00 $184,500.00 N/A $55,827.54 N/A
Sweep test of existing antenna $6,730.00 $6,550.00 N/A N/A N/A
Primary Antenna TFU-23ETT/VP-R 04 $558,582.50 $196,308.00 $196,308.00
Additional Antenna Costs $3,052.50 $3,052.50 See related costs on Dielectric order confirmation 1426002 $3,052.50 N/A
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized $289,500.00 $17,636.26 See Dielectric quote DSM159-3 less vpol ($19,575) and amounts submitted under Hpol ($158,726.24) $17,636.26 N/A
Sweep test of existing antenna $6,730.00 $6,595.00 Transmission line feasibility and final sweep test $6,595.00 N/A
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) $12,300.00 $10,298.00 See Dielectric quote DMS159-3 $10,298.00 N/A
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized $247,000.00 $158,726.24 ***System Notice: Estimate adjusted and locked because line has been superseded.*** $158,726.24 N/A

Components

Actual Information Description File Name
Additional Antenna Costs

Component Description:
Reducer
Amount:
$868.00

Component Description:
Interim antenna components
Amount:
$3,282.30
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) Information not provided.
Side mount brackets for high power antennas (if not included in antenna base cost) Information not provided.
Elbow complex, single channel, at antenna input, per 3 1/8. feedline (if needed) Information not provided.
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized

Component Description:
Lines 1-7 of invoice; see also Equipment Delivery
Amount:
$55,827.54
Sweep test of existing antenna Information not provided.
Additional Antenna Costs

Component Description:
Additional antenna components
Amount:
$3,052.50
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized

Component Description:
Main antenna, balance due
Amount:
$17,636.26
Sweep test of existing antenna

Component Description:
Credit for sweep test not done by Dielectric
Amount:
($5,760.00)

Component Description:
Main antenna sweep test
Amount:
$6,400.00

Component Description:
Sweep test not provided by Dielectric, credit against previously submitted cost; see cover letter
Amount:
($2,880.00)

Component Description:
Sweep test not provided by Dielectric, credit against previously submitted cost; see cover letter
Amount:
($2,880.00)

Component Description:
Payment 1 for Sweep Test
Amount:
$2,880.00

Component Description:
Payment 2 for Sweep Test
Amount:
$2,880.00

Component Description:
Study of Transmission Line Length
Amount:
$195.00
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed)

Component Description:
Elbow complex, balance due
Amount:
$1,029.80

Component Description:
Payment 1 for Elbow Complex
Amount:
$4,634.10

Component Description:
Elbow complex, line 2 of invoice, 10% balance due (see cover letter)
Amount:
$1,029.80

Component Description:
Payment 2 for Elbow complex
Amount:
$4,634.10
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized

Component Description:
Payment 2 for UHF High Power Top Mount
Amount:
$79,363.12

Component Description:
Main antenna, line 1 of invoice, 10% balance due (see cover letter)
Amount:
$17,636.26

Component Description:
Payment 1 for UHF High Power Top Mount
Amount:
$79,363.12

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $289,180.00 $214,312.90 N/A $187,785.87 N/A
Total for all systems $5,195,959.50 $3,874,782.90 N/A $3,046,254.02 N/A
Interim Transmission Line $60,000.00 $58,000.00 $31,736.97
Additional Transmission Line Components $1,000.00 $1,000.00 See Dielectric order confirmation 949002 $895.77 N/A
Flexible Air Transmission Line - dielectric, 3" $59,000.00 $57,000.00 N/A $30,841.20 N/A
Primary Transmission Line $229,180.00 $156,312.90 $156,048.90
Additional Transmission Line Components $9,000.00 $9,000.00 See Dielectric order confirmation 867002 $8,736.00 N/A
Rigid Transmission Line - copper, 6 1/8" $220,180.00 $147,312.90 See Dielectric quote DMS159-3 $147,312.90 N/A

Components

Actual Information Description File Name
Additional Transmission Line Components

Component Description:
Additional transmission line components
Amount:
$895.77
Flexible Air Transmission Line - dielectric, 3"

Component Description:
Line 1 of invoice. Installment #2 Transmission Line.
Amount:
$15,420.60

Component Description:
Line 1 of invoice. Installment #1 of Transmission Line.
Amount:
$15,420.60
Additional Transmission Line Components

Component Description:
Additional transmission line components
Amount:
$2,604.00

Component Description:
Additional transmission line components
Amount:
$2,604.00

Component Description:
Additional transmission line components
Amount:
$2,604.00

Component Description:
Additional transmission line component
Amount:
$924.00
Rigid Transmission Line - copper, 6 1/8"

Component Description:
Transmission line, balance due on single line
Amount:
$9,575.78

Component Description:
Transmission line, balance due
Amount:
$5,155.50

Component Description:
Payment 1 for Rigid Transmission Line
Amount:
$63,970.83

Component Description:
Payment 1 for Rigid Transmission Line
Amount:
$2,319.98

Component Description:
Transmission line costs, see cover letter
Amount:
$9,575.78

Component Description:
Payment 2 for Rigid Transmission Line
Amount:
$63,970.83

Component Description:
Payment 2 for Rigid Transmission Line
Amount:
$2,319.98

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,567,129.00 $1,884,879.00 N/A $1,816,634.00 N/A
Total for all systems $5,195,959.50 $3,874,782.90 N/A $3,046,254.02 N/A
Primary Tower LTOWER $1,567,129.00 $1,884,879.00 $1,816,634.00
Weather Delays, Additional Charges $25,200.00 $25,200.00 See Precision Communications Addendum to Proposal 20359-5 $25,200.00 N/A
Serious tower reinforcement/modifications $1,052,000.00 $1,173,050.00 See attached quotes from Precision Communications Quote # 18821-5 $996,650 and 20365-5 $176,400 $1,173,050.00 N/A
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study $26,300.00 $25,600.00 N/A N/A N/A
Tower Foundation Modifications $253,129.00 $253,129.00 See attached Kermit B. Buck & Son, Inc. Quote for Geotechnical and Tower Foundation Modifications $210,484.00 N/A
Tall Tower (greater than 500') $210,500.00 $407,900.00 See quotes: Interim antenna installation $108,300 plus extra costs $2600 PCI 18347-6; Interim antenna removal $98,700 PCL 20366-5; Main antenna installation $198,300 PCL 20359-5 $407,900.00 N/A

Components

Actual Information Description File Name
Weather Delays, Additional Charges

Component Description:
Main antenna installation weather delays
Amount:
$25,200.00
Serious tower reinforcement/modifications

Component Description:
Tower modifications, installment #1
Amount:
$117,600.00

Component Description:
Tower modifications installment #2
Amount:
$58,800.00

Component Description:
Tower modifications, balance due on completion; see also delivery freight
Amount:
$332,230.00

Component Description:
Tower mods, amount due on acceptance and amount due on crew arrival; see also sales tax on materials 26,185.67
Amount:
$664,420.00
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study Information not provided.
Tower Foundation Modifications

Component Description:
Install helical piers to reinforce foundations to add support to tower additions
Amount:
$210,484.00
Tall Tower (greater than 500')

Component Description:
Interim antenna removal, installment #1
Amount:
$65,800.00

Component Description:
Main antenna installation, installment #2
Amount:
$66,100.00

Component Description:
Main antenna installation, installment #1
Amount:
$132,200.00

Component Description:
Interim Antenna Installment #1
Amount:
$36,100.00

Component Description:
Interim antenna, installment #2
Amount:
$32,900.00

Component Description:
Amount due on completion; see also freight.
Amount:
$38,700.00

Component Description:
Amount due on crew arrival
Amount:
$36,100.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $221,920.00 $218,830.00 N/A $87,079.10 N/A
Total for all systems $5,195,959.50 $3,874,782.90 N/A $3,046,254.02 N/A
Outside Professional Services $221,920.00 $218,830.00 $87,079.10
Additional Field Engineering Service, 20 Days $108,000.00 $108,000.00 N/A N/A N/A
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase $2,105.00 $2,050.00 N/A $1,125.00 N/A
ASR modification (prepare FCC Form 854) $2,105.00 $2,050.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,585.00 N/A $1,500.00 N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,305.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,120.00 N/A N/A N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,825.00 See KGA costs $1,825.00 N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,535.00 N/A $625.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,070.00 N/A $3,000.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,170.00 N/A $7,000.00 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,560.00 N/A N/A N/A
Prepare and or review reimbursement form $2,630.00 $2,560.00 N/A $2,500.00 N/A
Project management of the transition $79,000.00 $77,000.00 N/A $69,504.10 N/A

Components

Actual Information Description File Name
Additional Field Engineering Service, 20 Days Information not provided.
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase

Component Description:
Item 8 from invoice summary
Amount:
$550.00

Component Description:
Item 7 from invoice summary
Amount:
$575.00
ASR modification (prepare FCC Form 854) Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization

Component Description:
Item 9 from invoice summary
Amount:
$1,500.00
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare request for Special Temporary Authorization

Component Description:
STA Extension
Amount:
$325.00

Component Description:
Item 10 from invoice summary
Amount:
$1,500.00
Prepare engineering section of FCC Form 2100 (main), License to Cover Application

Component Description:
Prepare Form 2100
Amount:
$625.00
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Kessler & Gehman subcontractor invoice line 3
Amount:
$3,000.00

Component Description:
Item 4 from invoice summary
Amount:
$3,000.00

Component Description:
Vendor has issued a revised invoice
Amount:
($3,000.00)
Perform engineering study for new channel assignment and antenna development

Component Description:
Vendor has issued a revised invoice
Amount:
($7,000.00)

Component Description:
Kessler & Gehman subcontractor invoice line 2
Amount:
$7,000.00

Component Description:
Item 3 from invoice summary
Amount:
$7,000.00
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Prepare and or review reimbursement form

Component Description:
Item 2 from invoice summary
Amount:
$2,500.00

Component Description:
Vendor has issued a revised invoice
Amount:
($2,500.00)

Component Description:
Kessler & Gehman Subcontractor invoice line 1
Amount:
$2,500.00
Project management of the transition

Component Description:
Project management services
Amount:
$866.50

Component Description:
Project Management for Structural Analysis and Tower Modifications including consultants Kessler and Gehman Associates. Services from October 27, 2017 through December 31, 2017.
Amount:
$7,800.00

Component Description:
Project management services Apr 2019
Amount:
$78.00

Component Description:
Project management services 3.30.19 through 4.26.19
Amount:
$225.00

Component Description:
Project management services
Amount:
$50.00

Component Description:
Project management services Jun 2020
Amount:
$290.00

Component Description:
Project management services Nov 2018
Amount:
$200.00

Component Description:
Project management services 3.2.19 through 3.29.19
Amount:
$150.00

Component Description:
Project management services 10.27.18 through 11.30.18
Amount:
$4,775.00

Component Description:
Project Management for Structural Analysis and Tower Modifications. Services from January 1, 2018 through January 26, 2018.
Amount:
$7,878.20

Component Description:
Project Management for Structural Analysis and Tower Modifications including consultants Kessler and Gehman Associates. Services from January 27, 2018 through February 23, 2018.
Amount:
$10,500.00

Component Description:
Project management services 12.1.18 through 1.31.19
Amount:
$900.00

Component Description:
Project management services Aug 2018
Amount:
$100.00

Component Description:
Project management services Sep 2018
Amount:
$150.00

Component Description:
Project management services 6.1.19 through 6.28.19
Amount:
$75.00

Component Description:
Project management services
Amount:
$250.00

Component Description:
Project management services 2.1.19 through 3.1.19
Amount:
$150.00

Component Description:
Project management services Oct 2018
Amount:
$20.00

Component Description:
Project management services 4.27.19 through 5.31.19
Amount:
$75.00

Component Description:
Project management services 9.29.18 through 10.26.18
Amount:
$825.00

Component Description:
Project management services
Amount:
$150.00

Component Description:
Project management services
Amount:
$229.00

Component Description:
Project management services, item 1 from invoice summary
Amount:
$13,755.00

Component Description:
Project management services
Amount:
$352.50

Component Description:
Project management services 5.26.18 through 6.29.18
Amount:
$4,920.00

Component Description:
Project management services 7.28.18 through 9.28.18 included consulting services provided by Kessler and Gehman Associates.
Amount:
$9,815.00

Component Description:
Project management services Jul 2019
Amount:
$1,625.00

Component Description:
Project management services
Amount:
$150.00

Component Description:
Item 6 from invoice summary
Amount:
$2,383.00

Component Description:
Items 12 and 13 from invoice summary
Amount:
$4.00

Component Description:
Vendor has issued a revised invoice
Amount:
($1,000.00)

Component Description:
Project management services Mar 2019
Amount:
$266.50

Component Description:
Project management services
Amount:
$150.00

Component Description:
Item 5 from invoice summary
Amount:
$150.00

Component Description:
Project Management for Structural Analysis and Tower Modifications including consultants Kessler and Gehman Associates. Services from May 27, 2017 through June 30, 2017.
Amount:
$1,000.00

Component Description:
Project management services 6.30.18 through 7.27.18
Amount:
$196.40

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $433,240.00 $432,180.00 N/A $172,296.21 N/A
Total for all systems $5,195,959.50 $3,874,782.90 N/A $3,046,254.02 N/A
Other Expenses $433,240.00 $432,180.00 $172,296.21
Equipment Delivery and Handling Charges $35,000.00 $35,000.00 See related invoices $33,090.66 N/A
Equipment Rentals $1,250.00 $1,250.00 Equipment rentals charged by tower crew $1,250.00 N/A
Sales Tax $263,000.00 $263,000.00 N/A $74,867.55 N/A
MVPD Notification of Channel Change $2,000.00 $2,000.00 N/A $0.00 N/A
Develop and air announcement of upcoming channel change $1,500.00 $1,500.00 N/A N/A N/A
Equipment Storage $45,000.00 $45,000.00 See related invoices $43,160.00 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $20,000.00 $20,000.00 N/A $18,000.00 N/A
Non-zoning permits $25,000.00 $25,000.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $11,250.00 N/A $1,928.00 N/A
AM Pattern Disturbance -- Remedy $21,050.00 $20,500.00 N/A N/A N/A
AM Pattern Disturbance -- Impact study $7,890.00 $7,680.00 N/A N/A N/A

Components

Actual Information Description File Name
Equipment Delivery and Handling Charges

Component Description:
Antenna shipping cost
Amount:
$2,288.01

Component Description:
Interim antenna shipping costs
Amount:
$454.00

Component Description:
Transmission line shipping cost
Amount:
$3,441.66

Component Description:
Antenna shipping cost
Amount:
$2,612.07

Component Description:
Antenna freight cost
Amount:
$4,819.00

Component Description:
Antenna shipping cost
Amount:
$4,652.07

Component Description:
Antenna shipping cost
Amount:
$119.60

Component Description:
Line 8 of invoice; See also Antenna Interim.
Amount:
$1,798.37

Component Description:
Antenna freight
Amount:
$6,971.88

Component Description:
Freight per invoice.
Amount:
$213.00

Component Description:
Freight costs per invoice
Amount:
$5,721.00
Equipment Rentals

Component Description:
Tower company equipment rentals
Amount:
$1,250.00
Sales Tax

Component Description:
Sales tax due on Electrical services
Amount:
$3,491.50

Component Description:
Tax on additional transmitter costs
Amount:
$1,043.25

Component Description:
Sales tax on materials for Tower Mods
Amount:
$26,185.67

Component Description:
sales tax due on Transmitter system
Amount:
$43,729.24

Component Description:
Sales tax due on 1st Installment
Amount:
$417.89
MVPD Notification of Channel Change

Component Description:
Notification of medical facilities
Amount:
$1,928.00
Develop and air announcement of upcoming channel change Information not provided.
Equipment Storage

Component Description:
Main antenna storage
Amount:
$40,950.00

Component Description:
Antenna storage costs
Amount:
$2,210.00
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
30% advance for Full Transmitter site cleanout
Amount:
$5,400.00

Component Description:
Balance due Full Transmitter site cleanout
Amount:
$12,600.00
Non-zoning permits Information not provided.
DTV Medical Facility Notification

Component Description:
WJKT Transmitter Medical Facility Notification
Amount:
$1,928.00
AM Pattern Disturbance -- Remedy Information not provided.
AM Pattern Disturbance -- Impact study Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $5,195,959.50 $3,874,782.90 $3,046,254.02

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Elizabeth Ryder

General Counsel


06/21/2021

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Elizabeth Ryder

General Counsel


06/21/2021

Attachments